CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 2 F Rel-8 8.0.0 - to 36.331 with Miscellaneous corrections RP-39 RP-080198 revised R2 R2-61 R2-081378 agreed by email 2008-03-04 LTE-L23 company proposal to revise this CR in RP-080163 (update of RP-080131) 2008-03-04
0001 3 F Rel-8 8.0.0 - to 36.331 with Miscellaneous corrections RP-39 RP-080131 revised Panasonic, Alcatel-Lucent, Broadcom Corporation, CATT, Ericsson, Fujitsu, Huawei, Infineon, Motorola, NEC, NTT DoCoMo, Inc., LG Electronics Inc., Qualcomm Europe, Samsung - - - 2008-03-04 LTE-L23 revised in RP-08163 2008-03-04
0001 4 F Rel-8 8.0.0 8.1.0 to 36.331 with Miscellaneous corrections RP-39 RP-080163 approved Panasonic, Alcatel-Lucent, Broadcom Corporation, CATT, Ericsson, Fujitsu, Huawei, Infineon, Motorola, NEC, NTT DoCoMo, Inc., LG Electronics Inc., Qualcomm Europe, Samsung, Nortel, Nokia, Nokia Siemens Networks, ZTE - - - 2008-03-04 LTE-L23 revision of RP-080131, RP-080163 is a proposal to replace RP-080198 2008-03-04
0002 - B Rel-8 8.0.0 - to 36.331 to Convert RRC to agreed ASN.1 format RP-39 RP-080199 revised R2 R2-61 R2-081379 agreed by email 2008-03-04 LTE-L23 company proposal to revise this CR in RP-080164 (update of RP-080132) 2008-03-04
0002 1 B Rel-8 8.0.0 - to 36.331 to convert RRC to agreed ASN.1 format RP-39 RP-080132 revised Panasonic, Ericsson, Alcatel-Lucent, Broadcom Corporation, CATT, Fujitsu, Huawei, Infineon, Motorola, NEC, NTT DoCoMo, Inc., LG Electronics Inc., Qualcomm Europe, Samsung - - - 2008-03-04 LTE-L23 - 2008-03-04
0002 2 B Rel-8 8.0.0 8.1.0 to 36.331 to convert RRC to agreed ASN.1 format RP-39 RP-080164 approved Panasonic, Ericsson, Alcatel-Lucent, Broadcom Corporation, CATT, Fujitsu, Huawei, Infineon, Motorola, NEC, NTT DoCoMo, Inc., LG Electronics Inc., Qualcomm Europe, Samsung, Nortel, Nokia, Nokia Siemens Networks, ZTE - - - 2008-03-04 LTE-L23 - 2008-03-04
0003 - F Rel-8 8.1.0 - Miscellaneous clarifications/ corrections to 36.331 with status after RAN2 #62 RP-40 RP-080413 revised R2 R2-62 R2-082903 agreed 2008-05-27 LTE revised by company contribution in RP-080361 2008-05-27
0003 1 F Rel-8 8.1.0 8.2.0 Miscellaneous clarifications/ corrections to 36.331 with status after RAN2 #62 RP-40 RP-080361 approved Samsung - - - 2008-05-27 LTE revision of RP-080413/R2-082903 2008-05-27
0005 - F Rel-8 8.2.0 8.3.0 on Miscellaneous corrections and clarifications RP-41 RP-080693 approved R2 R2-63 R2-084791 agreed 2008-09-09 LTE-L23 - 2008-09-08
0006 - F Rel-8 8.3.0 8.4.0 Miscellaneous corrections and clarifications RP-42 RP-081021 approved R2 R2-64 R2-087451 agreed 2008-02-12 LTE-L23 proposal to replace this CR by RP-081040 2008-12-02
0006 1 F Rel-8 8.3.0 - Miscellaneous corrections and clarifications RP-42 RP-081040 withdrawn Qualcomm Europe - - - 2008-02-12 LTE-L23 trying to replace R2-087451 in RP-081021 2008-12-02
0007 - F Rel-8 8.4.0 8.5.0 Correction to the Counter Check procedure RP-43 RP-090131 approved R2 R2-65 R2-091013 agreed 2009-03-03 LTE-L23 - 2009-03-02
0008 - F Rel-8 8.4.0 8.5.0 to 36.331-UE Actions on Receiving SIB11 RP-43 RP-090131 approved R2 R2-65 R2-091014 agreed 2009-03-03 LTE-L23 - 2009-03-02
0009 1 F Rel-8 8.4.0 8.5.0 Spare usage on BCCH RP-43 RP-090131 approved R2 R2-65 R2-091692 agreed 2009-03-03 LTE-L23 - 2009-03-02
0010 - F Rel-8 8.4.0 8.5.0 Issues in handling optional IE upon absence in GERAN NCL RP-43 RP-090131 approved R2 R2-65 R2-091016 agreed 2009-03-03 LTE-L23 - 2009-03-02
0011 - F Rel-8 8.4.0 8.5.0 to 36.331 on Removal of useless RLC re-establishment at RB release RP-43 RP-090131 approved R2 R2-65 R2-091017 agreed 2009-03-03 LTE-L23 - 2009-03-02
0012 1 F Rel-8 8.4.0 8.5.0 Clarification to RRC level padding at PCCH and BCCH RP-43 RP-090131 approved R2 R2-65 R2-091693 agreed 2009-03-03 LTE-L23 - 2009-03-02
0013 - F Rel-8 8.4.0 8.5.0 Removal of Inter-RAT message RP-43 RP-090131 approved R2 R2-65 R2-091019 agreed 2009-03-03 LTE-L23 - 2009-03-02
0014 - F Rel-8 8.4.0 8.5.0 Padding of the SRB-ID for security input RP-43 RP-090131 approved R2 R2-65 R2-091020 agreed 2009-03-03 LTE-L23 - 2009-03-02
0015 - F Rel-8 8.4.0 8.5.0 Validity of ETWS SIB RP-43 RP-090131 approved R2 R2-65 R2-091021 agreed 2009-03-03 LTE-L23 - 2009-03-02
0016 1 F Rel-8 8.4.0 8.5.0 Configuration of the Two-Intervals-SPS RP-43 RP-090131 approved R2 R2-65 R2-091694 agreed 2009-03-03 LTE-L23 - 2009-03-02
0017 - F Rel-8 8.4.0 8.5.0 Corrections on Scaling Factor Values of Qhyst RP-43 RP-090131 approved R2 R2-65 R2-091023 agreed 2009-03-03 LTE-L23 - 2009-03-02
0018 1 F Rel-8 8.4.0 8.5.0 Optionality of srsMaxUppts RP-43 RP-090131 approved R2 R2-65 R2-091695 agreed 2009-03-03 LTE-L23 - 2009-03-02
0019 - F Rel-8 8.4.0 8.5.0 for discussion on field name for common and dedicated IE RP-43 RP-090131 approved R2 R2-65 R2-091025 agreed 2009-03-03 LTE-L23 - 2009-03-02
0020 - F Rel-8 8.4.0 8.5.0 Corrections to Connected mode mobility RP-43 RP-090131 approved R2 R2-65 R2-091026 agreed 2009-03-03 LTE-L23 - 2009-03-02
0021 - F Rel-8 8.4.0 8.5.0 Clarification regarding the measurement reporting procedure RP-43 RP-090131 approved R2 R2-65 R2-091027 agreed 2009-03-03 LTE-L23 - 2009-03-02
0022 1 F Rel-8 8.4.0 8.5.0 Corrections on s-Measure RP-43 RP-090131 approved R2 R2-65 R2-091696 agreed 2009-03-03 LTE-L23 - 2009-03-02
0023 1 F Rel-8 8.4.0 8.5.0 R1 of CR0023 (R2-091029) on combination of SPS and TTI bundling for TDD RP-43 RP-090131 approved R2 R2-65 R2-091450 agreed 2009-03-03 LTE-L23 - 2009-03-02
0024 - F Rel-8 8.4.0 8.5.0 L3 filtering for path loss measurements RP-43 RP-090131 approved R2 R2-65 R2-091030 agreed 2009-03-03 LTE-L23 - 2009-03-02
0025 1 F Rel-8 8.4.0 8.5.0 S-measure handling for reportCGI RP-43 RP-090131 approved R2 R2-65 R2-091977 agreed 2009-03-03 LTE-L23 - 2009-03-02
0026 1 F Rel-8 8.4.0 8.5.0 Measurement configuration clean up RP-43 RP-090131 approved R2 R2-65 R2-091413 agreed 2009-03-03 LTE-L23 - 2009-03-02
0027 - F Rel-8 8.4.0 8.5.0 Alignment of measurement quantities for UTRA RP-43 RP-090131 approved R2 R2-65 R2-091033 agreed 2009-03-03 LTE-L23 - 2009-03-02
0028 - F Rel-8 8.4.0 8.5.0 to 36.331 on L1 parameters ranges alignment RP-43 RP-090131 approved R2 R2-65 R2-091034 agreed 2009-03-03 LTE-L23 - 2009-03-02
0029 - F Rel-8 8.4.0 8.5.0 Default configuration for transmissionMode RP-43 RP-090131 approved R2 R2-65 R2-091035 agreed 2009-03-03 LTE-L23 - 2009-03-02
0030 - F Rel-8 8.4.0 8.5.0 to 36.331 on RRC Parameters for MAC, RLC and PDCP RP-43 RP-090131 approved R2 R2-65 R2-091036 agreed 2009-03-03 LTE-L23 - 2009-03-02
0031 1 F Rel-8 8.4.0 8.5.0 to 36.331 - Clarification on Configured PRACH Freq Offset RP-43 RP-090131 approved R2 R2-65 R2-091626 agreed 2009-03-03 LTE-L23 - 2009-03-02
0032 - F Rel-8 8.4.0 8.5.0 Clarification on TTI bundling configuration RP-43 RP-090131 approved R2 R2-65 R2-091038 agreed 2009-03-03 LTE-L23 - 2009-03-02
0033 1 F Rel-8 8.4.0 8.5.0 Update of R2-091039 on Inter-RAT UE Capability RP-43 RP-090131 approved R2 R2-65 R2-091090 agreed 2009-03-03 LTE-L23 - 2009-03-02
0034 - F Rel-8 8.4.0 8.5.0 Feature Group Support Indicators RP-43 RP-090133 approved R2 R2-65 R2-091040 agreed 2009-03-03 LTE-L23 - 2009-03-02
0036 - F Rel-8 8.4.0 8.5.0 Corrections to RLF detection RP-43 RP-090131 approved R2 R2-65 R2-091042 agreed 2009-03-03 LTE-L23 - 2009-03-02
0037 - F Rel-8 8.4.0 8.5.0 Indication of Dedicated Priority RP-43 RP-090131 approved R2 R2-65 R2-091043 agreed 2009-03-03 LTE-L23 - 2009-03-02
0038 2 F Rel-8 8.4.0 8.5.0 Security Clean up RP-43 RP-090131 approved R2 R2-65 R2-091703 agreed 2009-03-03 LTE-L23 - 2009-03-02
0039 - F Rel-8 8.4.0 8.5.0 Correction of TTT value range RP-43 RP-090131 approved R2 R2-65 R2-091045 agreed 2009-03-03 LTE-L23 - 2009-03-02
0040 - F Rel-8 8.4.0 8.5.0 Correction on CDMA measurement result IE RP-43 RP-090131 approved R2 R2-65 R2-091046 agreed 2009-03-03 LTE-L23 - 2009-03-02
0041 1 F Rel-8 8.4.0 8.5.0 Clarification of Measurement Reporting RP-43 RP-090131 approved R2 R2-65 R2-091761 agreed 2009-03-03 LTE-L23 - 2009-03-02
0042 - F Rel-8 8.4.0 8.5.0 Spare values in DL and UL Bandwidth in MIB and SIB2 RP-43 RP-090131 approved R2 R2-65 R2-091048 agreed 2009-03-03 LTE-L23 - 2009-03-02
0044 1 F Rel-8 8.4.0 8.5.0 Clarifications to System Information Block Type 8 RP-43 RP-090131 approved R2 R2-65 R2-091810 agreed 2009-03-03 LTE-L23 - 2009-03-02
0045 - F Rel-8 8.4.0 8.5.0 Reception of ETWS secondary notification RP-43 RP-090131 approved R2 R2-65 R2-091051 agreed 2009-03-03 LTE-L23 - 2009-03-02
0046 1 F Rel-8 8.4.0 8.5.0 Validity time for ETWS message Id and Sequence No RP-43 RP-090131 approved R2 R2-65 R2-091770 agreed 2009-03-03 LTE-L23 - 2009-03-02
0047 - F Rel-8 8.4.0 8.5.0 for Timers and constants values used during handover to E-UTRA RP-43 RP-090131 approved R2 R2-65 R2-091053 agreed 2009-03-03 LTE-L23 - 2009-03-02
0048 - F Rel-8 8.4.0 8.5.0 Inter-RAT Security Clarification RP-43 RP-090131 approved R2 R2-65 R2-091054 agreed 2009-03-03 LTE-L23 - 2009-03-02
0049 - F Rel-8 8.4.0 8.5.0 to 36.331 on consistent naming of 1xRTT identifiers RP-43 RP-090131 approved R2 R2-65 R2-091055 agreed 2009-03-03 LTE-L23 - 2009-03-02
0050 - F Rel-8 8.4.0 8.5.0 Capturing RRC behavior regarding NAS local release RP-43 RP-090131 approved R2 R2-65 R2-091056 agreed 2009-03-03 LTE-L23 - 2009-03-02
0051 - F Rel-8 8.4.0 8.5.0 Report CGI before T321 expiry and UE null reporting RP-43 RP-090131 approved R2 R2-65 R2-091057 agreed 2009-03-03 LTE-L23 - 2009-03-02
0052 - F Rel-8 8.4.0 8.5.0 System Information and 3 hour validity RP-43 RP-090131 approved R2 R2-65 R2-091058 agreed 2009-03-03 LTE-L23 - 2009-03-02
0053 1 F Rel-8 8.4.0 8.5.0 Inter-Node AS Signalling RP-43 RP-090131 approved R2 R2-65 R2-091783 agreed 2009-03-03 LTE-L23 - 2009-03-02
0054 - F Rel-8 8.4.0 8.5.0 Set of values for the parameter ""messagePowerOffsetGroupB"" RP-43 RP-090131 approved R2 R2-65 R2-091060 agreed 2009-03-03 LTE-L23 - 2009-03-02
0055 - F Rel-8 8.4.0 8.5.0 to paging reception for ETWS capable UEs in RRC_CONNECTED RP-43 RP-090131 approved R2 R2-65 R2-091061 agreed 2009-03-03 LTE-L23 - 2009-03-02
0056 1 F Rel-8 8.4.0 8.5.0 for CSG related items in 36.331 RP-43 RP-090131 approved R2 R2-65 R2-091150 agreed 2009-03-03 LTE-L23 - 2009-03-02
0057 1 F Rel-8 8.4.0 8.5.0 SRS common configuration RP-43 RP-090131 approved R2 R2-65 R2-091605 agreed 2009-03-03 LTE-L23 - 2009-03-02
0058 - F Rel-8 8.4.0 8.5.0 RRC processing delay RP-43 RP-090131 approved R2 R2-65 R2-091064 agreed 2009-03-03 LTE-L23 - 2009-03-02
0059 - F Rel-8 8.4.0 8.5.0 for HNB Name RP-43 RP-090131 approved R2 R2-65 R2-091065 agreed 2009-03-03 LTE-L23 - 2009-03-02
0060 3 F Rel-8 8.4.0 8.5.0 Handover to EUTRA delta configuration RP-43 RP-090131 approved R2 R2-65 R2-091806 agreed 2009-03-03 LTE-L23 - 2009-03-02
0063 - F Rel-8 8.4.0 8.5.0 Delivery of Message Identifier and Serial Number to upper layers for ETWS RP-43 RP-090131 approved R2 R2-65 R2-091771 agreed 2009-03-03 LTE-L23 - 2009-03-02
0066 - F Rel-8 8.4.0 8.5.0 Clarification on the maximum size of cell lists RP-43 RP-090131 approved R2 R2-65 R2-091796 agreed 2009-03-03 LTE-L23 - 2009-03-02
0067 - F Rel-8 8.4.0 8.5.0 Missing RRC messages in 'Protection of RRC messages' RP-43 RP-090131 approved R2 R2-65 R2-091934 agreed 2009-03-03 LTE-L23 - 2009-03-02
0069 1 F Rel-8 8.4.0 8.5.0 Clarification on NAS Security Container RP-43 RP-090131 approved R2 R2-65 R2-091781 agreed 2009-03-03 LTE-L23 - 2009-03-02
0071 - F Rel-8 8.4.0 8.5.0 Extension of range of CQI/PMI configuration index RP-43 RP-090131 approved R2 R2-65 R2-091603 agreed 2009-03-03 LTE-L23 - 2009-03-02
0072 1 F Rel-8 8.4.0 8.5.0 Access barring alleviation in RRC connection establishment RP-43 RP-090131 approved R2 R2-65 R2-091751 agreed 2009-03-03 LTE-L23 - 2009-03-02
0077 1 F Rel-8 8.4.0 - Corrections to feature group support indicators RP-43 RP-090133 revised R2 R2-65 R2-091924 agreed 2009-03-03 LTE-L23 submitted to RAN #43 knowing that it might be revised there; revised in RP-090286 2009-03-02
0077 2 F Rel-8 8.4.0 - Revised RAN2 REL-8 CRs for LTE on Feature Group Indicators RP-43 RP-090286 revised NTT - - - 2009-03-03 LTE-L23 revision of R2-091924 in RP-090133 2009-03-03
0077 3 F Rel-8 8.4.0 - Corrections to feature group support indicators RP-43 RP-090304 revised NTT DOCOMO, INC. - - - 2009-02-27 LTE-L23 revision of RP-090286 replacing R2-091924 in RP-090133 2009-03-06
0077 4 F Rel-8 8.4.0 - Corrections to feature group support indicators RP-43 RP-090338 revised NTT DOCOMO, INC. - - - 2009-02-27 LTE-L23 revision of RP-090286, RP-090304; replacing R2-091924 in RP-090133; revised another time in RP-090365 2009-03-06
0077 5 F Rel-8 8.4.0 - Corrections to feature group support indicators RP-43 RP-090365 revised NTT DOCOMO - - - 2009-03-03 LTE-L23 revision of RP-090286, RP-090304, RP-090338; replacing R2-091924 in RP-090133; revised another time in RP-090367 2009-03-07
0077 6 F Rel-8 8.4.0 8.5.0 Corrections to feature group support indicators RP-43 RP-090367 approved NTT DOCOMO - - - 2009-03-03 LTE-L23 revision of RP-090286, RP-090304, RP-090338, RP-090365; replacing R2-091924 in RP-090133 2009-03-07
0078 - F Rel-8 8.4.0 8.5.0 from email discussion to capture DRX and TTT handling RP-43 RP-090131 approved R2 R2-65 R2-091759 agreed 2009-03-03 LTE-L23 - 2009-03-02
0079 1 F Rel-8 8.4.0 8.5.0 Need Code handling on BCCH messages RP-43 RP-090131 approved R2 R2-65 R2-091808 agreed 2009-03-03 LTE-L23 - 2009-03-02
0080 - F Rel-8 8.4.0 8.5.0 Unification of T300 and T301 and removal of miscallaneous FFSs RP-43 RP-090131 approved R2 R2-65 R2-091792 agreed 2009-03-03 LTE-L23 - 2009-03-02
0084 1 F Rel-8 8.4.0 8.5.0 Proposed modifying the code-point definitions of neighbourCellConfiguration RP-43 RP-090131 approved R2 R2-65 R2-091901 agreed 2009-03-03 LTE-L23 - 2009-03-02
0087 2 F Rel-8 8.4.0 8.5.0 Remove Redundant Optionality in SIB8 RP-43 RP-090131 approved R2 R2-65 R2-091803 agreed 2009-03-03 LTE-L23 - 2009-03-02
0089 - F Rel-8 8.4.0 8.5.0 Corrections to the generic error handling RP-43 RP-090131 approved R2 R2-65 R2-091791 agreed 2009-03-03 LTE-L23 - 2009-03-02
0090 - F Rel-8 8.4.0 8.5.0 Configurability of T301 RP-43 RP-090131 approved R2 R2-65 R2-091707 agreed 2009-03-03 LTE-L23 - 2009-03-02
0091 1 F Rel-8 8.4.0 8.5.0 Correction related to TTT RP-43 RP-090131 approved R2 R2-65 R2-091903 agreed 2009-03-03 LTE-L23 - 2009-03-02
0095 - F Rel-8 8.4.0 8.5.0 for 36.331 on SPS-config RP-43 RP-090131 approved R2 R2-65 R2-091606 agreed 2009-03-03 LTE-L23 - 2009-03-02
0096 2 F Rel-8 8.4.0 8.5.0 for Deactivation of periodical measurement RP-43 RP-090131 approved R2 R2-65 R2-091865 agreed 2009-03-03 LTE-L23 - 2009-03-02
0099 2 F Rel-8 8.4.0 8.5.0 SMC and reconfiguration RP-43 RP-090131 approved R2 R2-65 R2-091897 agreed 2009-03-03 LTE-L23 - 2009-03-02
0101 - F Rel-8 8.4.0 8.5.0 TDD handover RP-43 RP-090131 approved R2 R2-65 R2-091706 agreed 2009-03-03 LTE-L23 - 2009-03-02
0102 - F Rel-8 8.4.0 8.5.0 Corrections to system information acquisition RP-43 RP-090131 approved R2 R2-65 R2-091778 agreed 2009-03-03 LTE-L23 - 2009-03-02
0106 - F Rel-8 8.4.0 8.5.0 Some Corrections and Clarifications to 36.331 RP-43 RP-090131 approved R2 R2-65 R2-091779 agreed 2009-03-03 LTE-L23 - 2009-03-02
0109 - F Rel-8 8.4.0 8.5.0 Clarification on the Maximum number of ROHC context sessions parameter RP-43 RP-090131 approved R2 R2-65 R2-091608 agreed 2009-03-03 LTE-L23 - 2009-03-02
0110 - F Rel-8 8.4.0 8.5.0 Transmission of rrm-Config at Inter-RAT Handover RP-43 RP-090131 approved R2 R2-65 R2-091784 agreed 2009-03-03 LTE-L23 - 2009-03-02
0111 1 F Rel-8 8.4.0 8.5.0 Use of SameRefSignalsInNeighbor parameter RP-43 RP-090131 approved R2 R2-65 R2-091941 agreed 2009-03-03 LTE-L23 - 2009-03-02
0112 - F Rel-8 8.4.0 8.5.0 Default serving cell offset for measurement event A3 RP-43 RP-090131 approved R2 R2-65 R2-091768 agreed 2009-03-03 LTE-L23 - 2009-03-02
0114 - F Rel-8 8.4.0 8.5.0 dl-EARFCN missing in HandoverPreparationInformation RP-43 RP-090131 approved R2 R2-65 R2-091785 agreed 2009-03-03 LTE-L23 - 2009-03-02
0115 - F Rel-8 8.4.0 8.5.0 Cleanup of references to 36.101 RP-43 RP-090131 approved R2 R2-65 R2-091793 agreed 2009-03-03 LTE-L23 - 2009-03-02
0117 - F Rel-8 8.4.0 8.5.0 Correction to the value range of UE-Categories RP-43 RP-090131 approved R2 R2-65 R2-091788 agreed 2009-03-03 LTE-L23 - 2009-03-02
0122 1 F Rel-8 8.4.0 8.5.0 Correction on RRC connection re-establishment RP-43 RP-090131 approved R2 R2-65 R2-091756 agreed 2009-03-03 LTE-L23 - 2009-03-02
0124 - F Rel-8 8.4.0 8.5.0 Performing Measurements to report CGI for CDMA2000 RP-43 RP-090131 approved R2 R2-65 R2-091766 agreed 2009-03-03 LTE-L23 - 2009-03-02
0125 - F Rel-8 8.4.0 8.5.0 CDMA2000-SystemTimeInfo in VarMeasurementConfiguration RP-43 RP-090131 approved R2 R2-65 R2-091767 agreed 2009-03-03 LTE-L23 - 2009-03-02
0126 - F Rel-8 8.4.0 8.5.0 UE Capability Information for CDMA2000 1xRTT RP-43 RP-090131 approved R2 R2-65 R2-091782 agreed 2009-03-03 LTE-L23 - 2009-03-02
0127 - F Rel-8 8.4.0 8.5.0 CDMA2000 related editorial changes RP-43 RP-090131 approved R2 R2-65 R2-091794 agreed 2009-03-03 LTE-L23 - 2009-03-02
0128 - F Rel-8 8.4.0 8.5.0 Draft to 36.331 on State mismatch recovery at re-establishment RP-43 RP-090131 approved R2 R2-65 R2-091704 agreed 2009-03-03 LTE-L23 - 2009-03-02
0129 1 F Rel-8 8.4.0 8.5.0 Draft to 36.331 on Renaming of AC barring related IEs RP-43 RP-090131 approved R2 R2-65 R2-091868 agreed 2009-03-03 LTE-L23 - 2009-03-02
0130 2 F Rel-8 8.4.0 8.5.0 Draft to 36.331 on Inheriting of dedicated priorities at inter-RAT reselection RP-43 RP-090131 approved R2 R2-65 R2-091926 agreed 2009-03-03 LTE-L23 - 2009-03-02
0135 - F Rel-8 8.4.0 8.5.0 Proposed to 36.331 Description alignment for paging parameter, nB RP-43 RP-090131 approved R2 R2-65 R2-091795 agreed 2009-03-03 LTE-L23 - 2009-03-02
0139 2 F Rel-8 8.4.0 8.5.0 Miscellaneous corrections and clarifications resulting from ASN.1 review RP-43 RP-090131 approved R2 R2-65 R2-091971 agreed 2009-03-03 LTE-L23 - 2009-03-02
0141 1 F Rel-8 8.4.0 8.5.0 Correction regarding Redirection Information fo GERAN RP-43 RP-090131 approved R2 R2-65 R2-091757 agreed 2009-03-03 LTE-L23 - 2009-03-02
0142 - F Rel-8 8.4.0 8.5.0 Further ASN.1 review related issues RP-43 RP-090131 approved R2 R2-65 R2-091700 agreed 2009-03-03 LTE-L23 - 2009-03-02
0143 - F Rel-8 8.4.0 8.5.0 Periodic measurements RP-43 RP-090131 approved R2 R2-65 R2-091762 agreed 2009-03-03 LTE-L23 - 2009-03-02
0144 1 F Rel-8 8.4.0 8.5.0 Further analysis on code point ""OFF"" for ri-ConfigIndex RP-43 RP-090131 approved R2 R2-65 R2-091867 agreed 2009-03-03 LTE-L23 - 2009-03-02
0145 1 F Rel-8 8.4.0 8.5.0 Adding and deleting same measurement or configuration in one message RP-43 RP-090131 approved R2 R2-65 R2-091906 agreed 2009-03-03 LTE-L23 - 2009-03-02
0147 - F Rel-8 8.4.0 8.5.0 Corrections to IE dataCodingScheme in SIB11 RP-43 RP-090131 approved R2 R2-65 R2-091774 agreed 2009-03-03 LTE-L23 - 2009-03-02
0148 - F Rel-8 8.4.0 8.5.0 Clarification on Mobility from E-UTRA RP-43 RP-090131 approved R2 R2-65 R2-091773 agreed 2009-03-03 LTE-L23 - 2009-03-02
0149 - F Rel-8 8.4.0 8.5.0 36.331 related to “not applicable” RP-43 RP-090131 approved R2 R2-65 R2-091786 agreed 2009-03-03 LTE-L23 - 2009-03-02
0150 1 F Rel-8 8.4.0 8.5.0 UE radio capability transfer RP-43 RP-090131 approved R2 R2-65 R2-091807 agreed 2009-03-03 LTE-L23 - 2009-03-02
0151 - F Rel-8 8.4.0 8.5.0 to 36.331 on value of CDMA band classes RP-43 RP-090131 approved R2 R2-65 R2-091789 agreed 2009-03-03 LTE-L23 - 2009-03-02
0152 - F Rel-8 8.4.0 8.5.0 Corrections to DRB modification RP-43 RP-090131 approved R2 R2-65 R2-091797 agreed 2009-03-03 LTE-L23 - 2009-03-02
0153 - F Rel-8 8.4.0 8.5.0 Correction to presence condition for pdcp-config RP-43 RP-090131 approved R2 R2-65 R2-091801 agreed 2009-03-03 LTE-L23 - 2009-03-02
0155 - F Rel-8 8.4.0 8.5.0 TDD HARQ-ACK feedback mode RP-43 RP-090131 approved R2 R2-65 R2-091940 agreed 2009-03-03 LTE-L23 - 2009-03-02
0156 - F Rel-8 8.4.0 - Sending of GERAN SI/PSI information at Inter-RAT Handover RP-43 RP-090266 revised Ericsson - - - 2009-03-03 LTE-L23 compare R2-091619, R2-091959 2009-03-03
