Go to spec numbering scheme page
3GPP Specification Change Request records for: 36.300
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
000- | - | F | Rel-10 | 10.3.0 | - | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO | - | - | - | - | R3-72 | R3-111151 | Revised | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction on the Release of Supporting SRVCC | - | - | - | - | R3-72 | R3-111163 | Revised | 2011-05-23 | LTE-interfaces, TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Corrections on LIPA PDN Deactivation for X2 HO | - | - | - | - | R3-72 | R3-111173 | Postponed | 2011-05-23 | LIPA_SIPTO | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Update for relay startup figure | - | - | - | - | R3-72 | R3-111220 | Withdrawn | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-9 | 9.7.0 | - | Correction of MRO Too Late Definition | - | - | - | - | R3-72 | R3-111226 | rejected | 2011-05-23 | SON_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Corrections of MRO | - | - | - | - | R3-72 | R3-111228 | Revised | 2011-05-23 | SON_LTE-Core | - | 2011-05-23 |
000- | - | B | Rel-10 | 10.3.0 | - | Capture the agreed MRO mechanism in stage 2 | - | - | - | - | R3-72 | R3-111241 | rejected | 2011-05-23 | SONenh_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of MBMS Service Suspension and Resumption Function | - | - | - | - | R3-72 | R3-111244 | Revised | 2011-05-23 | MBMS_LTE_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of MBMS counting | - | - | - | - | R3-72 | R3-111245 | Revised | 2011-05-23 | MBMS_LTE_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | UE context release in HeNB GW | - | - | - | - | R3-72 | R3-111258 | - | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-9 | 9.7.0 | - | Correction on the Too Late HO scenario | - | - | - | - | R3-72 | R3-111262 | Postponed | 2011-05-23 | SON_LTE-Core | - | 2011-05-23 |
000- | - | A | Rel-10 | 10.3.0 | - | Correction on the Too Late HO scenario | - | - | - | - | R3-72 | R3-111263 | Postponed | 2011-05-23 | SON_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | UE Context Handling at the HeNB GW during X2 HO | - | - | - | - | R3-72 | R3-111281 | - | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | MME UE S1AP ID during X2HO | - | - | - | - | R3-72 | R3-111283 | - | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of the area restrictions description | - | - | - | - | R3-72 | R3-111289 | Revised | 2011-05-23 | LTE-interfaces | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Multiple HO Preparation for relay | - | - | - | - | R3-72 | R3-111297 | Revised | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-9 | 9.7.0 | - | Correction of Reset | - | - | - | - | R3-72 | R3-111306 | rejected | 2011-05-23 | TEI9 | - | 2011-05-23 |
000- | - | A | Rel-10 | 10.3.0 | - | Correction of Reset | - | - | - | - | R3-72 | R3-111307 | Revised | 2011-05-23 | TEI9 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of HeNB X2 Mobility | - | - | - | - | R3-72 | R3-111327 | rejected | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Overload Handling in HeNB GW | - | - | - | - | R3-72 | R3-111328 | rejected | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of Counting Function | - | - | - | - | R3-72 | R3-111330 | Revised | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of Suspension Function | - | - | - | - | R3-72 | R3-111331 | Postponed | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Clarification on order of MBMS counting request and MBMS session start request | - | - | - | - | R3-72 | R3-111364 | rejected | 2011-05-23 | MBMS_LTE_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Clarification on IP address of RN and DeNB | - | - | - | - | R3-72 | R3-111376 | rejected | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Clarification on RN release during the MME offloading procedure | - | - | - | - | R3-72 | R3-111379 | rejected | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Clarification to detection of unnecessary IRAT handover | - | - | - | - | R3-72 | R3-111385 | Revised | 2011-05-23 | SONenh_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | MRO Handover failure cause analysis | - | - | - | - | R3-72 | R3-111405 | - | 2011-05-23 | SONenh_LTE-Core | - | 2011-05-23 |
000- | - | B | Rel-10 | 10.3.0 | - | Load reporting for relaying | - | - | - | - | R3-72 | R3-111409 | Postponed | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Clarification on MME selection | - | - | - | - | R3-72 | R3-111412 | Technically endorsed | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Update of the MRO procedure to detect connection failures after connection setup | - | - | - | - | R3-72 | R3-111417 | - | 2011-05-23 | SONenh_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of the OAM requirements for TDM ICIC (eICIC) | - | - | - | - | R3-72 | R3-111418 | Revised | 2011-05-23 | eICIC_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Cleanup of Rel-10 and general topics | - | - | - | - | R3-72 | R3-111435 | Revised | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correcting the Note regarding the usage of the GUMMEI | - | - | - | - | R3-72 | R3-111452 | Revised | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Relaying Stage 2 Corrections | - | - | - | - | R3-72 | R3-111484 | Revised | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Relaying Stage 2 Corrections | - | - | - | - | R3-72 | R3-111542 | Revised | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO | - | - | - | - | R3-72 | R3-111549 | Revised | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of Reset | - | - | - | - | R3-72 | R3-111565 | Revised | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Cleanup of Rel-10 and general topics | - | - | - | - | R3-72 | R3-111582 | Revised | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Uncessary transmission of MME UE S1AP ID assigned by the MME | - | - | - | - | R3-72 | R3-111591 | Revised | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction on the Release of Supporting SRVCC | - | - | - | - | R3-72 | R3-111597 | Revised | 2011-05-23 | LTE-interfaces, TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction on the Release of Supporting SRVCC | - | - | - | - | R3-72 | R3-111606 | Technically endorsed | 2011-05-23 | LTE-interfaces, TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of the area restrictions description | - | - | - | - | R3-72 | R3-111608 | Technically endorsed | 2011-05-23 | LTE-interfaces | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correcting the Note regarding the usage of the GUMMEI | - | - | - | - | R3-72 | R3-111609 | Technically endorsed | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of Counting Function | - | - | - | - | R3-72 | R3-111617 | Technically endorsed | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of MBMS Service Suspension and Resumption Function | - | - | - | - | R3-72 | R3-111619 | Technically endorsed | 2011-05-23 | MBMS_LTE_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Clarification to detection of unnecessary IRAT handover | - | - | - | - | R3-72 | R3-111631 | Revised | 2011-05-23 | SONenh_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Relaying Stage 2 Corrections | - | - | - | - | R3-72 | R3-111646 | Technically endorsed | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of the OAM requirements for TDM ICIC (eICIC) | - | - | - | - | R3-72 | R3-111647 | rejected | 2011-05-23 | eICIC_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Multiple HO Preparation for relay | - | - | - | - | R3-72 | R3-111664 | rejected | 2011-05-23 | LTE_Relay-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Corrections of MRO | - | - | - | - | R3-72 | R3-111665 | Revised | 2011-05-23 | SON_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Cleanup of HeNB related topics before Rel-10 closure | - | - | - | - | R3-72 | R3-111672 | Revised | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Cleanup of LIPA related topics before Rel-10 closure | - | - | - | - | R3-72 | R3-111673 | rejected | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO | - | - | - | - | R3-72 | R3-111674 | Revised | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Correction of Reset | - | - | - | - | R3-72 | R3-111692 | Technically endorsed | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Cleanup of Rel-10 and general topics | - | - | - | - | R3-72 | R3-111725 | Technically endorsed | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Cleanup of HeNB related topics before Rel-10 closure | - | - | - | - | R3-72 | R3-111726 | Technically endorsed | 2011-05-23 | TEI10 | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Corrections of MRO | - | - | - | - | R3-72 | R3-111727 | Revised | 2011-05-23 | SON_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO | - | - | - | - | R3-72 | R3-111730 | Revised | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO | - | - | - | - | R3-72 | R3-111737 | Revised | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Corrections of MRO | - | - | - | - | R3-72 | R3-111743 | Technically endorsed | 2011-05-23 | SON_LTE-Core | Email agreement of CR by 2011-05-18 | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Clarification to detection of unnecessary IRAT handover | - | - | - | - | R3-72 | R3-111744 | Technically endorsed | 2011-05-23 | SONenh_LTE-Core | - | 2011-05-23 |
000- | - | F | Rel-10 | 10.3.0 | - | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO | - | - | - | - | R3-72 | R3-111765 | Technically endorsed | 2011-05-23 | HNB_HENB_mob_enh-Core | - | 2011-05-23 |
0000 | - | B | Rel-11 | 11.3.0 | - | New Information for BBF access (R3-122665) | - | - | - | - | S2-94 | S2-124555 | - | 2012-11-06 | BBAI | RAN WG3 CR. Not Handled | 2012-11-06 |
0001 | 1 | F | Rel-8 | 8.0.0 | 8.1.0 | Changes to management-, handover-, paging- and NAS functions, node- synchronization, X2 UP protocol stack, X2 inter cell load management, IP fragmentation, intra-LTE HO, and TA | RP-36 | RP-070399 | approved | R2 | R2-58 | R2-072344 | agreed | 2007-05-11 | LTE-interfaces | - | 2007-05-25 |
0002 | - | C | Rel-8 | 8.0.0 | - | Update on Mobility, Security, Random Access Procedure, etc… | RP-36 | RP-070399 | revised | R2 | R2-58 | R2-072338 | agreed | 2007-05-11 | LTE-L23 | - | 2007-05-25 |
0002 | 1 | C | Rel-8 | 8.0.0 | 8.1.0 | Update on Mobility, Security, Random Access Procedure, etcà | RP-36 | RP-070494 | approved | Nokia, Nokia Siemens Networks | - | - | - | 2007-05-31 | LTE-L23 | - | 2007-06-03 |
0002 | 1 | C | Rel-8 | 8.0.0 | - | Update on Mobility, Security, Random Access Procedure, etcà | RP-36 | RP-070494 | noted | Nokia, Nokia Siemens Networks | - | - | - | 2007-05-31 | LTE-L23 | - | 2007-06-04 |
0003 | - | C | Rel-8 | 8.0.0 | 8.1.0 | Update on MBMS | RP-36 | RP-070399 | approved | R2 | R2-58 | R2-072339 | agreed | 2007-05-11 | LTE-L23 | - | 2007-05-25 |
0004 | 1 | C | Rel-8 | 8.1.0 | 8.2.0 | Update on Security, System Information, Mobility, MBMS and DRX | RP-37 | RP-070637 | approved | R2 | - | R2-073863 | - | 2007-08-31 | LTE-L23 | - | 2007-09-12 |
0005 | 1 | F | Rel-8 | 8.1.0 | 8.2.0 | Correction of synchronization, handover, trace, eMBMS architecture, and S1 common functions and procedures | RP-37 | RP-070637 | approved | R3, R2 | - | R2-073880 | - | 2007-09-05 | LTE-interfaces | - | 2007-09-12 |
0006 | 1 | C | Rel-8 | 8.2.0 | 8.3.0 | Clean up and update on security, scheduling, mobility, MBMS and DRX | RP-38 | RP-070913 | approved | R2 | R2-60 | R2-075498 | agreed | 2007-11-20 | LTE-L23 | - | 2007-11-05 |
0007 | - | B | Rel-8 | 8.2.0 | 8.3.0 | Mobility management | RP-38 | RP-070913 | approved | R2 | R2-60 | R2-075505 | agreed | 2007-11-20 | LTE-interfaces | - | 2007-11-05 |
0008 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Correction of eMBMS functions and NAS handling during X2 handover | RP-38 | RP-070913 | approved | R2 | R2-60 | R2-075506 | agreed | 2007-11-20 | LTE-interfaces | - | 2007-11-05 |
0009 | - | B | Rel-8 | 8.2.0 | 8.3.0 | Update of Stage 2 to incorporate Interworking with cdma2000 | RP-38 | RP-071048 | approved | RAN | - | R2-075240 | - | - | LTE-L23 | - | 2007-12-06 |
0010 | - | F | Rel-8 | 8.3.0 | 8.4.0 | to 36.300 on NAS States, Persistent Scheduling, C-RNTI Allocation at Handover… | RP-39 | RP-080192 | approved | R2 | R2-61 | R2-081372 | agreed by email | 2008-03-04 | LTE-L23 | - | 2008-03-04 |
0011 | - | F | Rel-8 | 8.3.0 | 8.4.0 | RAN3 corrections to 36.300 (CR0011) | RP-39 | RP-080192 | approved | R2 | R2-61 | R2-081387 | agreed by email | 2008-03-04 | LTE-interfaces | - | 2008-03-04 |
0012 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Introduction of optimized FS2 for TDD | RP-40 | RP-080406 | approved | R2 | R2-62 | R2-082758 | agreed | 2008-05-27 | LTE | - | 2008-05-27 |
0013 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | System Information, Mobilty, QoS and miscellaneous updates | RP-40 | RP-080406 | approved | R2 | R2-62 | R2-082866 | agreed | 2008-05-27 | LTE | - | 2008-05-27 |
0014 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Updates to Stage 2 based on Stage 3 progress on CDMA inter-working | RP-40 | RP-080406 | approved | R2 | R2-62 | R2-082760 | agreed | 2008-05-27 | LTE | - | 2008-05-27 |
0016 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | 0016r1 to 36.300 on CSG mobility performance guidelines | RP-40 | RP-080406 | approved | R2 | R2-62 | R2-082879 | agreed | 2008-05-27 | LTE | - | 2008-05-27 |
0017 | - | F | Rel-8 | 8.4.0 | 8.5.0 | to 36.300 on AS-NAS interaction | RP-40 | RP-080406 | approved | R2 | R2-62 | R2-082880 | agreed | 2008-05-27 | LTE | - | 2008-05-27 |
0018 | - | B | Rel-8 | 8.4.0 | - | RAN3 agreed changes to TS 36.300 | RP-40 | RP-080407 | revised | R2 | R2-62 | R2-082908 | endorsed | 2008-05-27 | LTE | concerns raised during RAN2 email approval therefore company contribution expected | 2008-05-27 |
0018 | 1 | B | Rel-8 | 8.4.0 | 8.5.0 | RAN3 agreed changes to TS 36.300 | RP-40 | RP-080420 | approved | Ericsson, Nokia Siemens Networks, Nokia | - | R3-081592 | - | 2008-05-23 | LTE-interfaces | - | 2008-05-28 |
0019 | - | B | Rel-8 | 8.4.0 | 8.5.0 | Network Interface for ETWS support based on CBS solution | RP-40 | RP-080463 | approved | NTT DoCoMo | - | - | - | - | LTE-interfaces | - | 2008-05-29 |
