3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 36.523-1

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-8 8.0.1 8.1.0 Batch 1A - New test case for E-UTRA radio bearer testing RP-43 RP-090298 approved R5 R5-41b R5-086137 agreed 2008-10-20 LTE-UEConTest_SIG - 2008-12-02
0002 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update to RLC test case 7.2.3.10 RP-43 RP-090298 approved R5 R5-41b R5-086240 agreed 2008-12-02 LTE-UEConTest_SIG - 2008-12-02
0003 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to MAC test case 7.1.4.3 RP-43 RP-090298 approved R5 R5-41b R5-086241 agreed 2008-12-02 LTE-UEConTest_SIG - 2008-12-02
0004 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of new LTE test case UM RLC / Segmentation and Reassembly / 5-bit SN / 11-bit 'Length Indicators' / 'Framing Info Field' RP-43 RP-090224 approved R5 R5-41b R5-086242 agreed 2008-12-02 LTE-UEConTest_SIG - 2008-12-02
0005 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of new LTE test case UM RLC / Segmentation and Reassembly / 10-bit SN / 11-bit 'Length Indicators' / 'Framing Info Field' RP-43 RP-090298 approved R5 R5-41b R5-086243 agreed 2008-12-02 LTE-UEConTest_SIG - 2008-12-02
0006 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of new LTE test case UM RLC / 5-bit SN / Correct use of Sequence Numbering RP-43 RP-090298 approved R5 R5-41b R5-086245 agreed 2008-09-13 LTE-UEConTest_SIG - 2008-12-02
0007 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of new LTE test case UM RLC / 10 bit- SN / Correct use of Sequence Numbering RP-43 RP-090298 approved R5 R5-41b R5-086246 agreed 2009-03-04 LTE-UEConTest_SIG - 2009-03-04
0008 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of new LTE test case UM RLC / Concatenation, Segmentation and Reassembly RP-43 RP-090298 approved R5 R5-41b R5-086247 agreed 2009-03-04 LTE-UEConTest_SIG - 2009-03-04
0009 - F Rel-8 8.0.1 8.1.0 Batch 2: Addition of new LTE test case UM RLC / Duplicated detection of RLC PDUs RP-43 RP-090298 approved R5 R5-41b R5-086249 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0010 - F Rel-8 8.0.1 8.1.0 Batch 1B: Introduction of a new EMM test case for NW initiated detach procedure with Detach type IE = IMSI detach RP-43 RP-090298 approved R5 R5-41b R5-086253 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0011 - F Rel-8 8.0.1 8.1.0 Batch 1A: Introduction of a new EMM test case for Service Request procedure with mobile originating CS fallback RP-43 RP-090223 approved R5 R5-41b R5-086254 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0012 - F Rel-8 8.0.1 8.1.0 Correction to Idle Mode test method RP-43 RP-090223 approved R5 R5-41b R5-086260 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0013 - F Rel-8 8.0.1 8.1.0 Batch 2: Addition of E-UTRAN test case 6.1.2.8 for Cell reselection using cell status and cell reservations (access control class 0-9) RP-43 RP-090223 approved R5 R5-41b R5-086264 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0014 - F Rel-8 8.0.1 8.1.0 Batch 2: Addition of E-UTRAN test case 6.1.2.9 for Cell reselection using cell status and cell reservations (access control class 11-15) RP-43 RP-090223 approved R5 R5-41b R5-086265 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0015 - F Rel-8 8.0.1 8.1.0 Modification for 7.1.3.5 Correct HARQ process handling [CCCH] RP-43 RP-090223 approved R5 R5-41b R5-086266 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0016 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to RLC (AM) test case 7.2.3.13 RP-43 RP-090223 approved R5 R5-41b R5-086269 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0017 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.1.2.5 RP-43 RP-090223 approved R5 R5-41b R5-086273 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0018 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update to test case 8.1.2.7 RP-43 RP-090223 approved R5 R5-41b R5-086274 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0019 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update to test case 8.1.3.5 RP-43 RP-090223 approved R5 R5-41b R5-086275 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0020 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.2 RP-43 RP-090223 approved R5 R5-41b R5-086284 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0021 - F Rel-8 8.0.1 8.1.0 Batch 1B - Update to test case 8.2.4.5 RP-43 RP-090223 approved R5 R5-41b R5-086285 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0022 - F Rel-8 8.0.1 8.1.0 Batch 2- Update to test case 8.2.4.6 RP-43 RP-090223 approved R5 R5-41b R5-086286 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0023 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.9 RP-43 RP-090223 approved R5 R5-41b R5-086287 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0024 - F Rel-8 8.0.1 8.1.0 Batch 2- Update to test case 8.2.4.7 RP-43 RP-090223 approved R5 R5-41b R5-086288 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0025 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.3 RP-43 RP-090223 approved