0156 1 F Rel-8 8.4.0 8.5.0 Sending of GERAN SI/PSI information at Inter-RAT Handover RP-43 RP-090321 approved Ericsson - - - 2009-05-03 LTE-L23 compare R2-091619, R2-091959; revision of RP-090266 2009-03-06
0157 - F Rel-8 8.4.0 8.5.0 Corrections regarding use of carrierFreq for CDMA (SIB8) and GERAN (measObject) RP-43 RP-090275 approved Samsung - - - 2009-03-03 LTE-L23 ASN.1 impact 2009-03-03
0158 - F Rel-8 8.4.0 8.5.0 Clarification of CSG support RP-43 RP-090339 approved Panasonic - - - 2009-06-03 LTE-L23 related to LSout RP-090334 and answer RP-090353 2009-03-06
0159 - F Rel-8 8.5.0 8.6.0 Octet alignment of VarShortMAC-Input RP-44 RP-090516 approved R2 R2-66 R2-092788 agreed 2009-05-26 LTE-L23 - 2009-05-25
0160 3 F Rel-8 8.5.0 8.6.0 Minor corrections to the feature grouping RP-44 RP-090516 approved R2 R2-66 R2-093601 agreed 2009-05-26 LTE-L23 - 2009-05-25
0161 - F Rel-8 8.5.0 8.6.0 Security clarification RP-44 RP-090516 approved R2 R2-66 R2-092790 agreed 2009-05-26 LTE-L23 - 2009-05-25
0162 1 F Rel-8 8.5.0 8.6.0 Sending of GERAN SI/PSI information at Inter-RAT Handover RP-44 RP-090516 approved R2 R2-66 R2-093463 agreed 2009-05-26 LTE-L23 - 2009-05-25
0163 1 F Rel-8 8.5.0 8.6.0 Correction of UE measurement model RP-44 RP-090516 approved R2 R2-66 R2-093543 agreed 2009-05-26 LTE-L23 - 2009-05-25
0164 - F Rel-8 8.5.0 8.6.0 Restricting the reconfiguration of UM RLC SN field size RP-44 RP-090516 approved R2 R2-66 R2-092793 agreed 2009-05-26 LTE-L23 - 2009-05-25
0165 1 F Rel-8 8.5.0 8.6.0 36.331 on Clarification on cell change order from GERAN to E-UTRAN RP-44 RP-090516 approved R2 R2-66 R2-093464 agreed 2009-05-26 LTE-L23 - 2009-05-25
0166 - F Rel-8 8.5.0 8.6.0 36.331 - Handling of expired TAT and failed D-SR RP-44 RP-090516 approved R2 R2-66 R2-092795 agreed 2009-05-26 LTE-L23 - 2009-05-25
0167 1 F Rel-8 8.5.0 8.6.0 Proposed to 36.331 Clarification on mandatory information in AS-Config RP-44 RP-090516 approved R2 R2-66 R2-093465 agreed 2009-05-26 LTE-L23 - 2009-05-25
0168 2 F Rel-8 8.5.0 8.6.0 Miscellaneous small corrections RP-44 RP-090516 approved R2 R2-66 R2-093556 agreed 2009-05-26 LTE-L23 - 2009-05-25
0173 - F Rel-8 8.5.0 8.6.0 Clarification on the basis of delta signalling RP-44 RP-090516 approved R2 R2-66 R2-093467 agreed 2009-05-26 LTE-L23 - 2009-05-25
0177 - F Rel-8 8.5.0 8.6.0 on Alignment of CCCH and DCCH handling of missing mandatory field RP-44 RP-090516 approved R2 R2-66 R2-093477 agreed 2009-05-26 LTE-L23 - 2009-05-25
0180 2 F Rel-8 8.5.0 8.6.0 Handling of Measurement Context During HO Preparation RP-44 RP-090516 approved R2 R2-66 R2-093550 agreed 2009-05-26 LTE-L23 - 2009-05-25
0181 - F Rel-8 8.5.0 8.6.0 Clarification of key-eNodeB-Star in AdditionalReestabInfo RP-44 RP-090516 approved R2 R2-66 R2-093473 agreed 2009-05-26 LTE-L23 - 2009-05-25
0182 1 F Rel-8 8.5.0 8.6.0 UE Capability Transfer RP-44 RP-090516 approved R2 R2-66 R2-093615 agreed 2009-05-26 LTE-L23 - 2009-05-25
0186 1 F Rel-8 8.5.0 8.6.0 Clarification regarding mobility from E-UTRA in-between SMC and SRB2/DRB setup RP-44 RP-090516 approved R2 R2-66 R2-093525 agreed 2009-05-26 LTE-L23 - 2009-05-25
0188 1 F Rel-8 8.5.0 8.6.0 Correction and completion of specification conventions RP-44 RP-090516 approved R2 R2-66 R2-093617 agreed 2009-05-26 LTE-L23 - 2009-05-25
0195 2 F Rel-8 8.5.0 8.6.0 RB combination in feature group indicator RP-44 RP-090516 approved R2 R2-66 R2-093537 agreed 2009-05-26 LTE-L23 - 2009-05-25
0196 1 F Rel-8 8.5.0 8.6.0 for need code for fields in mobilityControlInfo RP-44 RP-090516 approved R2 R2-66 R2-093526 agreed 2009-05-26 LTE-L23 - 2009-05-25
0197 - F Rel-8 8.5.0 8.6.0 Alignment of pusch-HoppingOffset with 36.211 RP-44 RP-090497 approved Alcatel-Lucent, Ericsson, Nokia, Nokia Siemens Networks, Panasonic, Smsung - - - 2009-05-26 LTE-L23 - 2009-05-25
0198 - F Rel-8 8.5.0 8.6.0 Explicit srb-Identity values for SRB1 and SRB2 RP-44 RP-090570 approved Nokia Corporation, Nokia Siemens Networks, Smsung - - - 2009-05-26 LTE-L23 - 2009-05-25
0199 - F Rel-8 8.5.0 8.6.0 Removing use of defaultValue for mac-MainConfig RP-44 RP-090516 approved R2 R2-66 R2-093621 agreed 2009-05-26 LTE-L23 - 2009-05-25
0200 - F Rel-8 8.6.0 8.7.0 Proposed update of the feature grouping RP-45 RP-090906 approved R2 R2-67b R2-094171 agreed 2009-09-18 LTE-L23 - 2009-09-15
0201 - F Rel-8 8.6.0 8.7.0 Clarification on measurement object configuration for serving frequency RP-45 RP-090906 approved R2 R2-67b R2-094172 agreed 2009-09-18 LTE-L23 - 2009-09-15
0202 - F Rel-8 8.6.0 8.7.0 Correction regarding SRVCC RP-45 RP-090906 approved R2 R2-67b R2-094173 agreed 2009-09-18 LTE-L23 - 2009-09-15
0203 - F Rel-8 8.6.0 8.7.0 Indication of DRB Release during HO RP-45 RP-090906 approved R2 R2-67b R2-094174 agreed 2009-09-18 LTE-L23 - 2009-09-15
0204 1 F Rel-8 8.6.0 8.7.0 Correction regarding application of dedicated resource configuration upon handover RP-45 RP-090906 approved R2 R2-67b R2-095210 agreed 2009-09-18 LTE-L23 - 2009-09-15
0205 - F Rel-8 8.6.0 8.7.0 REL-9 protocol extensions in RRC RP-45 RP-090906 approved R2 R2-67b R2-094176 agreed 2009-09-18 LTE-L23 - 2009-09-15
0206 - F Rel-8 8.6.0 8.7.0 In-order delivery of NAS PDUs at RRC connection reconfiguration RP-45 RP-090906 approved R2 R2-67b R2-094177 agreed 2009-09-18 LTE-L23 - 2009-09-15
0207 - F Rel-8 8.6.0 8.7.0 Correction on Threshold of Measurement Event RP-45 RP-090906 approved R2 R2-67b R2-094178 agreed 2009-09-18 LTE-L23 - 2009-09-15
0210 - F Rel-8 8.6.0 8.7.0 Clarification on dedicated resource of RA procedure RP-45 RP-090906 approved R2 R2-67b R2-095211 agreed 2009-09-18 LTE-L23 - 2009-09-15
0213 1 F Rel-8 8.6.0 8.7.0 Cell barring when MasterInformationBlock or SystemInformationBlock1 is missing RP-45 RP-090906 approved R2 R2-67b R2-095323 agreed 2009-09-18 LTE-L23 - 2009-09-15
0218 - F Rel-8 8.6.0 8.7.0 Security threat with duplicate detection for ETWS RP-45 RP-090915 approved R2 R2-67b R2-095017 agreed 2009-09-18 ETWS - 2009-09-15
0220 1 B Rel-9 8.6.0 9.0.0 Introduction of Per-QCI radio link failure timers (option 1) RP-45 RP-090934 approved R2 R2-67b R2-095324 agreed 2009-09-18 LTE-L23, TEI9 - 2009-09-15
0222 - B Rel-9 8.6.0 9.0.0 Null integrity protection algorithm RP-45 RP-090926 approved R2 R2-67b R2-095221 agreed 2009-09-18 IMS_EMER_LTE - 2009-09-15
0223 - B Rel-9 8.6.0 9.0.0 Emergency Support Indicator in BCCH RP-45 RP-090926 approved R2 R2-67b R2-095220 agreed 2009-09-18 IMS_EMER_LTE - 2009-09-15
0224 - F Rel-8 8.6.0 8.7.0 Clarification on supported handover types in feature grouping RP-45 RP-090906 approved R2 R2-67b R2-095216 agreed 2009-09-18 LTE-L23 - 2009-09-15
0230 2 B Rel-9 8.6.0 9.0.0 to 36.331 for Enhanced CSFB to 1xRTT with concurrent PS handover RP-45 RP-090934 approved R2 R2-67b R2-095333 agreed 2009-09-18 LTE-L23, TEI9 - 2009-09-15
0243 - D Rel-9 8.6.0 9.0.0 REL-9 on Miscellaneous editorial corrections RP-45 RP-090934 approved R2 R2-67b R2-095215 agreed 2009-09-18 LTE-L23, TEI9 - 2009-09-15
0247 - B Rel-9 8.6.0 9.0.0 Periodic CQI/PMI/RI masking RP-45 RP-090934 approved R2 R2-67b R2-095321 agreed 2009-09-18 LTE-L23, TEI9 - 2009-09-15
0250 1 F Rel-8 8.6.0 8.7.0 Handling of unsupported / non-comprehended frequency band and emission requirement RP-45 RP-090906 approved R2 R2-67b R2-095322 agreed 2009-09-18 LTE-L23 - 2009-09-15
0251 - F Rel-8 8.6.0 8.7.0 RB combinations in feature group indicator 20 RP-45 RP-090906 approved R2 R2-67b R2-095217 agreed 2009-09-18 LTE-L23 - 2009-09-15
0252 - B Rel-9 8.6.0 9.0.0 Introduction of CMAS RP-45 RP-090933 approved R2 R2-67b R2-095228 agreed 2009-09-18 PWS-RAN - 2009-09-15
0253 1 F Rel-9 9.0.0 9.1.0 (Rel-9)-clarification on the description of redirectedCarrierInfo RP-46 RP-091346 approved R2 R2-68 R2-097344 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0254 1 F Rel-9 9.0.0 9.1.0 Adding references to RRC processing delay for inter-RAT mobiltiy messages RP-46 RP-091346 approved R2 R2-68 R2-097345 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0255 - F Rel-8 8.7.0 8.8.0 Alignment of srs-Bandwidth with 36.211 RP-46 RP-091314 approved R2 R2-68 R2-096430 agreed 2009-12-04 LTE-L23 - 2009-12-06
0256 - A Rel-9 9.0.0 9.1.0 Alignment of srs-Bandwidth with 36.211 RP-46 RP-091314 approved R2 R2-68 R2-096431 agreed 2009-12-04 LTE-L23 - 2009-12-06
0257 5 B Rel-9 9.0.0 9.1.0 Baseline capturing eMBMS agreements RP-46 RP-091341 approved R2 R2-68 R2-097507 agreed 2009-12-04 MBMS_LTE - 2009-12-06
0258 3 B Rel-9 9.0.0 9.1.0 Capturing agreements on inbound mobility RP-46 RP-091343 approved R2 R2-68 R2-097445 agreed 2009-12-04 EHNB-RAN2 - 2009-12-06
0259 - F Rel-8 8.7.0 8.8.0 Clarification of preRegistrationZoneID/secondaryPreRegistrationZoneID RP-46 RP-091314 approved R2 R2-68 R2-096434 agreed 2009-12-04 LTE-L23 - 2009-12-06
0260 - A Rel-9 9.0.0 9.1.0 Clarification of preRegistrationZoneID/secondaryPreRegistrationZoneID RP-46 RP-091314 approved R2 R2-68 R2-096435 agreed 2009-12-04 LTE-L23 - 2009-12-06
0261 - F Rel-9 9.0.0 9.1.0 Clarification on NCC for IRAT HO RP-46 RP-091346 approved R2 R2-68 R2-096436 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0262 - F Rel-8 8.7.0 8.8.0 Clarification on P-max RP-46 RP-091314 approved R2 R2-68 R2-096437 agreed 2009-12-04 LTE-L23 - 2009-12-06
0263 - A Rel-9 9.0.0 9.1.0 Clarification on P-max RP-46 RP-091314 approved R2 R2-68 R2-096438 agreed 2009-12-04 LTE-L23 - 2009-12-06
0264 1 F Rel-8 8.7.0 8.8.0 Clarification on the definition of maxCellMeas RP-46 RP-091314 approved R2 R2-68 R2-097333 agreed 2009-12-04 LTE-L23 - 2009-12-06
0265 1 A Rel-9 9.0.0 9.1.0 Clarification on the definition of maxCellMeas RP-46 RP-091314 approved R2 R2-68 R2-097334 agreed 2009-12-04 LTE-L23 - 2009-12-06
0266 - F Rel-9 9.0.0 9.1.0 Correction of q-RxLevMin reference in SIB7 RP-46 RP-091346 approved R2 R2-68 R2-096440 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0267 - D Rel-9 9.0.0 9.1.0 Correction on SPS-Config field descriptions RP-46 RP-091346 approved R2 R2-68 R2-096441 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0268 1 F Rel-9 9.0.0 9.1.0 correction on the definition of CellsTriggeredList RP-46 RP-091346 approved R2 R2-68 R2-097346 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0269 - F Rel-9 9.0.0 9.1.0 Correction relating to CMAS UE capability RP-46 RP-091345 approved R2 R2-68 R2-096443 agreed 2009-12-04 PWS-RAN - 2009-12-06
0270 1 F Rel-8 8.7.0 8.8.0 Feature grouping bit for SRVCC handover RP-46 RP-091314 approved R2 R2-68 R2-097335 agreed 2009-12-04 LTE-L23 - 2009-12-06
0271 1 A Rel-9 9.0.0 9.1.0 Feature grouping bit for SRVCC handover RP-46 RP-091314 approved R2 R2-68 R2-097336 agreed 2009-12-04 LTE-L23 - 2009-12-06
0272 1 A Rel-9 9.0.0 9.1.0 Correction and completion of extension guidelines RP-46 RP-091314 approved R2 R2-68 R2-097339 agreed 2009-12-04 LTE-L23 - 2009-12-06
0273 - B Rel-9 9.0.0 9.1.0 RACH optimization Stage-3 RP-46 RP-091344 approved R2 R2-68 R2-097388 agreed 2009-12-04 SON - 2009-12-06
0274 - F Rel-9 9.0.0 9.1.0 Stage 3 correction for CMAS RP-46 RP-091345 approved R2 R2-68 R2-096448 agreed 2009-12-04 PWS-RAN - 2009-12-06
0275 2 F Rel-8 8.7.0 8.8.0 Correction and completion of extension guidelines RP-46 RP-091314 approved R2 R2-68 R2-097502 agreed 2009-12-04 LTE-L23 - 2009-12-06
0276 1 B Rel-9 9.0.0 9.1.0 SR prohibit mechanism for UL SPS RP-46 RP-091346 approved R2 R2-68 R2-097460 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0277 - F Rel-9 9.0.0 9.1.0 Parameters used for enhanced 1xRTT CS fallback RP-46 RP-091346 approved R2 R2-68 R2-097353 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0281 - F Rel-9 9.0.0 9.1.0 Correction on UTRAN UE Capability transfer RP-46 RP-091346 approved R2 R2-68 R2-097350 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0285 - C Rel-9 9.0.0 9.1.0 Maximum number of CDMA2000 neighbors in SIB8 RP-46 RP-091346 approved R2 R2-68 R2-097125 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0287 - B Rel-8 8.7.0 - Introducing FGI for PDSCH mode 4 and 6 RP-46 RP-091316 postponed R2 R2-68 R2-097341 technically endorsed 2009-12-04 LTE-L23 - 2009-12-06
0287 1 F Rel-8 8.8.0 - FGI bit for PDSCH transmission mode 4 and 6 RP-47 RP-100241 withdrawn Nokia Corporation, Nokia Siemens Networks - - - 2010-03-19 LTE-L23 company contribution; resubmission of RP-091316 of RAN #46 (based on latest spec): REL-8 CR R2-097341 was technically endorsed by RAN2 #68 2010-03-21
0288 1 F Rel-9 9.0.0 9.1.0 Introduction of UE Rx-Tx Time Difference measurement RP-46 RP-091340 approved R2 R2-68 R2-097494 agreed 2009-12-04 LCS_LTE - 2009-12-06
0297 - B Rel-9 9.0.0 9.1.0 Introduction of SR prohibit timer RP-46 RP-091346 approved R2 R2-68 R2-097458 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0298 - F Rel-9 9.0.0 9.1.0 Remove FFSs from RAN2 specifications RP-46 RP-091346 approved R2 R2-68 R2-097331 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0301 1 F Rel-9 9.0.0 9.1.0 Renaming Allowed CSG List (36.331 Rel-9) RP-46 RP-091343 approved R2 R2-68 R2-097358 agreed 2009-12-04 EHNB-RAN2 - 2009-12-06
0305 - F Rel-9 9.0.0 9.1.0 Re-introduction of message segment discard time RP-46 RP-091346 approved R2 R2-68 R2-097340 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0306 1 F Rel-9 9.0.0 9.1.0 Application of ASN.1 extension guidelines RP-46 RP-091346 approved R2 R2-68 R2-097449 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0309 1 B Rel-9 9.0.0 9.1.0 Support for Dual Radio 1xCSFB RP-46 RP-091346 approved R2 R2-68 R2-097464 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0311 - B Rel-9 9.0.0 9.1.0 Shorter SR periodicity RP-46 RP-091346 approved R2 R2-68 R2-097332 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0316 - B Rel-9 9.0.0 9.1.0 to 36.331 for Introduction of Dual Layer Transmission RP-46 RP-091342 approved R2 R2-68 R2-097386 agreed 2009-12-04 LTEimp-eDL - 2009-12-06
0318 1 B Rel-9 9.0.0 9.1.0 Draft to 36.331 on Network ordered SI reporting RP-46 RP-091343 approved R2 R2-68 R2-097466 agreed 2009-12-04 EHNB-RAN2 - 2009-12-06
0322 - F Rel-9 9.0.0 9.1.0 UE e1xcsfb capabilities correction RP-46 RP-091346 approved R2 R2-68 R2-097355 agreed 2009-12-04 TEI9, LTE-L23 - 2009-12-06
0325 - A Rel-9 9.0.0 - Introducing FGI for PDSCH mode 4 and 6 RP-46 RP-091316 postponed R2 R2-68 R2-097342 technically endorsed 2009-12-04 LTE-L23 - 2009-12-06
0325 1 A Rel-9 9.1.0 - FGI bit for PDSCH transmission mode 4 and 6 RP-47 RP-100242 withdrawn Nokia Corporation, Nokia Siemens Networks - - - 2010-03-19 LTE-L23 company contribution; resubmission of RP-091316 of RAN #46 (based on latest spec): REL-8 CR R2-097342 was technically endorsed by RAN2 #68 2010-03-21
0326 1 F Rel-8 8.7.0 8.8.0 Clarification on coding of ETWS related IEs RP-46 RP-091331 approved R2 R2-68 R2-097498 agreed 2009-12-04 ETWS - 2009-12-06
0327 1 A Rel-9 9.0.0 9.1.0 Clarification on coding of ETWS related IEs RP-46 RP-091331 approved R2 R2-68 R2-097499 agreed 2009-12-04 ETWS - 2009-12-06
0328 - F Rel-8 8.8.0 8.9.0 Aligning the number of neighbor cells in SIB8 between Rel-8 and Rel-9 RP-47 RP-100285 approved R2 R2-69 R2-100978 agreed 2010-03-19 LTE-L23 - 2010-03-21
0330 - F Rel-8 8.8.0 8.9.0 Clarification of CGI reporting RP-47 RP-100285 approved R2 R2-69 R2-100980 agreed 2010-03-19 LTE-L23 - 2010-03-21
0331 - A Rel-9 9.1.0 9.2.0 Clarification of CGI reporting RP-47 RP-100285 approved R2 R2-69 R2-100981 agreed 2010-03-19 LTE-L23 - 2010-03-21
0332 - F Rel-9 9.1.0 9.2.0 Clarification on MCCH change notification RP-47 RP-100305 approved R2 R2-69 R2-100982 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0333 - F Rel-9 9.1.0 9.2.0 Clarification on measurement for serving cell only RP-47 RP-100308 approved R2 R2-69 R2-100983 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0334 - F Rel-9 9.1.0 9.2.0 Clarification on proximity indication configuraiton in handover to E-UTRA RP-47 RP-100306 approved R2 R2-69 R2-100984 agreed 2010-03-19 EHNB-RAN2 - 2010-03-21
0335 - F Rel-9 9.1.0 9.2.0 Clarification on radio resource configuration in handover to E-UTRA procedure RP-47 RP-100308 approved R2 R2-69 R2-100985 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0336 - F Rel-9 9.1.0 9.2.0 Clarification on UE maximum transmission power RP-47 RP-100308 approved R2 R2-69 R2-100986 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0337 - F Rel-9 9.1.0 9.2.0 Correction to field descriptions of UE-EUTRA-Capability RP-47 RP-100308 approved R2 R2-69 R2-100987 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0338 - F Rel-9 9.1.0 9.2.0 Correction to MBMS scheduling terminology RP-47 RP-100305 approved R2 R2-69 R2-100988 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0339 - F Rel-9 9.1.0 9.2.0 Corrections to SIB8 RP-47 RP-100308 approved R2 R2-69 R2-100989 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0340 - F Rel-9 9.1.0 9.2.0 CR 36.331 R9 for Unifying SI reading for ANR and inbound mobility RP-47 RP-100306 approved R2 R2-69 R2-100990 agreed 2010-03-19 EHNB-RAN2 - 2010-03-21
0341 1 C Rel-9 9.1.0 9.2.0 CR to 36.331 for 1xRTT pre-registration information in SIB8 RP-47 RP-100308 approved R2 R2-69 R2-101822 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0342 - F Rel-9 9.1.0 9.2.0 CR to 36.331 on corrections for MBMS RP-47 RP-100305 approved R2 R2-69 R2-100992 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0343 1 F Rel-9 9.1.0 9.2.0 CR to 36.331 on CSG identity reporting RP-47 RP-100306 approved R2 R2-69 R2-101531 agreed 2010-03-19 EHNB-RAN2 - 2010-03-21
0344 2 C Rel-9 9.1.0 9.2.0 CR to 36.331 on Optionality of Rel-9 UE features RP-47 RP-100308 approved R2 R2-69 R2-101611 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0345 1 B Rel-9 9.1.0 9.2.0 CR to 36.331 on Service Specific Acces Control (SSAC) RP-47 RP-100308 approved R2 R2-69 R2-101532 agreed 2010-03-19 TEI9, SSAC - 2010-03-21
0346 - B Rel-9 9.1.0 9.2.0 Introduction of power-limited device indication in UE capability. RP-47 RP-100308 approved R2 R2-69 R2-100996 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0347 - F Rel-9 9.1.0 9.2.0 Missing agreement in MCCH change notification. RP-47 RP-100305 approved R2 R2-69 R2-100997 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0348 1 F Rel-9 9.1.0 9.2.0 Corrections related to MCCH change notification and value ranges RP-47 RP-100305 approved R2 R2-69 R2-101810 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0349 2 F Rel-9 9.1.0 9.2.0 Prohibit timer for proximity indication RP-47 RP-100306 approved R2 R2-69 R2-101899 agreed 2010-03-19 EHNB-RAN2 - 2010-03-21
0350 1 F Rel-9 9.1.0 9.2.0 Proximity Indication after handover and re-establishment RP-47 RP-100306 approved R2 R2-69 R2-101585 agreed 2010-03-19 EHNB-RAN2 - 2010-03-21
0351 - F Rel-9 9.1.0 9.2.0 Specifying the exact mapping of notificationIndicator in SIB13 to PDCCH bits RP-47 RP-100305 approved R2 R2-69 R2-101001 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0352 - F Rel-9 9.1.0 9.2.0 Corrections out of ASN.1 review scope RP-47 RP-100308 approved R2 R2-69 R2-101827 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0353 - F Rel-9 9.1.0 9.2.0 CR on clarification of system information change RP-47 RP-100308 approved R2 R2-69 R2-101855 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0357 - F Rel-8 8.8.0 8.9.0 Measurement Result CDMA2000 Cell RP-47 RP-100285 approved R2 R2-69 R2-101861 agreed 2010-03-19 LTE-L23 - 2010-03-21
0358 - A Rel-9 9.1.0 9.2.0 Measurement Result CDMA2000 Cell RP-47 RP-100285 approved R2 R2-69 R2-101862 agreed 2010-03-19 LTE-L23 - 2010-03-21
0361 - F Rel-9 9.1.0 9.2.0 Correction on the range of UE Rx-Tx time difference measurement result RP-47 RP-100304 approved R2 R2-69 R2-101785 agreed 2010-03-19 LCS_LTE - 2010-03-21
0362 - F Rel-9 9.1.0 9.2.0 Small clarifications regarding MBMS RP-47 RP-100305 approved R2 R2-69 R2-101815 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0363 - F Rel-9 9.1.0 9.2.0 Introduction of REL-9 indication within field accessStratumRelease RP-47 RP-100308 approved R2 R2-69 R2-101828 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0364 - F Rel-9 9.1.0 9.2.0 Extending mobility description to cover inbound mobility RP-47 RP-100306 approved R2 R2-69 R2-101821 agreed 2010-03-19 EHNB-RAN2 - 2010-03-21