0020 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction for Rename of L1/L2 control channel | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084379 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0021 | - | F | Rel-8 | 8.5.0 | 8.6.0 | to 36.300 on Paging Channel Description | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-083831 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0022 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Proposed updates to Stage 2 for CDMA2000 handover | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-083932 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0023 | - | F | Rel-8 | 8.5.0 | 8.6.0 | to 36.300 on Semi-Persistent Scheduling | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084737 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0024 | - | F | Rel-8 | 8.5.0 | 8.6.0 | to 36.300 on System Information | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084738 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0026 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Clarification of PDCCH description | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084739 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0027 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Removal of DRX interval threshold in 36.300 | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084740 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0028 | - | F | Rel-8 | 8.5.0 | 8.6.0 | on Randon Access procedure | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084741 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0032 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Transport of NAS messages by AS during Handover | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084878 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0034 | - | B | Rel-8 | 8.5.0 | 8.6.0 | to 36.300 capturing home eNB conclusions of RAN2 #63 | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084712 | agreed | 2008-09-09 | LTE-L23 | - | 2008-09-08 |
0035 | - | B | Rel-8 | 8.5.0 | 8.6.0 | Changes to TS36.300 agreed in RAN3#61 | RP-41 | RP-080688 | approved | R2 | R2-63 | R2-084924 | agreed | 2008-09-09 | LTE-interfaces | - | 2008-09-08 |
0036 | - | D | Rel-8 | 8.6.0 | 8.7.0 | CR0036 to 36.300 [Rel-8] on Contention Resolution | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086068 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0037 | - | F | Rel-8 | 8.6.0 | 8.7.0 | CR0037 to 36.300 [Rel-8] on ETWS SIB | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086069 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0038 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Alignment of 36.300 with stage 3 on 1xRTT CSfallback | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086544 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0039 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Data handling in UE during Inter-RAT mobility | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086956 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0040 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Removing of end time for dedicated preamble | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086148 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0041 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Remove the Note about RA preamble for FS2 | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086466 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0042 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Clarification of AS-NAS concatenation - Stage 2 | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086608 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0044 | - | F | Rel-8 | 8.6.0 | 8.7.0 | 0044 to 36.300 on Miscellaneous corrections | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086127 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0046 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Proposed to 36.300 [Rel-8] on Security Overview | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086999 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0047 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Proposed to 36.300 [Rel-8] on MBMS | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-086997 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0050 | - | F | Rel-8 | 8.6.0 | 8.7.0 | PDCP reordering function removal | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087000 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0052 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Align Number of Cell Identities | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087001 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0055 | 2 | F | Rel-8 | 8.6.0 | 8.7.0 | Periodic Updates In Connected Mode DRX | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087380 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0056 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Cleaning of the figure w.r.t Handover Control Plane - to TS 36.300 | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087003 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0057 | - | D | Rel-8 | 8.6.0 | 8.7.0 | to 36.300 to capture measurement model for EUTRAN | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087002 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0058 | 2 | F | Rel-8 | 8.6.0 | 8.7.0 | CSG Mobility Updates from RAN2 #63bis and RAN2 #64 | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087427 | agreed | 2008-02-12 | LTE-L23 (HNB) | - | 2008-12-02 |
0059 | - | F | Rel-8 | 8.6.0 | 8.7.0 | to 36.300 on Correction of the Description of FS2 | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087434 | agreed | 2008-02-12 | LTE-L23 | - | 2008-12-02 |
0060 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Changes to TS36.300 agreed in RAN3#61bis and RAN3#62 | RP-42 | RP-081016 | approved | R2 | R2-64 | R2-087450 | agreed | 2008-02-12 | LTE-interfaces | - | 2008-12-02 |
0061 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | to 36.300 - Clarification on RAPreambles | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091523 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0062 | - | F | Rel-8 | 8.7.0 | 8.8.0 | to 36.300 on E-UTRAN Identities | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-090942 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0063 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | to 36.300 - MME in temporary UE identity | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091491 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0064 | - | F | Rel-8 | 8.7.0 | 8.8.0 | UE with SIM in EUTRA | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-090944 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0065 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Collected 36.300 corrections | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-090945 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0066 | - | F | Rel-8 | 8.7.0 | 8.8.0 | for 36.300 on Local NACK feature | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091609 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0067 | - | F | Rel-8 | 8.7.0 | 8.8.0 | for allowed CSG list | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091610 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0068 | 3 | F | Rel-8 | 8.7.0 | 8.8.0 | UE capability transfer upon handover to E-UTRA | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091959 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0069 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Inter-RAT ANR Function for CDMA2000 | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091611 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0070 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Corrections to Handover Scenario | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091612 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0071 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Corrections to Security for alignment with 33.401 | RP-43 | RP-090123 | approved | R2 | R2-65 | R2-091525 | agreed | 2009-03-03 | LTE-L23 | - | 2009-03-02 |
0072 | - | B | Rel-8 | 8.7.0 | 8.8.0 | Establishment of X2 Interface to HeNB GW | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091946 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0073 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Clarification of PLMN id to be used in E-CGI and Global eNB ID | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091947 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0074 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Specification of UL PDUs handling | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091948 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0075 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Update of AMBR Concept with UE-AMBR and APN-AMBR | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091949 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0076 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Aligning E-RAB release request procedure with E-RAB release indication in 36.413 | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091950 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0077 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Stage 2 on S1 CDMA2000 Tunnelling Function | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091951 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0078 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Finalisation of dynamic configuration of the X2 and S1 interfaces | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091952 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0079 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Addition and correction of X2 procedures in stage 2 specification | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091953 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0080 | - | F | Rel-8 | 8.7.0 | 8.8.0 | NNSF Description | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091954 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0081 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Collection of minor corrections to 36.300 agreed by RAN3 | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091955 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0082 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Data Forwarding Resource Release | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091956 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0083 | - | B | Rel-8 | 8.7.0 | 8.8.0 | Support of Paging Optimisation for CSG cells | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091957 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0084 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Handling of trace session and location reporting during UE context release | RP-43 | RP-090134 | approved | R2 | R2-65 | R2-091958 | agreed | 2009-03-03 | LTE-interfaces | - | 2009-03-02 |
0085 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Proposed to 36.300 on RLC status report triggers | RP-44 | RP-090507 | approved | R2 | R2-66 | R2-092761 | agreed | 2009-05-26 | LTE-L23 | - | 2009-05-25 |
0086 | 2 | F | Rel-8 | 8.8.0 | 8.9.0 | Updates on UE capability transfer and container handling for E-UTRA | RP-44 | RP-090507 | approved | R2 | R2-66 | R2-093613 | agreed | 2009-05-26 | LTE-L23 | - | 2009-05-25 |
0087 | 1 | B | Rel-9 | 8.8.0 | 9.0.0 | MBMS baseline for Rel-9 LTE | RP-44 | RP-090523 | approved | R2 | R2-66 | R2-093533 | agreed | 2009-05-26 | MBMS_LTE | - | 2009-05-25 |
0088 | - | B | Rel-9 | 8.8.0 | 9.0.0 | Idle mode requirements to support Hybrid Cells | RP-44 | RP-090524 | approved | R2 | R2-66 | R2-092799 | agreed | 2009-05-26 | EHNB-RAN2 | - | 2009-05-25 |
0089 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Proposed to 36.300 Rel-8 on FFS and outdated statements | RP-44 | RP-090507 | approved | R2 | R2-66 | R2-093400 | agreed | 2009-05-26 | LTE-L23 | - | 2009-05-25 |
0096 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Removal of no longer necessary notes | RP-44 | RP-090508 | approved | R2 | R2-66 | R2-093602 | agreed | 2009-05-26 | LTE-interfaces | - | 2009-05-25 |
0097 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Introduction of support for Cell traffic trace | RP-44 | RP-090508 | approved | R2 | R2-66 | R2-093603 | agreed | 2009-05-26 | LTE-interfaces | - | 2009-05-25 |
0098 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Correction the text about the UE History Information | RP-44 | RP-090508 | approved | R2 | R2-66 | R2-093604 | agreed | 2009-05-26 | LTE-interfaces | - | 2009-05-25 |
0099 | - | C | Rel-9 | 8.8.0 | 9.0.0 | eMBMS Stage 2 description | RP-44 | RP-090523 | approved | R2 | R2-66 | R2-093605 | agreed | 2009-05-26 | MBMS_LTE | - | 2009-05-25 |
0100 | - | B | Rel-9 | 8.8.0 | 9.0.0 | for eMBMS Deployment Alternatives in 36.300 | RP-44 | RP-090523 | approved | R2 | R2-66 | R2-093607 | agreed | 2009-05-26 | MBMS_LTE | - | 2009-05-25 |
0101 | 1 | B | Rel-9 | 8.8.0 | 9.0.0 | QoS support for Hybrid CSG cells | RP-44 | RP-090534 | approved | Qualcomm Europe | - | - | - | 2009-05-26 | EHNB-RAN3 | revision of R2-093608 = R3-091482 | 2009-05-25 |
0102 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Configuration transfer | RP-44 | RP-090538 | approved | Motorola | - | - | - | 2009-05-26 | LTE-interfaces | was agreed in RAN3 as R3-090996 | 2009-05-25 |
0103 | - | B | Rel-9 | 8.8.0 | 9.0.0 | TAI based handover routing for HeNBs | RP-44 | RP-090537 | approved | NSN, Nokia, Alcatel Lucent, Motorola, Orange, Huawei, Thomson, T-Mobile, Airvana, Vodafone, IP.Access | - | - | - | 2009-05-26 | EHNB-RAN3 | was agreed in RAN3 as R3-091430 | 2009-05-25 |
0105 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Correction regarding SRVCC | RP-45 | RP-090906 | approved | R2 | R2-67b | R2-094152 | agreed | 2009-09-18 | LTE-L23 | - | 2009-09-15 |
0106 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Correction regarding SRVCC | RP-45 | RP-090906 | approved | R2 | R2-67b | R2-095200 | agreed | 2009-09-18 | LTE-L23 | - | 2009-09-15 |
0107 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Clarification on UE behaviour in case of L2 buffer overflow | RP-45 | RP-090906 | approved | R2 | R2-67b | R2-094154 | agreed | 2009-09-18 | LTE-L23 | - | 2009-09-15 |
0108 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Clarification on UE behaviour in case of L2 buffer overflow | RP-45 | RP-090906 | approved | R2 | R2-67b | R2-094155 | agreed | 2009-09-18 | LTE-L23 | - | 2009-09-15 |
0109 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Removal of MBMS | RP-45 | RP-090906 | approved | R2 | R2-67b | R2-094156 | agreed | 2009-09-18 | LTE-L23 | - | 2009-09-15 |