0365 1 F Rel-9 9.1.0 9.2.0 Clarification regarding enhanced CSFB to 1XRTT RP-47 RP-100308 approved R2 R2-69 R2-101872 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0368 - F Rel-9 9.1.0 9.2.0 Handling of dedicated RLF timers RP-47 RP-100308 approved R2 R2-69 R2-101830 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0370 1 F Rel-9 9.1.0 9.2.0 Clarification on UE's behavior of receiving MBMS service RP-47 RP-100305 approved R2 R2-69 R2-101858 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0371 - F Rel-9 9.1.0 9.2.0 MBMS Service ID and Session ID RP-47 RP-100305 approved R2 R2-69 R2-101817 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0372 1 C Rel-9 9.1.0 9.2.0 Inclusion of non-MBSFN region length in SIB13 RP-47 RP-100305 approved R2 R2-69 R2-101898 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0374 1 B Rel-9 9.1.0 9.2.0 CR to 36.331 for e1xCSFB access class barring parameters in SIB8 RP-47 RP-100309 approved R2 R2-69 R2-101866 technically endorsed 2010-03-19 TEI9, LTE-L23 approved under the condition that SA if fine with the approval of R2-101866 CR (see LS RP-100387) 2010-03-21
0375 - F Rel-9 9.1.0 9.2.0 Multiple 1xRTT/HRPD target cells in MobilityFromEUTRACommand RP-47 RP-100308 approved R2 R2-69 R2-101835 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0376 - F Rel-9 9.1.0 9.2.0 Independent support indicators for Dual-Rx CSFB and S102 in SIB8 RP-47 RP-100308 approved R2 R2-69 R2-101850 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0377 - F Rel-8 8.8.0 8.9.0 Clarification on DRX StartOffset for TDD RP-47 RP-100285 approved R2 R2-69 R2-101803 agreed 2010-03-19 LTE-L23 - 2010-03-21
0378 - A Rel-9 9.1.0 9.2.0 Clarification on DRX StartOffset for TDD RP-47 RP-100285 approved R2 R2-69 R2-101804 agreed 2010-03-19 LTE-L23 - 2010-03-21
0379 1 F Rel-9 9.1.0 9.2.0 Miscellaneous corrections from REL-9 ASN.1 review RP-47 RP-100308 approved R2 R2-69 R2-101933 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0381 - F Rel-9 9.1.0 9.2.0 Need codes and missing conventions RP-47 RP-100308 approved R2 R2-69 R2-101831 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0383 1 B Rel-9 9.1.0 9.2.0 Introduction of Full Configuration Handover for handling earlier eNB releases RP-47 RP-100308 approved R2 R2-69 R2-101883 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0385 - D Rel-9 9.1.0 9.2.0 Clarification to SFN reference in RRC RP-47 RP-100308 approved R2 R2-69 R2-101832 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0390 - F Rel-9 9.1.0 9.2.0 RSRP and RSRQ based Thresholds RP-47 RP-100308 approved R2 R2-69 R2-101806 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0392 3 B Rel-9 9.1.0 9.2.0 Redirection enhancements to GERAN RP-47 RP-100189 approved Ericsson, ST-Ericsson, Vodafone, Research in Motion, AT&T, Telecom Italia - - - 2010-03-19 TEI9, LTE-L23 company contribution; previous version of the CR R2-101885 was not agreed in RAN2 #69 2010-03-21
0398 - B Rel-9 9.1.0 9.2.0 Cell reselection enhancements CR for 36.331 RP-47 RP-100308 approved R2 R2-69 R2-101613 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0401 3 B Rel-9 9.1.0 9.2.0 CR on UE-originated RLFreporting for MRO SON use case RP-47 RP-100307 approved R2 R2-69 R2-101943 agreed 2010-03-19 SON - 2010-03-21
0402 3 B Rel-9 9.1.0 9.2.0 CR to 36.331 on Redirection enhancements to UTRAN RP-47 RP-100309 approved R2 R2-69 R2-101940 technically endorsed 2010-03-19 TEI9, LTE-L23 LS to GERAN2 in RP-100395 2010-03-21
0403 2 F Rel-9 9.1.0 9.2.0 Proximity status indication handling at mobility RP-47 RP-100306 approved R2 R2-69 R2-101944 agreed 2010-03-19 EHNB-RAN2 - 2010-03-21
0404 - F Rel-9 9.1.0 9.2.0 Upper layer aspect of MBSFN area id RP-47 RP-100305 approved R2 R2-69 R2-101818 agreed 2010-03-19 MBMS_LTE - 2010-03-21
0405 - F Rel-9 9.1.0 9.2.0 Redirection for enhanced 1xRTT CS fallback with concurrent PSHO RP-47 RP-100308 approved R2 R2-69 R2-101834 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0406 - F Rel-9 9.1.0 9.2.0 Avoiding interleaving transmission of CMAS notifications RP-47 RP-100301 approved R2 R2-69 R2-101859 agreed 2010-03-19 PWS-RAN - 2010-03-21
0407 1 F Rel-9 9.1.0 9.2.0 Introduction of UE GERAN DTM capability indicator RP-47 RP-100308 approved R2 R2-69 R2-101882 agreed 2010-03-19 TEI9, LTE-L23 - 2010-03-21
0408 - F Rel-9 9.1.0 - Introducing provisions for late corrections RP-47 RP-100308 revised R2 R2-69 R2-101934 agreed 2010-03-19 TEI9, LTE-L23 revised in RP-100131 2010-03-21
0408 1 F Rel-9 9.1.0 - Introducing provisions for late ASN.1 corrections RP-47 RP-100131 revised Smsung - - - 2010-03-19 TEI9, LTE-L23 company contribution; intending to replace RAN2 agreed CR R2-101934 in RP-100308; revised in RP-100381 2010-03-21
0408 2 F Rel-9 9.1.0 9.2.0 Introducing provisions for late ASN.1 corrections RP-47 RP-100381 approved Smsung - - - 2010-03-19 TEI9, LTE-L23 company contribution; intending to replace RAN2 agreed CR R2-101934 in RP-100308 2010-03-21
0409 - F Rel-8 8.8.0 - FGI bit for PDSCH transmission mode 4 and 6: separate FGI bits RP-47 RP-100243 withdrawn Nokia Corporation, Nokia Siemens Networks - - - 2010-03-19 LTE-L23 alternative approach to RP-100241 where modes 4 and 6 are separated to separate FGI bits 2010-03-21
0410 - A Rel-9 9.1.0 - FGI bit for PDSCH transmission mode 4 and 6: separate FGI bits RP-47 RP-100244 withdrawn Nokia Corporation, Nokia Siemens Networks - - - 2010-03-19 LTE-L23 alternative approach to RP-100242 where modes 4 and 6 are separated to separate FGI bits 2010-03-21
0411 - F Rel-9 9.1.0 9.2.0 Correction/ alignment of REL-9 UE capability signalling RP-47 RP-100245 approved Smsung - - - 2010-03-19 TEI9, LTE-L23 company CR; last minute ASN.1 correction before the ASN.1 freeze 2010-03-21
0412 - F Rel-9 9.2.0 9.3.0 Clarification for mapping between warning message and CB-data RP-48 RP-100553 approved R2 R2-70 R2-102727 agreed 2010-06-04 PWS-RAN - 2010-05-31
0413 - F Rel-9 9.2.0 9.3.0 Clarification of radio link failure related actions RP-48 RP-100556 approved R2 R2-70 R2-102728 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0414 - F Rel-9 9.2.0 9.3.0 Clarification on UE actions upon leaving RRC_CONNECTED RP-48 RP-100554 approved R2 R2-70 R2-102729 agreed 2010-06-04 MBMS_LTE - 2010-05-31
0415 - F Rel-9 9.2.0 9.3.0 Correction on CMAS system information RP-48 RP-100553 approved R2 R2-70 R2-102730 agreed 2010-06-04 PWS-RAN - 2010-05-31
0416 1 F Rel-9 9.2.0 9.3.0 Corrections to MBMS RP-48 RP-100554 approved R2 R2-70 R2-103417 agreed 2010-06-04 MBMS_LTE - 2010-05-31
0417 1 F Rel-8 8.9.0 8.10.0 Decoding of unknown future extensions RP-48 RP-100536 approved R2 R2-70 R2-103405 agreed 2010-06-04 LTE-L23 - 2010-05-31
0418 - A Rel-9 9.2.0 9.3.0 Decoding of unknown future extensions RP-48 RP-100536 approved R2 R2-70 R2-102733 agreed 2010-06-04 LTE-L23 - 2010-05-31
0419 1 F Rel-9 9.2.0 9.3.0 Miscellaneous small corrections and clarifications RP-48 RP-100556 approved R2 R2-70 R2-103419 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0420 - F Rel-9 9.2.0 9.3.0 Prohibit timer for proximity indication RP-48 RP-100551 approved R2 R2-70 R2-102735 agreed 2010-06-04 EHNB-RAN2 - 2010-05-31
0421 - F Rel-9 9.2.0 9.3.0 RLF report for MRO correction RP-48 RP-100556 approved R2 R2-70 R2-102736 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0422 1 F Rel-8 8.9.0 8.10.0 Missing UTRA bands in IRAT-ParametersUTRA-FDD RP-48 RP-100546 approved R2 R2-70 R2-103275 agreed 2010-06-04 RInImp9-UMTSLTE800, RInImp9-UMTSLTE800EU, UMTSLTE1500 - 2010-05-31
0423 1 A Rel-9 9.2.0 9.3.0 Missing UTRA bands in IRAT-ParametersUTRA-FDD RP-48 RP-100546 approved R2 R2-70 R2-103276 agreed 2010-06-04 RInImp9-UMTSLTE800, RInImp9-UMTSLTE800EU, UMTSLTE1500 - 2010-05-31
0424 - F Rel-9 9.2.0 9.3.0 Correction on handling of dedicated RLF timers RP-48 RP-100556 approved R2 R2-70 R2-103263 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0431 1 F Rel-9 9.2.0 9.3.0 Protection of RRC messages RP-48 RP-100556 approved R2 R2-70 R2-103442 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0433 - F Rel-9 9.2.0 9.3.0 Handling missing Essential system information RP-48 RP-100556 approved R2 R2-70 R2-103423 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0434 1 F Rel-9 9.2.0 9.3.0 Clarification on UMTS CSG detected cell reporting in LTE RP-48 RP-100551 approved R2 R2-70 R2-103458 agreed 2010-06-04 EHNB-RAN2 - 2010-05-31
0436 - F Rel-9 9.2.0 9.3.0 Introducing provisions for late corrections RP-48 RP-100556 approved R2 R2-70 R2-103424 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0437 - F Rel-9 9.2.0 9.3.0 Clarification regarding / alignment of REL-9 UE capabilities RP-48 RP-100556 approved R2 R2-70 R2-103425 agreed 2010-06-04 TEI9, LTE-L23 - 2010-05-31
0439 - F Rel-8 8.10.0 8.11.0 Correction to 3GPP2 reference for interworking with cdma2000 1x RP-49 RP-100845 approved R2 R2-71 R2-104273 agreed 2010-08-11 LTE-L23 - 2010-09-14
0440 - F Rel-9 9.3.0 9.4.0 Correction to 3GPP2 reference for interworking with cdma2000 1x RP-49 RP-100845 approved R2 R2-71 R2-104274 agreed 2010-08-11 TEI9, LTE-L23 - 2010-09-14
0441 - F Rel-9 9.3.0 9.4.0 Clarification on UL handover preparation transfer RP-49 RP-100851 approved R2 R2-71 R2-104275 agreed 2010-08-16 TEI9 - 2010-09-14
0442 1 F Rel-9 9.3.0 9.4.0 Clarifications regarding fullConfiguration RP-49 RP-100851 approved R2 R2-71 R2-104979 agreed 2010-09-08 TEI9, LTE-L23 - 2010-09-14
0443 - F Rel-9 9.3.0 9.4.0 Clarifications regarding handover to E-UTRAN RP-49 RP-100851 approved R2 R2-71 R2-104277 agreed 2010-09-08 TEI9, LTE-L23 - 2010-09-14
0444 - F Rel-9 9.3.0 9.4.0 Correction on the table of conditionally mandatory Release 9 features RP-49 RP-100854 approved R2 R2-71 R2-104278 agreed 2010-08-12 LTE-L23, TEI9, SSAC - 2010-09-14
0445 - F Rel-9 9.3.0 9.4.0 Corrections to TS36.331 on MeasConfig IE RP-49 RP-100851 approved R2 R2-71 R2-104279 agreed 2010-08-16 TEI9, LTE-L23 - 2010-09-14
0446 2 F Rel-9 9.3.0 9.4.0 CR to 36.331 on clarification for MBMS PTM RBs RP-49 RP-100853 approved R2 R2-71 R2-104989 agreed 2010-08-27 MBMS_LTE - 2010-09-14
0447 - F Rel-9 9.3.0 9.4.0 Introduction of late corrections container for E-UTRA UE capabilities RP-49 RP-100851 approved R2 R2-71 R2-104281 agreed 2010-09-08 TEI9, LTE-L23 - 2010-09-14
0448 - F Rel-9 9.3.0 9.4.0 Renaming of containers for late non-critical extensions RP-49 RP-100851 approved R2 R2-71 R2-104282 agreed 2010-09-08 TEI9 - 2010-09-14
0452 - F Rel-9 9.3.0 9.4.0 Clarifications Regarding Redirection from LTE RP-49 RP-100851 approved R2 R2-71 R2-104943 agreed 2010-08-27 TEI9, LTE-L23 - 2010-09-14
0453 - F Rel-8 8.10.0 8.11.0 Description of multi-user MIMO functionality in feature group indicator table RP-49 RP-100845 approved R2 R2-71 R2-104965 agreed 2010-08-25 LTE-L23 - 2010-09-14
0456 - A Rel-9 9.3.0 9.4.0 Description of multi-user MIMO functionality in feature group indicator table RP-49 RP-100845 approved R2 R2-71 R2-104966 agreed 2010-08-25 LTE-L23 - 2010-09-14
0457 - F Rel-8 8.10.0 8.11.0 Correct the PEMAX_H to PEMAX RP-49 RP-100845 approved R2 R2-71 R2-104969 agreed 2010-08-24 TEI8, LTE-L23 - 2010-09-14
0458 - A Rel-9 9.3.0 9.4.0 Correct the PEMAX_H to PEMAX RP-49 RP-100845 approved R2 R2-71 R2-104970 agreed 2010-08-24 TEI8, LTE-L23 - 2010-09-14
0460 - F Rel-9 9.3.0 9.4.0 Clarification for feature group indicator bit 11 RP-49 RP-100851 approved R2 R2-71 R2-104980 agreed 2010-08-24 TEI9, LTE-L23 - 2010-09-14
0465 1 F Rel-9 9.3.0 9.4.0 Clarification on FGI setting for inter-RAT features not supported by the UE RP-49 RP-100851 approved R2 R2-71 R2-105234 agreed 2010-08-27 LTE-L23, TEI9 - 2010-09-14
0473 - F Rel-9 9.3.0 - Clarification of the meaning of FGI bit 1 and bit 2 for Rel-9 RP-49 RP-100929 revised Telecom Italia, KDDI, Verizon - - - 2010-09-09 LTE-L23, TEI9 - 2010-09-14
0473 1 F Rel-9 9.3.0 - Clarification of the meaning of FGI bit 1 and bit 2 for Rel-9 RP-49 RP-100949 withdrawn KDDI, Telecom Italia, Verizon - - - 2010-09-12 LTE-L23, TEI9 - 2010-09-13
0474 - F Rel-9 9.3.0 - FGI settings in Rel-9 RP-49 RP-100943 revised KDDI - - - 2010-09-09 LTE-L23, TEI9 - 2010-09-14
0474 1 F Rel-9 9.3.0 - FGI bits related to CDMA2000 in Rel-9 RP-49 RP-100948 withdrawn KDDI - - - 2010-09-12 LTE-L23, TEI9 - 2010-09-14
0475 - F Rel-9 9.3.0 - FGI settings in Rel-9 RP-49 RP-100947 revised NTT DOCOMO, INC., Deutsche Telekom, AT&T, Telecom - - - 2010-09-14 LTE-L23, TEI9 - 2010-09-14
0475 1 F Rel-9 9.3.0 9.4.0 FGI settings in Rel-9 RP-49 RP-101008 approved Sme as above - - - 2010-09-17 LTE-L23, TEI9 - 2010-09-18
0476 3 B Rel-10 9.4.0 - Introduction of Minimization of Drive Tests RP-50 RP-101221 revised R2 R2-72 R2-106937 agreed 2010-12-10 MDT_UMTSLTE-Core company contribution in RP-101183 for RAN #50 to revise this CR 2010-12-05
0476 4 B Rel-10 9.4.0 10.0.0 36.331 CR on Introduction of Minimization of Drive Tests RP-50 RP-101183 approved Nokia Siemens Networks, Nokia Corporation - - - 2010-12-10 MDT_UMTSLTE-Core company contribution to RAN #50 replacing R2-106937 in RP-101221 2010-12-05
0477 4 B Rel-10 9.4.0 10.0.0 AC-Barring for Mobile Originating CSFB call RP-50 RP-101293 approved NTT DOCOMO, INC., Panasonic, NEC, Fujitsu, Samsung - - - 2010-12-10 LTE-L23, TEI10 company contribution to RAN #50; is a revision of R2-106940 for which RAN2 email discussion [72#05] achieved no consensus;^^see also counter proposal in RP-101289 2010-12-05
0478 - F Rel-10 9.4.0 10.0.0 Addition of UE-EUTRA-Capability descriptions RP-50 RP-101214 approved R2 R2-72 R2-106137 agreed 2010-12-10 TEI10, LTE-L23 - 2010-12-05
0481 - F Rel-10 9.4.0 10.0.0 Clarification on Default Configuration for CQI-ReportConfig RP-50 RP-101214 approved R2 R2-72 R2-106140 agreed 2010-12-10 TEI10, LTE-L23 - 2010-12-05
0482 - F Rel-8 8.11.0 8.12.0 Clarification on Meaning of FGI Bits RP-50 RP-101197 approved R2 R2-72 R2-106141 agreed 2010-12-10 LTE-L23 - 2010-12-05
0483 - A Rel-9 9.4.0 9.5.0 Clarification on Meaning of FGI Bits RP-50 RP-101197 approved R2 R2-72 R2-106142 agreed 2010-12-10 LTE-L23 - 2010-12-05
0484 - F Rel-8 8.11.0 8.12.0 Clarification regarding reconfiguration of the quantityConfig RP-50 RP-101197 approved R2 R2-72 R2-106143 agreed 2010-12-10 LTE-L23 - 2010-12-05
0485 - A Rel-9 9.4.0 9.5.0 Clarification regarding reconfiguration of the quantityConfig RP-50 RP-101197 approved R2 R2-72 R2-106144 agreed 2010-12-10 LTE-L23 - 2010-12-05
0486 1 F Rel-9 9.4.0 9.5.0 Corrections to the presence of IE regarding DRX and CQI RP-50 RP-101210 approved R2 R2-72 R2-106851 agreed 2010-12-10 TEI9, LTE-L23 - 2010-12-05
0487 - B Rel-10 9.4.0 10.0.0 CR to 36.331 adding e1xCSFB support for dual Rx/Tx UE RP-50 RP-101215 approved R2 R2-72 R2-106146 agreed 2010-12-10 TEI10, LTE-L23 linked to CT CRs 2010-12-05
0488 1 B Rel-10 9.4.0 10.0.0 Introduction of Carrier Aggregation and UL/ DL MIMO RP-50 RP-101227 approved R2 R2-72 R2-106856 agreed 2010-12-10 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2010-12-05
0489 1 B Rel-10 9.4.0 10.0.0 Introduction of relays in RRC RP-50 RP-101228 approved R2 R2-72 R2-106886 agreed 2010-12-10 LTE_Relay-Core - 2010-12-05
0490 1 B Rel-10 9.4.0 10.0.0 Priority indication for CSFB with re-direction RP-50 RP-101214 approved R2 R2-72 R2-106906 agreed 2010-12-10 TEI10, LTE-L23, eMPS - 2010-12-05
0491 - F Rel-10 9.4.0 10.0.0 SIB Size Limitations RP-50 RP-101214 approved R2 R2-72 R2-106150 agreed 2010-12-10 TEI10, LTE-L23 - 2010-12-05
0492 1 B Rel-10 9.4.0 - Stage-3 CR for MBMS enhancement RP-50 RP-101231 postponed R2 R2-72 R2-106882 agreed 2010-12-10 MBMS_LTE_enh-Core - 2010-12-05
0493 - F Rel-9 9.4.0 9.5.0 The field descriptions of MeasObjectEUTRA RP-50 RP-101210 approved R2 R2-72 R2-106152 agreed 2010-12-10 TEI9, LTE-L23 - 2010-12-05
0497 2 F Rel-8 8.11.0 8.12.0 Clarification of FGI settings non ANR periodical measurement reporting (contact: NSN) RP-50 RP-101197 approved R2 R2-72 R2-106945 agreed 2010-12-10 LTE-L23 - 2010-12-05
0498 1 A Rel-9 9.4.0 9.5.0 Clarification of FGI settings non ANR periodical measurement reporting RP-50 RP-101197 approved R2 R2-72 R2-106690 agreed 2010-12-10 LTE-L23 - 2010-12-05
0500 - F Rel-9 9.4.0 9.5.0 Corrections to RLF Report RP-50 RP-101209 approved R2 R2-72 R2-106853 agreed 2010-12-10 SON - 2010-12-05
0506 - F Rel-8 8.11.0 8.12.0 Clarification regarding default configuration value N/A RP-50 RP-101197 approved R2 R2-72 R2-106691 agreed 2010-12-10 LTE-L23 - 2010-12-05
0513 - C Rel-10 9.4.0 10.0.0 Combined Quantity Report for IRAT measurement of UTRAN RP-50 RP-101214 approved R2 R2-72 R2-106912 agreed 2010-12-10 TEI10, LTE-L23 - 2010-12-05
0519 1 F Rel-9 9.4.0 9.5.0 T321 timer fix RP-50 RP-101206 approved R2 R2-72 R2-106923 agreed 2010-12-10 EHNB-RAN2 - 2010-12-05
0523 - F Rel-8 8.11.0 8.12.0 Restriction of AC barring parameter setting RP-50 RP-101197 approved R2 R2-72 R2-106693 agreed 2010-12-10 LTE-L23 - 2010-12-05
0524 - A Rel-9 9.4.0 9.5.0 Restriction of AC barring parameter setting RP-50 RP-101197 approved R2 R2-72 R2-106694 agreed 2010-12-10 LTE-L23, SSAC - 2010-12-05
0525 - F Rel-9 9.4.0 9.5.0 Removal of SEQUENCE OF SEQUENCE in UEInformationResponse RP-50 RP-101210 approved R2 R2-72 R2-106852 agreed 2010-12-10 TEI9, LTE-L23 - 2010-12-05
0526 1 A Rel-9 9.4.0 9.5.0 Clarification regarding default configuration value N/A RP-50 RP-101197 approved R2 R2-72 R2-106901 agreed 2010-12-10 LTE-L23 - 2010-12-05
0527 1 F Rel-10 9.4.0 10.0.0 UE power saving and Local release RP-50 RP-101214 approved R2 R2-72 R2-106941 agreed 2010-12-10 TEI10, LTE-L23 - 2010-12-05
0528 - B Rel-10 9.4.0 - UE capability signaling for CA and MIMO in REL10 RP-50 RP-101291 withdrawn Renesas Technology Europe, Nokia Corporation, Nokia Siemens Networks - - - 2010-12-10 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core company contribution to RAN #50; is a resubmission of R2-106934 which was not agreed in RAN2 email discussion [72#01] 2010-12-05
0529 - F Rel-9 9.4.0 - FGI bits related to CDMA2000 in Rel-9 RP-50 RP-101259 postponed KDDI - - - 2010-12-10 TEI9, LTE-L23 company contribution to RAN #50 2010-12-05
0530 - B Rel-10 9.4.0 - Inclusion of new UE categories in Rel-10 RP-50 RP-101267 revised Ericsson, ST-Ericsson - - - 2010-12-10 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core is a counter proposal to RP-101291 which was not agreed in RAN2 as R2-106934 in email discussion [72#01] 2010-12-05
0530 1 B Rel-10 9.4.0 10.0.0 Inclusion of new UE categories in Rel-10 RP-50 RP-101429 approved Ericsson, ST-Ericsson, Renesas Technology Europe, - - - 2010-12-09 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_M - 2010-12-09
0531 - B Rel-10 9.4.0 - AC-Barring for Mobile Originating CSFB call RP-50 RP-101289 withdrawn Renesas Technology Europe, Nokia Corporation, Nokia Siemens Networks - - - 2010-12-10 LTE-L23, TEI10 company contribution to RAN #50; is a counter proposal to RP-101293 2010-12-05
0532 - F Rel-9 9.4.0 9.5.0 Splitting FGI bit 3 RP-50 RP-101431 approved Qualcomm Incorporated - - - 2010-12-09 TEI9 - 2010-12-09
0533 - F Rel-10 10.0.0 10.1.0 36331_CRxxx_Protection of Logged Measurements Configuration RP-51 RP-110282 approved R2 R2-73 R2-110799 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0534 1 B Rel-10 10.0.0 10.1.0 Stage-3 CR for MBMS enhancement RP-51 RP-110294 approved R2 R2-73 R2-110800 agreed 2011-03-18 MBMS_LTE_enh-Core - 2011-03-14
0535 - D Rel-10 10.0.0 10.1.0 Clean up MDT-related text RP-51 RP-110282 approved R2 R2-73 R2-110801 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0536 - F Rel-10 10.0.0 10.1.0 Clear MDT configuration and logs when the UE is not registered RP-51 RP-110282 approved R2 R2-73 R2-110802 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0537 - F Rel-10 10.0.0 10.1.0 Correction to the field description of nB RP-51 RP-110280 approved R2 R2-73 R2-110803 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0538 - F Rel-10 10.0.0 10.1.0 CR on impact on UP with remove&add approach_2 RP-51 RP-110289 approved R2 R2-73 R2-110804 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0539 - F Rel-10 10.0.0 10.1.0 CR to 36.331 on corrections for MDT RP-51 RP-110282 approved R2 R2-73 R2-110805 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0542 - C Rel-10 10.0.0 - Explicit AS signalling for mapped PTMSI/GUTI RP-51 RP-110280 postponed R2 R2-73 R2-110808 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0543 - B Rel-10 10.0.0 10.1.0 Introduction of CA/MIMO capability signalling and measurement capability signalling in CA RP-51 RP-110290 approved R2 R2-73 R2-110809 agreed 2011-03-18 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-03-14