0112 | 1 | B | Rel-9 | 9.0.0 | 9.1.0 | IMS Emergency Call | RP-45 | RP-090926 | approved | R2 | R2-67b | R2-094949 | agreed | 2009-09-18 | IMS_EMER_LTE | - | 2009-09-15 |
0113 | - | B | Rel-9 | 9.0.0 | 9.1.0 | Introduction of position cause for dedicated PRACH allocation | RP-45 | RP-090927 | approved | R2 | R2-67b | R2-094160 | agreed | 2009-09-18 | LCS_LTE | - | 2009-09-15 |
0114 | - | B | Rel-9 | 9.0.0 | 9.1.0 | Adding Support for Explicit Congestion Notification | RP-45 | RP-090929 | approved | R2 | R2-67b | R2-094161 | agreed | 2009-09-18 | LTEimp-Vocoder | - | 2009-09-15 |
0115 | 2 | B | Rel-9 | 9.0.0 | 9.1.0 | Agreements on inbound mobility to CSG | RP-45 | RP-090930 | approved | R2 | R2-67b | R2-095342 | agreed | 2009-09-18 | EHNB-RAN2 | - | 2009-09-15 |
0116 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Alignment to the stage3 specification | RP-45 | RP-090934 | approved | R2 | R2-67b | R2-094163 | agreed | 2009-09-18 | LTE-L23, TEI9 | - | 2009-09-15 |
0117 | 2 | B | Rel-9 | 9.0.0 | 9.1.0 | MBMS agreements RAN2#66bis and RAN2#67 | RP-45 | RP-090928 | approved | R2 | R2-67b | R2-095326 | agreed | 2009-09-18 | MBMS_LTE | - | 2009-09-15 |
0123 | - | B | Rel-9 | 9.0.0 | 9.1.0 | to 36.300 for Stage 2 alignment of Enhanced CSFB to 1xRTT | RP-45 | RP-090934 | approved | R2 | R2-67b | R2-095205 | agreed | 2009-09-18 | LTE-L23, TEI9 | - | 2009-09-15 |
0125 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Corrections to ECGI Specification | RP-45 | RP-090906 | approved | R2 | R2-67b | R2-095206 | agreed | 2009-09-18 | LTE-L23 | - | 2009-09-15 |
0129 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections to ECGI Specification | RP-45 | RP-090906 | approved | R2 | R2-67b | R2-095207 | agreed | 2009-09-18 | LTE-L23 | - | 2009-09-15 |
0130 | - | B | Rel-9 | 9.0.0 | 9.1.0 | Support for Mobility Robustness Optimization SON Function (contact: Qualcomm) | RP-45 | RP-090932 | approved | R2 | R2-67b | R2-095360 | agreed | 2009-09-18 | SON | - | 2009-09-15 |
0131 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Addition of missing Resource Status Reporting procedures (contact: Ericsson) | RP-45 | RP-090919 | approved | R2 | R2-67b | R2-095361 | agreed | 2009-09-18 | LTE-interfaces | - | 2009-09-15 |
0132 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Addition of missing Resource Status Reporting procedures (contact: Ericsson) | RP-45 | RP-090919 | approved | R2 | R2-67b | R2-095362 | agreed | 2009-09-18 | LTE-interfaces | - | 2009-09-15 |
0133 | - | B | Rel-9 | 9.0.0 | 9.1.0 | HeNB Access Mode Sginalling (contact: NSN, Nokia) | RP-45 | RP-090931 | approved | R2 | R2-67b | R2-095364 | agreed | 2009-09-18 | EHNB-RAN3 | - | 2009-09-15 |
0134 | - | B | Rel-9 | 9.0.0 | 9.1.0 | QoS principles in Hybrid access cell (contact: Ericsson) | RP-45 | RP-090931 | approved | R2 | R2-67b | R2-095365 | agreed | 2009-09-18 | EHNB-RAN3 | - | 2009-09-15 |
0135 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Handling of Radio Link Failure and S1 UE Context Release Request (contact: Alcatel-Lucent, Ericsson) | RP-45 | RP-090919 | approved | R2 | R2-67b | R2-095366 | agreed | 2009-09-18 | LTE-interfaces | - | 2009-09-15 |
0136 | - | B | Rel-9 | 9.0.0 | 9.1.0 | Introduction of PWS (which includes ETWS and CMAS) delivery function (contact: Alcatel-Lucent) | RP-45 | RP-090933 | approved | R2 | R2-67b | R2-095367 | agreed | 2009-09-18 | PWS-RAN | - | 2009-09-15 |
0137 | 1 | B | Rel-9 | 9.0.0 | 9.1.0 | Dynamic service multiplexing (contact: Alcatel-Lucent Shanghai Bell, Alcatel-Lucent) | RP-45 | RP-090928 | approved | R2 | R2-67b | R2-095378 | agreed | 2009-09-18 | MBMS_LTE | - | 2009-09-15 |
0138 | - | B | Rel-9 | 9.0.0 | 9.1.0 | MBMS SYNC configuration (contact: Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CMCC) | RP-45 | RP-090928 | approved | R2 | R2-67b | R2-095369 | agreed | 2009-09-18 | MBMS_LTE | - | 2009-09-15 |
0139 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Introduction of informative text on Initial Context Setup failure (contact: Motorola) | RP-45 | RP-090919 | approved | R2 | R2-67b | R2-095370 | agreed | 2009-09-18 | LTE-interfaces | - | 2009-09-15 |
0140 | - | B | Rel-9 | 9.0.0 | 9.1.0 | Adding Mobility Load Balancing (MLB) use case to the SON section (contact: Nokia Siemens Networks) | RP-45 | RP-090932 | approved | R2 | R2-67b | R2-095371 | agreed | 2009-09-18 | SON | - | 2009-09-15 |
0141 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Handling of Radio Link Failure and S1 UE Context Release Request (contact: Alcatel-Lucent, Ericsson) | RP-45 | RP-090919 | approved | R2 | R2-67b | R2-095372 | agreed | 2009-09-18 | LTE-interfaces | - | 2009-09-15 |
0142 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Introduction of informative text on Initial Context Setup failure (contact: Motorola) | RP-45 | RP-090919 | approved | R2 | R2-67b | R2-095373 | agreed | 2009-09-18 | LTE-interfaces | - | 2009-09-15 |
0143 | - | B | Rel-9 | 9.0.0 | 9.1.0 | Support for paging optimization with CSG membership changes (contact: Qualcomm) | RP-45 | RP-090931 | approved | R2 | R2-67b | R2-095374 | agreed | 2009-09-18 | EHNB-RAN3 | - | 2009-09-15 |
0144 | - | F | Rel-8 | 8.10.0 | 8.11.0 | on the usage of Transparent Mode MAC | RP-46 | RP-091314 | approved | R2 | R2-68 | R2-096399 | agreed | 2009-12-04 | LTE-L23 | - | 2009-12-06 |
0145 | - | A | Rel-9 | 9.1.0 | 9.2.0 | on the usage of Transparent Mode MAC | RP-46 | RP-091314 | approved | R2 | R2-68 | R2-096400 | agreed | 2009-12-04 | LTE-L23 | - | 2009-12-06 |
0146 | 2 | F | Rel-9 | 9.1.0 | 9.2.0 | Capturing HeNB inbound mobility agreements | RP-46 | RP-091343 | approved | R2 | R2-68 | R2-097503 | agreed | 2009-12-04 | EHNB-RAN2 | - | 2009-12-06 |
0147 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | ETWS correction to 36.300 | RP-46 | RP-091331 | approved | R2 | R2-68 | R2-097321 | agreed | 2009-12-04 | ETWS | - | 2009-12-06 |
0148 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | ETWS correction to 36.300 | RP-46 | RP-091331 | approved | R2 | R2-68 | R2-097322 | agreed | 2009-12-04 | ETWS | - | 2009-12-06 |
0149 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Inclusion of INTER RAT HANDOVER INFO at HO from UTRAN to GERAN | RP-46 | RP-091314 | approved | R2 | R2-68 | R2-096404 | agreed | 2009-12-04 | LTE-L23 | - | 2009-12-06 |
0150 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Inclusion of INTER RAT HANDOVER INFO at HO from UTRAN to GERAN | RP-46 | RP-091314 | approved | R2 | R2-68 | R2-096405 | agreed | 2009-12-04 | LTE-L23 | - | 2009-12-06 |
0151 | 1 | F | Rel-9 | 9.1.0 | 9.2.0 | MBMS Agreements | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097264 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0152 | - | F | Rel-9 | 9.1.0 | 9.2.0 | Measurement Overview | RP-46 | RP-091346 | approved | R2 | R2-68 | R2-096407 | agreed | 2009-12-04 | TEI9, LTE-L23 | - | 2009-12-06 |
0153 | 1 | B | Rel-9 | 9.1.0 | 9.2.0 | High level feature description of CMAS | RP-46 | RP-091345 | approved | R2 | R2-68 | R2-097337 | agreed | 2009-12-04 | PWS-RAN | - | 2009-12-06 |
0154 | 1 | B | Rel-9 | 9.1.0 | 9.2.0 | RACH optimization in 36.300 | RP-46 | RP-091344 | approved | R2 | R2-68 | R2-097389 | agreed | 2009-12-04 | SON | - | 2009-12-06 |
0155 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Correction on the precondition for cell reselection to HRPD | RP-46 | RP-091314 | approved | R2 | R2-68 | R2-097323 | agreed | 2009-12-04 | LTE-L23 | - | 2009-12-06 |
0156 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Correction on the precondition for cell reselection to HRPD | RP-46 | RP-091314 | approved | R2 | R2-68 | R2-097324 | agreed | 2009-12-04 | LTE-L23 | - | 2009-12-06 |
0158 | 1 | F | Rel-9 | 9.1.0 | 9.2.0 | Miscellaneous corrections to 36.300 (Rel-9) | RP-46 | RP-091346 | approved | R2 | R2-68 | R2-097399 | agreed | 2009-12-04 | TEI9, LTE-L23 | - | 2009-12-06 |
0162 | - | F | Rel-9 | 9.1.0 | 9.2.0 | Renaming Allowed CSG List (36.300, Rel-9) | RP-46 | RP-091343 | approved | R2 | R2-68 | R2-097357 | agreed | 2009-12-04 | EHNB-RAN2 | - | 2009-12-06 |
0165 | - | C | Rel-9 | 9.1.0 | 9.2.0 | The scope and method for HO negotiations | RP-46 | RP-091344 | approved | R2 | R2-68 | R2-097516 | agreed | 2009-12-04 | SON | - | 2009-12-06 |
0166 | 1 | B | Rel-9 | 9.1.0 | 9.2.0 | Access control for handover procedures to LTE CSG/hybrid cells | RP-46 | RP-091151 | approved | Nokia Siemens Networks, Nokia Corporation, Qualcom | - | - | - | 2009-11-25 | EHNB-RAN3 | - | 2009-12-04 |
0167 | - | B | Rel-9 | 9.1.0 | 9.2.0 | Admission Control in MCE | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097518 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0168 | - | F | Rel-9 | 9.1.0 | 9.2.0 | Clarification on SFN Synchronization | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097519 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0169 | 1 | B | Rel-9 | 9.1.0 | 9.2.0 | BMSC-MCE signaling synchronization in session start message | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097555 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0170 | - | B | Rel-9 | 9.1.0 | 9.2.0 | on multiplexing decision and DSP length | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097522 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0171 | - | B | Rel-9 | 9.1.0 | 9.2.0 | M3AP stage 2 | RP-46 | RP-091237 | approved | RAN | - | - | - | 2009-11-26 | MBMS_LTE | - | 2009-12-04 |
0172 | 1 | B | Rel-9 | 9.1.0 | 9.2.0 | M2AP stage 2 | RP-46 | RP-091150 | approved | Nokia Siemens Networks, Nokia | - | - | - | 2009-11-26 | MBMS_LTE | - | 2009-12-04 |
0173 | - | B | Rel-9 | 9.1.0 | 9.2.0 | for Transportation support for LPPa | RP-46 | RP-091340 | approved | R2 | R2-68 | R2-097527 | agreed | 2009-12-04 | LCS_LTE | - | 2009-12-06 |
0174 | - | B | Rel-9 | 9.1.0 | 9.2.0 | Introduction of MBMS for LTE: C- and U-Plane synchronisation principles | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097528 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0175 | - | B | Rel-9 | 9.1.0 | 9.2.0 | on Mechanism for Consecutive Packet Loss in 36.300 | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097529 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0176 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Overload reduction | RP-46 | RP-091332 | approved | R2 | R2-68 | R2-097530 | agreed | 2009-12-04 | LTE-Interfaces | - | 2009-12-06 |
0177 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Overload reduction | RP-46 | RP-091332 | approved | R2 | R2-68 | R2-097531 | agreed | 2009-12-04 | LTE-Interfaces | - | 2009-12-06 |
0178 | - | C | Rel-9 | 9.1.0 | 9.2.0 | The scope and method for HO negotiations | RP-46 | RP-091344 | approved | R2 | R2-68 | R2-097532 | agreed | 2009-12-04 | SON | - | 2009-12-06 |
0179 | - | B | Rel-9 | 9.1.0 | 9.2.0 | Introduction of MRO procedures in stage 2 | RP-46 | RP-091344 | approved | R2 | R2-68 | R2-097533 | agreed | 2009-12-04 | SON | - | 2009-12-06 |
0180 | 1 | F | Rel-9 | 9.1.0 | 9.2.0 | MCE to MME session start response | RP-46 | RP-091341 | approved | R2 | R2-68 | R2-097556 | agreed | 2009-12-04 | MBMS_LTE | - | 2009-12-06 |
0181 | - | F | Rel-8 | 8.10.0 | 8.11.0 | In order delivery of the multiple NAS PDUs | RP-46 | RP-091332 | approved | R2 | R2-68 | R2-097552 | agreed | 2009-12-04 | LTE-Interfaces | - | 2009-12-06 |
0182 | - | A | Rel-9 | 9.1.0 | 9.2.0 | In order delivery of the multiple NAS PDUs | RP-46 | RP-091332 | approved | R2 | R2-68 | R2-097553 | agreed | 2009-12-04 | LTE-Interfaces | - | 2009-12-06 |
0183 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Correction regarding support of multiple MBSFN areas | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-100956 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0184 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Correction to MBMS terminology | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101809 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0185 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Corrections on eNB muting MBSFN transmission | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-100958 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0186 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Corrections to TS 36.300 on MBMS | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-100959 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0187 | - | F | Rel-9 | 9.2.0 | 9.3.0 | CR capturing HeNB inbound mobility agreeements | RP-47 | RP-100306 | approved | R2 | R2-69 | R2-100960 | agreed | 2010-03-19 | EHNB-RAN2 | - | 2010-03-21 |
0188 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Remove FFSs from RAN2 specifications | RP-47 | RP-100308 | approved | R2 | R2-69 | R2-100961 | agreed | 2010-03-19 | TEI9, LTE-L23 | - | 2010-03-21 |
0189 | - | F | Rel-9 | 9.2.0 | 9.3.0 | SIM based access for Emergency calls in LTE | RP-47 | RP-100296 | approved | R2 | R2-69 | R2-100962 | agreed | 2010-03-19 | IMS_EMER_LTE | - | 2010-03-21 |
0191 | - | F | Rel-9 | 9.2.0 | 9.3.0 | RA for Positioning | RP-47 | RP-100304 | approved | R2 | R2-69 | R2-101779 | agreed | 2010-03-19 | LCS_LTE | - | 2010-03-21 |
0192 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Corrections to TS36.300 on MBMS | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101811 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0196 | 1 | B | Rel-9 | 9.2.0 | 9.3.0 | Stage 2 update for Full Configuration Handover for handling earlier eNB releases | RP-47 | RP-100308 | approved | R2 | R2-69 | R2-101880 | agreed | 2010-03-19 | TEI9, LTE-L23 | - | 2010-03-21 |
0197 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Handling Kasme mismatch for IMS Emergency calls | RP-47 | RP-100296 | approved | R2 | R2-69 | R2-101807 | agreed | 2010-03-19 | IMS_EMER_LTE | - | 2010-03-21 |
0199 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Correction to MTU endpoint | RP-47 | RP-100308 | approved | R2 | R2-69 | R2-101860 | agreed | 2010-03-19 | TEI9, LTE-L23 | - | 2010-03-21 |
0200 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Stage 2 correction of Load Reporting for MLB | RP-47 | RP-100307 | approved | R2 | R2-69 | R2-101904 | agreed | 2010-03-19 | SON | - | 2010-03-21 |
0201 | - | F | Rel-9 | 9.2.0 | 9.3.0 | CR for Allowed Range in Negotiation | RP-47 | RP-100307 | approved | R2 | R2-69 | R2-101905 | agreed | 2010-03-19 | SON | - | 2010-03-21 |
0202 | - | B | Rel-9 | 9.2.0 | 9.3.0 | Clarification of definitions of HO failure cases | RP-47 | RP-100307 | approved | R2 | R2-69 | R2-101906 | agreed | 2010-03-19 | SON | - | 2010-03-21 |
0203 | - | B | Rel-9 | 9.2.0 | 9.3.0 | Clarification on the usage of the mechanism to transfer IRAT MLB information | RP-47 | RP-100307 | approved | R2 | R2-69 | R2-101907 | agreed | 2010-03-19 | SON | - | 2010-03-21 |
0204 | - | F | Rel-9 | 9.2.0 | 9.3.0 | MBMS Session Update in M3AP stage 2 | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101908 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0205 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Correction on radio bearer configuration | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101909 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0206 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Correction to the MSAP occasion implied by SYNC timestamp | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101910 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0207 | - | F | Rel-9 | 9.2.0 | 9.3.0 | MCCH related BCCH content | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101911 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0208 | - | F | Rel-9 | 9.2.0 | 9.3.0 | MCCH update synchronization | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101912 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0209 | - | F | Rel-9 | 9.2.0 | 9.3.0 | MBMS Session Update in M2AP stage 2 | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101913 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0210 | - | F | Rel-9 | 9.2.0 | 9.3.0 | CR for MBMS User Data flow synchronisation in 36.300 | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101914 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0211 | - | F | Rel-9 | 9.2.0 | 9.3.0 | MBMS User Data flow synchronisation | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101915 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0212 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Packet dropping | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101916 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0213 | - | F | Rel-9 | 9.2.0 | 9.3.0 | SYNC sequence duration configuration in MCE | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101917 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0214 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Adding the description of simultaneously change of SIB13 and MCCH | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101918 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0215 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Addition u-plane protocol stack for M1 | RP-47 | RP-100305 | approved | R2 | R2-69 | R2-101919 | agreed | 2010-03-19 | MBMS_LTE | - | 2010-03-21 |
0216 | - | F | Rel-8 | 8.11.0 | 8.12.0 | Queue concurrent NAS messages if necessary for in seq delivery | RP-47 | RP-100295 | approved | R2 | R2-69 | R2-101920 | agreed | 2010-03-19 | LTE-interfaces | - | 2010-03-21 |
0217 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Queue concurrent NAS messages if necessary for in seq delivery | RP-47 | RP-100295 | approved | R2 | R2-69 | R2-101921 | agreed | 2010-03-19 | LTE-interfaces | - | 2010-03-21 |
0218 | - | F | Rel-8 | 8.11.0 | 8.12.0 | Support of X2 Inter-PLMN HO | RP-47 | RP-100295 | approved | R2 | R2-69 | R2-101922 | agreed | 2010-03-19 | LTE-interfaces | - | 2010-03-21 |
0219 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Support of X2 Inter-PLMN HO | RP-47 | RP-100295 | approved | R2 | R2-69 | R2-101923 | agreed | 2010-03-19 | LTE-interfaces | - | 2010-03-21 |
0220 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Clarifications on CSG process definition and mobility procedures | RP-47 | RP-100300 | approved | R2 | R2-69 | R2-101924 | agreed | 2010-03-19 | EHNB-RAN3 | - | 2010-03-21 |
0221 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Corrections of HeNB | RP-47 | RP-100300 | approved | R2 | R2-69 | R2-101925 | agreed | 2010-03-19 | EHNB-RAN3 | - | 2010-03-21 |
0222 | - | F | Rel-9 | 9.2.0 | 9.3.0 | CSG expiry Handling | RP-47 | RP-100300 | approved | R2 | R2-69 | R2-101926 | agreed | 2010-03-19 | EHNB-RAN3 | - | 2010-03-21 |
0223 | - | F | Rel-8 | 8.11.0 | 8.12.0 | eNB/MME Status Transfer procedure | RP-47 | RP-100295 | approved | R2 | R2-69 | R2-101927 | agreed | 2010-03-19 | LTE-interfaces | - | 2010-03-21 |
0224 | - | A | Rel-9 | 9.2.0 | 9.3.0 | eNB/MME Status Transfer procedure | RP-47 | RP-100295 | approved | R2 | R2-69 | R2-101928 | agreed | 2010-03-19 | LTE-interfaces | - | 2010-03-21 |
0225 | - | F | Rel-9 | 9.2.0 | 9.3.0 | SPID implementation guidelines | RP-47 | RP-100308 | approved | R2 | R2-69 | R2-101929 | agreed | 2010-03-19 | TEI9 | - | 2010-03-21 |
0226 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Handling of handover restriction for emergency call | RP-47 | RP-100308 | approved | R2 | R2-69 | R2-101930 | agreed | 2010-03-19 | TEI9 | - | 2010-03-21 |
0227 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Some corrections for HeNB | RP-47 | RP-100300 | approved | R2 | R2-69 | R2-101932 | agreed | 2010-03-19 | EHNB-RAN3 | - | 2010-03-21 |
0228 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR to 36.300 for CSFB to 1xRTT | RP-48 | RP-100556 | approved | R2 | R2-70 | R2-102714 | agreed | 2010-06-04 | TEI9, LTE-L23 | - | 2010-05-31 |
0229 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | Proposed CR to 36.322 on RLC re-establishment for MBMS | RP-48 | RP-100554 | approved | R2 | R2-70 | R2-103414 | agreed | 2010-06-04 | MBMS_LTE | - | 2010-05-31 |
0230 | 3 | B | Rel-10 | 9.3.0 | 10.0.0 | Stage 2 description of Carrier Aggregation | RP-48 | RP-100561 | approved | R2 | R2-70 | R2-103427 | agreed | 2010-06-04 | LTE_CA-Core | - | 2010-05-31 |
0231 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Stage2 correction for HeNB inbound handover | RP-48 | RP-100551 | approved | R2 | R2-70 | R2-102717 | agreed | 2010-06-04 | EHNB-RAN2 | - | 2010-05-31 |
0232 | 1 | B | Rel-10 | 9.3.0 | 10.0.0 | Stage-2 description of relaying into 36.300 | RP-48 | RP-100562 | approved | R2 | R2-70 | R2-103437 | agreed | 2010-06-04 | LTE_Relay-Core | - | 2010-05-31 |
0235 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR to 36.300 on MBMS terminology | RP-48 | RP-100554 | approved | R2 | R2-70 | R2-103418 | agreed | 2010-06-04 | MBMS_LTE | - | 2010-05-31 |
0238 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | Add MOBILITY SETTINGS CHANGE Procedure to X2-CP Procedure section | RP-48 | RP-100570 | approved | Motorola | - | - | - | 2010-06-04 | SON | - | 2010-05-31 |
0239 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Introduction of trace functions and procedures in S1 sections of 36.300 (contact: Motorola) | RP-48 | RP-100556 | approved | R2 | R2-70 | R2-103465 | agreed | 2010-06-04 | TEI9, LTE-interfaces | - | 2010-05-31 |
0240 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction of Synchronization Sequence (contact: Alcatel-Lucent Shanghai Bell, Alcatel-Lucent) | RP-48 | RP-100554 | approved | R2 | R2-70 | R2-103466 | agreed | 2010-06-04 | MBMS_LTE | - | 2010-05-31 |
0241 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Clarification of CSG / Hybrid cell definitions (contact: Ericsson) | RP-48 | RP-100552 | approved | R2 | R2-70 | R2-103467 | agreed | 2010-06-04 | EHNB-RAN3 | - | 2010-05-31 |
0242 | - | F | Rel-9 | 9.3.0 | 9.4.0 | SON stage 2 clean up (contact: Samsung, Nokia Siemens Networks) | RP-48 | RP-100555 | approved | R2 | R2-70 | R2-103468 | agreed | 2010-06-04 | SON | - | 2010-05-31 |
0243 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Updating Stage-2 on R9 Automatic Neighbour Relation Function (contact: ETRI, Samsung) | RP-48 | RP-100555 | approved | R2 | R2-70 | R2-103469 | agreed | 2010-06-04 | SON | - | 2010-05-31 |
0244 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | Adding of description in EUTRAN for IP Multicast (contact: NEC) | RP-48 | RP-100554 | approved | R2 | R2-70 | R2-103479 | agreed | 2010-06-04 | MBMS_LTE | - | 2010-05-31 |
0245 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction of trace failure description in Stage 2 (contact: NEC, Motorola, Huawei) | RP-48 | RP-100556 | approved | R2 | R2-70 | R2-103471 | agreed | 2010-06-04 | TEI9, LTE-interfaces | - | 2010-05-31 |
0246 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction of packet dropping (contact: Alcatel-Lucent Shanghai Bell, Alcatel-Lucent) | RP-48 | RP-100554 | approved | R2 | R2-70 | R2-103472 | agreed | 2010-06-04 | MBMS_LTE | - | 2010-05-31 |
0247 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Clarification of paging optimization (contact: Qualcomm) | RP-48 | RP-100552 | approved | R2 | R2-70 | R2-103473 | agreed | 2010-06-04 | EHNB-RAN3 | - | 2010-05-31 |
0248 | 4 | B | Rel-10 | 10.0.0 | 10.1.0 | Corrections and new Agreements on Carrier Aggregation | RP-49 | RP-100865 | approved | - | R2-71 | R2-105268 | agreed | 2010-09-07 | LTE_CA-Core | - | 2010-09-14 |
0249 | 1 | C | Rel-10 | 10.0.0 | 10.1.0 | Additions to Stage-2 description of relaying | RP-49 | RP-100866 | approved | R2 | R2-71 | R2-104998 | agreed | 2010-09-04 | LTE_Relay-Core | Expect revision of text at RP-50. | 2010-09-14 |
0254 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | CSFB Summary | RP-49 | RP-100851 | approved | R2 | R2-71 | R2-105216 | agreed | 2010-08-27 | TEI9 | - | 2010-09-14 |
0255 | - | B | Rel-10 | 10.0.0 | 10.1.0 | Start-up procedure for relays | RP-49 | RP-100866 | approved | R2 | R2-71 | R2-105202 | agreed | 2010-08-26 | LTE_Relay-Core | Wrong WG tdoc on cover | 2010-09-14 |
0256 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Keeping neighbouring eNBs up-to-date with complete list of served cells | RP-49 | RP-100851 | approved | R2 | R2-71 | R2-105249 | agreed | 2010-08-31 | TEI9 | - | 2010-09-14 |
0257 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Keeping neighbouring eNBs up-to-date with complete list of served cells | RP-49 | RP-100851 | approved | R2 | R2-71 | R2-105250 | agreed | 2010-08-31 | TEI9 | - | 2010-09-14 |
0258 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Description of Energy Saving mechanisms | RP-49 | RP-100851 | approved | R2 | R2-71 | R2-105251 | agreed | 2010-08-31 | TEI9 | - | 2010-09-14 |
0259 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Description of Energy Saving mechanisms | RP-49 | RP-100851 | approved | R2 | R2-71 | R2-105252 | agreed | 2010-08-31 | TEI9 | - | 2010-09-14 |
0260 | - | B | Rel-10 | 10.0.0 | 10.1.0 | Handover request routing toward RN | RP-49 | RP-100866 | approved | R2 | R2-71 | R2-105253 | agreed | 2010-08-31 | LTE_Relay-Core | - | 2010-09-14 |
0261 | - | F | Rel-9 | 9.4.0 | 9.5.0 | MBMS Session Update procedure | RP-49 | RP-100853 | approved | R2 | R2-71 | R2-105254 | agreed | 2010-08-31 | MBMS_LTE | Wrong WG tdoc on cover | 2010-09-14 |
0262 | - | A | Rel-10 | 10.0.0 | 10.1.0 | MBMS Session Update procedure | RP-49 | RP-100853 | approved | R2 | R2-71 | R2-105255 | agreed | 2010-08-31 | MBMS_LTE | Wrong WG tdoc on cover | 2010-09-14 |
0263 | - | F | Rel-9 | 9.4.0 | 9.5.0 | CS Fallback Indication and Handover Restriction List | RP-49 | RP-100860 | approved | R2 | R2-71 | R2-105256 | agreed | 2010-08-31 | TEI9, LTE-interfaces | - | 2010-09-14 |
0264 | - | A | Rel-10 | 10.0.0 | 10.1.0 | CS Fallback Indication and Handover Restriction List | RP-49 | RP-100860 | approved | R2 | R2-71 | R2-105257 | agreed | 2010-08-31 | TEI9, LTE-interfaces | - | 2010-09-14 |
0265 | - | B | Rel-10 | 10.0.0 | 10.1.0 | X2-AP non UE dedicated messages handling | RP-49 | RP-100866 | approved | R2 | R2-71 | R2-105258 | agreed | 2010-08-31 | LTE_Relay-Core | - | 2010-09-14 |
0266 | - | B | Rel-10 | 10.0.0 | 10.1.0 | Detach procedure for relays | RP-49 | RP-100866 | approved | R2 | R2-71 | R2-105259 | agreed | 2010-08-31 | LTE_Relay-Core | - | 2010-09-14 |
0267 | 1 | B | Rel-10 | 10.0.0 | 10.1.0 | RN and DeNB OAMs should be able to exchange info | RP-49 | RP-100866 | approved | R2 | R2-71 | R2-105261 | agreed | 2010-09-02 | LTE_Relay-Core | - | 2010-09-14 |
0268 | - | A | Rel-10 | 10.0.0 | 10.1.0 | CSFB Summary | RP-49 | RP-100882 | approved | Nokia Siemens Networks, Nokia Corporation | - | - | - | 2010-09-08 | TEI9 | - | 2010-09-14 |
0269 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | Corrections and new agreements on Carrier Aggregation | RP-50 | RP-101226 | approved | R2 | R2-72 | R2-106854 | agreed | 2010-12-10 | LTE_CA-Core | - | 2010-12-05 |
0270 | - | F | Rel-9 | 9.5.0 | 9.6.0 | 36300_CRxxx_Handover for Hybrid Cells | RP-50 | RP-101206 | approved | R2 | R2-72 | R2-106124 | agreed | 2010-12-10 | EHNB-RAN2 | - | 2010-12-05 |
0271 | - | A | Rel-10 | 10.1.0 | 10.2.0 | 36300_CRxxx_Handover for Hybrid Cells | RP-50 | RP-101206 | approved | R2 | R2-72 | R2-106125 | agreed | 2010-12-10 | EHNB-RAN2 | - | 2010-12-05 |
0272 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Correction on MAC padding on MCH | RP-50 | RP-101208 | approved | R2 | R2-72 | R2-106126 | agreed | 2010-12-10 | MBMS_LTE | - | 2010-12-05 |
0273 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Correction on MAC padding on MCH | RP-50 | RP-101208 | approved | R2 | R2-72 | R2-106127 | agreed | 2010-12-10 | MBMS_LTE | - | 2010-12-05 |
0274 | 3 | B | Rel-10 | 10.1.0 | 10.2.0 | Additions and corrections to relaying description | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106930 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0275 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | LTE - Stage 2 agreements on MBMS enhancement | RP-50 | RP-101231 | approved | R2 | R2-72 | R2-106880 | agreed | 2010-12-10 | MBMS_LTE_enh-Core | - | 2010-12-05 |
0276 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | CR to 36.300 adding e1xCSFB support for dual Rx/Tx UE | RP-50 | RP-101214 | approved | R2 | R2-72 | R2-106887 | agreed | 2010-12-10 | TEI10, LTE-L23 | - | 2010-12-05 |
0277 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Editorial Clean-Up | RP-50 | RP-101214 | approved | R2 | R2-72 | R2-106907 | agreed | 2010-12-10 | TEI10, LTE-L23 | - | 2010-12-05 |
0278 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | Introduction of enhanced ICIC | RP-50 | RP-101229 | approved | R2 | R2-72 | R2-106943 | agreed | 2010-12-10 | eICIC_LTE-Core | - | 2010-12-05 |
0285 | 2 | C | Rel-10 | 10.1.0 | 10.2.0 | Setting of Maximum Bit Rate (MBR) to be greater than the Guaranteed Bit Rate (GBR) over E-UTRA: MBR enforcement at eNB side. | RP-50 | RP-101214 | approved | R2 | R2-72 | R2-106924 | agreed | 2010-12-10 | TEI10, LTE-L23 | - | 2010-12-05 |
0286 | - | F | Rel-10 | 10.1.0 | 10.2.0 | CR for Description of Energy Saving | RP-50 | RP-101214 | approved | R2 | R2-72 | R2-106947 | agreed | 2010-12-10 | TEI10, LTE-interfaces | - | 2010-12-05 |