0544 - F Rel-10 10.0.0 10.1.0 MDT PDU related clarifications RP-51 RP-110282 approved R2 R2-73 R2-110810 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0545 - F Rel-10 10.0.0 10.1.0 Correction on release of logged measurement configuration while in another RAT RP-51 RP-110282 approved R2 R2-73 R2-110811 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0546 - F Rel-10 10.0.0 10.1.0 Miscellaneous Corrections for CA Running RRC CR RP-51 RP-110289 approved R2 R2-73 R2-110812 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0547 1 F Rel-10 10.0.0 10.1.0 Miscellaneous small clarifications and corrections RP-51 RP-110280 approved R2 R2-73 R2-111595 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0548 4 B Rel-10 10.0.0 10.1.0 Necessary changes for RLF reporting enhancements RP-51 RP-110293 approved R2 R2-73 R2-111764 agreed 2011-03-18 SONenh_LTE-Core - 2011-03-14
0549 1 F Rel-10 10.0.0 10.1.0 Memory size for logged measurements capable UE RP-51 RP-110282 approved R2 R2-73 R2-111510 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0550 - F Rel-10 10.0.0 10.1.0 Parameters confusion of non-CA and CA configurations RP-51 RP-110289 approved R2 R2-73 R2-110816 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0552 - F Rel-9 9.5.0 9.6.0 Presence condition for cellSelectionInfo-v920 in SIB1 RP-51 RP-110272 approved R2 R2-73 R2-110818 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0553 - A Rel-10 10.0.0 10.1.0 Presence condition for cellSelectionInfo-v920 in SIB1 RP-51 RP-110272 approved R2 R2-73 R2-110819 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0554 1 F Rel-10 10.0.0 10.1.0 Removal of MDT configuration at T330 expiry RP-51 RP-110282 approved R2 R2-73 R2-111381 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0556 1 F Rel-10 10.0.0 10.1.0 Signalling aspects of existing LTE-A parameters RP-51 RP-110289 approved R2 R2-73 R2-111552 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0557 1 F Rel-10 10.0.0 10.1.0 Some Corrections on measurement RP-51 RP-110280 approved R2 R2-73 R2-111391 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0558 - F Rel-10 10.0.0 10.1.0 Stored system information for RNs RP-51 RP-110291 approved R2 R2-73 R2-110824 agreed 2011-03-18 LTE_Relay-Core - 2011-03-14
0559 - B Rel-10 10.0.0 10.1.0 Support of Integrity Protection for Relay RP-51 RP-110291 approved R2 R2-73 R2-110825 agreed 2011-03-18 LTE_Relay-Core - 2011-03-14
0561 2 B Rel-10 10.0.0 10.1.0 Updates of L1 parameters for CA and UL/DL MIMO RP-51 RP-110290 approved R2 R2-73 R2-111688 agreed 2011-03-18 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-03-14
0571 1 F Rel-10 10.0.0 10.1.0 Note for Dedicated SIB for RNs RP-51 RP-110291 approved R2 R2-73 R2-111605 agreed 2011-03-18 LTE_Relay-Core - 2011-03-14
0572 1 F Rel-8 8.12.0 - 36331_CRxxx_(REL-8)_Handling of Spare Establishment Cause RP-51 RP-110285 rejected R2 R2-73 R2-111704 technically endorsed 2011-03-18 LTE-L23 - 2011-03-14
0573 - A Rel-9 9.5.0 - 36331_CRxxx_(REL-9)_Handling of Spare Establishment Cause RP-51 RP-110285 rejected R2 R2-73 R2-111696 technically endorsed 2011-03-18 LTE-L23 - 2011-03-14
0574 - A Rel-10 10.0.0 - 36331_CRxxx_(REL-10)_Handling of Spare Establishment Cause RP-51 RP-110285 rejected R2 R2-73 R2-111697 technically endorsed 2011-03-18 LTE-L23 - 2011-03-14
0578 - F Rel-9 9.5.0 9.6.0 Correction to cs-fallbackIndicator field description RP-51 RP-110272 approved R2 R2-73 R2-111530 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0579 - A Rel-10 10.0.0 10.1.0 Correction to cs-fallbackIndicator field description RP-51 RP-110272 approved R2 R2-73 R2-111531 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0580 - F Rel-10 10.0.0 10.1.0 Clarification to the default configuration of sCellDeactivationTimer RP-51 RP-110289 approved R2 R2-73 R2-111550 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0581 - F Rel-10 10.0.0 10.1.0 Miscellaneous corrections to TS 36.331 on Carrier Aggregation RP-51 RP-110289 approved R2 R2-73 R2-111570 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0584 - F Rel-10 10.0.0 10.1.0 Correction of configuration description in SIB2 RP-51 RP-110280 approved R2 R2-73 R2-111519 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0585 - F Rel-8 8.12.0 8.13.0 Clarification of band indicator in handover from E-UTRAN to GERAN RP-51 RP-110265 approved R2 R2-73 R2-111710 agreed 2011-03-18 LTE-L23 - 2011-03-14
0586 - F Rel-9 9.5.0 9.6.0 Clarification of band indicator in handover from E-UTRAN to GERAN RP-51 RP-110265 approved R2 R2-73 R2-111711 agreed 2011-03-18 LTE-L23 - 2011-03-14
0587 - A Rel-10 10.0.0 10.1.0 Clarification of band indicator in handover from E-UTRAN to GERAN RP-51 RP-110265 approved R2 R2-73 R2-111712 agreed 2011-03-18 LTE-L23 - 2011-03-14
0588 1 B Rel-10 10.0.0 10.1.0 36331_CRxxxx Support of Delay Tolerant access requests RP-51 RP-110285 approved R2 R2-73 R2-111703 technically endorsed 2011-03-18 NIMTC-RAN_overload - 2011-03-14
0590 - B Rel-10 10.0.0 10.1.0 Update of R2-110807 on CSI measurement resource restriction for time domain ICIC RP-51 RP-110292 approved R2 R2-73 R2-111618 agreed 2011-03-18 eICIC_LTE-Core - 2011-03-14
0591 - B Rel-10 10.0.0 10.1.0 Update of R2-110821 on RRM/RLM resource restriction for time domain ICIC RP-51 RP-110292 approved R2 R2-73 R2-111617 agreed 2011-03-18 eICIC_LTE-Core - 2011-03-14
0592 - F Rel-10 10.0.0 10.1.0 Corrections on UE capability related parameters RP-51 RP-110290 approved R2 R2-73 R2-111551 agreed 2011-03-18 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-03-14
0596 - B Rel-10 10.0.0 10.1.0 Validity time for location information in Immediate MDT RP-51 RP-110282 approved R2 R2-73 R2-111574 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0597 - B Rel-10 10.0.0 10.1.0 CR to 36.331 adding UE capability indicator for dual Rx/Tx e1xCSFB RP-51 RP-110280 approved R2 R2-73 R2-111585 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0598 - F Rel-10 10.0.0 10.1.0 Miscellaneous corrections to CA RP-51 RP-110289 approved R2 R2-73 R2-111549 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0599 - F Rel-10 10.0.0 10.1.0 Further correction to combined measurement report of UTRAN RP-51 RP-110280 approved R2 R2-73 R2-111576 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0600 - F Rel-10 10.0.0 10.1.0 Correction to the reference of ETWS RP-51 RP-110280 approved R2 R2-73 R2-111577 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0602 1 C Rel-10 10.0.0 10.1.0 Introduction of OTDOA inter-freq RSTD measurement indication procedure RP-51 RP-110269 approved R2 R2-73 R2-111692 agreed 2011-03-18 TEI10, LCS_LTE - 2011-03-14
0603 - F Rel-10 10.0.0 10.1.0 Correction of use of RRCConnectionReestablishment message for contention resolution RP-51 RP-110280 approved R2 R2-73 R2-111578 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0604 - F Rel-10 10.0.0 10.1.0 CR to 36.331 on MDT neighbour cell measurements logging RP-51 RP-110282 approved R2 R2-73 R2-111571 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0608 - F Rel-9 9.5.0 9.6.0 Minor ASN.1 corrections for the UEInformationResponse message RP-51 RP-110272 approved R2 R2-73 R2-111534 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0609 - A Rel-10 10.0.0 10.1.0 Minor ASN.1 corrections for the UEInformationResponse message RP-51 RP-110272 approved R2 R2-73 R2-111535 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0613 - F Rel-10 10.0.0 10.1.0 Clarification regarding dedicated RLF timers and constants RP-51 RP-110280 approved R2 R2-73 R2-111579 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0615 - F Rel-10 10.0.0 10.1.0 Release of Logged Measurement Configuration RP-51 RP-110282 approved R2 R2-73 R2-111572 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0616 - F Rel-10 10.0.0 10.1.0 Some corrections on TS 36.331 RP-51 RP-110280 approved R2 R2-73 R2-111580 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0623 - F Rel-10 10.0.0 10.1.0 AC barring procedure clean up RP-51 RP-110280 approved R2 R2-73 R2-111587 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0624 - B Rel-10 10.0.0 10.1.0 Counter proposal to R2-110826 on UE capabilities for MDT RP-51 RP-110282 approved R2 R2-73 R2-111509 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0628 1 F Rel-10 10.0.0 10.1.0 UE information report for RACH RP-51 RP-110280 approved R2 R2-73 R2-111623 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0629 2 B Rel-10 10.0.0 10.1.0 Measurement on the deactivated SCells RP-51 RP-110289 approved R2 R2-73 R2-111721 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0632 1 F Rel-10 10.0.0 10.1.0 Trace configuration paremeters for Logged MDT RP-51 RP-110282 approved R2 R2-73 R2-111718 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0635 - F Rel-10 10.0.0 10.1.0 Clarification on stop condition for timer T3330 RP-51 RP-110282 approved R2 R2-73 R2-111573 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0637 - F Rel-10 10.0.0 10.1.0 User consent for MDT RP-51 RP-110282 approved R2 R2-73 R2-111513 agreed 2011-03-18 MDT_UMTSLTE-Core - 2011-03-14
0638 - F Rel-10 10.0.0 10.1.0 Correction on the range of CQI resource index RP-51 RP-110280 approved R2 R2-73 R2-111520 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0639 - F Rel-9 9.5.0 9.6.0 Small corrections to ETWS & CMAS system information RP-51 RP-110272 approved R2 R2-73 R2-111532 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0640 1 A Rel-10 10.0.0 10.1.0 Small corrections to ETWS & CMAS system information RP-51 RP-110272 approved R2 R2-73 R2-111606 agreed 2011-03-18 TEI9, LTE-L23 - 2011-03-14
0641 1 F Rel-10 10.0.0 10.1.0 UE capability signaling structure w.r.t carrier aggregation, MIMO and measurement gap RP-51 RP-110290 approved R2 R2-73 R2-111625 agreed 2011-03-18 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-03-14
0642 1 F Rel-10 10.0.0 10.1.0 Normal PHR and the multiple uplink carriers RP-51 RP-110289 approved R2 R2-73 R2-111622 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0643 1 C Rel-10 10.0.0 10.1.0 Corrections to TS36.331 on SIB2 handling RP-51 RP-110280 approved R2 R2-73 R2-111581 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0644 1 C Rel-10 10.0.0 10.1.0 Adding a Power Management indication in PHR RP-51 RP-110280 approved R2 R2-73 R2-111680 agreed 2011-03-18 TEI10, LTE-L23 - 2011-03-14
0646 1 F Rel-10 10.0.0 10.1.0 Clarification for CA and TTI bundling in RRC RP-51 RP-110289 approved R2 R2-73 R2-111725 agreed 2011-03-18 LTE_CA-Core - 2011-03-14
0647 - F Rel-9 9.5.0 - Updates to FGI settings RP-51 RP-110210 revised NTT DOCOMO - - - 2011-03-18 LTE-L23, TEI9 combined into CR0648r1 2011-03-14
0647 1 F Rel-9 9.5.0 - Updates to FGI settings RP-51 RP-110442 revised NTT DOCOMO, INC., AT&T, CMCC, Deutsche Telekom, KD - - - 2011-03-19 TEI9, LTE-L23 revision of RP-110210;^^revised in RP-110455 2011-03-19
0647 2 F Rel-9 9.5.0 9.6.0 Updates to FGI settings RP-51 RP-110455 approved NTT DOCOMO, INC., AT&T, CMCC, Deutsche Telekom, KDDI, Orange, Telecom Italia, Telefonica, TeliaSonera, Verizon - - - 2011-03-18 LTE-L23, TEI9 revision of RP-110442 2011-03-19
0648 - A Rel-10 10.0.0 - Updates to FGI settings RP-51 RP-110211 revised NTT DOCOMO - - - 2011-03-18 LTE-L23, TEI9 revised in RP-110443 2011-03-14
0648 1 A Rel-10 10.0.0 10.1.0 Updates to FGI settings RP-51 RP-110443 approved NTT DOCOMO, INC., AT&T, CMCC, Deutsche Telekom, KD - - - 2011-03-19 TEI9, LTE-L23 revision of RP-110211 2011-03-19
0649 - F Rel-9 9.5.0 - FGI bits related to CDMA2000 in Rel-9 RP-51 RP-110241 rejected KDDI - - - 2011-03-18 LTE-L23, TEI9 - 2011-03-14
0650 - A Rel-10 10.0.0 - FGI bits related to CDMA2000 in Rel-9 RP-51 RP-110242 rejected KDDI - - - 2011-03-18 LTE-L23, TEI9 - 2011-03-14
0651 - F Rel-10 10.1.0 10.2.0 Add MBMS counting procedure to processing delay requirement for RRC procedure section 11.2 RP-52 RP-110836 approved R2 R2-74 R2-112745 agreed 2011-04-28 MBMS_LTE_enh-Core - 2011-05-31
0652 - F Rel-9 9.6.0 9.7.0 Add pre Rel-10 procedures to processing delay requirement for RRC procedure section 11.2 RP-52 RP-110830 approved R2 R2-74 R2-112746 - 2011-04-28 TEI9, LTE-L23 - 2011-05-31
0653 - A Rel-10 10.1.0 10.2.0 Add pre Rel-10 procedures to processing delay requirement for RRC procedure section 11.2 RP-52 RP-110830 approved R2 R2-74 R2-112747 - 2011-04-28 TEI10, LTE-L23 - 2011-05-31
0654 1 B Rel-10 10.1.0 10.2.0 Addition of a specific reference for physical configuration fields RP-52 RP-110847 approved R2 R2-74 R2-113114 agreed 2011-04-30 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-05-31
0656 - F Rel-10 10.1.0 10.2.0 Clarification of inter-frequency RSTD measurement indication procedure RP-52 RP-110839 approved R2 R2-74 R2-112750 agreed 2011-05-01 TEI10, LTE-L23 - 2011-05-31
0657 - F Rel-9 9.6.0 9.7.0 Clarification of optionality of UE features without capability RP-52 RP-110830 approved R2 R2-74 R2-112751 agreed 2011-04-29 TEI9, LTE-L23 - 2011-05-31
0658 - F Rel-10 10.1.0 10.2.0 Clarification of optionality of UE features without capability RP-52 RP-110830 approved R2 R2-74 R2-112752 agreed 2011-04-29 TEI9, LTE-L23 - 2011-05-31
0660 - F Rel-10 10.1.0 10.2.0 Clarification on the definition of maxCellBlack RP-52 RP-110839 approved R2 R2-74 R2-112754 agreed 2011-04-29 TEI10, LTE-L23 - 2011-05-31
0661 - F Rel-10 10.1.0 10.2.0 Clarification on upper layers requested connection release RP-52 RP-110839 approved R2 R2-74 R2-112755 agreed 2011-04-29 TEI10, LTE-L23 - 2011-05-31
0662 3 F Rel-10 10.1.0 10.2.0 Clarification regarding eICIC measurements RP-52 RP-110850 approved R2 R2-74 R2-113540 agreed 2011-05-10 eICIC_LTE-Core - 2011-05-31
0663 - F Rel-10 10.1.0 10.2.0 CR for s-measure handling RP-52 RP-110839 approved R2 R2-74 R2-112757 agreed 2011-04-29 TEI10, LTE-L23 - 2011-05-31
0664 1 F Rel-10 10.1.0 10.2.0 CR on Clarification of RLF report in Carrier Aggregation RP-52 RP-110851 approved R2 R2-74 R2-113381 agreed 2011-05-04 SONenh_LTE-Core - 2011-05-31
0665 - F Rel-8 8.13.0 8.14.0 36.331 correction on CSG identity validity to allow introduction of CSG RAN sharing RP-52 RP-110828 approved R2 R2-74 R2-112759 agreed 2011-04-29 EHNB-RAN2 - 2011-05-31
0666 3 F Rel-9 9.6.0 - 36.331 correction on CSG identity validity to allow introduction of CSG RAN sharing RP-52 RP-110828 revised R2 R2-74 R2-113626 agreed 2011-05-13 TEI10, EHNB-RAN2 - 2011-05-31
0666 4 F Rel-9 9.6.0 - 36.331 correction on CSG identity validity to allow introduction of CSG RAN sharing RP-52 RP-110871 postponed TeliaSonera - R2-113626 - 2011-06-01 EHNB-RAN2 company contribution related to RP-110784;^^revision of R2-113626 (included in RP-110828);^^postponed, to be provided to next RAN2 meeting for review (based on latest spec) 2011-06-02
0667 3 F Rel-10 10.1.0 - 36.331 correction on CSG identity validity to allow introduction of CSG RAN sharing RP-52 RP-110828 revised R2 R2-74 R2-113627 agreed 2011-05-13 LTE-L23 - 2011-05-31
0667 4 F Rel-10 10.1.0 - 36.331 correction on CSG identity validity to allow introduction of CSG RAN sharing RP-52 RP-110872 postponed TeliaSonera - R2-113627 - 2011-06-01 TEI10, EHNB-RAN2 company contribution related to RP-110784;^^revision of R2-113627 (included in RP-110828);^^postponed, to be provided to next RAN2 meeting for review (based on latest spec) 2011-06-02
0668 - F Rel-9 9.6.0 9.7.0 Introduction of FGI bit for handover between FDD and TDD RP-52 RP-110830 approved R2 R2-74 R2-112762 agreed 2011-04-30 TEI9, LTE-L23 - 2011-05-31
0669 - A Rel-10 10.1.0 10.2.0 Introduction of FGI bit for handover between FDD and TDD RP-52 RP-110830 approved R2 R2-74 R2-112763 agreed 2011-04-30 TEI9, LTE-L23 - 2011-05-31
0670 2 B Rel-10 10.1.0 10.2.0 Further updates on L1 parameters RP-52 RP-110847 approved R2 R2-74 R2-113691 agreed 2011-05-21 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-05-31
0671 2 F Rel-10 10.1.0 10.2.0 General error handling for extension fields RP-52 RP-110839 approved R2 R2-74 R2-113544 agreed 2011-05-10 TEI10, LTE-L23 - 2011-05-31
0672 2 F Rel-10 10.1.0 10.2.0 Additional information for RLF report RP-52 RP-110851 approved R2 R2-74 R2-113636 agreed 2011-05-14 SONenh_LTE-Core - 2011-05-31
0673 - F Rel-10 10.1.0 10.2.0 Introduction of TCE ID for logged MDT RP-52 RP-110843 approved R2 R2-74 R2-112767 agreed 2011-04-29 MDT_UMTSLTE-Core - 2011-05-31
0674 3 F Rel-10 10.1.0 - Miscellaneous corrections (related to review in preparation for ASN.1 freeze) RP-52 RP-110839 revised R2 R2-74 R2-113641 agreed 2011-05-20 TEI10, LTE-L23 - 2011-05-31
0674 4 F Rel-10 10.1.0 10.2.0 Miscellaneous corrections (related to review in preparation for ASN.1 freeze) RP-52 RP-110670 approved Samsung - R2-113641 - 2011-05-25 TEI10, LTE-L23 company contribution replacing R2-113641 in RP-110839 2011-05-31
0675 - F Rel-10 10.1.0 10.2.0 PLMN check for MDT logging RP-52 RP-110843 approved R2 R2-74 R2-112769 agreed 2011-04-28 MDT_UMTSLTE-Core - 2011-05-31
0677 - F Rel-10 10.1.0 10.2.0 UE actions upon leaving RRC_CONNECTED RP-52 RP-110839 approved R2 R2-74 R2-112771 agreed 2011-04-29 TEI10, LTE-L23 - 2011-05-31
0678 - F Rel-10 10.1.0 10.2.0 Clarification on bandEUTRA-r10 and supportedBandListEUTRA RP-52 RP-110847 approved R2 R2-74 R2-112772 agreed 2011-04-29 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-05-31
0679 - F Rel-10 10.1.0 10.2.0 Updated value range for the Extended Wait Timer RP-52 RP-110837 approved R2 R2-74 R2-112773 agreed 2011-05-02 NIMTC-RAN_overload - 2011-05-31
0680 1 C Rel-10 10.1.0 10.2.0 Value range of drx-InactivityTimer RP-52 RP-110839 approved R2 R2-74 R2-113415 agreed 2011-05-10 TEI10, LTE-L23 - 2011-05-31
0691 1 F Rel-8 8.13.0 8.14.0 Correction for SR-VCC and QCI usage RP-52 RP-110828 approved R2 R2-74 R2-113654 agreed 2011-05-13 LTE-L23 - 2011-05-31
0692 1 A Rel-9 9.6.0 9.7.0 Correction for SR-VCC and QCI usage RP-52 RP-110828 approved R2 R2-74 R2-113655 agreed 2011-05-13 LTE-L23 - 2011-05-31
0693 1 A Rel-10 10.1.0 10.2.0 Correction for SR-VCC and QCI usage RP-52 RP-110828 approved R2 R2-74 R2-113656 agreed 2011-05-13 LTE-L23 - 2011-05-31
0694 - F Rel-10 10.1.0 10.2.0 Restructuring of CQI-ReportConfig-r10 RP-52 RP-110847 approved R2 R2-74 R2-113527 agreed 2011-05-10 LTE_CA-Core, LTE_eDL_MIMO-Core, eICIC_LTE-Core - 2011-05-31
0695 2 F Rel-10 10.1.0 10.2.0 Correction on DL allocations in MBSFN subframes RP-52 RP-110839 approved R2 R2-74 R2-113635 agreed 2011-05-13 TEI10, LTE-L23 - 2011-05-31
0698 1 F Rel-8 8.13.0 8.14.0 Introduction of UE capability for handover between FDD and TDD RP-52 RP-110828 approved R2 R2-74 R2-113666 agreed 2011-05-13 LTE-L23 - 2011-05-31
0699 - F Rel-9 9.6.0 9.7.0 Radio frame alignment of CSA and MSP RP-52 RP-110830 approved R2 R2-74 R2-113521 agreed 2011-05-10 MBMS_LTE - 2011-05-31
0700 - A Rel-10 10.1.0 10.2.0 Reference SFN for MeasSubframePattern RP-52 RP-110850 approved R2 R2-74 R2-113542 agreed 2011-05-11 eICIC_LTE-Core - 2011-05-31
0701 - F Rel-10 10.1.0 10.2.0 Clarifications to CA related field descriptions RP-52 RP-110846 approved R2 R2-74 R2-113533 agreed 2011-05-11 LTE_CA-Core - 2011-05-31
0702 - F Rel-10 10.1.0 10.2.0 Corrections to codebookSubsetRestriction and SRS parameters RP-52 RP-110847 approved R2 R2-74 R2-113534 agreed 2011-05-11 LTE_CA-Core, LTE_eDL_MIMO-Core - 2011-05-31
0704 - F Rel-10 10.1.0 10.2.0 Corrections to the handling of ri-ConfigIndex for TM9 RP-52 RP-110834 approved R2 R2-74 R2-113535 agreed 2011-05-11 LTE_eDL_MIMO-Core - 2011-05-31
0710 1 F Rel-10 10.1.0 - UE capabilities for Rel-10 LTE features with eICIC measurement restrictions as FGI (Alt.1) RP-52 RP-110840 revised R2 R2-74 R2-113563 tech endorsed 2011-05-12 TEI10, LTE-L23 - 2011-05-31
0710 2 F Rel-10 10.1.0 10.2.0 CR to 36.331 on UE capabilities for Rel-10 LTE features with eICIC measurement restrictions as FGI (Alt.1) RP-52 RP-110715 approved NTT DOCOMO, INC., Nokia Siemens Networks, Nokia Co - RP-110715 - 2011-05-27 TEI10, LTE-L23 company contribution replacing technically endorsed CR R2-113563 in RP-110840 2011-05-31