0287 | - | B | Rel-10 | 10.1.0 | 10.2.0 | S1 non UE associated message handling | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106948 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0288 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Clarification to ANR Operation | RP-50 | RP-101214 | approved | R2 | R2-72 | R2-106949 | agreed | 2010-12-10 | LTE-interfaces, TEI10 | - | 2010-12-05 |
0289 | - | F | Rel-10 | 10.1.0 | 10.2.0 | P-GW function embedded in DeNB and addressing requirements | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106950 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0290 | - | B | Rel-10 | 10.1.0 | 10.2.0 | eNB Configuration Update procedure in RN startup and detach procedure | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106951 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0291 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Introduction of MCE initiated MBMS Session Start Request | RP-50 | RP-101231 | approved | R2 | R2-72 | R2-106952 | agreed | 2010-12-10 | MBMS_LTE_enh-Core | - | 2010-12-05 |
0292 | - | F | Rel-10 | 10.1.0 | 10.2.0 | No NNSF function in RN | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106953 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0293 | - | B | Rel-10 | 10.1.0 | 10.2.0 | S1 handover routing toward RN | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106954 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0294 | - | F | Rel-10 | 10.1.0 | 10.2.0 | TNL address Handling | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106955 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0295 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction on SPID Transfer | RP-50 | RP-101214 | approved | R2 | R2-72 | R2-106956 | agreed | 2010-12-10 | LTE-Interfaces, TEI10 | - | 2010-12-05 |
0296 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Support of ARP Pre-emption | RP-50 | RP-101231 | approved | R2 | R2-72 | R2-106957 | agreed | 2010-12-10 | MBMS_LTE_enh-Core | - | 2010-12-05 |
0297 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Support of MBMS Service Counting Report procedure | RP-50 | RP-101231 | approved | R2 | R2-72 | R2-106958 | agreed | 2010-12-10 | MBMS_LTE_enh-Core | - | 2010-12-05 |
0298 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Stage 2 for the X2 based mobility enhancement between HeNBs | RP-50 | RP-101222 | approved | R2 | R2-72 | R2-106959 | agreed | 2010-12-10 | HNB_HENB_mob_enh-Core | - | 2010-12-05 |
0299 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Introduction of event-triggered inter-RAT cell load reporting | RP-50 | RP-101230 | approved | R2 | R2-72 | R2-106960 | agreed | 2010-12-10 | SONenh_LTE-Core | - | 2010-12-05 |
0300 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Introduction of LIPA function | RP-50 | RP-101216 | approved | R2 | R2-72 | R2-106961 | agreed | 2010-12-10 | LIPA_SIPTO | LIPA_SIPTO has no RAN WI, it is an SA2 feature and it will be treated at RAN #50 under TEI10 | 2010-12-05 |
0301 | - | B | Rel-10 | 10.1.0 | 10.2.0 | OAM requirements for QCI to DSCP mapping config for relays | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106962 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0302 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Non UE associated message handling | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106963 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0303 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Introduction of MTC Overload Support | RP-50 | RP-101224 | approved | R2 | R2-72 | R2-106964 | agreed | 2010-12-10 | NIMTC-RAN_overload | - | 2010-12-05 |
0304 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Relay Node Un Signalling Transport Support | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106965 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0305 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Complete S1 Interface Signalling Procedures | RP-50 | RP-101214 | approved | R2 | R2-72 | R2-106966 | agreed | 2010-12-10 | LTE-Interfaces, TEI10 | - | 2010-12-05 |
0306 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | X2 procedure and OAM requirements to support eICIC | RP-50 | RP-101229 | approved | R2 | R2-72 | R2-106972 | agreed | 2010-12-10 | eICIC_LTE-Core | - | 2010-12-05 |
0307 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Stage-2 updates to RN initial attachment | RP-50 | RP-101228 | approved | R2 | R2-72 | R2-106968 | agreed | 2010-12-10 | LTE_Relay-Core | - | 2010-12-05 |
0308 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Functionality of SON MRO defined for Rel.10 | RP-50 | RP-101230 | approved | R2 | R2-72 | R2-106969 | agreed | 2010-12-10 | SONenh_LTE-Core | - | 2010-12-05 |
0309 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Enforcing uplink MBR in the eNodeB | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-110788 | agreed | 2011-03-18 | TEI10, LTE-L23 | - | 2011-03-14 |
0310 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Implementation Updates on Non-UE associated S1X2 message Handling | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-110789 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0311 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Introduction of 2 subsets for pattern 3 | RP-51 | RP-110292 | approved | R2 | R2-73 | R2-110790 | agreed | 2011-03-18 | eICIC_LTE-Core | - | 2011-03-14 |
0312 | - | C | Rel-10 | 10.2.0 | 10.3.0 | MBR management for uplink grant | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-110791 | agreed | 2011-03-18 | TEI10, LTE-L23 | - | 2011-03-14 |
0313 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Measurements in CA | RP-51 | RP-110289 | approved | R2 | R2-73 | R2-111540 | agreed | 2011-03-18 | LTE_CA-Core | - | 2011-03-14 |
0314 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Annex J Clean Up | RP-51 | RP-110289 | approved | R2 | R2-73 | R2-111541 | agreed | 2011-03-18 | LTE_CA-Core | - | 2011-03-14 |
0317 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Stage-2 relay updates | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-111554 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0320 | 2 | B | Rel-10 | 10.2.0 | 10.3.0 | stage-2 clarification on relay security | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-111635 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0321 | - | F | Rel-10 | 10.2.0 | 10.3.0 | stage-2 Clarification on handover and system information description | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-111575 | agreed | 2011-03-18 | TEI10, LTE-L23 | - | 2011-03-14 |
0324 | - | B | Rel-10 | 10.2.0 | 10.3.0 | CR to 36.300 adding UE capability indicator for dual Rx/Tx e1xCSFB | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-111584 | agreed | 2011-03-18 | TEI10, LTE-L23 | - | 2011-03-14 |
0328 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Update of Inter-cell Interference Coordination Feature Description | RP-51 | RP-110292 | approved | R2 | R2-73 | R2-111639 | agreed | 2011-03-18 | eICIC_LTE-Core | - | 2011-03-14 |
0330 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | CR on ABS definition | RP-51 | RP-110292 | approved | R2 | R2-73 | R2-111701 | agreed | 2011-03-18 | eICIC_LTE-Core | - | 2011-03-14 |
0331 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Fix incorrect name for CT4 GTP message in HO Procedure | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-111728 | agreed | 2011-03-18 | TEI10 | - | 2011-03-14 |
0332 | - | F | Rel-10 | 10.2.0 | 10.3.0 | CR for MBMS User Data flow synchronisation | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-111729 | agreed | 2011-03-18 | TEI10 | - | 2011-03-14 |
0333 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Remove Procedure Lists for MBMS | RP-51 | RP-110294 | approved | R2 | R2-73 | R2-111730 | agreed | 2011-03-18 | MBMS_LTE_enh-Core | - | 2011-03-14 |
0334 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Routing functionality for X2 handover between HeNB | RP-51 | RP-110283 | approved | R2 | R2-73 | R2-111731 | agreed | 2011-03-18 | HNB_HENB_mob_enh-Core | - | 2011-03-14 |
0335 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Update to OAM Traffic QoS requirements | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-111732 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0336 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Completion of LIPA feature | RP-51 | RP-110278 | approved | R2 | R2-73 | R2-111733 | agreed | 2011-03-18 | LIPA_SIPTO | - | 2011-03-14 |
0337 | - | D | Rel-10 | 10.2.0 | 10.3.0 | Editorial update for inter-RAT load reporting | RP-51 | RP-110293 | approved | R2 | R2-73 | R2-111734 | agreed | 2011-03-18 | SONenh_LTE-Core | - | 2011-03-14 |
0338 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Correction of MBMS Deployment consideration | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-111735 | agreed | 2011-03-18 | TEI10 | - | 2011-03-14 |
0339 | - | B | Rel-10 | 10.2.0 | 10.3.0 | OAM requirement for time domain eICIC for macro-pico scenario | RP-51 | RP-110292 | approved | R2 | R2-73 | R2-111736 | agreed | 2011-03-18 | eICIC_LTE-Core | - | 2011-03-14 |
0340 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Cleanup of MRO | RP-51 | RP-110293 | approved | R2 | R2-73 | R2-111737 | agreed | 2011-03-18 | SONenh_LTE-Core | - | 2011-03-14 |
0341 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Stage-2 Updates of Relaying | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-111738 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0342 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Clean up of LIPA | RP-51 | RP-110278 | approved | R2 | R2-73 | R2-111739 | agreed | 2011-03-18 | LIPA_SIPTO | - | 2011-03-14 |
0343 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Correction to usage of Handover Report for MRO | RP-51 | RP-110272 | approved | R2 | R2-73 | R2-111740 | agreed | 2011-03-18 | TEI9, LTE-L23 | - | 2011-03-14 |
0344 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Correction to usage of Handover Report for MRO | RP-51 | RP-110272 | approved | R2 | R2-73 | R2-111741 | agreed | 2011-03-18 | TEI9, LTE-L23 | - | 2011-03-14 |
0345 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Clarification of the RN authorisation | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-111742 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0346 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Requirements for OAM control of MRO | RP-51 | RP-110293 | approved | R2 | R2-73 | R2-111743 | agreed | 2011-03-18 | SONenh_LTE-Core | - | 2011-03-14 |
0347 | - | F | Rel-10 | 10.2.0 | 10.3.0 | LIPA packets reordering in downlink | RP-51 | RP-110278 | approved | R2 | R2-73 | R2-111744 | agreed | 2011-03-18 | LIPA_SIPTO | - | 2011-03-14 |
0348 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Support for MDT | RP-51 | RP-110282 | approved | R2 | R2-73 | R2-111745 | agreed | 2011-03-18 | MDT_UMTSLTE-Core | - | 2011-03-14 |
0349 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Introduction of a Stepwise Load Reduction Indication for the Overload procedure in Stage 2 | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-111746 | agreed | 2011-03-18 | TEI10 | - | 2011-03-14 |
0350 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Remove FFS on Differentiating the Receiving or Interested UEs | RP-51 | RP-110294 | approved | R2 | R2-73 | R2-111747 | agreed | 2011-03-18 | MBMS_LTE_enh-Core | - | 2011-03-14 |
0351 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Correction on MBMS Reset procedure | RP-51 | RP-110223 | approved | R2 | R2-73 | R2-111748 | agreed | 2011-03-18 | MBMS_LTE | - | 2011-03-14 |
0352 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Correction on MBMS Reset procedure | RP-51 | RP-110223 | approved | R2 | R2-73 | R2-111749 | agreed | 2011-03-18 | MBMS_LTE | - | 2011-03-14 |
0353 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Clarification of RN Architecture and Startup | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-111750 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0354 | - | D | Rel-10 | 10.2.0 | 10.3.0 | Miscellaneous small corrections to TS 36.300 on Relay | RP-51 | RP-110291 | approved | R2 | R2-73 | R2-111751 | agreed | 2011-03-18 | LTE_Relay-Core | - | 2011-03-14 |
0355 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Suspension and Resume function | RP-51 | RP-110294 | approved | R2 | R2-73 | R2-111752 | agreed | 2011-03-18 | MBMS_LTE_enh-Core | - | 2011-03-14 |
0356 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Correction on physical layer part on TS36.300 | RP-51 | RP-110280 | approved | R2 | R2-73 | R2-111755 | agreed | 2011-03-18 | LTE-Phys, TEI10 | - | 2011-03-14 |
0357 | - | F | Rel-9 | 9.6.0 | - | CSFB to GERAN | RP-51 | RP-110259 | revised | TeliaSonera | - | - | - | 2011-03-18 | TEI9 | revised in RP-110326 | 2011-03-14 |
0357 | 1 | F | Rel-9 | 9.6.0 | - | CSFB to GERAN | RP-51 | RP-110326 | revised | TeliaSonera | - | - | - | 2011-03-18 | TEI9 | revision of RP-110259; revised in R2-110380 | 2011-03-14 |
0357 | 2 | F | Rel-9 | 9.6.0 | - | Options for CSFB to GSM | RP-51 | RP-110380 | revised | TeliaSonera, Orange, Telecom Italia, CMCC | - | - | - | 2011-03-15 | TEI9, LTE-L23 | revision of RP-110326; revised in R2-110404 | 2011-03-17 |
0357 | 3 | F | Rel-9 | 9.6.0 | 9.7.0 | Options for CSFB to GSM | RP-51 | RP-110404 | approved | TeliaSonera, Orange, Telecom Italia, CMCC | - | - | - | 2011-03-17 | TEI9, LTE-L23 | revision of RP-110380 | 2011-03-17 |
0358 | - | A | Rel-10 | 10.2.0 | - | CSFB to GERAN | RP-51 | RP-110260 | revised | TeliaSonera | - | - | - | 2011-03-18 | TEI9 | revised in RP-110327 | 2011-03-14 |
0358 | 1 | A | Rel-10 | 10.2.0 | - | CSFB to GERAN | RP-51 | RP-110327 | revised | TeliaSonera | - | - | - | 2011-03-18 | TEI9 | revision of RP-110260; revised in R2-110381 | 2011-03-14 |
0358 | 2 | A | Rel-9 | 10.2.0 | - | Options for CSFB to GSM | RP-51 | RP-110381 | revised | TeliaSonera, Orange, Telecom Italia, CMCC | - | - | - | 2011-03-15 | TEI9, LTE-L23 | revision of RP-110327; revised in R2-110405 | 2011-03-17 |
0358 | 3 | A | Rel-10 | 10.2.0 | 10.3.0 | Options for CSFB to GSM | RP-51 | RP-110405 | approved | TeliaSonera, Orange, Telecom Italia, CMCC | - | - | - | 2011-03-17 | TEI9, LTE-L23 | revision of RP-110381 | 2011-03-17 |
0359 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Clarification on redirection in 36.300 | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-112722 | agreed | 2011-04-29 | TEI10, LTE-L23 | - | 2011-05-31 |