0711 2 F Rel-10 10.1.0 - UE capabilities for Rel-10 LTE features with eICIC measurement restrictions as UE capabilit (Alt.2) RP-52 RP-110840 revised R2 R2-74 R2-113620 tech endorsed 2011-05-13 TEI10, LTE-L23 - 2011-05-31
0711 3 F Rel-10 10.1.0 - CR to 36.331 on UE capabilities for Rel-10 LTE features with eICIC measurement restrictions as UE capability (Alt.2) RP-52 RP-110716 rejected NTT DOCOMO, INC., Nokia Siemens Networks, Nokia Co - RP-110716 - 2011-05-27 TEI10, LTE-L23 company contribution replacing technically endorsed CR R2-113620 in RP-110840 2011-05-31
0713 - C Rel-10 10.1.0 10.2.0 CR to 36.331 on redirected utra-TDD carrier frequency RP-52 RP-110839 approved R2 R2-74 R2-113405 agreed 2011-05-13 TEI10, LTE-L23 - 2011-05-31
0714 - C Rel-10 10.1.0 10.2.0 Explicit AS signalling for mapped PTMSI/GUTI RP-52 RP-110839 approved R2 R2-74 R2-113558 agreed 2011-05-11 TEI10, LTE-L23 - 2011-05-31
0718 - F Rel-10 10.1.0 10.2.0 Counter proposal for Updates of mandatory information in AS-Config RP-52 RP-110847 approved R2 R2-74 R2-113229 agreed 2011-05-11 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-05-31
0719 - F Rel-10 10.1.0 10.2.0 Reconfiguration of discardTimer field in PDCP-Config RP-52 RP-110839 approved R2 R2-74 R2-113638 agreed 2011-05-13 TEI10, LTE-L23 - 2011-05-31
0723 - F Rel-10 10.1.0 10.2.0 On the missing multiplicity of UE capability parameters RP-52 RP-110847 approved R2 R2-74 R2-113529 agreed 2011-05-13 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-05-31
0735 - A Rel-10 10.1.0 10.2.0 Radio frame alignment of CSA and MSP RP-52 RP-110830 approved R2 R2-74 R2-113522 agreed 2011-05-10 MBMS_LTE - 2011-05-31
0740 - F Rel-10 10.1.0 10.2.0 Reconfiguration involving critically extended IEs (using fullFieldConfig i.e. option 2) RP-52 RP-110847 approved R2 R2-74 R2-113545 agreed 2011-05-12 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-05-31
0744 - F Rel-10 10.1.0 10.2.0 Clarification on CSG identity RP-52 RP-110839 approved R2 R2-74 R2-113543 agreed 2011-05-11 TEI10, LTE-L23 - 2011-05-31
0746 1 C Rel-10 10.1.0 10.2.0 Increase of prioritisedBitRate RP-52 RP-110839 approved R2 R2-74 R2-113622 agreed 2011-05-13 TEI10, LTE-L23 - 2011-05-31
0747 - F Rel-10 10.1.0 10.2.0 CA and MIMO Capabilities in LTE Rel-10 RP-52 RP-110847 approved R2 R2-74 R2-113631 agreed 2011-05-13 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-05-31
0748 - F Rel-9 9.6.0 9.7.0 Default value of extensions introduced from REL-9 RP-52 RP-110830 approved R2 R2-74 R2-113657 agreed 2011-05-13 TEI9, LTE-L23 - 2011-05-31
0749 - F Rel-10 10.1.0 - Correction on PUCCH configuration for Un interface RP-52 RP-110854 revised CATT - - - 2011-05-31 LTE_Relay-Core company contribution of new CR; CR linked to RP-110853 2011-05-31
0749 1 F Rel-10 10.1.0 - Correction on PUCCH configuration for Un interface RP-52 RP-110877 postponed CATT - - - 2011-06-02 LTE_Relay-Core company contribution of new CR; CR linked to RP-110853;^^shifted back to RAN2, ASN.1 Uu interface not frozen 2011-06-03
0752 - F Rel-10 10.2.0 10.3.0 TS36.331 Correction RP-53 RP-111297 approved R2 R2-75 R2-114766 agreed 2011-09-16 TEI10, LTE-L23 - 2011-09-12
0754 - F Rel-10 10.2.0 10.3.0 maxNumberROHC-ContextSessions when no ROHC profile is supported RP-53 RP-111297 approved R2 R2-75 R2-114590 agreed 2011-09-16 TEI10, LTE-L23 - 2011-09-12
0756 - F Rel-9 9.7.0 9.8.0 Correction to Subframe Allocation End in PMCH-Info RP-53 RP-111280 approved R2 R2-75 R2-114588 agreed 2011-09-16 MBMS_LTE - 2011-09-12
0757 - A Rel-10 10.2.0 10.3.0 Correction to Subframe Allocation End in PMCH-Info RP-53 RP-111280 approved R2 R2-75 R2-114589 agreed 2011-09-16 MBMS_LTE - 2011-09-12
0761 - F Rel-10 10.2.0 10.3.0 Correction on PUCCH configuration for Un interface RP-53 RP-111288 approved R2 R2-75 R2-114528 agreed 2011-09-16 LTE_Relay-Core - 2011-09-12
0762 - F Rel-10 10.2.0 10.3.0 Miscellaneous corrections to 36.331 RP-53 RP-111297 approved R2 R2-75 R2-114767 agreed 2011-09-16 TEI10, LTE-L23 - 2011-09-12
0764 2 A Rel-10 10.2.0 10.3.0 36.331 correction on CSG identity validity to allow introduction of CSG RAN sharing RP-53 RP-111278 approved R2 R2-75 R2-114553 agreed 2011-09-16 EHNB-RAN2 - 2011-09-12
0765 2 F Rel-9 9.7.0 9.8.0 36.331 correction on CSG identity validity to allow introduction of CSG RAN sharing RP-53 RP-111278 approved R2 R2-75 R2-114552 agreed 2011-09-16 EHNB-RAN2 - 2011-09-12
0770 2 F Rel-10 10.2.0 10.3.0 AdditionalSpectrumEmissions in CA RP-53 RP-111283 approved R2 R2-75 R2-114798 agreed 2011-09-16 LTE_CA-Core - 2011-09-12
0773 - F Rel-10 10.2.0 10.3.0 CR to 36.331 on Small correction of PHR parameter RP-53 RP-111297 approved R2 R2-75 R2-114765 agreed 2011-09-16 TEI10, LTE-L23 - 2011-09-12
0775 2 F Rel-10 10.2.0 10.3.0 Clarifications to P-max on CA RP-53 RP-111283 approved R2 R2-75 R2-114793 agreed 2011-09-16 LTE_CA-Core - 2011-09-12
0782 - F Rel-9 9.7.0 9.8.0 Clarification on for which subframes signalling MCS applies RP-53 RP-111280 approved R2 R2-75 R2-114586 agreed 2011-09-16 MBMS_LTE - 2011-09-12
0784 - A Rel-10 10.2.0 10.3.0 Clarification on for which subframes signalling MCS applies RP-53 RP-111280 approved R2 R2-75 R2-114587 agreed 2011-09-16 MBMS_LTE - 2011-09-12
0792 - F Rel-10 10.2.0 10.3.0 Corrections in RRC RP-53 RP-111283 approved R2 R2-75 R2-114754 agreed 2011-09-16 LTE_CA-Core, LTE_UL_MIMO-Core, LTE_eDL_MIMO-Core - 2011-09-12
0793 - F Rel-10 10.2.0 10.3.0 Replace the tables with exception list in 10.5 AS-Config RP-53 RP-111297 approved R2 R2-75 R2-114756 agreed 2011-09-16 TEI10, LTE-L23 - 2011-09-12
0796 - F Rel-10 10.2.0 10.3.0 Corrections to the field descriptions RP-53 RP-111297 approved R2 R2-75 R2-114769 agreed 2011-09-16 TEI10, LTE-L23 - 2011-09-12
0798 - F Rel-10 10.2.0 10.3.0 Configuration of simultaneous PUCCH&PUSCH RP-53 RP-111283 approved R2 R2-75 R2-114778 agreed 2011-09-16 LTE_CA-Core - 2011-09-12
0806 - F Rel-10 10.2.0 10.3.0 Corrections to release of csi-SubframePatternConfig and cqi-Mask RP-53 RP-111297 approved R2 R2-75 R2-114772 agreed 2011-09-16 TEI10, LTE-L23 - 2011-09-12
0808 - F Rel-8 8.14.0 8.15.0 GERAN SI format for cell change order&PS handover to GERAN RP-53 RP-111272 approved R2 R2-75 R2-114572 agreed 2011-09-16 LTE-L23 - 2011-09-12
0809 - F Rel-9 9.7.0 9.8.0 GERAN SI format for cell change order&PS handover& enhanced redirection to GERAN RP-53 RP-111272 approved R2 R2-75 R2-114573 agreed 2011-09-16 TEI9, LTE-L23 - 2011-09-12
0810 - A Rel-10 10.2.0 10.3.0 GERAN SI format for cell change order&PS handover& enhanced redirection to GERAN RP-53 RP-111272 approved R2 R2-75 R2-114574 agreed 2011-09-16 TEI9, LTE-L23 - 2011-09-12
0811 - F Rel-10 10.2.0 10.3.0 Corrections to PUCCH-Config field descriptions RP-53 RP-111283 approved R2 R2-75 R2-114753 agreed 2011-09-16 LTE_CA-Core, LTE_UL_MIMO-Core - 2011-09-12
0812 1 F Rel-10 10.3.0 10.4.0 Clarification of PCI range for CSG cells RP-54 RP-111711 approved R2 R2-76 R2-116483 agreed 2011-12-09 EHNB-RAN2, TEI10 - 2011-12-10
0813 - F Rel-10 10.3.0 10.4.0 Clarifications to Default Radio Configurations RP-54 RP-111716 approved R2 R2-76 R2-115708 agreed 2011-12-09 TEI10, LTE-L23 - 2011-12-10
0814 1 F Rel-10 10.3.0 10.4.0 Corrections to enhancedDualLayerTDD RP-54 RP-111716 approved R2 R2-76 R2-116380 agreed 2011-12-09 TEI10, LTE-L23 - 2011-12-10
0815 - F Rel-10 10.3.0 10.4.0 Miscellaneous small corrections RP-54 RP-111716 approved R2 R2-76 R2-115710 agreed 2011-12-09 TEI10, LTE-L23 - 2011-12-10
0816 1 F Rel-10 10.3.0 10.4.0 Correction on notation of SRS transmission comb RP-54 RP-111716 approved R2 R2-76 R2-116513 agreed 2011-12-09 TEI10, LTE-L23 - 2011-12-10
0823 1 A Rel-10 10.3.0 10.4.0 36.331 CR SPS reconfiguration RP-54 RP-111706 approved R2 R2-76 R2-116523 agreed 2011-12-09 LTE-L23 - 2011-12-10
0824 - F Rel-8 8.15.0 8.16.0 Clarification on SPS intervals RP-54 RP-111706 approved R2 R2-76 R2-116389 agreed 2011-12-09 LTE-L23 - 2011-12-10
0825 - A Rel-9 9.8.0 9.9.0 Clarification on SPS intervals RP-54 RP-111706 approved R2 R2-76 R2-116390 agreed 2011-12-09 LTE-L23 no REL-10 cat.A CR needed 2011-12-10
0827 2 F Rel-10 10.3.0 10.4.0 Clarification of list sizes in measurement configuration stored by UE RP-54 RP-111716 approved R2 R2-76 R2-116521 agreed 2011-12-09 TEI10, LTE-L23 - 2011-12-10
0833 - F Rel-8 8.15.0 8.16.0 Clarification of the event B1 and ANR related FGI bits RP-54 RP-111706 approved R2 R2-76 R2-116384 agreed 2011-12-09 LTE-L23 - 2011-12-10
0834 - A Rel-9 9.8.0 9.9.0 Clarification of the event B1 and ANR related FGI bits RP-54 RP-111706 approved R2 R2-76 R2-116385 agreed 2011-12-09 LTE-L23 - 2011-12-10
0835 - A Rel-10 10.3.0 10.4.0 Clarification of the event B1 and ANR related FGI bits RP-54 RP-111706 approved R2 R2-76 R2-116386 agreed 2011-12-09 LTE-L23 - 2011-12-10
0838 - F Rel-8 8.15.0 8.16.0 Clarification on parallel message transmission upon connection re-establishment RP-54 RP-111706 approved R2 R2-76 R2-116395 agreed 2011-12-09 LTE-L23 - 2011-12-10
0840 1 F Rel-10 10.3.0 10.4.0 Clarification on MBSFN and measurement resource restrictions RP-54 RP-111714 approved R2 R2-76 R2-116511 agreed 2011-12-09 eICIC_LTE-Core - 2011-12-10
0842 - F Rel-8 8.15.0 8.16.0 36.331 CR SPS reconfiguration RP-54 RP-111706 approved R2 R2-76 R2-116392 agreed 2011-12-09 LTE-L23 - 2011-12-10
0843 - A Rel-9 9.8.0 9.9.0 36.331 CR SPS reconfiguration RP-54 RP-111706 approved R2 R2-76 R2-116393 agreed 2011-12-09 LTE-L23 - 2011-12-10
0844 - A Rel-9 9.8.0 9.9.0 Clarification on parallel message transmission upon connection re-establishment RP-54 RP-111706 approved R2 R2-76 R2-116550 agreed 2011-12-09 LTE-L23 - 2011-12-10
0845 - A Rel-10 10.3.0 10.4.0 Clarification on parallel message transmission upon connection re-establishment RP-54 RP-111706 approved R2 R2-76 R2-116551 agreed 2011-12-09 LTE-L23 - 2011-12-10
0846 - F Rel-9 9.8.0 - Rel-9 CR to 36.331 for Mandating setting FGI bit 27 to ""1"" RP-54 RP-111632 revised NTT DOCOMO, INC. - - - 2011-12-09 TEI9, LTE-L23 company contribution that was revised in RP-111731 2011-12-10
0846 1 F Rel-9 9.8.0 - Rel-9 CR to 36.331 for Mandating setting FGI bit 27 to ""1"" RP-54 RP-111731 revised NTT DOCOMO, INC. - - - 2011-12-09 TEI9, LTE-L23 company contribution that was revised in RP-111738 2011-12-10
0846 2 F Rel-9 9.8.0 - Rel-9 CR to 36.331 for Mandating setting FGI bit 27 to ""1"" RP-54 RP-111738 withdrawn NTT DOCOMO, INC. - - - 2011-12-09 TEI9, LTE-L23 company contributions that was finally withdrawn, instead LS RP-111769 was sent 2011-12-10
0847 - A Rel-10 10.3.0 - Rel-9 CR to 36.331 for Mandating setting FGI bit 27 to ""1"" RP-54 RP-111633 revised NTT DOCOMO, INC. - - - 2011-12-09 TEI9, LTE-L23 company contribution that was revised in RP-111732 2011-12-10
0847 1 A Rel-10 10.3.0 - Rel-9 CR to 36.331 for Mandating setting FGI bit 27 to ""1"" RP-54 RP-111732 revised NTT DOCOMO, INC. - - - 2011-12-09 TEI9, LTE-L23 company contribution that was revised in RP-111739 2011-12-10
0847 2 A Rel-10 10.3.0 - Rel-9 CR to 36.331 for Mandating setting FGI bit 27 to ""1"" RP-54 RP-111739 withdrawn NTT DOCOMO, INC. - - - 2011-12-09 TEI9, LTE-L23 company contributions that was finally withdrawn, instead LS RP-111769 was sent 2011-12-10
0855 1 F Rel-10 10.4.0 10.5.0 Limiting MBMS counting responses to within the PLMN RP-55 RP-120326 approved R2 R2-77 R2-121017 agreed 2012-03-02 MBMS_LTE_enh-Core - 2012-03-02
0856 - F Rel-9 9.9.0 9.10.0 CR to 36.331 on cdma2000 band classes and references RP-55 RP-120321 approved R2 R2-77 R2-121001 agreed 2012-03-02 TEI9, LTE-L23 - 2012-03-02
0857 - A Rel-10 10.4.0 10.5.0 CR to 36.331 on cdma2000 band classes and references RP-55 RP-120321 approved R2 R2-77 R2-121002 agreed 2012-03-02 TEI9, LTE-L23 - 2012-03-02
0862 1 F Rel-10 10.4.0 10.5.0 Clarification on MBSFN and measurement resource restrictions RP-55 RP-120326 approved R2 R2-77 R2-121036 agreed 2012-03-02 eICIC_LTE-Core - 2012-03-02
0871 - F Rel-10 10.4.0 10.5.0 On SIB10/11 Reception Timing RP-55 RP-120325 approved R2 R2-77 R2-120840 agreed 2012-03-02 TEI10, PWS-RAN - 2012-03-02
0875 1 F Rel-10 10.4.0 10.5.0 Clarification on MBMS counting for uncipherable services RP-55 RP-120326 approved R2 R2-77 R2-121020 agreed 2012-03-02 MBMS_LTE_enh-Core - 2012-03-02
0876 - F Rel-10 10.4.0 10.5.0 Minor correction regarding limited service access on non-CSG-member cell RP-55 RP-120325 approved R2 R2-77 R2-120839 agreed 2012-03-02 EHNB-RAN2, TEI10 - 2012-03-02
0890 2 F Rel-8 8.16.0 - Clarification on the setting of FGI bit 25 RP-55 RP-120262 revised Intel Corporation, Qualcomm Incorporated, Samsung - - - 2012-03-02 LTE-L23 company contribution;^^note: RAN2 email discussion [77#03] did not achieve consensus about R2-120838;^^revised in RP-120330 2012-03-02
0890 3 F Rel-8 8.16.0 - Clarification on the setting of FGI bit 25 RP-55 RP-120330 rejected Intel Corporation, Qualcomm Incorporated, Samsung - - - 2012-03-02 LTE-L23 company contribution; revision of RP-120262 2012-03-02
0891 2 A Rel-9 9.9.0 - Clarification on the setting of FGI bit 25 RP-55 RP-120263 revised Intel Corporation, Qualcomm Incorporated, Samsung - - - 2012-03-02 LTE-L23 company contribution;^^note: RAN2 email discussion [77#03] did not achieve consensus about R2-111039;^^revised in RP-120331 2012-03-02
0891 3 A Rel-9 9.9.0 - Clarification on the setting of FGI bit 25 RP-55 RP-120331 rejected Intel Corporation, Qualcomm Incorporated, Samsung - - - 2012-03-02 LTE-L23 company contribution; revision of RP-120263 2012-03-02
0892 2 A Rel-10 10.4.0 - Clarification on the setting of FGI bit 25 RP-55 RP-120264 revised Intel Corporation, Qualcomm Incorporated, Samsung - - - 2012-03-02 LTE-L23 company contribution;^^note: RAN2 email discussion [77#03] did not achieve consensus about R2-111040;^^revised in RP-120332 2012-03-02
0892 3 A Rel-10 10.4.0 - Clarification on the setting of FGI bit 25 RP-55 RP-120332 rejected Intel Corporation, Qualcomm Incorporated, Samsung - - - 2012-03-02 LTE-L23 company contribution; revision of RP-120264 2012-03-02
0894 - F Rel-10 10.4.0 10.5.0 Time to keep RLF Reporting logs RP-55 RP-120326 approved R2 R2-77 R2-120820 agreed 2012-03-02 SONenh_LTE-Core - 2012-03-02
0895 - F Rel-10 10.4.0 - Introducing means to signal different FDD/TDD Capabilities/FGIs for Dual-xDD UE RP-55 RP-120323 revised R2 R2-77 R2-120833 endorsed 2012-03-02 LTE-L23, TEI10 revised in RP-120356 2012-03-02
0895 1 F Rel-10 10.4.0 10.5.0 Introducing means to signal different FDD/TDD Capabilities/FGIs for Dual-xDD UE RP-55 RP-120356 approved Samsung - - - 2012-03-02 LTE-L23, TEI9 revision of R2-120833 of RP-120323 2012-03-02
0896 1 F Rel-9 9.9.0 - FGI bit related to ANR and inter-RAT measurement RP-55 RP-120324 withdrawn R2 R2-77 R2-121044 agreed 2012-03-02 TEI9, LTE-L23 - 2012-03-02
0897 1 F Rel-10 10.4.0 - FGI bit related to ANR and inter-RAT measurement RP-55 RP-120324 withdrawn R2 R2-77 R2-121045 agreed 2012-03-02 TEI10, LTE-L23 - 2012-03-02
0899 - F Rel-10 10.4.0 10.5.0 Clarification on SRB2 resumption upon connection re-establishment (parallel message transmission) RP-55 RP-120321 approved R2 R2-77 R2-120845 agreed 2012-03-02 LTE-L23, TEI10 - 2012-03-02
0900 1 F Rel-10 10.4.0 10.5.0 Duplicated ASN.1 naming correction RP-55 RP-120321 approved R2 R2-77 R2-121018 agreed 2012-03-02 TEI10, LTE-L23 - 2012-03-02
0901 - F Rel-9 9.9.0 - Introducing means to signal different FDD/TDD Capabilities/FGIs for Dual-xDD UE RP-55 RP-120323 revised R2 R2-77 R2-121014 endorsed 2012-03-02 LTE-L23, TEI9 revised in RP-120355 2012-03-02
0901 1 F Rel-9 9.9.0 9.10.0 Introducing means to signal different FDD/TDD Capabilities/FGIs for Dual-xDD UE RP-55 RP-120355 approved Samsung - - - 2012-03-02 LTE-L23, TEI9 revision of R2-121014 of RP-120323 2012-03-02
0902 - F Rel-10 10.4.0 - Introducing means to signal different FDD/TDD Capabilities/FGIs for Dual-xDD UE RP-55 RP-120323 withdrawn R2 R2-77 R2-121015 endorsed 2012-03-02 LTE-L23, TEI10 - 2012-03-02
0903 - F Rel-10 10.4.0 - Clarification of the meaning of FGI bit 1 and bit 2 for Rel-10 RP-55 RP-120313 revised Telecom Italia, Mediatek, NEC and NVIDIA - - - 2012-03-02 TEI10, LTE-L23 revised in RP-120348 2012-03-02
0903 1 F Rel-10 10.4.0 - Clarification of the meaning of FGI bit 1 and bit 2 for Rel-10 RP-55 RP-120348 postponed Telecom Italia, Mediatek, NEC and NVIDIA - - - 2012-03-02 TEI10, LTE-L23 revision of RP-120313 2012-03-02
0904 - F Rel-8 8.16.0 - Invalidation of ETWS with security feature - - - - R2-78 R2-122045 withdrawn 2012-06-15 ETWS - 2012-06-16
0905 - A Rel-9 9.10.0 - Invalidation of ETWS with security feature - - - - R2-78 R2-122046 withdrawn 2012-06-15 ETWS - 2012-06-16
0906 - A Rel-10 10.5.0 - Invalidation of ETWS with security feature - - - - R2-78 R2-122047 withdrawn 2012-06-15 ETWS - 2012-06-16
0907 - F Rel-8 8.16.0 8.17.0 SPS Reconfiguration RP-56 RP-120805 approved R2 R2-78 R2-122081 agreed 2012-06-15 LTE-L23 - 2012-06-16
0908 - A Rel-9 9.10.0 9.11.0 SPS Reconfiguration RP-56 RP-120805 approved R2 R2-78 R2-122082 agreed 2012-06-15 LTE-L23 - 2012-06-16
0909 - A Rel-10 10.5.0 10.6.0 SPS Reconfiguration RP-56 RP-120805 approved R2 R2-78 R2-122083 agreed 2012-06-15 LTE-L23 - 2012-06-16
0910 - F Rel-8 8.16.0 - Change in Scheduling Information for ETWS - - - - R2-78 R2-122084 revised 2012-06-15 ETWS, LTE-L23 - 2012-06-16
0910 1 F Rel-8 8.16.0 8.17.0 Change in Scheduling Information for ETWS RP-56 RP-120805 approved R2 R2-78 R2-123060 agreed 2012-06-15 ETWS, LTE-L23 - 2012-06-16
0911 - A Rel-9 9.10.0 - Change in Scheduling Information for ETWS - - - - R2-78 R2-122085 revised 2012-06-15 ETWS, LTE-L23 - 2012-06-16
0911 1 A Rel-9 9.10.0 9.11.0 Change in Scheduling Information for ETWS RP-56 RP-120805 approved R2 R2-78 R2-123061 agreed 2012-06-15 ETWS, LTE-L23 - 2012-06-16
0912 - A Rel-10 10.5.0 - Change in Scheduling Information for ETWS - - - - R2-78 R2-122086 revised 2012-06-15 ETWS, LTE-L23 - 2012-06-16
0912 1 A Rel-10 10.5.0 10.6.0 Change in Scheduling Information for ETWS RP-56 RP-120805 approved R2 R2-78 R2-123062 agreed 2012-06-15 ETWS, LTE-L23 - 2012-06-16
0913 - F Rel-9 9.10.0 - Clarification of mch-SchedulingPeriod configuration RP-56 RP-120807 revised R2 R2-78 R2-122087 agreed 2012-06-15 MBMS_LTE during RAN #56 it was detected that R2-122087 had the wrong spec version on the CR cover so CR R2-122087 was revised in RP-120854 2012-06-16
0913 1 F Rel-9 9.10.0 9.11.0 Clarification of mch-SchedulingPeriod configuration RP-56 RP-120854 approved Alcatel-Lucent, Ericsson, Nokia Siemens Networks, Samsung - - - 2012-06-15 MBMS_LTE company contribution as it was detected that R2-122087 of RP-120807 mentions wrong spec version 9.9.0 (instead of 9.10.0) on CR cover; 2012-06-16
0914 - A Rel-10 10.5.0 10.6.0 Clarification of mch-SchedulingPeriod configuration RP-56 RP-120807 approved R2 R2-78 R2-122088 agreed 2012-06-15 MBMS_LTE - 2012-06-16
0915 - F Rel-9 9.10.0 - Change in Scheduling Information for CMAS - - - - R2-78 R2-122089 revised 2012-06-15 PWS-RAN - 2012-06-16
0915 1 F Rel-9 9.10.0 9.11.0 Change in Scheduling Information for CMAS RP-56 RP-120808 approved R2 R2-78 R2-123063 agreed 2012-06-15 PWS-RAN - 2012-06-16
0916 - A Rel-10 10.5.0 - Change in Scheduling Information for CMAS - - - - R2-78 R2-122090 revised 2012-06-15 PWS-RAN - 2012-06-16
0916 1 A Rel-10 10.5.0 10.6.0 Change in Scheduling Information for CMAS RP-56 RP-120808 approved R2 R2-78 R2-123064 agreed 2012-06-15 PWS-RAN - 2012-06-16
0917 - F Rel-9 9.10.0 - Handling of features in FGI1 and FGI2 - - - - R2-78 R2-122091 rejected 2012-06-15 LTE-L23, TEI9 - 2012-06-16
0917 1 F Rel-9 9.10.0 - Handling of features in FGI1 and FGI2 - - - - R2-78 R2-123067 withdrawn 2012-06-15 LTE-L23, TEI9 - 2012-06-16
0918 - A Rel-10 10.5.0 - Handling of features in FGI1 and FGI2 - - - - R2-78 R2-122092 rejected 2012-06-15 LTE-L23, TEI9 - 2012-06-16
0918 1 A Rel-10 10.5.0 - Handling of features in FGI1 and FGI2 - - - - R2-78 R2-123068 withdrawn 2012-06-15 LTE-L23, TEI9 - 2012-06-16
0919 - F Rel-10 10.5.0 - Introducing means to signal different REL-10 FDD/TDD Capabilities/FGIs for Dual-xDD UE - - - - R2-78 R2-122093 revised 2012-06-15 LTE-L23, TEI10 - 2012-06-16
0919 1 F Rel-10 10.5.0 10.6.0 Introducing means to signal different REL-10 FDD/TDD Capabilities/FGIs for Dual-xDD UE RP-56 RP-120814 approved R2 R2-78 R2-123066 agreed 2012-06-15 LTE-L23, TEI10 - 2012-06-16