0360 | - | F | Rel-10 | 10.3.0 | 10.4.0 | CR to 36.300 for eICIC updates | RP-52 | RP-110850 | approved | R2 | R2-74 | R2-112723 | agreed | 2011-04-29 | eICIC_LTE-Core | - | 2011-05-31 |
0361 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Update MCCH Structure description for CountingRequest message | RP-52 | RP-110836 | approved | R2 | R2-74 | R2-112724 | agreed | 2011-04-29 | MBMS_LTE_enh-Core | - | 2011-05-31 |
0362 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Miscellaneous corrections to 36.300 | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113546 | agreed | 2011-05-11 | TEI10, LTE-L23 | - | 2011-05-31 |
0363 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Correction on eICIC description | RP-52 | RP-110850 | approved | R2 | R2-74 | R2-113541 | agreed | 2011-05-10 | eICIC_LTE-Core | - | 2011-05-31 |
0365 | 2 | F | Rel-10 | 10.3.0 | 10.4.0 | Some small corrections to 36.300 | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113662 | agreed | 2011-05-13 | TEI10, LTE-L23 | - | 2011-05-31 |
0369 | - | F | Rel-10 | 10.3.0 | 10.4.0 | UE receiver window for inter-band non-contiguous CA | RP-52 | RP-110846 | approved | R2 | R2-74 | R2-113389 | agreed | 2011-05-09 | LTE_CA-Core | - | 2011-05-31 |
0370 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Introduction of the RLF report | RP-52 | RP-110843 | approved | R2 | R2-74 | R2-113633 | agreed | 2011-05-28 | MDT_UMTSLTE-Core | - | 2011-05-31 |
0372 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Clarification on MME selection | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113669 | agreed | 2011-05-18 | TEI10 | - | 2011-05-31 |
0373 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Correction on the Release of Supporting SRVCC | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113670 | agreed | 2011-05-18 | LTE-interfaces, TEI10 | - | 2011-05-31 |
0374 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Correction of the area restrictions description | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113671 | agreed | 2011-05-18 | LTE-interfaces, TEI10 | - | 2011-05-31 |
0375 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Correcting the Note regarding the usage of the GUMMEI | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113672 | agreed | 2011-05-18 | TEI10 | - | 2011-05-31 |
0376 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Correction of Counting Function | RP-52 | RP-110836 | approved | R2 | R2-74 | R2-113673 | agreed | 2011-05-18 | MBMS_LTE_enh-Core | - | 2011-05-31 |
0377 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Correction of MBMS Service Suspension and Resumption Function | RP-52 | RP-110836 | approved | R2 | R2-74 | R2-113674 | agreed | 2011-05-18 | MBMS_LTE_enh-Core | - | 2011-05-31 |
0378 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Relaying Stage 2 Corrections | RP-52 | RP-110849 | approved | R2 | R2-74 | R2-113675 | agreed | 2011-05-18 | LTE_Relay-Core | - | 2011-05-31 |
0379 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Correction of Reset | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113678 | agreed | 2011-05-18 | TEI10 | - | 2011-05-31 |
0380 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Cleanup general topics before Rel-10 closure | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113679 | agreed | 2011-05-18 | TEI10 | - | 2011-05-31 |
0381 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Cleanup of HeNB related topics before Rel-10 closure | RP-52 | RP-110839 | approved | R2 | R2-74 | R2-113680 | agreed | 2011-05-18 | TEI10 | - | 2011-05-31 |
0382 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Clarification to detection of unnecessary IRAT handover | RP-52 | RP-110713 | approved | R3 | R3-72 | R2-113681 | Agreed | 2011-05-26 | SONenh_LTE-Core | - | 2011-05-26 |
0382 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Clarification to detection of unnecessary IRAT handover (contact: Alcatel-Lucent) | RP-52 | RP-110713 | approved | R2 | R2-74 | R2-113681 | agreed | 2011-06-03 | SONenh_LTE-Core | RAN2 CR provided in RAN3 CR package since linked | 2011-06-04 |
0383 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO (contact: Huawei) | RP-52 | RP-110714 | approved | R2 | R2-74 | R2-113682 | agreed | 2011-06-03 | HNB_HENB_mob_enh-Core | RAN2 CR provided in RAN3 CR package since linked | 2011-06-04 |
0383 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Release the UE context in the source HeNB-GW after HeNB-HeNB X2 HO | RP-52 | RP-110714 | approved | R3 | R3-72 | R2-113682 | Agreed | 2011-05-26 | HNB_HENB_mob_enh-Core | - | 2011-05-26 |
0384 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Corrections of MRO | RP-52 | RP-110851 | approved | R2 | R2-74 | R2-113683 | agreed | 2011-05-19 | SONenh_LTE-Core | - | 2011-05-31 |
0387 | - | F | Rel-9 | 9.7.0 | 9.8.0 | RLC/MAC synchronization for MBSFN | RP-53 | RP-111280 | approved | R2 | R2-75 | R2-114581 | agreed | 2011-09-16 | MBMS_LTE | - | 2011-09-12 |
0388 | - | A | Rel-10 | 10.4.0 | 10.5.0 | RLC/MAC synchronization for MBSFN | RP-53 | RP-111280 | approved | R2 | R2-75 | R2-114582 | agreed | 2011-09-16 | MBMS_LTE | - | 2011-09-12 |
0390 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Miscellaneous correction to 36.300 on Security Overview | RP-53 | RP-111297 | approved | R2 | R2-75 | R2-114771 | agreed | 2011-09-16 | TEI10, LTE-L23 | - | 2011-09-12 |
0391 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Corrections to 1xRTT CS Fallback | RP-53 | RP-111297 | approved | R2 | R2-75 | R2-114556 | agreed | 2011-09-16 | TEI10, LTE-L23 | - | 2011-09-12 |
0392 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Corrections on MCCH and MBMS counting | RP-53 | RP-111287 | approved | R2 | R2-75 | R2-114763 | agreed | 2011-09-16 | MBMS_LTE_enh-Core | - | 2011-09-12 |
0393 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Correction on the MME Direct Information Transfer procedure | RP-53 | RP-111297 | approved | R2 | R2-75 | R2-114817 | agreed | 2011-09-16 | LTE-interfaces, TEI10 | - | 2011-09-12 |
0394 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Security Mechanism for H(e)NB ""no-IPsec"" usage option | RP-53 | RP-111290 | approved | R2 | R2-75 | R2-114818 | agreed | 2011-09-16 | HNB_HENB_mob_enh-Core | - | 2011-09-12 |
0395 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Correction of MBMS Suspension Function | RP-53 | RP-111287 | approved | R2 | R2-75 | R2-114819 | agreed | 2011-09-16 | MBMS_LTE_enh-Core | - | 2011-09-12 |
0396 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Cleanup of editor’s notes for relay | RP-53 | RP-111288 | approved | R2 | R2-75 | R2-114820 | agreed | 2011-09-16 | LTE_Relay-Core | - | 2011-09-12 |
0397 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Correction on LIPA PDN Deactivation for X2 HO | RP-53 | RP-111292 | approved | R2 | R2-75 | R2-114821 | agreed | 2011-09-16 | LIPA_SIPTO | - | 2011-09-12 |
0398 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Correction of Release Indication | RP-53 | RP-111290 | approved | R2 | R2-75 | R2-114822 | agreed | 2011-09-16 | HNB_HENB_mob_enh-Core | - | 2011-09-12 |
0399 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Correction of Trace Function | RP-53 | RP-111297 | approved | R2 | R2-75 | R2-114823 | agreed | 2011-09-16 | TEI10, LTE-interfaces | - | 2011-09-12 |
0400 | - | F | Rel-10 | 10.4.0 | 10.5.0 | RN security correction | RP-53 | RP-111288 | approved | R2 | R2-75 | R2-114824 | agreed | 2011-09-16 | LTE_Relay-Core | - | 2011-09-12 |
0401 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Correction of Emergency Call | RP-53 | RP-111297 | approved | R2 | R2-75 | R2-114825 | agreed | 2011-09-16 | TEI10, LTE-interfaces | - | 2011-09-12 |
0402 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Overload Handling by HeNB GW | RP-53 | RP-111290 | approved | R2 | R2-75 | R2-114826 | agreed | 2011-09-16 | HNB_HENB_mob_enh-Core | - | 2011-09-12 |
0403 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Synchronisation of MBMS Service Resumption | RP-53 | RP-111287 | approved | R2 | R2-75 | R2-114827 | agreed | 2011-09-16 | MBMS_LTE_enh-Core | - | 2011-09-12 |
0404 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Miscellaneous Correction for MBMS | RP-53 | RP-111287 | approved | R2 | R2-75 | R2-114828 | agreed | 2011-09-16 | MBMS_LTE_enh-Core | - | 2011-09-12 |
0405 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | Small correction on unnecessary IRAT HO | RP-53 | RP-111291 | approved | R2 | R2-75 | R2-114832 | agreed | 2011-09-16 | SONenh_LTE-Core | - | 2011-09-12 |
0406 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Clarification of TAI handling between MME and HeNB(-GW) | RP-53 | RP-111297 | approved | R2 | R2-75 | R2-114830 | agreed | 2011-09-16 | TEI10, LTE-L23 | - | 2011-09-12 |
0411 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Correction on RN security | RP-54 | RP-111714 | approved | R2 | R2-76 | R2-116528 | agreed | 2011-12-09 | LTE_Relay-Core, TEI10 | - | 2011-12-10 |
0412 | - | F | Rel-9 | 9.8.0 | 9.9.0 | Correction of Emergency call | RP-54 | RP-111647 | approved | R2 | R2-76 | R2-116529 | agreed | 2011-12-09 | TEI9 | no REL-10 cat.A CR needed as already fixed there | 2011-12-10 |
0413 | - | F | Rel-10 | 10.5.0 | 10.6.0 | HeNB Architecture Clarification | RP-54 | RP-111711 | approved | R2 | R2-76 | R2-116530 | agreed | 2011-12-09 | TEI10, EHNB-RAN3 | - | 2011-12-10 |
0414 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | Correction of Support for RACH optimization | RP-54 | RP-111604 | approved | Qualcomm | - | - | - | 2011-12-09 | SONenh_LTE-Core | company contribution since original RAN3 CR R3-112731 = R2-116531 to RAN2 TS 36.300 was based on wrong spec version | 2011-12-10 |
0415 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Correction of inbound mobility | RP-54 | RP-111711 | approved | R2 | R2-76 | R2-116532 | agreed | 2011-12-09 | TEI10, EHNB-RAN3 | - | 2011-12-10 |
0416 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Correction of MBMS Resumption Function | RP-54 | RP-111714 | approved | R2 | R2-76 | R2-116533 | agreed | 2011-12-09 | MBMS_LTE_enh-Core | - | 2011-12-10 |
0417 | 1 | F | Rel-11 | 10.5.0 | 11.0.0 | MME behavior in case of broken SCTP connection | RP-54 | RP-111644 | approved | Vodafone | - | - | - | 2011-12-09 | TEI11 | company contribution; note: This CR was developed in RAN3 as R3-112760 and it did not pass email agreement in RAN2 (R2-116534) as wrong spec version was indicated on CR cover | 2011-12-10 |
0418 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Routing of MME Direct Information Transfer message | RP-54 | RP-111711 | approved | R2 | R2-76 | R2-116535 | agreed | 2011-12-09 | TEI10, EHNB-RAN3 | - | 2011-12-10 |
0419 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Correction of support for Mobility Robustness Optimisation | RP-54 | RP-111714 | approved | R2 | R2-76 | R2-116536 | agreed | 2011-12-09 | SONenh_LTE-Core | - | 2011-12-10 |
0420 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Clarification of MRO Unnecessary Handover | RP-54 | RP-111714 | approved | R2 | R2-76 | R2-116537 | agreed | 2011-12-09 | SONenh_LTE-Core | MRO = Mobility Robustness Optimization | 2011-12-10 |
0421 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Correction of the MRO stage-2 description | RP-54 | RP-111716 | approved | R2 | R2-76 | R2-116538 | agreed | 2011-12-09 | TEI10, LTE-L23 | Mobility Robustness Optimization | 2011-12-10 |
0422 | - | C | Rel-11 | 10.5.0 | 11.0.0 | Addition of M3 Setup | RP-54 | RP-111721 | approved | R2 | R2-76 | R2-116539 | agreed | 2011-12-09 | TEI11, MBMS_LTE | - | 2011-12-10 |
0423 | - | C | Rel-11 | 10.5.0 | 11.0.0 | Correction of MCCH Update Synchronization mechanism | RP-54 | RP-111721 | approved | R2 | R2-76 | R2-116540 | agreed | 2011-12-09 | TEI11, MBMS_LTE | - | 2011-12-10 |
0424 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Correction to the handling of RRC container during the inter-RAT handover | RP-55 | RP-120327 | approved | R2 | R2-77 | R2-120813 | agreed | 2012-03-02 | TEI10 | - | 2012-03-02 |
0425 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Correction to the handling of RRC container during the inter-RAT handover | RP-55 | RP-120327 | approved | R2 | R2-77 | R2-120814 | agreed | 2012-03-02 | TEI10 | - | 2012-03-02 |
0431 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction on MME/eNB behaviour in case of broken SCTP connection | RP-55 | RP-120329 | approved | R2 | R2-77 | R2-120920 | agreed | 2012-03-02 | TEI11 | - | 2012-03-02 |
0432 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of Emergency Call | RP-55 | RP-120329 | approved | R2 | R2-77 | R2-120921 | agreed | 2012-03-02 | TEI11 | - | 2012-03-02 |
0433 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Correction on unnecessary HO | RP-55 | RP-120232 | approved | R2 | R2-77 | R2-120922 | agreed | 2012-03-02 | SONenh_LTE-Core | - | 2012-03-02 |
0434 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Correction on unnecessary HO | RP-55 | RP-120232 | approved | R2 | R2-77 | R2-120923 | agreed | 2012-03-02 | SONenh_LTE-Core | - | 2012-03-02 |
0435 | - | F | Rel-11 | 11.0.0 | 11.1.0 | CR for clarification of eMBMS architecture description | RP-55 | RP-120326 | approved | R2 | R2-77 | R2-120924 | agreed | 2012-03-02 | MBMS_LTE_enh-Core, TEI11 | - | 2012-03-02 |
0436 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Restriction on Rel-10 X2-based handover between HeNBs | RP-55 | RP-120326 | approved | R2 | R2-77 | R2-120925 | agreed | 2012-03-02 | HNB_HENB_mob_enh-Core | - | 2012-03-02 |
0437 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Restriction on Rel-10 X2-based handover between HeNBs | RP-55 | RP-120326 | approved | R2 | R2-77 | R2-120926 | agreed | 2012-03-02 | HNB_HENB_mob_enh-Core | - | 2012-03-02 |
0438 | - | B | Rel-11 | 11.1.0 | - | Introduction of Carrier aggregation enhancements | - | - | - | - | R2-78 | R2-122076 | revised | 2012-06-15 | LTE_CA_enh-Core | - | 2012-06-16 |
0438 | 1 | B | Rel-11 | 11.1.0 | - | Introduction of Carrier aggregation enhancements | - | - | - | - | R2-78 | R2-123022 | endorsed | 2012-06-15 | LTE_CA_enh-Core | - | 2012-06-16 |
0439 | - | B | Rel-11 | 11.1.0 | - | Introduction of service contimuity improvements for MBMS on LTE | - | - | - | - | R2-78 | R2-122078 | revised | 2012-06-15 | MBMS_LTE_SC-Core | - | 2012-06-16 |
0439 | 1 | B | Rel-11 | 11.1.0 | - | Introduction of service contimuity improvements for MBMS on LTE | - | - | - | - | R2-78 | R2-123101 | revised | 2012-06-15 | MBMS_LTE_SC-Core | - | 2012-06-16 |