0920 - F Rel-10 10.5.0 - Clarification on setting of dedicated NS value for CA by E-UTRAN - - - - R2-78 R2-122094 revised 2012-06-15 LTE_CA-Core - 2012-06-16
0920 1 F Rel-10 10.5.0 10.6.0 Clarification on setting of dedicated NS value for CA by E-UTRAN RP-56 RP-120812 approved R2 R2-78 R2-123065 agreed 2012-06-15 LTE_CA-Core - 2012-06-16
0928 - F Rel-9 9.10.0 - Voice support Capabilities RP-56 RP-120810 postponed R2 R2-78 R2-122957 agreed 2012-06-15 TEI9 company contribution to RAN #56 in RP-120759 to revise R2-122957 (ASN.1 update to follow the convention to functionally group UE capabilities) 2012-06-16
0928 1 F Rel-9 9.10.0 - Voice support Capabilities RP-56 RP-120759 postponed Nokia Siemens Networks, Deutsche Telekom, CMCC, Clearwire, Sprint, CATT, ZTE, Huawei - - - 2012-06-15 TEI9 company contribution to replace R2-122957 of RP-120810 2012-06-16
0929 - A Rel-10 10.5.0 - Voice support Capabilities RP-56 RP-120810 postponed R2 R2-78 R2-122958 agreed 2012-06-15 TEI9 company contribution to RAN #56 in RP-120760 to revise R2-122958 (ASN.1 update to follow the convention to functionally group UE capabilities) 2012-06-16
0929 1 A Rel-10 10.5.0 - Voice support Capabilities RP-56 RP-120760 postponed Nokia Siemens Networks, Deutsche Telekom, CMCC, Clearwire, Sprint, CATT, ZTE, Huawei - - - 2012-06-15 TEI9 company contribution to replace R2-122958 of RP-120810 2012-06-16
0930 - F Rel-9 9.10.0 9.11.0 T321 value for UTRA SI acquisition RP-56 RP-120808 approved R2 R2-78 R2-123070 agreed 2012-06-15 EHNB-RAN2 - 2012-06-16
0931 - A Rel-10 10.5.0 10.6.0 T321 value for UTRA SI acquisition RP-56 RP-120808 approved R2 R2-78 R2-123071 agreed 2012-06-15 EHNB-RAN2 - 2012-06-16
0933 - B Rel-11 10.5.0 - Introduction of Further Enhancements to CELL_FACH: Absolute priority re-selection mobility - - - - R2-78 R2-123186 postponed 2012-06-15 Cell_FACH_enh-Core - 2012-06-16
0934 - B Rel-11 10.5.0 11.0.0 Introduction of a new security algorithm ZUC RP-56 RP-120825 approved R2 R2-78 R2-123001 agreed 2012-06-15 EEA3_EIA3 revision of R2-122298 (note: RAN2 #77 endorsed the CR already but it was kept on hold in order to not yet introduce 36.331 REL-11.) 2012-06-16
0938 - F Rel-9 9.10.0 - Voice over PS continuity - - - - R2-78 R2-123118 revised 2012-06-15 TEI9 - 2012-06-16
0938 1 F Rel-9 9.10.0 - Voice over PS continuity - - - - R2-78 R2-123151 withdrawn 2012-06-15 TEI9 - 2012-06-16
0938 1 F Rel-9 9.10.0 - Voice over PS continuity RP-56 RP-120684 postponed Qualcomm Incorporated, Nokia Corporation, Renesas Mobile Europe Ltd, Motorola Mobility, Research In Motion UK Limited - - - 2012-06-15 TEI9 company contribution;^^this CR could not be endorsed in RAN2 email discussion [78#01];^^it represents an alternative to RAN2 agreed CR R2-122957 (see RP-120810) 2012-06-16
0939 - A Rel-10 10.5.0 - Voice over PS continuity - - - - R2-78 R2-123119 revised 2012-06-15 TEI9 - 2012-06-16
0939 1 A Rel-10 10.5.0 - Voice over PS continuity - - - - R2-78 R2-123152 withdrawn 2012-06-15 TEI9 - 2012-06-16
0939 1 A Rel-10 10.5.0 - Voice over PS continuity RP-56 RP-120685 postponed Qualcomm Incorporated, Nokia Corporation, Renesas Mobile Europe Ltd, Motorola Mobility, Research In Motion UK Limited - - - 2012-06-15 TEI9 company contribution;^^this CR could not be endorsed in RAN2 email discussion [78#01];^^it represents an alternative to RAN2 agreed CR R2-122958 (see RP-120810) 2012-06-16
0940 - F Rel-9 9.10.0 - Differentiating UTRA modes in FGIs RP-56 RP-120809 postponed R2 R2-78 R2-122959 agreed 2012-06-15 TEI9 CR was postponed to further discussion in RAN2 2012-06-16
0941 - A Rel-10 10.5.0 - Differentiating UTRA modes in FGIs RP-56 RP-120809 postponed R2 R2-78 R2-122960 agreed 2012-06-15 TEI9 CR was postponed to further discussion in RAN2 2012-06-16
0945 - B Rel-11 10.5.0 - Introduction of EAB in 36.331 - - - - R2-78 R2-123045 endorsed 2012-06-15 SIMTC-RAN_OC-Core - 2012-06-16
0957 - F Rel-10 10.5.0 - Korean Public Alert System (KPAS) in relation to CMAS - - - - R2-78 R2-122942 revised 2012-06-15 PWS-RAN, TEI10 - 2012-06-16
0957 1 F Rel-10 10.5.0 10.6.0 Korean Public Alert System (KPAS) in relation to CMAS RP-56 RP-120813 approved R2 R2-78 R2-123139 agreed 2012-06-15 PWS-RAN, TEI10 - 2012-06-16
0969 - F Rel-10 10.5.0 - Introduction of supported bandwidth combinations for CA - - - - R2-78 R2-123127 withdrawn 2012-06-15 LTE_CA-Core - 2012-06-16
0969 1 F Rel-10 10.5.0 10.6.0 Introduction of supported bandwidth combinations for CA RP-56 RP-120812 approved R2 R2-78 R2-123155 agreed 2012-06-15 LTE_CA-Core - 2012-06-16
0970 - B Rel-10 10.5.0 - Multiple frequency band indicators per cell - - - - R2-78 R2-122946 withdrawn 2012-06-15 TEI10 - 2012-06-16
0970 1 A Rel-10 10.5.0 10.6.0 Introduction of multiple frequency band indicator RP-56 RP-120734 approved Ericsson, ST-Ericsson, Alcatel-Lucent, Nokia, eAccess, KDDI, Sprint, Qualcomm, Samsung and Renesas - - - 2012-06-15 TEI8 company contribution;^^note: No consensus about this topic in RAN2 email discussion [78#00] by the deadline;^^Release independent feature, introduced to Rel-8 signalling for LTE. Wrong rev# shown on cover. 2012-06-16
0973 - F Rel-11 10.5.0 - EU-Alert in relation to CMAS - - - - R2-78 R2-123080 revised 2012-06-15 PWS-RAN, TEI11 - 2012-06-16
0973 1 C Rel-11 10.5.0 11.0.0 EU-Alert in relation to CMAS RP-56 RP-120813 approved R2 R2-78 R2-123165 agreed 2012-06-15 PWS-RAN, TEI11 - 2012-06-16
0974 - F Rel-9 9.10.0 - Rel-9 CR to 36.331 for Mandating setting of FGI bit 27 and 28 to ""1"" RP-56 RP-120690 postponed NTT DOCOMO, INC., Telecom Italia, KT Corp. - - - 2012-06-15 TEI9, LTE-L23 company contribution; CR is supported by AT&T 2012-06-16
0975 - A Rel-10 10.5.0 - Rel-10 CR to 36.331 for Mandating setting of FGI bit 27 and 28 to ""1"" RP-56 RP-120691 postponed NTT DOCOMO, INC., Telecom italia, KT Corp. - - - 2012-06-15 TEI9, LTE-L23 company contribution; CR is supported by AT&T 2012-06-16
0976 - B Rel-8 8.16.0 8.17.0 Introduction of multiple frequency band indicator RP-56 RP-120732 approved Ericsson, ST-Ericsson, Alcatel-Lucent, Nokia, eAccess, KDDI, Sprint, Qualcomm, Samsung and Renesas - - - 2012-06-15 TEI8 company contribution;^^Release independent feature, introduced to Rel-8 signalling for LTE 2012-06-16
0977 - A Rel-9 9.10.0 9.11.0 Introduction of multiple frequency band indicator RP-56 RP-120733 approved Ericsson, ST-Ericsson, Alcatel-Lucent, Nokia, eAccess, KDDI, Sprint, Qualcomm, Samsung and Renesas - - - 2012-06-15 TEI8 company contribution;^^Release independent feature, introduced to Rel-8 signalling for LTE 2012-06-16
0978 - C Rel-11 11.0.0 - CR to 36.331 on Enhancements to RLF Report - - - - R2-79 R2-124128 withdrawn 2012-09-07 SONenh2_LTE_UTRA-Core - 2012-09-10
0982 - B Rel-11 11.0.0 - Introduction of EAB - - - - R2-79 R2-124301 revised 2012-09-07 SIMTC-RAN_OC-Core - 2012-09-10
0982 1 B Rel-11 11.0.0 11.1.0 Introduction of EAB in 36.331 RP-57 RP-121371 approved R2 R2-79 R2-124344 agreed 2012-08-17 SIMTC-RAN_OC-Core - 2012-09-04
0990 - B Rel-11 11.0.0 11.1.0 Additional special subframe configuration related correction RP-57 RP-121381 approved R2 R2-79 R2-124332 agreed 2012-08-17 LTE_TDD_add_subframe-Core - 2012-09-04
0993 - B Rel-10 10.6.0 - Draft CR 36.331: Redirection Enhancement to HRPD - - - - R2-79 R2-124207 rejected 2012-09-07 LTE-L23, TEI10 - 2012-09-10
0994 - A Rel-11 11.0.0 - Draft CR 36.331: Redirection Enhancement to HRPD - - - - R2-79 R2-124208 postponed 2012-09-07 LTE-L23, TEI10 - 2012-09-10
1000 - B Rel-11 11.0.0 - 36.331 CR introducing In-Device Coexistence (IDC) - - - - R2-79 R2-124268 revised 2012-09-07 SPIA_IDC_LTE-Core - 2012-09-10
1000 1 B Rel-11 11.0.0 - 36.331 CR introducing In-Device Coexistence (IDC) - - - - R2-79 R2-124312 postponed 2012-09-07 SPIA_IDC_LTE-Core - 2012-09-10
1000 2 B Rel-11 11.0.0 - 36.331 CR introducing In-Device Coexistence (IDC) RP-57 RP-121259 revised RAN - - - 2012-08-30 SPIA_IDC_LTE-Core - 2012-09-04
1000 3 B Rel-11 11.0.0 - 36.331 CR introducing In-Device Coexistence (IDC) RP-57 RP-121404 revised RAN - - - 2012-09-05 SPIA_IDC_LTE-Core - 2012-09-06
1000 4 B Rel-11 11.0.0 11.1.0 Iintroducing In-Device Coexistence (IDC) RP-57 RP-121423 approved Huawei, HiSilicon, CMCC, Qualcomm Incorporated, Er - - - 2012-09-06 SPIA_IDC_LTE-Core - 2012-09-06
1003 - F Rel-10 10.6.0 - CR on SCell measurement cycle RP-57 RP-121362 reissued R2 R2-79 R2-124204 agreed 2012-08-14 LTE_CA-Core - 2012-09-04
1003 - F Rel-10 10.6.0 10.7.0 CR on SCell measurement cycle RP-57 RP-121395 approved R2 R2-79 R2-124204 agreed 2012-08-14 LTE_CA-Core - 2012-09-04
1004 - F Rel-9 9.11.0 - CR on measurement report - - - - R2-79 R2-124101 revised 2012-09-07 LTE-L23, TEI9 - 2012-09-10
1004 1 F Rel-9 9.11.0 - CR on measurement report - - - - R2-79 R2-124242 withdrawn 2012-09-07 LTE-L23, TEI9 - 2012-09-10
1005 - A Rel-10 10.6.0 - CR on measurement report - - - - R2-79 R2-124102 revised 2012-09-07 LTE-L23, TEI9 - 2012-09-10
1005 1 F Rel-10 10.6.0 - CR on measurement report RP-57 RP-121362 reissued R2 R2-79 R2-124243 agreed 2012-09-02 TEI10 - 2012-09-04
1005 1 F Rel-10 10.6.0 10.7.0 CR on measurement report RP-57 RP-121395 approved R2 R2-79 R2-124243 agreed 2012-09-02 TEI10 - 2012-09-04
1005 2 F Rel-10 10.6.0 - CR on measurement report RP-57 RP-121285 withdrawn Ericsson, ST-Ericsson - - - 2012-08-30 TEI10 - 2012-09-04
1006 - F Rel-9 9.11.0 9.12.0 Voice support Capabilities RP-57 RP-121359 approved R2 R2-79 R2-124226 agreed 2012-08-15 TEI9 - 2012-09-04
1007 - A Rel-10 10.6.0 10.7.0 Voice support Capabilities RP-57 RP-121359 approved R2 R2-79 R2-124227 agreed 2012-08-15 TEI9 - 2012-09-04
1008 - A Rel-11 11.0.0 11.1.0 Voice support Capabilities RP-57 RP-121359 approved R2 R2-79 R2-124228 agreed 2012-08-15 TEI9 - 2012-09-04
1011 - F Rel-9 9.11.0 9.12.0 Differentiating UTRAN modes in FGIs RP-57 RP-121361 approved R2 R2-79 R2-124253 agreed 2012-08-17 TEI9 - 2012-09-04
1012 - A Rel-10 10.6.0 10.7.0 Differentiating UTRAN modes in FGIs RP-57 RP-121361 approved R2 R2-79 R2-124254 agreed 2012-08-17 TEI9 - 2012-09-04
1013 - A Rel-11 11.0.0 11.1.0 Differentiating UTRAN modes in FGIs RP-57 RP-121361 approved R2 R2-79 R2-124255 agreed 2012-08-17 TEI9 - 2012-09-04
1022 - B Rel-11 11.0.0 - Introduction of absolute priority based measurements and reselection in CELL_FACH State in 36.331 - - - - R2-79 R2-124196 revised 2012-09-07 Cell_FACH_enh-Core - 2012-09-10
1022 1 B Rel-11 11.0.0 11.1.0 Introduction of Absolute Priority Based Cell Reselection in CELL_FACH State in 36.331 RP-57 RP-121368 approved R2 R2-79 R2-124367 agreed 2012-09-03 Cell_FACH_enh-Core - 2012-09-04
1024 - B Rel-11 11.0.0 11.1.0 Introducing MDT enhancements for REL-11 RP-57 RP-121370 approved R2 R2-79 R2-124325 agreed 2012-09-02 eMDT_UMTSLTE-Core - 2012-09-04
1025 - B Rel-11 10.5.0 - Introducing Carrier aggregation enhancements for REL-11 RP-57 RP-121377 revised R2 R2-79 R2-124258 agreed 2012-09-02 LTE_CA_enh-Core - 2012-09-04
1025 1 B Rel-11 10.5.0 - Introducing Carrier aggregation enhancements for REL-11 RP-57 RP-121231 revised Samsung - - - 2012-08-30 LTE_CA_enh-Core Written to wrong version 2012-09-03
1025 2 B Rel-11 11.0.0 11.1.0 Introducing Carrier aggregation enhancements for REL-11 RP-57 RP-121349 approved Samsung - - - 2012-09-03 LTE_CA_enh-Core - 2012-09-03
1026 - B Rel-11 11.0.0 11.1.0 Introducing MBMS enhancements for REL-11 RP-57 RP-121375 approved R2 R2-79 R2-124261 agreed 2012-08-17 MBMS_LTE_SC-Core - 2012-09-04
1028 - B Rel-11 11.0.0 - Introducing support for Coordinated Multi-Point (CoMP) operation - - - - R2-79 R2-124363 postponed 2012-09-07 COMP_LTE_DL-Core - 2012-09-10
1039 - F Rel-9 9.11.0 - Rules for including featureGroupIndRel9Add in Rel-9 RP-57 RP-121358 reissued R2 R2-79 R2-124215 agreed 2012-08-14 TEI9 - 2012-09-04
1039 - F Rel-9 9.11.0 9.12.0 Rules for including featureGroupIndRel9Add in Rel-9 RP-57 RP-121394 approved R2 R2-79 R2-124215 agreed 2012-08-14 TEI9 - 2012-09-04
1042 - C Rel-11 11.0.0 - RAN overload handling using RRC connection Rejection RP-57 RP-121288 postponed Ericsson, ST-Ericsson - - - 2012-08-30 TEI11 - 2012-09-04
1043 - F Rel-9 9.11.0 - Voice support Capabilities RP-57 RP-121360 rejected R2 R2-79 R2-124238 agreed 2012-08-17 TEI9 - 2012-09-04
1044 - A Rel-10 10.6.0 - Voice support Capabilities RP-57 RP-121360 rejected R2 R2-79 R2-124239 agreed 2012-08-17 TEI9 - 2012-09-04
1045 - A Rel-11 11.0.0 - Voice support Capabilities RP-57 RP-121360 rejected R2 R2-79 R2-124240 agreed 2012-08-17 TEI9 - 2012-09-04
1052 - B Rel-11 11.0.0 - Signaling support for CRS interference management in eICIC - - - - R2-79 R2-124305 revised 2012-09-07 eICIC_enh_LTE-Core - 2012-09-10
1052 1 B Rel-11 11.0.0 - Signaling support for CRS interference management in eICIC - - - - R2-79 R2-124307 revised 2012-09-07 eICIC_enh_LTE-Core - 2012-09-10
1052 2 B Rel-11 11.0.0 11.1.0 Signaling support for CRS interference management in eICIC RP-57 RP-121376 approved R2 R2-79 R2-124326 agreed 2012-08-17 eICIC_enh_LTE-Core - 2012-09-04
1055 - A Rel-11 11.0.0 - CR on SCell measurement cycle RP-57 RP-121362 reissued R2 R2-79 R2-124205 agreed 2012-08-14 LTE_CA-Core - 2012-09-04
1055 - A Rel-11 11.0.0 11.1.0 CR on SCell measurement cycle RP-57 RP-121395 approved R2 R2-79 R2-124205 agreed 2012-08-14 LTE_CA-Core - 2012-09-04
1056 - A Rel-11 11.0.0 - CR on measurement report RP-57 RP-121362 reissued R2 R2-79 R2-124244 agreed 2012-08-17 TEI10 - 2012-09-04
1056 - A Rel-11 11.0.0 11.1.0 CR on measurement report RP-57 RP-121395 approved R2 R2-79 R2-124244 agreed 2012-08-17 TEI10 - 2012-09-04
1056 1 A Rel-11 11.0.0 - CR on Measurement Report RP-57 RP-121286 withdrawn Ericsson, ST-Ericsson - - - 2012-09-07 TEI10 company contribution to replace RAN2 agreed CR R2-124244 of RP-121362 2012-09-10
1057 - B Rel-11 11.0.0 - Introduction of 'Power preference indication' - - - - R2-79 R2-124308 revised 2012-09-07 LTE_eDDA-Core - 2012-09-10
1057 1 B Rel-11 11.0.0 - Introduction of 'Power preference indication' - - - - R2-79 R2-124341 revised 2012-09-07 LTE_eDDA-Core - 2012-09-10
1057 2 B Rel-11 11.0.0 - Introduction of 'Power preference indication' - - - - R2-79 R2-124362 revised 2012-09-07 LTE_eDDA-Core - 2012-09-10
1057 3 B Rel-11 11.0.0 11.1.0 Introduction of 'Power preference indication' RP-57 RP-121378 approved R2 R2-79 R2-124364 agreed 2012-08-27 LTE_eDDA-Core - 2012-09-04
1058 - B Rel-11 11.0.0 - Introduction of Rel-11 UE capabilities RP-57 RP-121373 postponed R2 R2-79 R2-124314 agreed 2012-08-27 LTE_CA_enh-Core, LTE_eDDA-Core, eMDT_UMT - 2012-09-04
1059 - F Rel-10 10.6.0 10.7.0 Correction for PUCCH/SRS Release RP-57 RP-121279 approved Nokia Siemens Networks, Samsung - - - 2012-08-30 LTE_CA-Core - 2012-09-04
1060 - A Rel-11 11.0.0 11.1.0 Correction for PUCCH/SRS Release RP-57 RP-121280 approved Nokia Siemens Networks, Samsung - - - 2012-08-30 LTE_CA-Core - 2012-09-04
1061 - F Rel-9 9.12.0 9.13.0 Correction related to differentiating UTRAN modes in FGIs RP-58 RP-121933 approved R2 R2-80 R2-125284 agreed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1062 - A Rel-10 10.7.0 10.8.0 Correction related to differentiating UTRAN modes in FGIs RP-58 RP-121933 approved R2 R2-80 R2-125285 agreed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1063 - A Rel-11 11.1.0 11.2.0 Correction related to differentiating UTRAN modes in FGIs RP-58 RP-121933 approved R2 R2-80 R2-125286 agreed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1064 - F Rel-10 10.7.0 10.8.0 Processing delay for RRCConnectionReconfiguration RP-58 RP-121936 approved R2 R2-80 R2-125287 agreed 2012-12-07 LTE_CA-Core - 2012-12-04
1065 - A Rel-11 11.1.0 11.2.0 Processing delay for RRCConnectionReconfiguration RP-58 RP-121936 approved R2 R2-80 R2-125288 agreed 2012-12-07 LTE_CA-Core - 2012-12-04
1066 - B Rel-11 11.1.0 - Addition of the stage-3 agreements on IDC - - - - R2-80 R2-125289 revised 2012-12-07 SPIA_IDC_LTE-Core - 2012-12-04
1066 1 B Rel-11 11.1.0 - Addition of the stage-3 agreements on IDC - - - - R2-80 R2-125894 revised 2012-12-07 SPIA_IDC_LTE-Core - 2012-12-04
1066 2 B Rel-11 11.1.0 11.2.0 Addition of the stage-3 agreements on IDC RP-58 RP-121953 approved R2 R2-80 R2-126114 agreed 2012-12-07 SPIA_IDC_LTE-Core - 2012-12-04
1067 - B Rel-11 11.1.0 - Carrier Aggregation Enhancement RAN1 parameters - - - - R2-80 R2-125290 revised 2012-12-07 LTE_CA_enh-Core - 2012-12-04
1067 1 B Rel-11 11.1.0 - Upgrade of R2-125290 - Carrier Aggregation Enhancement RAN1 parameters - - - - R2-80 R2-125570 revised 2012-12-07 LTE_CA_enh-Core - 2012-12-04
1067 2 B Rel-11 11.1.0 - Carrier Aggregation Enhancement RAN1 parameters - - - - R2-80 R2-126041 revised 2012-12-07 LTE_CA_enh-Core - 2012-12-04
1067 3 B Rel-11 11.1.0 11.2.0 Carrier Aggregation Enhancement RAN1 parameters RP-58 RP-121951 approved R2 R2-80 R2-126075 agreed 2012-12-07 LTE_CA_enh-Core - 2012-12-04
1068 - F Rel-11 11.1.0 - Clarification of SR period - - - - R2-80 R2-125291 revised 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1068 1 F Rel-11 11.1.0 11.2.0 Clarification of SR period RP-58 RP-121957 approved R2 R2-80 R2-126127 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1069 - F Rel-11 11.1.0 - Clarification on HandoverCommand message - - - - R2-80 R2-125292 revised 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1069 1 F Rel-11 11.1.0 11.2.0 Clarification on HandoverCommand message RP-58 RP-121957 approved R2 R2-80 R2-125859 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1070 - F Rel-11 11.1.0 11.2.0 Clarification on mobility related issues RP-58 RP-121957 approved R2 R2-80 R2-125293 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1071 - F Rel-11 11.1.0 - Correction of the signaling for Uncertainty and Confidence - - - - R2-80 R2-125294 revised 2012-12-07 eMDT_UMTSLTE-Core - 2012-12-04
1071 1 F Rel-11 11.1.0 11.2.0 Correction of the signaling for Uncertainty and Confidence RP-58 RP-121946 approved R2 R2-80 R2-125851 agreed 2012-12-07 eMDT_UMTSLTE-Core - 2012-12-04
1072 - F Rel-11 11.1.0 - Corrections to MBMS Service Continuity - - - - R2-80 R2-125295 revised 2012-12-07 MBMS_LTE_SC-Core - 2012-12-04
1072 1 F Rel-11 11.1.0 - Corrections to MBMS Service Continuity - - - - R2-80 R2-126053 revised 2012-12-07 MBMS_LTE_SC-Core - 2012-12-04
1072 2 F Rel-11 11.1.0 11.2.0 Corrections to MBMS Service Continuity RP-58 RP-121940 approved R2 R2-80 R2-126077 agreed 2012-12-07 MBMS_LTE_SC-Core - 2012-12-04
1073 - F Rel-11 11.1.0 11.2.0 CR to 36.331 on SIB15 acquisition RP-58 RP-121940 approved R2 R2-80 R2-125296 agreed 2012-12-07 MBMS_LTE_SC-Core - 2012-12-04
1074 - F Rel-11 11.1.0 - Handling of 1xCSFB failure - - - - R2-80 R2-125297 revised 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1074 1 F Rel-11 11.1.0 11.2.0 Handling of 1xCSFB failure RP-58 RP-121957 approved R2 R2-80 R2-126134 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1075 - F Rel-11 11.1.0 11.2.0 Miscellaneous corrections RP-58 RP-121957 approved R2 R2-80 R2-125298 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1076 - C Rel-11 11.1.0 - RAN overload control using RRC connection Rejection - - - - R2-80 R2-125299 revised 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1076 1 C Rel-11 11.1.0 11.2.0 RAN overload control using RRC connection Rejection RP-58 RP-121958 approved R2 R2-80 R2-125833 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1077 - B Rel-11 11.1.0 11.2.0 RRC support for CoMP in UL RP-58 RP-121954 approved R2 R2-80 R2-125300 agreed 2012-12-07 COMP_LTE_UL-Core - 2012-12-04
1078 - F Rel-11 11.1.0 11.2.0 Some clarification to Carrier aggregation enhancements RP-58 RP-121951 approved R2 R2-80 R2-125301 agreed 2012-12-07 LTE_CA_enh-Core - 2012-12-04
1079 - F Rel-11 11.1.0 - Validity of EAB SIB and acquisition of SIB1 - - - - R2-80 R2-125302 revised 2012-12-07 SIMTC-RAN_OC-Core - 2012-12-04
1079 1 F Rel-11 11.1.0 11.2.0 Validity of EAB SIB and acquisition of SIB1 RP-58 RP-121939 approved R2 R2-80 R2-125850 agreed 2012-12-07 SIMTC-RAN_OC-Core - 2012-12-04
1081 - F Rel-11 11.1.0 - Clarification on IDC-SubframePattern for FDD - - - - R2-80 R2-125895 rejected 2012-12-07 SPIA_IDC_LTE-Core - 2012-12-04
1082 - C Rel-8 8.17.0 8.18.0 Clarification for Multiple Frequency Band Indicators feature RP-58 RP-121922 approved R2 R2-80 R2-126109 agreed 2012-12-07 TEI8 feature was introduced at RAN #56 with CR RP-120732 2012-12-04
1083 - A Rel-9 9.12.0 9.13.0 Clarification for Multiple Frequency Band Indicators feature RP-58 RP-121922 approved R2 R2-80 R2-126110 agreed 2012-12-07 TEI8 feature was introduced at RAN #56 with CR RP-120733 2012-12-04
1084 - A Rel-10 10.7.0 10.8.0 Clarification for Multiple Frequency Band Indicators feature RP-58 RP-121922 approved R2 R2-80 R2-126111 agreed 2012-12-07 TEI8 feature was introduced at RAN #56 with CR RP-120734 2012-12-04
1085 - A Rel-11 11.1.0 11.2.0 Clarification for Multiple Frequency Band Indicators feature RP-58 RP-121922 approved R2 R2-80 R2-126112 agreed 2012-12-07 TEI8 - 2012-12-04
1086 - F Rel-8 8.17.0 8.18.0 Moving the TM5 capability RP-58 RP-121924 approved R2 R2-80 R2-126087 tech endorsed 2012-12-07 LTE-L23 - 2012-12-04
1087 - F Rel-9 9.12.0 9.13.0 Moving the TM5 capability RP-58 RP-121924 approved R2 R2-80 R2-126088 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1088 - A Rel-10 10.7.0 - Moving the TM5 capability - - - - R2-80 R2-126089 revised 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1088 1 A Rel-10 10.7.0 10.8.0 Moving the TM5 capability RP-58 RP-121924 approved R2 R2-80 R2-126132 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1089 - A Rel-11 11.1.0 - Moving the TM5 capability - - - - R2-80 R2-126090 revised 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1089 1 A Rel-11 11.1.0 11.2.0 Moving the TM5 capability RP-58 RP-121924 approved R2 R2-80 R2-126129 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1093 - B Rel-11 11.1.0 - CR to 36.331 on introducing ROHC context continue for intra-ENB handover - - - - R2-80 R2-125600 revised 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1093 1 B Rel-11 11.1.0 11.2.0 CR to 36.331 on introducing ROHC context continue for intra-ENB handover RP-58 RP-121959 approved R2 R2-80 R2-126128 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1100 - F Rel-11 11.1.0 11.2.0 Correction on MDT multi-PLMN support RP-58 RP-121946 approved R2 R2-80 R2-125855 agreed 2012-12-07 eMDT_UMTSLTE-Core - 2012-12-04
1101 - A Rel-11 11.1.0 - Extension of FBI and EARFCN - - - - R2-80 R2-125846 withdrawn 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1102 - F Rel-11 11.1.0 11.2.0 Clarification and alignment of handling of other configuration RP-58 RP-121953 approved R2 R2-80 R2-126038 agreed 2012-12-07 LTE_eDDA-Core, SPIA_IDC_LTE-Core - 2012-12-04
1103 - B Rel-11 11.1.0 - Introducing support for Coordinated Multi-Point (CoMP) operation in DL - - - - R2-80 R2-125599 revised 2012-12-07 COMP_LTE_DL-Core - 2012-12-04
1103 1 B Rel-11 11.1.0 - Introducing support for Coordinated Multi-Point (CoMP) operation in DL - - - - R2-80 R2-126031 revised 2012-12-07 COMP_LTE_DL-Core - 2012-12-04
1103 2 B Rel-11 11.1.0 - Introducing support for Coordinated Multi-Point (CoMP) operation in DL - - - - R2-80 R2-126107 revised 2012-12-07 COMP_LTE_DL-Core - 2012-12-04
1103 2 B Rel-11 11.1.0 - Introducing support for Coordinated Multi-Point (CoMP) operation RP-58 RP-121753 revised Samsung - - - 2012-12-07 COMP_LTE_DL-Core company contribution; resubmission of CR R2-126107; note: rev 3 R2-126126 was not agreed in RAN2 email discussion [80#13] 2012-12-04
1103 3 B Rel-11 11.1.0 - Introducing support for Coordinated Multi-Point (CoMP) operation in DL - - - - R2-80 R2-126126 rejected 2012-12-07 COMP_LTE_DL-Core - 2012-12-04
1103 4 B Rel-11 11.1.0 - Introducing support for Coordinated Multi-Point (CoMP) operation RP-58 RP-121796 revised Nokia Siemens Networks, Huawei, NTT DOCOMO, INC., LG Electronics Inc. - - - 2012-12-07 COMP_LTE_DL-Core company contribution; alternative proposal to RP-121753;^^revised in RP-121963 2012-12-04
1103 5 B Rel-11 11.1.0 - Introducing support for Coordinated Multi-Point (CoMP) operation RP-58 RP-121963 rejected Nokia Siemens Networks, Huawei, NTT DOCOMO, INC., LG Electronics Inc., Nokia Corporation, Panasonic - - - 2012-12-07 COMP_LTE_DL-Core company contribution; alternative proposal to RP-121753 2012-12-04
1103 6 B Rel-11 11.1.0 11.2.0 Introducing support for Coordinated Multi-Point (CoMP) operation RP-58 RP-121970 approved Samsung - - - 2012-12-04 COMP_LTE_DL-Core - 2012-12-05
1105 - A Rel-11 11.1.0 - Introducing further UE aspects regarding multi band cells - - - - R2-80 R2-126046 revised 2012-12-07 LTE-L23, LTE-RF - 2012-12-04
1105 1 A Rel-11 11.1.0 - Introducing further UE aspects regarding multi band cells - - - - R2-80 R2-126118 revised 2012-12-07 LTE-L23, LTE-RF, TEI10 - 2012-12-04
1105 2 A Rel-11 11.1.0 11.2.0 Introducing further UE aspects regarding multi band cells RP-58 RP-121922 approved R2 R2-80 R2-126131 agreed 2012-12-07 LTE-L23, LTE-RF, TEI10 - 2012-12-04
1118 - F Rel-11 11.1.0 - Behaviour in case of excessive dedicated priority information - - - - R2-80 R2-125869 rejected 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1120 - C Rel-11 11.1.0 11.2.0 CR to 36.331 on additional information in RLF report for inter-RAT MRO RP-58 RP-121947 approved R2 R2-80 R2-125857 agreed 2012-12-07 SONenh2_LTE_UTRA-Core - 2012-12-04
1125 - F Rel-11 11.1.0 - Correction on Power preference indication - - - - R2-80 R2-125898 revised 2012-12-07 LTE_eDDA-Core - 2012-12-04
1125 1 F Rel-11 11.1.0 11.2.0 Correction on Power preference indication RP-58 RP-121952 approved R2 R2-80 R2-126078 agreed 2012-12-07 LTE_eDDA-Core - 2012-12-04
1126 - F Rel-10 10.7.0 - Measurement reporting of Scells - - - - R2-80 R2-125873 revised 2012-12-07 LTE_CA-Core - 2012-12-04
1126 1 F Rel-10 10.7.0 10.8.0 Measurement reporting of Scells RP-58 RP-121936 approved R2 R2-80 R2-126073 agreed 2012-12-07 LTE_CA-Core - 2012-12-04
1127 - B Rel-11 11.1.0 - SIB1 provisioning via dedicated signalling - - - - R2-80 R2-126015 revised 2012-12-07 eICIC_enh_LTE-Core - 2012-12-04
1127 1 B Rel-11 11.1.0 11.2.0 SIB1 provisioning via dedicated signalling RP-58 RP-121950 approved R2 R2-80 R2-126104 agreed 2012-12-07 eICIC_enh_LTE-Core - 2012-12-04
1128 - A Rel-11 11.1.0 - Measurement reporting of Scells - - - - R2-80 R2-125874 revised 2012-12-07 LTE_CA-Core - 2012-12-04
1128 1 A Rel-11 11.1.0 - Measurement reporting of Scells - - - - R2-80 R2-126074 revised 2012-12-07 LTE-CA-Core - 2012-12-04
1128 2 A Rel-11 11.1.0 11.2.0 Measurement reporting of Scells RP-58 RP-121936 approved R2 R2-80 R2-126130 agreed 2012-12-07 LTE_CA-Core - 2012-12-04
1129 - B Rel-11 11.1.0 - Introduction of EPDCCH parameters in TS 36.331 - - - - R2-80 R2-126056 revised 2012-12-07 LTE_enh_dl_ctrl-Core - 2012-12-04
1129 1 B Rel-11 11.1.0 11.2.0 Introduction of EPDCCH parameters in TS 36.331 RP-58 RP-121956 approved R2 R2-80 R2-126116 agreed 2012-12-07 LTE_enh_dl_ctrl-Core - 2012-12-04
1130 - B Rel-11 11.1.0 - Introduction of Rel-11 UE capabilities - - - - R2-80 R2-126027 revised 2012-12-07 LTE_CA_enh-Core, LTE_eDDA-Core, eMDT_UMTSLTE-Core, SPIA_IDC_LTE-Core, COMP_LTE_DL-Core, COMP_LTE_UL-Core, eICIC_enh_LTE-Core, LTE_enh_dl_ctrl-Core, LTE_TDD_add_subframe-Core, TEI11 - 2012-12-04
1130 1 B Rel-11 11.1.0 - Introduction of Rel-11 UE capabilities - - - - R2-80 R2-126061 revised 2012-12-07 LTE_CA_enh-Core, LTE_eDDA-Core, eMDT_UMTSLTE-Core, SPIA_IDC_LTE-Core, COMP_LTE_DL-Core, COMP_LTE_UL-Core, eICIC_enh_LTE-Core, LTE_enh_dl_ctrl-Core, LTE_TDD_add_subframe-Core, TEI11 - 2012-12-04
1130 2 B Rel-11 11.1.0 11.2.0 Introduction of Rel-11 UE capabilities RP-58 RP-121961 approved R2 R2-80 R2-126121 agreed 2012-12-07 LTE_CA_enh-Core, LTE_eDDA-Core, eMDT_UMTSLTE-Core, SPIA_IDC_LTE-Core, COMP_LTE_DL-Core, COMP_LTE_UL-Core, eICIC_enh_LTE-Core, LTE_enh_dl_ctrl-Core, LTE_TDD_add_subframe-Core, TEI11 - 2012-12-04
1131 - B Rel-11 11.1.0 11.2.0 Introducion of wideband RSRQ measurements RP-58 RP-121958 approved R2 R2-80 R2-125862 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1132 - F Rel-9 9.12.0 - Update on setting of FGI bit 27 - - - - R2-80 R2-125886 revised 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1132 1 F Rel-9 9.12.0 - Update on setting of FGI bit 27 RP-58 RP-121929 postponed R2 R2-80 R2-126036 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1133 - A Rel-10 10.7.0 - Update on setting of FGI bit 27 RP-58 RP-121929 postponed R2 R2-80 R2-125885 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1134 - A Rel-11 11.1.0 - Update on setting of FGI bit 27 - - - - R2-80 R2-125887 revised 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1134 1 A Rel-11 11.1.0 - Update on setting of FGI bit 27 RP-58 RP-121929 postponed R2 R2-80 R2-126037 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1135 - F Rel-9 9.12.0 - Update on setting of FGI bit 28 RP-58 RP-121930 postponed R2 R2-80 R2-126081 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1136 - F Rel-10 10.7.0 - Update on setting of FGI bit 28 RP-58 RP-121930 postponed R2 R2-80 R2-126082 agreed 2012-12-07 LTE-L23, TEI10 - 2012-12-04
1137 - A Rel-11 11.1.0 - Update on setting of FGI bit 28 RP-58 RP-121930 postponed R2 R2-80 R2-126083 agreed 2012-12-07 LTE-L23, TEI10 - 2012-12-04
1138 - F Rel-9 9.12.0 - Update on setting of FGI bit 14 RP-58 RP-121927 postponed R2 R2-80 R2-126084 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1139 - F Rel-10 10.7.0 - Update on setting of FGI bit 14 RP-58 RP-121927 postponed R2 R2-80 R2-126085 agreed 2012-12-07 LTE-L23, TEI10 - 2012-12-04
1140 - A Rel-11 11.1.0 - Update on setting of FGI bit 14 RP-58 RP-121927 postponed R2 R2-80 R2-126086 agreed 2012-12-07 LTE-L23, TEI10 - 2012-12-04
1141 - F Rel-9 9.12.0 - Update on setting of FGI bit 9 RP-58 RP-121926 rejected R2 R2-80 R2-126098 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1142 - A Rel-10 10.7.0 - Update on setting of FGI bit 9 RP-58 RP-121926 rejected R2 R2-80 R2-126099 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1143 - A Rel-11 11.1.0 - Update on setting of FGI bit 9 RP-58 RP-121926 rejected R2 R2-80 R2-126100 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1146 - C Rel-11 11.1.0 11.2.0 Introduction of network sharing for CDMA2000 inter-working RP-58 RP-121958 approved R2 R2-80 R2-126068 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1153 - F Rel-10 10.7.0 - Corrections on the definition of CSG member cell - - - - R2-80 R2-125891 postponed 2012-12-07 LTE-L23, TEI10 - 2012-12-04
1154 - A Rel-11 11.1.0 - Corrections on the definition of CSG member cell - - - - R2-80 R2-125892 postponed 2012-12-07 LTE-L23, TEI10 - 2012-12-04
1157 - B Rel-11 11.1.0 11.2.0 Broadcast of Time Info by Using a New SIB RP-58 RP-121960 approved R2 R2-80 R2-125992 tech endorsed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1166 - F Rel-9 9.12.0 - The setting of FGI1 and FGI2 RP-58 RP-121924 rejected R2 R2-80 R2-126091 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1167 - A Rel-10 10.7.0 - The setting of FGI1 and FGI2 RP-58 RP-121924 rejected R2 R2-80 R2-126092 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1168 - A Rel-11 11.1.0 - The setting of FGI1 and FGI2 RP-58 RP-121924 rejected R2 R2-80 R2-126093 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1169 - F Rel-9 9.12.0 - Extension of FBI and EARFCN - - - - R2-80 R2-125844 withdrawn 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1170 - A Rel-10 10.7.0 - Extension of FBI and EARFCN - - - - R2-80 R2-125845 withdrawn 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1171 - F Rel-11 11.1.0 - PDCCH monitoring for UL retransmission grants - - - - R2-80 R2-126022 rejected 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1172 - F Rel-8 8.17.0 - Introducing further UE aspects regarding multi band cells - - - - R2-80 R2-126043 revised 2012-12-07 LTE-L23, LTE-RF - 2012-12-04
1172 1 F Rel-8 8.17.0 8.18.0 Introducing further UE aspects regarding multi band cells RP-58 RP-121922 approved R2 R2-80 R2-126108 agreed 2012-12-07 LTE-L23, LTE-RF - 2012-12-04
1173 - A Rel-9 9.12.0 9.13.0 Introducing further UE aspects regarding multi band cells RP-58 RP-121922 approved R2 R2-80 R2-126044 agreed 2012-12-07 LTE-L23, LTE-RF - 2012-12-04
1174 - A Rel-10 10.7.0 - Introducing further UE aspects regarding multi band cells - - - - R2-80 R2-126045 revised 2012-12-07 LTE-L23, LTE-RF - 2012-12-04
1174 1 F Rel-10 10.7.0 10.8.0 Introducing further UE aspects regarding multi band cells RP-58 RP-121922 approved R2 R2-80 R2-126117 agreed 2012-12-07 LTE-L23, LTE-RF, TEI10 - 2012-12-04
1175 - F Rel-11 11.1.0 11.2.0 GERAN measurement object at ANR RP-58 RP-121957 approved R2 R2-80 R2-126069 agreed 2012-12-07 LTE-L23, TEI11 - 2012-12-04
1176 - F Rel-9 9.12.0 - Update on setting of FGI bit 23 RP-58 RP-121928 rejected R2 R2-80 R2-126101 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1177 - A Rel-10 10.7.0 - Update on setting of FGI bit 23 RP-58 RP-121928 rejected R2 R2-80 R2-126102 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1178 - A Rel-11 11.1.0 - Update on setting of FGI bit 23 RP-58 RP-121928 rejected R2 R2-80 R2-126103 tech endorsed 2012-12-07 LTE-L23, TEI9 - 2012-12-04
1179 - F Rel-9 9.12.0 - Update on setting of FGI bit 29 RP-58 RP-121781 rejected KDDI - - - 2012-12-07 TEI9, LTE-L23 company contribution; CR was not provided to RAN2 #80 2012-12-04
1180 - A Rel-10 10.7.0 - Update on setting of FGI bit 29 RP-58 RP-121782 rejected KDDI - - - 2012-12-07 TEI9, LTE-L23 company contribution; CR was not provided to RAN2 #80 2012-12-04
1181 - A Rel-11 11.1.0 - Update on setting of FGI bit 29 RP-58 RP-121783 rejected KDDI - - - 2012-12-07 TEI9, LTE-L23 company contribution; CR was not provided to RAN2 #80 2012-12-04
1182 - F Rel-11 11.2.0 - Miscellaneous corrections from review preceeding ASN.1 freeze - - - - R2-81 R2-130235 revised 2013-03-01 TEI11 - 2013-03-03
1182 1 F Rel-11 11.2.0 - Miscellaneous corrections from review preceeding ASN.1 freeze - - - - R2-81 R2-130824 revised 2013-03-01 TEI11 - 2013-03-03
1182 2 F Rel-11 11.2.0 11.3.0 Miscellaneous corrections from review preceeding ASN.1 freeze RP-59 RP-130246 approved R2 R2-81 R2-130859 agreed 2013-03-01 TEI11 - 2013-02-25
1182 3 F Rel-11 11.2.0 - Miscellaneous corrections from review preceeding ASN.1 freeze - - - - R2-81 R2-130889 withdrawn 2013-03-01 TEI11 - 2013-03-03
1186 - F Rel-11 11.2.0 - DL COMP capability related correction - - - - R2-81 R2-130838 revised 2013-03-01 COMP_LTE_DL-Core - 2013-03-03
1186 1 F Rel-11 11.2.0 - DL COMP capability related correction - - - - R2-81 R2-130858 revised 2013-03-01 COMP_LTE_DL-Core - 2013-03-03
1186 2 F Rel-11 11.2.0 11.3.0 DL COMP capability related correction RP-59 RP-130243 approved R2 R2-81 R2-130871 endorsed 2013-03-01 COMP_LTE_DL-Core R2-130871 is technically endorsed and will be provided to RAN #59; CR for removing both per-UE capability bits (if the feature is decided to be optional) 2013-02-25
1191 - F Rel-9 9.13.0 - Mandatory supporting of B1 measurement to UMTS FDD (FGI bit 15) - - - - R2-81 R2-130809 revised 2013-03-01 TEI9, LTE-L23 - 2013-03-03
1191 1 F Rel-9 9.13.0 9.14.0 Mandatory supporting of B1 measurement to UMTS FDD (FGI bit 15) RP-59 RP-130231 approved R2 R2-81 R2-130841 tech endorsed 2013-03-01 TEI9, LTE-L23 Since there is a pending RAN5 LS answer to be provided to RAN #59, the CR was just technically endorsed in RAN2 2013-02-25
1192 - A Rel-10 10.8.0 - Mandatory supporting of B1 measurement to UMTS FDD (FGI bit 15) - - - - R2-81 R2-130810 revised 2013-03-01 TEI9, LTE-L23 - 2013-03-03
1192 1 A Rel-10 10.8.0 10.9.0 Mandatory supporting of B1 measurement to UMTS FDD (FGI bit 15) RP-59 RP-130231 approved R2 R2-81 R2-130842 tech endorsed 2013-03-01 TEI9, LTE-L23 Since there is a pending RAN5 LS answer to be provided to RAN #59, the CR was just technically endorsed in RAN2 2013-02-25
1193 - A Rel-11 11.2.0 - Mandatory supporting of B1 measurement to UMTS FDD (FGI bit 15) - - - - R2-81 R2-130811 revised 2013-03-01 TEI9, LTE-L23 - 2013-03-03
1193 1 A Rel-11 11.2.0 11.3.0 Mandatory supporting of B1 measurement to UMTS FDD (FGI bit 15) RP-59 RP-130231 approved R2 R2-81 R2-130843 tech endorsed 2013-03-01 TEI9, LTE-L23 Since there is a pending RAN5 LS answer to be provided to RAN #59, the CR was just technically endorsed in RAN2 2013-02-25
1197 - F Rel-11 11.2.0 11.3.0 Clarification on MBMS Service Continuity RP-59 RP-130241 approved R2 R2-81 R2-130831 agreed 2013-03-01 MBMS_LTE_SC-Core - 2013-02-25
1198 - F Rel-11 11.2.0 11.3.0 IDC Problem Reporting RP-59 RP-130241 approved R2 R2-81 R2-130834 agreed 2013-03-01 SPIA_IDC_LTE-Core - 2013-02-25
1208 - F Rel-11 11.2.0 - Clarification on PhysCellIdRange - - - - R2-81 R2-130816 withdrawn 2013-03-01 LTE-L23 - 2013-03-03
1209 - F Rel-10 10.8.0 - Corrections on definition of CSG member cell - - - - R2-81 R2-130650 withdrawn 2013-03-01 TEI10 finally only REL-11 CR was considered 2013-03-03
1210 - F Rel-11 11.2.0 11.3.0 Corrections on definition of CSG member cell RP-59 RP-130247 approved R2 R2-81 R2-130651 agreed 2013-03-01 TEI11 - 2013-02-25
1211 - C Rel-11 11.2.0 11.3.0 Extension of FBI and EARFCN RP-59 RP-130237 approved R2 R2-81 R2-130622 agreed 2013-03-01 LTE-L23, LTE-RF, TEI9 - 2013-02-25
1214 - F Rel-10 10.8.0 - The presence of bandcombination for non-CA capable UEs - - - - R2-81 R2-130801 revised 2013-03-01 LTE_CA-Core - 2013-03-03
1214 1 F Rel-10 10.8.0 - The presence of bandcombination for non-CA capable UEs - - - - R2-81 R2-130848 revised 2013-03-01 LTE_CA-Core - 2013-03-03
1214 2 F Rel-10 10.8.0 10.9.0 The presence of bandcombination for non-CA capable UEs RP-59 RP-130233 approved R2 R2-81 R2-130855 agreed 2013-03-01 LTE_CA-Core - 2013-02-25
1217 - F Rel-8 8.18.0 8.19.0 Invalidation of ETWS with security feature RP-59 RP-130228 approved R2 R2-81 R2-130646 agreed 2013-03-01 ETWS - 2013-02-25
1218 - A Rel-9 9.13.0 9.14.0 Invalidation of ETWS with security feature RP-59 RP-130228 approved R2 R2-81 R2-130647 agreed 2013-03-01 ETWS - 2013-02-25
1219 - A Rel-10 10.8.0 10.9.0 Invalidation of ETWS with security feature RP-59 RP-130228 approved R2 R2-81 R2-130648 agreed 2013-03-01 ETWS - 2013-02-25
1220 - F Rel-11 11.2.0 11.3.0 Invalidation of ETWS with security feature RP-59 RP-130228 approved R2 R2-81 R2-130649 agreed 2013-03-01 ETWS - 2013-02-25
1221 - F Rel-8 8.18.0 8.19.0 Invalid measurement configuration with different (E)ARFCN RP-59 RP-130225 approved R2 R2-81 R2-130636 agreed 2013-03-01 TEI8 - 2013-02-25
1222 - A Rel-9 9.13.0 9.14.0 Invalid measurement configuration with different (E)ARFCN RP-59 RP-130225 approved R2 R2-81 R2-130637 agreed 2013-03-01 TEI8 - 2013-02-25
1223 - A Rel-10 10.8.0 10.9.0 Invalid measurement configuration with different (E)ARFCN RP-59 RP-130225 approved R2 R2-81 R2-130638 agreed 2013-03-01 TEI8 - 2013-02-25
1224 - A Rel-11 11.2.0 11.3.0 Invalid measurement configuration with different (E)ARFCN RP-59 RP-130225 approved R2 R2-81 R2-130639 agreed 2013-03-01 TEI8 - 2013-02-25
1227 - F Rel-10 10.8.0 - RRC CR of periodic CSI reporting and DRX - - - - R2-81 R2-130603 rejected 2013-03-01 LTE-L23 - 2013-03-03
1228 - F Rel-11 11.2.0 - RRC CR of periodic CSI reporting and DRX - - - - R2-81 R2-130601 rejected 2013-03-01 LTE-L23 - 2013-03-03
1231 - F Rel-11 11.2.0 - PPI, MBMS, IDC indication upon HO - - - - R2-81 R2-130828 revised 2013-03-01 LTE_eDDA-Core, MBMS_LTE_SC-Core, SPIA_IDC_LTE-Core - 2013-03-03
1231 1 F Rel-11 11.2.0 - PPI, MBMS, IDC indication upon HO - - - - R2-81 R2-130862 revised 2013-03-01 LTE_eDDA-Core, MBMS_LTE_SC-Core, SPIA_IDC_LTE-Core - 2013-03-03
1231 2 F Rel-11 11.2.0 11.3.0 PPI and IDC indication upon handover RP-59 RP-130241 approved R2 R2-81 R2-130863 agreed 2013-03-01 LTE_eDDA-Core, SPIA_IDC_LTE-Core result of email discussion [81#03] 2013-02-25
1232 - F Rel-8 8.18.0 - Correcting further UE aspects regarding multi band cells - - - - R2-81 R2-130605 revised 2013-03-01 LTE-L23, LTE-RF - 2013-03-03
1232 1 F Rel-8 8.18.0 8.19.0 Correcting further UE aspects regarding multi band cells RP-59 RP-130227 approved R2 R2-81 R2-130628 agreed 2013-03-01 LTE-L23, LTE-RF - 2013-02-25
1233 - A Rel-9 9.13.0 - Correcting further UE aspects regarding multi band cells - - - - R2-81 R2-130606 revised 2013-03-01 LTE-L23, LTE-RF - 2013-03-03
1233 1 A Rel-9 9.13.0 9.14.0 Correcting further UE aspects regarding multi band cells RP-59 RP-130227 approved R2 R2-81 R2-130629 agreed 2013-03-01 LTE-L23, LTE-RF - 2013-02-25