0439 | 2 | B | Rel-11 | 11.1.0 | - | Introduction of service contimuity improvements for MBMS on LTE | - | - | - | - | R2-78 | R2-123159 | revised | 2012-06-15 | MBMS_LTE_SC-Core | - | 2012-06-16 |
0439 | 3 | B | Rel-11 | 11.1.0 | 11.2.0 | Introduction of service continuity improvements for MBMS on LTE | RP-56 | RP-120821 | approved | R2 | R2-78 | R2-123190 | agreed | 2012-06-15 | MBMS_LTE_SC-Core | - | 2012-06-16 |
0440 | - | B | Rel-11 | 11.1.0 | - | Stage-2 agreements on signalling and procedure for interference avoidance for IDC | - | - | - | - | R2-78 | R2-122079 | withdrawn | 2012-06-15 | SPIA_IDC_LTE-Core | - | 2012-06-16 |
0441 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Clarification on networking sharing for MBMS | RP-56 | RP-120807 | approved | R2 | R2-78 | R2-122080 | agreed | 2012-06-15 | MBMS_LTE, TEI11 | - | 2012-06-16 |
0443 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Correction to Measurement Restriction Description of eICIC in 36.300 | RP-56 | RP-120812 | approved | R2 | R2-78 | R2-123072 | agreed | 2012-06-15 | eICIC_LTE-Core | - | 2012-06-16 |
0444 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Correction to Measurement Restriction Description of eICIC in 36.300 | RP-56 | RP-120812 | approved | R2 | R2-78 | R2-123073 | agreed | 2012-06-15 | eICIC_LTE-Core | - | 2012-06-16 |
0445 | - | B | Rel-11 | 11.1.0 | 11.2.0 | Introduction of Absolute Priority Based Cell Reselection to CELL_FACH in 36.300 | RP-56 | RP-120817 | approved | R2 | R2-78 | R2-123041 | agreed | 2012-06-15 | Cell_FACH_enh-Core | - | 2012-06-16 |
0446 | - | B | Rel-11 | 11.1.0 | - | Stage-2 CR on signalling and procedure for interference avoidance for IDC | - | - | - | - | R2-78 | R2-122329 | revised | 2012-06-15 | SPIA_IDC_LTE-Core | - | 2012-06-16 |
0446 | 1 | B | Rel-11 | 11.1.0 | 11.2.0 | Stage-2 CR on signalling and procedure for interference avoidance for IDC | RP-56 | RP-120823 | approved | R2 | R2-78 | R2-123111 | agreed | 2012-06-15 | SPIA_IDC_LTE-Core | - | 2012-06-16 |
0450 | - | B | Rel-11 | 11.1.0 | - | Stage 2 CR on eDDA UE assistance information | - | - | - | - | R2-78 | R2-123109 | revised | 2012-06-15 | LTE_eDDA-Core | - | 2012-06-16 |
0450 | 1 | B | Rel-11 | 11.1.0 | - | Stage 2 CR on eDDA UE assistance information | - | - | - | - | R2-78 | R2-123123 | revised | 2012-06-15 | LTE_eDDA-Core | - | 2012-06-16 |
0450 | 2 | B | Rel-11 | 11.1.0 | - | Stage 2 CR on eDDA UE assistance information | - | - | - | - | R2-78 | R2-123144 | revised | 2012-06-15 | LTE_eDDA-Core | - | 2012-06-16 |
0450 | 3 | B | Rel-11 | 11.1.0 | 11.2.0 | Stage 2 CR on eDDA UE assistance information | RP-56 | RP-120822 | approved | R2 | R2-78 | R2-123160 | agreed | 2012-06-15 | LTE_eDDA-Core | - | 2012-06-16 |
0451 | - | F | Rel-10 | 10.7.0 | - | Korean Public Alert System (KPAS) in relation to CMAS | - | - | - | - | R2-78 | R2-122940 | revised | 2012-06-15 | PWS-RAN, TEI10 | - | 2012-06-16 |
0451 | 1 | F | Rel-10 | 10.7.0 | 10.8.0 | Korean Public Alert System (KPAS) in relation to CMAS | RP-56 | RP-120813 | approved | R2 | R2-78 | R2-123122 | agreed | 2012-06-15 | PWS-RAN, TEI10 | note: 36.300 REL-11 exists already; cat.A REL-11 part of this CR is merged into CR R2-123078; | 2012-06-16 |
0452 | - | F | Rel-11 | 11.1.0 | - | Korean Public Alert System (KPAS) and EU-Alert in relation to CMAS | - | - | - | - | R2-78 | R2-123078 | revised | 2012-06-15 | PWS-RAN, TEI11 | - | 2012-06-16 |
0452 | 1 | C | Rel-11 | 11.1.0 | 11.2.0 | Korean Public Alert System (KPAS) and EU-Alert in relation to CMAS | RP-56 | RP-120813 | approved | R2 | R2-78 | R2-123163 | agreed | 2012-06-15 | PWS-RAN, TEI11 | - | 2012-06-16 |
0453 | - | B | Rel-11 | 11.1.0 | - | Introduction of MDT enhancements - multi-PLMN RLF Report | - | - | - | - | R2-78 | R2-123099 | revised | 2012-06-15 | eMDT_UMTSLTE-Core | - | 2012-06-16 |
0453 | 1 | B | Rel-11 | 11.1.0 | 11.2.0 | Introduction of MDT enhancements - multi-PLMN RLF Report | RP-56 | RP-120819 | approved | R2 | R2-78 | R2-123157 | agreed | 2012-06-15 | eMDT_UMTSLTE-Core | - | 2012-06-16 |
0454 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Correction of eMBMS architecture deployment consideration | RP-56 | RP-120807 | approved | R2 | R2-78 | R2-123010 | agreed | 2012-06-15 | MBMS_LTE, TEI10 | contact: NEC; no REL-11 cat.A CR as for REL-11 the relevant description has already been modified by an earlier CR (CR0435) | 2012-06-16 |
0455 | - | F | Rel-11 | 11.1.0 | - | Adding missing definition in the specification | - | - | - | - | R2-78 | R2-123011 | rejected | 2012-06-15 | SONenh_LTE-Core, TEI11 | - | 2012-06-16 |
0456 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Correction on Session Start and Session Stop procedure | RP-56 | RP-120811 | approved | R2 | R2-78 | R2-123012 | agreed | 2012-06-15 | TEI11, LTE-interfaces | contact: Samsung | 2012-06-16 |
0457 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Correction of the MRO definitions | RP-56 | RP-120812 | approved | R2 | R2-78 | R2-123013 | agreed | 2012-06-15 | SONenh_LTE-Core, TEI11 | contact: Alcatel-Lucent | 2012-06-16 |
0458 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Clarification on MME's support for inter-PLMN handover to CSG and hybrid cells | RP-56 | RP-120812 | approved | R2 | R2-78 | R2-123014 | agreed | 2012-06-15 | HNB_HENB_mob_enh | contact: New Postcom | 2012-06-16 |
0459 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Clarification on MME's support for inter-PLMN handover to CSG and hybrid cells | RP-56 | RP-120812 | approved | R2 | R2-78 | R2-123015 | agreed | 2012-06-15 | HNB_HENB_mob_enh, TEI11 | contact: New Postcom | 2012-06-16 |
0460 | - | F | Rel-10 | 10.7.0 | - | GUMMEI handling by RN and HeNB | - | - | - | - | R2-78 | R2-123016 | revised | 2012-06-15 | TEI10, LTE-interfaces | - | 2012-06-16 |
0460 | 1 | F | Rel-10 | 10.7.0 | 10.8.0 | GUMMEI handling by RN and HeNB | RP-56 | RP-120811 | approved | R2 | R2-78 | R2-123023 | agreed | 2012-06-15 | TEI10, LTE-interfaces | contact: Huawei | 2012-06-16 |
0461 | - | A | Rel-11 | 11.1.0 | 11.2.0 | GUMMEI handling by RN and HeNB | RP-56 | RP-120811 | approved | R2 | R2-78 | R2-123017 | agreed | 2012-06-15 | TEI10, LTE-interfaces | contact: Huawei | 2012-06-16 |
0462 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Clarification on TAC in X2 Setup | RP-56 | RP-120811 | approved | R2 | R2-78 | R2-123018 | agreed | 2012-06-15 | TEI11, LTE-interfaces | contact: Huawei | 2012-06-16 |
0463 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Correction of Session Update | RP-56 | RP-120811 | approved | R2 | R2-78 | R2-123019 | agreed | 2012-06-15 | TEI11, LTE-interfaces | contact: Alcatel-Lucent | 2012-06-16 |
0464 | - | B | Rel-11 | 11.1.0 | 11.2.0 | Addition of Energy Saving function for Inter-RAT scenario | RP-56 | RP-120824 | approved | R2 | R2-78 | R2-123020 | agreed | 2012-06-15 | Netw_Energy_LTE-Core | contact: CMCC | 2012-06-16 |
0465 | - | F | Rel-11 | 11.1.0 | 11.2.0 | MCE and MBSFN role for distributed MCE architecture | RP-56 | RP-120807 | approved | R2 | R2-78 | R2-123021 | agreed | 2012-06-15 | TEI11, MBMS_LTE | contact: Huawei | 2012-06-16 |
0466 | - | B | Rel-11 | 11.1.0 | - | Introduction of EAB in 36.300 | - | - | - | - | R2-78 | R2-123047 | endorsed | 2012-06-15 | SIMTC-RAN_OC-Core | - | 2012-06-16 |
0467 | - | F | Rel-8 | 8.12.0 | - | PCI range note on RAN sharing | RP-56 | RP-120626 | withdrawn | TeliaSonera | - | - | - | 2012-06-15 | LTE-L23 | company contribution; | 2012-06-16 |
0468 | - | A | Rel-9 | 9.9.0 | - | PCI range note on RAN sharing | RP-56 | RP-120627 | withdrawn | TeliaSonera | - | - | - | 2012-06-15 | LTE-L23 | company contribution; | 2012-06-16 |
0469 | - | A | Rel-10 | 10.7.0 | - | PCI range note on RAN sharing | RP-56 | RP-120628 | withdrawn | TeliaSonera | - | - | - | 2012-06-15 | LTE-L23 | company contribution; | 2012-06-16 |
0470 | - | A | Rel-11 | 11.1.0 | - | PCI range note on RAN sharing | RP-56 | RP-120629 | revised | TeliaSonera | - | - | - | 2012-06-15 | LTE-L23 | company contribution; | 2012-06-16 |
0470 | 1 | F | Rel-11 | 11.1.0 | 11.2.0 | PCI range note on RAN sharing | RP-56 | RP-120881 | approved | TeliaSonera | - | - | - | 2012-06-15 | LTE-L23 | company contribution;^^only REL-11 CR considered now (compare RP-120626, RP-120627, RP-120628 and RP-120629) | 2012-06-16 |
0472 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Introduction of EAB in 36.300 | RP-57 | RP-121371 | approved | R2 | R2-79 | R2-124300 | agreed | 2012-08-17 | SIMTC-RAN_OC-Core | - | 2012-09-04 |
0475 | - | F | Rel-11 | 11.2.0 | - | Corrections to physical channels of RN and the number of measurement types | RP-57 | RP-121362 | reissued | R2 | R2-79 | R2-124247 | agreed | 2012-09-02 | LTE_Relay-Core, TEI11 | - | 2012-09-04 |
0475 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to physical channels of RN and the number of measurement types | RP-57 | RP-121395 | approved | R2 | R2-79 | R2-124247 | agreed | 2012-09-02 | LTE_Relay-Core, TEI11 | - | 2012-09-04 |
0476 | - | B | Rel-11 | 11.2.0 | - | Draft 36.300 CR NBPS Support in LTE | - | - | - | - | R2-79 | R2-124317 | revised | 2012-09-07 | LCS_LTE-NBPS-Core | - | 2012-09-10 |
0476 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Network Based Positioning Support | RP-57 | RP-121374 | approved | R2 | R2-79 | R2-124330 | agreed | 2012-08-16 | LCS_LTE-NBPS-Core | - | 2012-09-04 |
0479 | - | F | Rel-10 | 10.8.0 | - | Corrections on mobility to CSG and hybrid cells | - | - | - | - | R2-79 | R2-124120 | revised | 2012-09-07 | LTE-L23, TEI10 | - | 2012-09-10 |
0479 | 1 | F | Rel-10 | 10.8.0 | - | Corrections on mobility to CSG and hybrid cells | - | - | - | - | R2-79 | R2-124339 | not treated | 2012-09-07 | LTE-L23, TEI10 | - | 2012-09-10 |
0480 | - | A | Rel-11 | 11.2.0 | - | Corrections on mobility to CSG and hybrid cells | - | - | - | - | R2-79 | R2-124121 | revised | 2012-09-07 | LTE-L23, TEI10 | - | 2012-09-10 |
0480 | 1 | A | Rel-11 | 11.2.0 | - | Corrections on mobility to CSG and hybrid cells | - | - | - | - | R2-79 | R2-124340 | not treated | 2012-09-07 | LTE-L23, TEI10 | - | 2012-09-10 |
0481 | - | B | Rel-11 | 11.2.0 | 11.3.0 | CR on the addition of the stage-2 agreements on IDC | RP-57 | RP-121379 | approved | R2 | R2-79 | R2-124311 | agreed | 2012-08-25 | SPIA_IDC_LTE-Core | - | 2012-09-04 |
0483 | - | B | Rel-11 | 11.2.0 | - | Introduction of Carrier aggregation enhancements | - | - | - | - | R2-79 | R2-124259 | revised | 2012-09-07 | LTE_CA_enh-Core | - | 2012-09-10 |
0483 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Introduction of Carrier aggregation enhancements | RP-57 | RP-121377 | approved | R2 | R2-79 | R2-124366 | agreed | 2012-09-02 | LTE_CA_enh-Core | - | 2012-09-04 |
0488 | - | B | Rel-11 | 11.2.0 | - | Introduction of CoMP Resource Management | RP-57 | RP-121380 | postponed | R2 | R2-79 | R2-124267 | agreed | 2012-08-17 | COMP_LTE_DL-Core | - | 2012-09-04 |
0492 | - | C | Rel-11 | 11.2.0 | - | Location Information in Event Ax, Bx measurement report for Immediate MDT | - | - | - | - | R2-79 | R2-124327 | revised | 2012-09-07 | eMDT_UMTSLTE-Core | note: CR was requested for 36.300 but includes a CR for 37.320 misusing the CR number; contents is merged into R2-124353 | 2012-09-10 |
0493 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Support of MBMS Service Continuity | RP-57 | RP-121137 | approved | R2 | - | R2-124281 | - | 2012-08-22 | MBMS_LTE_SC-Core | - | 2012-09-11 |
0494 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Correction of GUMMEI | RP-57 | RP-121140 | approved | R2 | R2-79 | R2-124282 | agreed | 2012-09-07 | TEI11 | contact: Alcatel-Lucent | 2012-09-11 |
0495 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Verification of HeNB Identity | RP-57 | RP-121382 | approved | R2 | R2-79 | R2-124283 | agreed | 2012-08-22 | TEI11 | - | 2012-09-04 |
0496 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Introduction of UE Radio Capability Match procedure | RP-57 | RP-121140 | approved | R2 | R2-79 | R2-124284 | agreed | 2012-09-07 | TEI11 | contact: Ericsson | 2012-09-10 |
0497 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Support for inter-RAT MRO | RP-57 | RP-121372 | approved | R2 | R2-79 | R2-124285 | agreed | 2012-08-22 | SONenh2_LTE_UTRA-Core | - | 2012-09-04 |
0498 | - | B | Rel-11 | 11.2.0 | 11.3.0 | EAB for CN Overload Control | RP-57 | RP-121140 | approved | R2 | R2-79 | R2-124286 | agreed | 2012-09-07 | SIMTC-RAN_OC-Core, TEI11 | contact: Alcatel-Lucent | 2012-09-10 |
0499 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Description of the failure information retrieval function for SON MRO purposes | RP-57 | RP-121372 | approved | R2 | R2-79 | R2-124287 | agreed | 2012-08-22 | SONenh2_LTE_UTRA-Core | - | 2012-09-04 |
0500 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Description of the inter-RAT ping-pong problem | RP-57 | RP-121372 | approved | R2 | R2-79 | R2-124288 | agreed | 2012-08-22 | SONenh2_LTE_UTRA-Core | - | 2012-09-04 |
0501 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Addition of UE measurements solution for Inter-RAT energy saving scenario | RP-57 | RP-121138 | approved | R2 | R2-79 | R2-124289 | agreed | 2012-09-07 | Netw_Energy_LTE-Core | contact: KPN | 2012-09-11 |
0502 | - | B | Rel-11 | 11.3.0 | 11.4.0 | Addition of the stage-2 agreements on IDC | RP-58 | RP-121953 | approved | R2 | R2-80 | R2-125260 | agreed | 2012-12-07 | SPIA_IDC_LTE-Core | - | 2012-12-04 |
0503 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification on PCell SIB15 | RP-58 | RP-121940 | approved | R2 | R2-80 | R2-125261 | agreed | 2012-12-07 | MBMS_LTE_SC-Core | - | 2012-12-04 |
0504 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification on Radio link failure recovery | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-125262 | agreed | 2012-12-07 | LTE-L23, TEI11 | - | 2012-12-04 |
0505 | - | B | Rel-11 | 11.3.0 | 11.4.0 | CR to 36.300 on introducing ROHC context continue for intra-ENB handover | RP-58 | RP-121959 | approved | R2 | R2-80 | R2-125263 | agreed | 2012-12-07 | LTE-L23, TEI11 | - | 2012-12-04 |
0506 | - | C | Rel-11 | 11.3.0 | 11.4.0 | Introduction of network sharing for CDMA2000 inter-working | RP-58 | RP-121958 | approved | R2 | R2-80 | R2-125264 | agreed | 2012-12-07 | LTE-L23, TEI11 | - | 2012-12-04 |
0510 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction on effect of MBMS on unicast mobility procedures | RP-58 | RP-121932 | approved | R2 | R2-80 | R2-125875 | agreed | 2012-12-07 | MBMS_LTE, TEI11 | - | 2012-12-04 |
0512 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification on sending timing advance updates | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-126004 | agreed | 2012-12-07 | LTE-L23, TEI11 | - | 2012-12-04 |