1234 - A Rel-10 10.8.0 - Correcting further UE aspects regarding multi band cells - - - - R2-81 R2-130607 revised 2013-03-01 LTE-L23, LTE-RF - 2013-03-03
1234 1 A Rel-10 10.8.0 10.9.0 Correcting further UE aspects regarding multi band cells RP-59 RP-130227 approved R2 R2-81 R2-130630 agreed 2013-03-01 LTE-L23, LTE-RF - 2013-02-25
1235 - A Rel-11 11.2.0 - Correcting further UE aspects regarding multi band cells - - - - R2-81 R2-130608 revised 2013-03-01 LTE-L23, LTE-RF - 2013-03-03
1235 1 A Rel-11 11.2.0 11.3.0 Correcting further UE aspects regarding multi band cells RP-59 RP-130227 approved R2 R2-81 R2-130631 agreed 2013-03-01 LTE-L23, LTE-RF - 2013-02-25
1236 - F Rel-11 11.2.0 - Behaviour in case of excessive dedicated priority information - - - - R2-81 R2-130829 revised 2013-03-01 TEI11, LTE-L23 - 2013-03-03
1236 1 F Rel-11 11.2.0 11.3.0 Behaviour in case of excessive dedicated priority information RP-59 RP-130248 approved R2 R2-81 R2-130881 agreed 2013-03-01 TEI11, LTE-L23 - 2013-02-25
1238 - F Rel-8 8.18.0 8.19.0 Clarification on EARFCN signalling in Mobility control info RP-59 RP-130225 approved R2 R2-81 R2-130812 agreed 2013-03-01 LTE-L23 - 2013-02-25
1239 - A Rel-9 9.13.0 9.14.0 Clarification on EARFCN signalling in Mobility control info RP-59 RP-130225 approved R2 R2-81 R2-130813 agreed 2013-03-01 LTE-L23 - 2013-02-25
1240 - A Rel-10 10.8.0 10.9.0 Clarification on EARFCN signalling in Mobility control info RP-59 RP-130225 approved R2 R2-81 R2-130814 agreed 2013-03-01 LTE-L23 - 2013-02-25
1241 - A Rel-11 11.2.0 11.3.0 Clarification on EARFCN signalling in Mobility control info RP-59 RP-130225 approved R2 R2-81 R2-130815 agreed 2013-03-01 LTE-L23 - 2013-02-25
1244 - F Rel-11 11.2.0 11.3.0 IDC-SubframePattern length for FDD RP-59 RP-130241 approved R2 R2-81 R2-130835 agreed 2013-03-01 SPIA_IDC_LTE-Core - 2013-02-25
1252 - B Rel-11 11.2.0 11.3.0 Introduction of wideband RSRQ measurements in RRC_IDLE RP-59 RP-130249 approved R2 R2-81 R2-130669 agreed 2013-03-01 TEI11, LTE-L23 - 2013-02-25
1255 - F Rel-11 11.2.0 11.3.0 Optional support of RLF report for inter-RAT MRO RP-59 RP-130240 approved R2 R2-81 R2-130666 agreed 2013-03-01 SONenh2_LTE_UTRA-Core - 2013-02-25
1256 - C Rel-9 9.13.0 9.14.0 Extension of FBI and EARFCN RP-59 RP-130237 approved R2 R2-81 R2-130620 agreed 2013-03-01 LTE-L23, LTE-RF, TEI9 - 2013-02-25
1257 - C Rel-10 10.8.0 10.9.0 Extension of FBI and EARFCN RP-59 RP-130237 approved R2 R2-81 R2-130621 agreed 2013-03-01 LTE-L23, LTE-RF, TEI9 - 2013-02-25
1258 - A Rel-11 11.2.0 - The presence of bandcombination for non-CA capable UEs - - - - R2-81 R2-130802 revised 2013-03-01 LTE_CA-Core - 2013-03-03
1258 1 A Rel-11 11.2.0 - The presence of bandcombination for non-CA capable UEs - - - - R2-81 R2-130849 revised 2013-03-01 LTE_CA-Core - 2013-03-03
1258 2 A Rel-11 11.2.0 11.3.0 The presence of bandcombination for non-CA capable UEs RP-59 RP-130233 approved R2 R2-81 R2-130856 agreed 2013-03-01 LTE_CA-Core - 2013-02-25
1259 - F Rel-11 11.2.0 11.3.0 Correction for event A5 RP-59 RP-130248 approved R2 R2-81 R2-130818 agreed 2013-03-01 TEI11 - 2013-02-25
1260 - F Rel-11 11.2.0 - CR on ROHC parameter configuration in Rel-11 RRC - - - - R2-81 R2-130819 withdrawn 2013-03-01 LTE-L23, TEI9 - 2013-03-03
1261 - F Rel-10 10.8.0 - Inter RAT inconsistency RLF report - - - - R2-81 R2-130864 revised 2013-03-01 SONenh_LTE_UTRA-Core no cat.A CR needed 2013-03-03
1261 1 F Rel-10 10.8.0 10.9.0 Inter RAT inconsistency RLF report RP-59 RP-130234 approved R2 R2-81 R2-130879 agreed 2013-03-01 SONenh_LTE-Core no cat.A CR needed 2013-02-25
1262 - F Rel-11 11.2.0 - Per-UE capability for DL CoMP RP-59 RP-130242 rejected R2 R2-81 R2-130866 endorsed 2013-03-01 COMP_LTE_DL-Core alternative to R2-130858; R2-130866 is technically endorsed and will be provided to RAN #59; CR for keeping one capability bit (if the feature is decided to be mandatory) 2013-02-25
1263 - F Rel-9 9.13.0 - Mandating the settings of FGI bit 14, 27 and 28 to true RP-59 RP-130330 revised NTT DOCOMO, INC., Nokia Siemens Networks, Huawei, HiSilicon, Telecom Italia, Vodafone, TeliaSonera, Orange, Deutsche Telekom, AT&T - - - 2013-03-01 TEI9, LTE-L23 company contribution: resubmission of postponed CRs RP-121927, RP-121929, RP-121930 of RAN #58 2013-02-25
1263 1 F Rel-9 9.13.0 9.14.0 Mandating the settings of FGI bit 14 and 27 to true RP-59 RP-130413 approved NTT DOCOMO, INC., Nokia Siemens Networks, Huawei, - - - 2013-03-01 TEI9, LTE-L23 - 2013-03-01
1264 - A Rel-10 10.8.0 - Mandating the settings of FGI bit 14, 27 and 28 to true RP-59 RP-130331 revised NTT DOCOMO, INC., Nokia Siemens Networks, Huawei, HiSilicon, Telecom Italia, Vodafone, TeliaSonera, Orange, Deutsche Telekom, AT&T - - - 2013-03-01 TEI9, LTE-L23 company contribution: resubmission of postponed CRs RP-121927, RP-121929, RP-121930 of RAN #58 2013-02-25
1264 1 F Rel-10 10.8.0 10.9.0 Mandating the settings of FGI bit 14, 27 and 28 to true RP-59 RP-130414 approved NTT DOCOMO, INC., Nokia Siemens Networks, Huawei, - - - 2013-03-01 TEI9, LTE-L23 - 2013-03-01
1265 - A Rel-11 11.2.0 11.3.0 Mandating the settings of FGI bit 14, 27 and 28 to true RP-59 RP-130332 approved NTT DOCOMO, INC., Nokia Siemens Networks, Huawei, HiSilicon, Telecom Italia, Vodafone, TeliaSonera, Orange, Deutsche Telekom, AT&T - - - 2013-03-01 TEI9, LTE-L23 company contribution: resubmission of postponed CRs RP-121927, RP-121929, RP-121930 of RAN #58 2013-02-25
1266 - F Rel-10 10.9.0 10.10.0 Clarification on the redirection to UTRA-TDD frequency in case of CSFB High Priority RP-60 RP-130805 approved R2 R2-82 R2-131602 agreed 2013-06-14 LTE-L23, TEI10 - 2013-06-15
1267 - A Rel-11 11.3.0 11.4.0 Clarification on the redirection to UTRA-TDD frequency in case of CSFB High Priority RP-60 RP-130805 approved R2 R2-82 R2-131603 agreed 2013-06-14 LTE-L23, TEI10 - 2013-06-15
1268 - F Rel-10 10.9.0 - Correction of wrong reference - - - - R2-82 R2-131604 revised 2013-06-14 LTE_CA-Core - 2013-06-15
1268 1 F Rel-10 10.9.0 10.10.0 Correction of wrong reference RP-60 RP-130804 approved R2 R2-82 R2-132200 agreed 2013-06-14 LTE_CA-Core - 2013-06-15
1269 - A Rel-11 11.3.0 - Correction of wrong reference - - - - R2-82 R2-131605 revised 2013-06-14 LTE_CA-Core implicitly in principle agreed with cat.F CR R2-131139 of RAN2 #81bis 2013-06-15
1269 1 A Rel-11 11.3.0 11.4.0 Correction of wrong reference RP-60 RP-130804 approved R2 R2-82 R2-132201 agreed 2013-06-14 LTE_CA-Core - 2013-06-15
1270 - F Rel-11 11.3.0 11.4.0 Clarification to support of deprioritisation feature RP-60 RP-130809 approved R2 R2-82 R2-131606 agreed 2013-06-14 LTE-L23, TEI11 - 2013-06-15
1271 - F Rel-11 11.3.0 11.4.0 Clarification on KASME key usage RP-60 RP-130809 approved R2 R2-82 R2-131607 agreed 2013-06-14 LTE-L23, TEI11 - 2013-06-15
1272 - F Rel-11 11.3.0 11.4.0 Correction on multi-TA capability RP-60 RP-130808 approved R2 R2-82 R2-131608 agreed 2013-06-14 LTE_CA_enh-Core - 2013-06-15
1273 - F Rel-11 11.3.0 11.4.0 MBMS interest indication upon handover/ re-establishment RP-60 RP-130808 approved R2 R2-82 R2-131609 agreed 2013-06-14 MBMS_LTE_SC-Core - 2013-06-15
1274 - F Rel-11 11.3.0 11.4.0 Conditions RI reference inheriting CSI process (DL CoMP) RP-60 RP-130808 approved R2 R2-82 R2-131610 agreed 2013-06-14 COMP_LTE_DL-Core - 2013-06-15
1275 - F Rel-11 11.3.0 11.4.0 Clarification on NZP CSI-RS resource configuration for UE supporting 1 CSI process RP-60 RP-130808 approved R2 R2-82 R2-131611 agreed 2013-06-14 COMP_LTE_DL-Core - 2013-06-15
1276 - F Rel-11 11.3.0 11.4.0 Corrections to field description of pdsch-Start-r11 RP-60 RP-130808 approved R2 R2-82 R2-131612 agreed 2013-06-14 COMP_LTE_DL-Core - 2013-06-15
1277 - F Rel-11 11.3.0 11.4.0 Need code corrections in Rel-11 RRC RP-60 RP-130809 approved R2 R2-82 R2-131613 agreed 2013-06-14 LTE-L23, TEI11 - 2013-06-15
1278 - F Rel-11 11.3.0 11.4.0 Miscellanous small corrections RP-60 RP-130808 approved R2 R2-82 R2-131614 agreed 2013-06-14 TEI11, LTE_CA-Core, COMP_LTE_DL-Core - 2013-06-15
1279 - F Rel-11 11.3.0 - FDD/TDD diff column correction for FGI31 - - - - R2-82 R2-131615 revised 2013-06-14 TEI11, LTE-L23 for earlier REL it was already set to no 2013-06-15
1279 1 F Rel-11 11.3.0 11.4.0 FDD/TDD diff column correction for FGI31 RP-60 RP-130809 approved R2 R2-82 R2-131628 agreed 2013-06-14 LTE-L23, TEI11 - 2013-06-15
1281 - F Rel-10 10.9.0 10.10.0 measCycleSCell upon SCell configuration RP-60 RP-130804 approved R2 R2-82 R2-132099 agreed 2013-06-14 LTE_CA-Core - 2013-06-15
1282 - A Rel-11 11.3.0 11.4.0 measCycleSCell upon SCell configuration RP-60 RP-130804 approved R2 R2-82 R2-132100 agreed 2013-06-14 LTE_CA-Core - 2013-06-15
1294 - F Rel-11 11.3.0 11.4.0 Clarification on RRC Connection Reconfiguration with Critical Extension RP-60 RP-130809 approved R2 R2-82 R2-132212 agreed 2013-06-14 LTE-L23, TEI11 - 2013-06-15
1295 - F Rel-8 8.19.0 8.20.0 Security key generation in case of MFBI RP-60 RP-130802 approved R2 R2-82 R2-132205 agreed 2013-06-14 LTE-L23 - 2013-06-15
1296 - A Rel-9 9.14.1 9.15.0 Security key generation in case of MFBI RP-60 RP-130802 approved R2 R2-82 R2-132206 agreed 2013-06-14 LTE-L23 - 2013-06-15
1297 - A Rel-10 10.9.0 10.10.0 Security key generation in case of MFBI RP-60 RP-130802 approved R2 R2-82 R2-132207 agreed 2013-06-14 LTE-L23 - 2013-06-15
1298 - A Rel-11 11.3.0 11.4.0 Security key generation in case of MFBI RP-60 RP-130802 approved R2 R2-82 R2-132208 agreed 2013-06-14 LTE-L23 - 2013-06-15
1302 - F Rel-9 9.14.1 - MFBI aspects for dedicated signalling - - - - R2-82 R2-132195 revised 2013-06-14 LTE-RF, TEI9 - 2013-06-15
1302 1 A Rel-9 9.14.1 - MFBI aspects for dedicated signalling RP-60 RP-130802 revised R2 R2-82 R2-132245 agreed 2013-06-14 LTE-RF result of email discussion [82#00]; revised in RP-130817 2013-06-15
1302 2 F Rel-9 9.14.1 9.15.0 MFBI aspects for dedicated signalling RP-60 RP-130817 approved Samsung - - - 2013-06-14 LTE-RF, TEI9 company contribution; intends to replace R2-132245 of RP-130802 2013-06-15
1303 - F Rel-11 11.3.0 - Clarification on inclusion of non-CA band combinations - - - - R2-82 R2-132178 revised 2013-06-14 LTE_CA-Core, COMP_LTE_DL-Core result of email discussion [82#05]; at first R2-132178 was agreed, later it turned out that this CR used the wrong CR number so revised in R2-132252 2013-06-15
1303 1 F Rel-11 11.3.0 11.4.0 Clarification on inclusion of non-CA band combinations RP-60 RP-130804 approved R2 R2-82 R2-132252 agreed 2013-06-14 LTE_CA-Core, COMP_LTE_DL-Core result of email discussion [82#05] 2013-06-15
1308 - F Rel-11 11.3.0 11.4.0 CR on ROHC parameter configuration in Rel-11 RRC RP-60 RP-130809 approved R2 R2-82 R2-132210 agreed 2013-06-14 LTE-L23, TEI11 - 2013-06-15
1314 - F Rel-10 10.9.0 - Clarification on UE CA capability - - - - R2-82 R2-132203 revised 2013-06-14 LTE_CA-Core - 2013-06-15
1314 1 F Rel-10 10.9.0 10.10.0 Clarification on UE CA capability RP-60 RP-130804 approved R2 R2-82 R2-132234 agreed 2013-06-14 LTE_CA-Core - 2013-06-15
1315 - A Rel-11 11.3.0 - Clarification on UE CA capability - - - - R2-82 R2-132204 revised 2013-06-14 LTE_CA-Core - 2013-06-15
1315 1 A Rel-11 11.3.0 - Clarification on UE CA capability - - - - R2-82 R2-132235 revised 2013-06-14 LTE_CA-Core - 2013-06-15
1315 2 A Rel-11 11.3.0 11.4.0 Clarification on UE CA capability RP-60 RP-130804 approved R2 R2-82 R2-132238 agreed 2013-06-14 LTE_CA-Core - 2013-06-15
1316 - C Rel-10 10.9.0 - 36.331 CR (Rel-10,C) - Decouple UL 64QAM from UE category RP-60 RP-130686 rejected Huawei - - - 2013-06-14 LTE-L23, TEI10 company contribution; related to RAN2 LS in RP-130439; CR was postponed in RAN2 #82 in R2-131945; no cat.A CRs so far as RAN has to decide the REL 2013-06-10
1321 - F Rel-11 11.3.0 11.4.0 Updating 3GPP2 specification references RP-60 RP-130809 approved R2 R2-82 R2-132218 agreed 2013-06-14 LTE-L23, TEI11 - 2013-06-15
1322 - F Rel-10 10.9.0 10.10.0 Clarification on the configuration of the extended PHR RP-60 RP-130805 approved R2 R2-82 R2-132227 agreed 2013-06-14 LTE-L23, TEI10 - 2013-06-15
1323 - A Rel-11 11.3.0 11.4.0 Clarification on the configuration of the extended PHR RP-60 RP-130805 approved R2 R2-82 R2-132228 agreed 2013-06-14 LTE-L23, TEI10 - 2013-06-15
1324 - A Rel-11 11.3.0 11.4.0 Clarifications on SystemTimeInfoCDMA2000 IE RP-60 RP-130805 approved R2 R2-82 R2-132215 agreed 2013-06-14 LTE-L23, TEI10 - 2013-06-15
1325 - F Rel-11 11.3.0 11.4.0 MFBI impact on MBMS service continuity RP-60 RP-130808 approved R2 R2-82 R2-132213 agreed 2013-06-14 MBMS_LTE_SC-Core, LTE-RF - 2013-06-15
1326 - F Rel-10 10.9.0 - Clarifications on SystemTimeInfoCDMA2000 IE - - - - R2-82 R2-132216 revised 2013-06-14 LTE-L23, TEI10 version number on CR cover to be corrected 2013-06-15
1326 1 F Rel-10 10.9.0 10.10.0 Clarifications on SystemTimeInfoCDMA2000 IE RP-60 RP-130805 approved R2 R2-82 R2-132230 agreed 2013-06-14 LTE-L23, TEI10 - 2013-06-15
1327 - F Rel-10 10.9.0 10.10.0 Clarification on inclusion of non-CA band combinations RP-60 RP-130804 approved R2 R2-82 R2-132177 agreed 2013-06-14 LTE_CA-Core result of email discussion [82#05] 2013-06-15
1328 - A Rel-10 10.9.0 - MFBI aspects for dedicated signalling RP-60 RP-130802 revised R2 R2-82 R2-132246 agreed 2013-06-14 LTE-RF result of email discussion [82#00]; revised in RP-130818 2013-06-15
1328 1 F Rel-10 10.9.0 10.10.0 MFBI aspects for dedicated signalling RP-60 RP-130818 approved Samsung - - - 2013-06-14 LTE-RF, TEI10 company contribution; intends to replace R2-132246 of RP-130802 2013-06-15
1329 - A Rel-11 11.3.0 - MFBI aspects for dedicated signalling RP-60 RP-130802 revised R2 R2-82 R2-132247 agreed 2013-06-14 LTE-RF result of email discussion [82#00]; revised in RP-130819 2013-06-15
1329 1 F Rel-11 11.3.0 11.4.0 MFBI aspects for dedicated signalling RP-60 RP-130819 approved Samsung - - - 2013-06-14 LTE-RF, TEI11 company contribution; intends to replace R2-132247 of RP-130802 2013-06-15
1330 - F Rel-8 8.19.0 - MFBI aspects for dedicated signalling RP-60 RP-130802 revised R2 R2-82 R2-132248 agreed 2013-06-14 LTE-RF result of email discussion [82#00]; revised in RP-130816 2013-06-15
1330 1 F Rel-8 8.19.0 8.20.0 MFBI aspects for dedicated signalling RP-60 RP-130816 approved Samsung - - - 2013-06-14 LTE-RF company contribution; intends to replace R2-132248 of RP-130802 2013-06-15
1331 - F Rel-9 9.14.1 9.15.0 Mandating the setting of FGI bit 28 to true RP-60 RP-130718 approved NTT DOCOMO, INC., Huawei, HiSilicon, Telecom Italia, Vodafone, TeliaSonera, Orange, Deutsche Telekom, AT&T - - - 2013-06-14 TEI9, LTE-L23 company contribution; coming back to this aspect of RP-130330 that was excluded at RAN #59 (note: topic was not discussed in RAN2 again); note: no cat.A CRs are needed as CRs RP-130414 and RP-130332 covered this at RAN #59 2013-06-10
1332 - F Rel-9 9.14.1 - Mandating the settings of FGI bit 9 and 23 to true RP-60 RP-130724 postponed Vodafone Group - - - 2013-06-14 TEI9, LTE-L23 company contribution; RAN2 #81bis postponed R2-131250 (RAN should first decide whether there is sufficient IOT) 2013-06-10
1333 - A Rel-10 10.9.0 - Mandating the settings of FGI bit 9 and 23 to true RP-60 RP-130725 postponed Vodafone Group - - - 2013-06-14 TEI9, LTE-L23 company contribution; RAN2 #81bis postponed R2-131252 (RAN should first decide whether there is sufficient IOT) 2013-06-15
1334 - A Rel-11 11.3.0 - Mandating the settings of FGI bit 9 and 23 to true RP-60 RP-130726 postponed Vodafone Group - - - 2013-06-14 TEI9, LTE-L23 company contribution; RAN2 #81bis postponed R2-131253 (RAN should first decide whether there is sufficient IOT) 2013-06-15
1335 - F Rel-11 11.4.0 11.5.0 Clarification on PhysCellIdRange RP-61 RP-131311 approved R2 - R2-133008 agreed 2013-08-21 LTE-L23, TEI11 - 2013-09-05
1338 - F Rel-10 10.10.0 10.11.0 Correction on the first subframe of the measurement gap RP-61 RP-131311 approved R2 - R2-132918 agreed 2013-09-01 TEI10, LTE-L23 - 2013-09-05
1339 - A Rel-11 11.4.0 - Correction on the first subframe of the measurement gap - - - - R2-83 R2-132919 revised 2013-09-06 LTE-L23, TEI10 CR was agreed during RAN2 #83 but it turned out that it had a wrong REL on the CR cover so revised in R2-133048 2013-09-08
1339 1 A Rel-11 11.4.0 11.5.0 Correction on the first subframe of the measurement gap RP-61 RP-131311 approved R2 - R2-133048 agreed 2013-09-01 TEI10, LTE-L23 - 2013-09-05
1340 - F Rel-11 11.4.0 - Correction for MFBI in SIB15 - - - - R2-83 R2-132890 revised 2013-09-06 MBMS_LTE_SC-Core - 2013-09-08
1340 1 F Rel-11 11.4.0 11.5.0 Correction for MFBI in SIB15 and SIB6 RP-61 RP-131319 approved R2 - R2-133005 agreed 2013-08-22 MBMS_LTE_SC-Core - 2013-09-05
1342 - B Rel-12 11.4.0 - Introducing UE support for inbound mobility to a shared CSG cell - - - - R2-83 R2-133016 tech endorsed 2013-09-06 EHNB_enh3-Core CR is in principle agreed, i.e. it will not be submitted to RAN #61 for approval (avoiding too early REL-12 spec introduction) but it can be resubmitted to RAN2 in Nov. (based on latest TS) for quick agreement 2013-09-08
1343 - F Rel-11 11.4.0 11.5.0 Clarification of MFBI impact on MBMS service continuity RP-61 RP-131319 approved R2 - R2-133006 agreed 2013-08-23 MBMS_LTE_SC-Core, LTE-RF - 2013-09-05
1344 - F Rel-11 11.4.0 - Clarification of UE action for otherwise in conditions - - - - R2-83 R2-133007 revised 2013-09-06 LTE-L23, TEI11 result of email discussion [82#14]; revision of R2-132591 which includes also agreements of R2-132865 2013-09-08
1344 1 F Rel-11 11.4.0 - Clarification of UE action for otherwise in conditions RP-61 RP-131311 revised R2 - R2-133043 agreed 2013-09-01 LTE-L23, TEI11 revised in company contribution RP-131238 2013-09-05
1344 2 F Rel-11 11.4.0 11.5.0 Clarification of UE action for otherwise in conditions RP-61 RP-131238 approved Samsung - - - 2013-08-28 LTE-L23 company CR replacing R2-133043 in RP-131311 to remove some left-overs of previous revision from CR cover 2013-09-03
1346 - F Rel-9 9.15.0 9.16.0 Correction of misplaced statement RP-61 RP-131311 approved R2 - R2-133001 agreed 2013-09-01 LTE-L23, TEI9 no cat.A CRs needed 2013-09-05
1348 - F Rel-11 11.4.0 11.5.0 Corrections to the 3GPP2 specification references in 36.331 RP-61 RP-131311 approved R2 - R2-133010 agreed 2013-08-23 TEI11 - 2013-09-05
1350 - B Rel-12 11.4.0 - Introduction of support of further DL MIMO enhancement - - - - R2-83 R2-132916 revised 2013-09-06 LTE_eDL_MIMO_enh-Core - 2013-09-08
1350 1 B Rel-12 11.4.0 - Introduction of support of further DL MIMO enhancement - - - - R2-83 R2-132994 tech endorsed 2013-09-06 LTE_eDL_MIMO_enh-Core CR is in principle agreed, i.e. it will not be submitted to RAN #61 for approval (avoiding too early REL-12 spec introduction) but it can be resubmitted to RAN2 in Nov. (based on latest TS) for quick agreement 2013-09-08
1351 - F Rel-12 11.4.0 - CR for SSAC in CONNECTED - - - - R2-83 R2-133000 revised 2013-09-06 SSAC, TEI12 - 2013-09-08
1351 1 F Rel-12 11.4.0 - CR for SSAC in CONNECTED - - - - R2-83 R2-133013 tech endorsed 2013-09-06 SSAC, TEI12 CR is in principle agreed, i.e. it will not be submitted to RAN #61 for approval (avoiding too early REL-12 spec introduction) but it can be resubmitted to RAN2 in Nov. (based on latest TS) for quick agreement 2013-09-08
1353 - F Rel-11 11.4.0 11.5.0 Clarifications regarding the usage of ôrlf-Causeö in case of handover failure RP-61 RP-131318 approved R2 - R2-132901 agreed 2013-08-23 eMDT_UMTSLTE-Core - 2013-09-05
1361 - F Rel-9 9.15.0 - Mandating the settings of FGI bit 9 and 23 to true RP-61 RP-131223 postponed Same as above - - - 2013-08-28 TEI9, LTE-L23 company contribution; CR was postponed at RAN #60 in RP-130724 2013-09-03
1362 - A Rel-10 10.10.0 - Mandating the settings of FGI bit 9 and 23 to true RP-61 RP-131224 postponed Same as above - - - 2013-08-28 TEI9, LTE-L23 company contribution; CR was postponed at RAN #60 in RP-130725 2013-09-03
1363 - A Rel-11 11.4.0 - Mandating the settings of FGI bit 9 and 23 to true RP-61 RP-131225 postponed Same as above - - - 2013-08-28 TEI9, LTE-L23 company contribution; CR was postponed at RAN #60 in RP-130726 2013-09-03

page generated from database: 2013-10-16 10:34:27