0513 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification on inter-RAT handover | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-125866 | agreed | 2012-12-07 | LTE-L23, TEI11 | - | 2012-12-04 |
0516 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Correction to padding on RLC UM PDU corresponding to MTCH/MCCH | RP-58 | RP-121932 | approved | R2 | R2-80 | R2-125876 | agreed | 2012-12-07 | MBMS_LTE | - | 2012-12-04 |
0517 | - | A | Rel-10 | 10.8.0 | 10.9.0 | Correction to padding on RLC UM PDU corresponding to MTCH/MCCH | RP-58 | RP-121932 | approved | R2 | R2-80 | R2-125877 | agreed | 2012-12-07 | MBMS_LTE | - | 2012-12-04 |
0518 | - | A | Rel-11 | 11.3.0 | 11.4.0 | Correction to padding on RLC UM PDU corresponding to MTCH/MCCH | RP-58 | RP-121932 | approved | R2 | R2-80 | R2-125878 | agreed | 2012-12-07 | MBMS_LTE | - | 2012-12-04 |
0519 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Stage 2 aspects of UE assistance information | RP-58 | RP-121952 | approved | R2 | R2-80 | R2-125899 | agreed | 2012-12-07 | LTE_eDDA-Core | - | 2012-12-04 |
0520 | - | F | Rel-11 | 11.3.0 | - | Clarification on Power Preference Indication and QoS requirements | - | - | - | - | R2-80 | R2-126057 | postponed | 2012-12-07 | LTE_eDDA-Core | - | 2012-12-04 |
0521 | - | B | Rel-11 | 11.3.0 | 11.4.0 | Stage 2 for the FeICIC | RP-58 | RP-121950 | approved | R2 | R2-80 | R2-126033 | agreed | 2012-12-07 | eICIC_enh_LTE-Core | - | 2012-12-04 |
0522 | - | F | Rel-10 | 10.8.0 | - | Corrections on mobility to CSG and hybrid cells | - | - | - | - | R2-80 | R2-126018 | postponed | 2012-12-07 | LTE-L23, TEI10 | - | 2012-12-04 |
0523 | - | A | Rel-11 | 11.3.0 | - | Corrections on mobility to CSG and hybrid cells | - | - | - | - | R2-80 | R2-126019 | postponed | 2012-12-07 | LTE-L23, TEI10 | - | 2012-12-04 |
0525 | - | F | Rel-11 | 11.3.0 | - | Corrections to UE assistance information for RRM and UE power optimisation | - | - | - | - | R2-80 | R2-125836 | not treated | 2012-12-07 | LTE_eDDA-Core | - | 2012-12-04 |
0526 | - | F | Rel-9 | 9.9.0 | 9.10.0 | correction for Inter-RAT ANR | RP-58 | RP-121933 | approved | R2 | R2-80 | R2-125888 | agreed | 2012-12-07 | LTE-L23, TEI9 | - | 2012-12-04 |
0527 | - | A | Rel-10 | 10.8.0 | 10.9.0 | correction for Inter-RAT ANR | RP-58 | RP-121933 | approved | R2 | R2-80 | R2-125889 | agreed | 2012-12-07 | LTE-L23, TEI9 | - | 2012-12-04 |
0528 | - | A | Rel-11 | 11.3.0 | 11.4.0 | correction for Inter-RAT ANR | RP-58 | RP-121933 | approved | R2 | R2-80 | R2-125890 | agreed | 2012-12-07 | LTE-L23, TEI9 | - | 2012-12-04 |
0529 | - | B | Rel-11 | 11.3.0 | - | Introduction of CoMP | - | - | - | - | R2-80 | R2-126067 | revised | 2012-12-07 | COMP_LTE_DL-Core, COMP_LTE_UL-Core | - | 2012-12-04 |
0529 | 1 | B | Rel-11 | 11.3.0 | 11.4.0 | Introduction of CoMP | RP-58 | RP-121955 | approved | R2 | R2-80 | R2-126076 | agreed | 2012-12-07 | COMP_LTE_DL-Core, COMP_LTE_UL-Core | - | 2012-12-04 |
0530 | - | B | Rel-11 | 11.3.0 | 11.4.0 | HeNB Mobility enhancement | RP-58 | RP-121948 | approved | R2 | R2-80 | R2-125971 | agreed | 2012-12-07 | EHNB_enh1-Core | contact: Nokia Siemens Networks, Ericsson, Qualcomm Incorporated, Interdigital, LG Electronics, CATT, New Postcom, ZTE, Samsung, NEC, Alcatel-Lucent, Huawei | 2012-12-04 |
0531 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Verification of HeNB | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-125972 | agreed | 2012-12-07 | TEI11 | contact: Samsung | 2012-12-04 |
0532 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification of scenario for Handover Report procedure | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-125974 | agreed | 2012-12-07 | TEI11 | contact: New Postcom, Alcatel-Lucent, Nokia Siemens Networks, Huawei | 2012-12-04 |
0533 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction of GUMMEI Type for RN | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-125975 | agreed | 2012-12-07 | TEI11 | contact: CATT, Nokia Siemens Networks, Alcatel-Lucent, CMCC, LG Electronics Inc., NEC, Qualcomm Incorporated,Samsung, Vodafone, ZTE, Institute for Information Industry (III) | 2012-12-04 |
0534 | - | B | Rel-11 | 11.3.0 | 11.4.0 | UE context release in source HeNB GW after X2 handover from HeNB to eNB | RP-58 | RP-121948 | approved | R2 | R2-80 | R2-125976 | agreed | 2012-12-07 | EHNB_enh1-Core | contact: Huawei | 2012-12-04 |
0535 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of the stage-2 MRO specification for inter-RAT failure detection | RP-58 | RP-121947 | approved | R2 | R2-80 | R2-125978 | agreed | 2012-12-07 | SONenh2_LTE_UTRA-Core | contact: Nokia Siemens Networks | 2012-12-04 |
0536 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of the stage-2 MRO specification for intra-RAT HetNet failure detection | RP-58 | RP-121947 | approved | R2 | R2-80 | R2-125979 | agreed | 2012-12-07 | SONenh2_LTE_UTRA-Core | contact: Nokia Siemens Networks | 2012-12-04 |
0537 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of the stage-2 MRO specification for inter-RAT ping-pong detection | RP-58 | RP-121947 | approved | R2 | R2-80 | R2-125980 | agreed | 2012-12-07 | SONenh2_LTE_UTRA-Core | contact: Nokia Siemens Networks | 2012-12-04 |
0538 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Restriction of Resource Allocation during SCell activation | RP-58 | RP-121936 | approved | R2 | R2-80 | R2-125983 | agreed | 2012-12-07 | LTE_CA-Core, TEI11 | contact: Alcatel-Lucent, Nokia Siemens Networks | 2012-12-04 |
0539 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Misc corrections on MBMS | RP-58 | RP-121932 | approved | R2 | R2-80 | R2-125984 | agreed | 2012-12-07 | MBMS_LTE, TEI11 | contact: Nokia Siemens Networks | 2012-12-04 |
0540 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction on UE Radio Capability Match | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-125985 | agreed | 2012-12-07 | TEI11 | contact: Huawei | 2012-12-04 |
0541 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification on the use of HRL in GWCN scenarios | RP-58 | RP-121957 | approved | R2 | R2-80 | R2-125990 | agreed | 2012-12-07 | TEI11 | contact: Ericsson, Huawei | 2012-12-04 |
0542 | - | B | Rel-11 | 11.3.0 | 11.4.0 | Membership Verification for HeNB Enhanced Mobility | RP-58 | RP-121732 | approved | R3 | R3-78 | R2-125991 | agreed | 2012-12-07 | EHNB_enh1-Core | contact: Ericsson | 2012-12-04 |
0543 | - | B | Rel-11 | 11.3.0 | 11.4.0 | New Information for BBF access | RP-58 | RP-121739 | approved | R3 | R3-78 | R3-122915 | tech endorsed | 2012-11-30 | BBAI | Approval conditional on other CRs at SP-58 | 2012-12-02 |
0544 | - | F | Rel-11 | 11.4.0 | - | Clarification on the ANR when UTRAN is shared | - | - | - | - | R2-81 | R2-130672 | revised | 2013-03-01 | TEI11 | - | 2013-03-03 |
0544 | 1 | F | Rel-11 | 11.4.0 | - | Clarification on the ANR when UTRAN is shared | - | - | - | - | R2-81 | R2-130885 | revised | 2013-03-01 | TEI11 | - | 2013-03-03 |
0544 | 2 | F | Rel-11 | 11.4.0 | 11.5.0 | Clarification on the ANR when UTRAN is shared | RP-59 | RP-130248 | approved | R2 | R2-81 | R2-130891 | agreed | 2013-03-01 | TEI11 | - | 2013-02-25 |
0545 | - | F | Rel-11 | 11.4.0 | 11.5.0 | IDC Problem Reporting | RP-59 | RP-130241 | approved | R2 | R2-81 | R2-130833 | agreed | 2013-03-01 | SPIA_IDC_LTE-Core | - | 2013-02-25 |
0548 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Corrections on mobility to CSG and hybrid cells | RP-59 | RP-130247 | approved | R2 | R2-81 | R2-130653 | agreed | 2013-03-01 | TEI11 | - | 2013-02-25 |
0550 | - | F | Rel-11 | 11.4.0 | 11.5.0 | 36300 CR(Rel-11)_Miscellaneous correction to 36.300 on handover | RP-59 | RP-130248 | approved | R2 | R2-81 | R2-130817 | agreed | 2013-03-01 | TEI11, LTE-L23 | - | 2013-02-25 |
0551 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Clarification on PS handover from GERAN to EUTRAN | RP-59 | RP-130248 | approved | R2 | R2-81 | R2-130673 | agreed | 2013-03-01 | TEI11 | - | 2013-02-25 |
0556 | - | B | Rel-11 | 11.4.0 | 11.5.0 | Introduction of EPDCCH in TS 36.300 | RP-59 | RP-130241 | approved | R2 | R2-81 | R2-130840 | agreed | 2013-03-01 | LTE_enh_dl_ctrl-Core | - | 2013-02-25 |
0557 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Clarifying the impact of PPI on QoS | RP-59 | RP-130241 | approved | R2 | R2-81 | R2-130827 | agreed | 2013-03-01 | LTE_eDDA-Core | - | 2013-02-25 |
0559 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Correction of BBF Access Interworking | RP-59 | RP-130241 | approved | R2 | R2-81 | R2-130687 | agreed | 2013-03-01 | TEI11, BBAI | - | 2013-02-25 |
0560 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Correction of GUMMEI Type mandatory inclusion | RP-59 | RP-130248 | approved | R2 | R2-81 | R2-130688 | agreed | 2013-03-01 | TEI11 | - | 2013-02-25 |
0561 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Correction of IRAT MRO | RP-59 | RP-130240 | approved | R2 | R2-81 | R2-130689 | agreed | 2013-03-01 | SONenh2_LTE_UTRA-Core | - | 2013-02-25 |
0562 | - | F | Rel-11 | 11.4.0 | - | Clarification on the Absence of HRL | - | - | - | - | R2-81 | R2-130690 | revised | 2013-03-01 | TEI11 | - | 2013-03-03 |
0562 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Clarification on the Absence of HRL | RP-59 | RP-130248 | approved | R2 | R2-81 | R2-130695 | agreed | 2013-03-01 | TEI11 | - | 2013-02-25 |
0563 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Correction of update of MBMS parameters | RP-59 | RP-130248 | approved | R2 | R2-81 | R2-130691 | agreed | 2013-03-01 | TEI11 | - | 2013-02-25 |
0564 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Introduction of SIB16 | RP-60 | RP-130809 | approved | R2 | R2-82 | R2-131592 | agreed | 2013-06-14 | LTE-L23, TEI11 | - | 2013-06-15 |
0565 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Correction of timing reference of sTAG | RP-60 | RP-130808 | approved | R2 | R2-82 | R2-131593 | agreed | 2013-06-14 | LTE_CA_enh-Core | - | 2013-06-15 |
0566 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Correction on physical layer part on TS36.300 | RP-60 | RP-130809 | approved | R2 | R2-82 | R2-131618 | agreed | 2013-06-14 | LTE-Phys, TEI11 | CR was endorsed by RAN1 | 2013-06-15 |
0570 | - | F | Rel-10 | 10.9.0 | 10.10.0 | Correction to correlation ID in LIPA | RP-60 | RP-130805 | approved | R2 | R2-82 | R2-132168 | agreed | 2013-06-14 | TEI10 | contact: New Postcom | 2013-06-15 |
0571 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Correction to correlation ID in LIPA | RP-60 | RP-130805 | approved | R2 | R2-82 | R2-132169 | agreed | 2013-06-14 | TEI10 | contact: New Postcom | 2013-06-15 |
0572 | - | F | Rel-10 | 10.9.0 | 10.10.0 | Correction on the another secured interface for LIPA | RP-60 | RP-130804 | approved | R2 | R2-82 | R2-132170 | agreed | 2013-06-14 | LIPA_SIPTO | contact: NEC | 2013-06-15 |
0573 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Correction on the another secured interface for LIPA | RP-60 | RP-130804 | approved | R2 | R2-82 | R2-132171 | agreed | 2013-06-14 | LIPA_SIPTO | contact: NEC | 2013-06-15 |
0574 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification on area restriction information propagation | RP-60 | RP-130809 | approved | R2 | R2-82 | R2-132172 | agreed | 2013-06-14 | TEI11 | contact: Ericsson, Samsung, Huawei, Nokia Siemens Networks | 2013-06-15 |
0575 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Correction on the update of time of MBMS data transfer | RP-60 | RP-130809 | approved | R2 | R2-82 | R2-132173 | agreed | 2013-06-14 | TEI11 | contact: Huawei | 2013-06-15 |
0576 | - | F | Rel-10 | 10.9.0 | 10.10.0 | Correction on RLF Indication procedure | RP-60 | RP-130640 | approved | R2 | R2-82 | R2-132174 | agreed | 2013-06-14 | TEI10 | contact: CATT, New Postcom, ZTE, Nokia Siemens Networks | 2013-06-15 |
0577 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Correction on RLF Indication procedure | RP-60 | RP-130640 | approved | R2 | R2-82 | R2-132175 | agreed | 2013-06-14 | TEI10 | contact: CATT, Nokia Siemens Networks, New Postcom, ZTE, Alcatel-Lucent | 2013-06-15 |
0578 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification on the UE reported timer in MRO | RP-60 | RP-130809 | approved | R2 | R2-82 | R2-132176 | agreed | 2013-06-14 | TEI11 | contact: Fujitsu | 2013-06-15 |
0581 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Modification to CA downlink timing difference | RP-61 | RP-131315 | approved | R2 | - | R2-132982 | agreed | 2013-08-21 | LTE_CA-Core | - | 2013-09-05 |
0582 | - | A | Rel-11 | 11.6.0 | 11.7.0 | Modification to CA downlink timing difference | RP-61 | RP-131315 | approved | R2 | - | R2-132983 | agreed | 2013-08-21 | LTE_CA-Core | - | 2013-09-05 |
0583 | - | F | Rel-11 | 11.6.0 | 11.7.0 | Correction on the MBMS session update | RP-61 | RP-131319 | approved | R2 | - | R2-133021 | agreed | 2013-09-01 | MBMS_LTE_SC-Core | contact: NSN | 2013-09-05 |
0584 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Transfer GRE key to MME for PMIP-based S5 | RP-61 | RP-131315 | approved | R2 | - | R2-133022 | agreed | 2013-08-26 | LIPA_SIPTO | contact: NSN | 2013-09-05 |
0585 | - | A | Rel-11 | 11.6.0 | 11.7.0 | Transfer GRE key to MME for PMIP-based S5 | RP-61 | RP-131315 | approved | R2 | - | R2-133023 | agreed | 2013-08-26 | LIPA_SIPTO | contact: NSN | 2013-09-05 |
0586 | - | F | Rel-11 | 11.6.0 | 11.7.0 | Correction of HeNB Verification | RP-61 | RP-131319 | approved | R2 | - | R2-133024 | agreed | 2013-09-01 | SEC11 | contact: Alcatel-Lucent | 2013-09-05 |
0587 | - | F | Rel-11 | 11.6.0 | 11.7.0 | Correction of Service Area Identity Null | RP-61 | RP-131320 | approved | R2 | - | R2-133025 | agreed | 2013-08-26 | TEI11 | contact: Alcatel-Lucent | 2013-09-05 |
0588 | - | F | Rel-11 | 11.6.0 | - | Correction of terminology concerning the mobility restriction function | - | - | - | - | R2-83 | R2-133045 | rejected | 2013-09-06 | TEI11 | contact: Ericsson; CR could not be agreed due to broken reference and inconsistency with previous releases | 2013-09-08 |
0588 | 1 | F | Rel-11 | 11.6.0 | 11.7.0 | Correction of terminology concerning the mobility restriction function | RP-61 | RP-131152 | approved | Ericsson | - | - | - | 2013-08-27 | TEI11 | company contribution in order to resubmit a RAN3 CR for RAN2 TS 36.300 that could not be agreed by email in RAN2 (broken reference, consistency with REL-8/9/10) | 2013-09-03 |
page generated from database: 2013-10-16 10:34:26