R5 R5-41b R5-086289 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0026 - F Rel-8 8.0.1 8.1.0 Batch 1A Update test case 8.2.1.1 RP-43 RP-090223 approved R5 R5-41b R5-086290 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0027 - F Rel-8 8.0.1 8.1.0 Batch 2 Update test case 8.2.1.3 RP-43 RP-090223 approved R5 R5-41b R5-086291 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0028 - F Rel-8 8.0.1 8.1.0 Batch 1A Update test case 8.2.3.1 RP-43 RP-090223 approved R5 R5-41b R5-086293 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0029 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.3.1.8 RP-43 RP-090223 approved R5 R5-41b R5-086295 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0030 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.3.1.9 RP-43 RP-090223 approved R5 R5-41b R5-086296 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0031 - F Rel-8 8.0.1 8.1.0 Batch 1A - Removal of E-UTRA RLC test case: 7.2.3.12 RP-43 RP-090224 approved R5 R5-41b R5-086297 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0032 - F Rel-8 8.0.1 8.1.0 Batch 1A - Removal of E-UTRA RLC test case - 7.2.3.11 AM RLC / Operation of the RLC reestablishment procedure / UE Originated RP-43 RP-090224 approved R5 R5-41b R5-086298 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0033 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.3.2.3 RP-43 RP-090224 approved R5 R5-41b R5-086299 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0034 - F Rel-8 8.0.1 8.1.0 Batch 1B: Update to test case 8.3.1.1 Measurement configuration control and reporting/ intra E-UTRAN measurements: event A1 RP-43 RP-090224 approved R5 R5-41b R5-086300 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0035 - F Rel-8 8.0.1 8.1.0 Batch 1B: Update to test case 8.3.1.2 Measurement configuration control and reporting/ intra E-UTRAN measurements: event A2 RP-43 RP-090224 approved R5 R5-41b R5-086301 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0036 - F Rel-8 8.0.1 8.1.0 Batch 2 - Addition of new test case 8.4.1.8 RP-43 RP-090224 approved R5 R5-41b R5-086305 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0037 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of EMM TC 9.2.1.1.17 for Attach / rejected / no suitable cells in this tracking area RP-43 RP-090224 approved R5 R5-41b R5-086311 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0038 - F Rel-8 8.0.1 8.1.0 Batch 1B - New TC 9.1.2.2 Authentication not accepted by the network, GUTI used, identification procedure and authentication restart RP-43 RP-090224 approved R5 R5-41b R5-086318 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0039 - F Rel-8 8.0.1 8.1.0 Batch 3 - Removal of TC 9.1.4.1 Identification procedure, IMSI requested RP-43 RP-090224 approved R5 R5-41b R5-086320 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0040 - F Rel-8 8.0.1 8.1.0 New Batch 2 test case: 9.2.2.1.6 UE initiated detach / Abnormal case / local detach after 5 attempts due to no network response RP-43 RP-090224 approved R5 R5-41b R5-086321 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0041 - F Rel-8 8.0.1 8.1.0 Batch 1B: Introduction of a new EMM test case for Paging procedure with mobile terminating CS fallback. RP-43 RP-090224 approved R5 R5-41b R5-086322 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0042 - F Rel-8 8.0.1 8.1.0 Batch 1B: Correction to 9.2.3.1.1 Normal tracking area update / accepted RP-43 RP-090224 approved R5 R5-41b R5-086327 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0043 - F Rel-8 8.0.1 8.1.0 Batch 1B: Correction to 9.2.3.1.5 Periodic tracking area update / accepted RP-43 RP-090224 approved R5 R5-41b R5-086328 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0044 - F Rel-8 8.0.1 8.1.0 New Batch 1A test case: 9.2.1.1.7 Attach Procedure / Success / list of equivalent PLMNs in the ATTACH ACCEPT message RP-43 RP-090224 approved R5 R5-41b R5-086329 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0045 - F Rel-8 8.0.1 8.1.0 New Batch 2 test case: 9.2.1.1.25 Attach / Abnormal case / Mobile originated detach required RP-43 RP-090224 approved R5 R5-41b R5-086330 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0046 - F Rel-8 8.0.1 8.1.0 Batch 1B: new EMM TC 9.2.1.1.15 for Attach / rejected / roaming not allowed in this tracking area RP-43 RP-090224 approved R5 R5-41b R5-086331 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0047 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of EMM TC 9.2.1.2.2 Combined attach procedure / Success / EPS services only / IMSI unknown in HLR RP-43 RP-090224 approved R5 R5-41b R5-086332 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0048 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of EMM TC 10.2.1for Dedicated EPS bearer context activation / Success RP-43 RP-090224 approved R5 R5-41b R5-086333 agreed 2009-02-13 LTE-UEConTest_SIG - 2009-02-13
0049 - F Rel-8 8.0.1 8.1.0 Batch 1B: Addition of EMM TC 10.3.1 for EPS bearer context modification / Success RP-43 RP-090224 approved R5 R5-41b R5-086334 agreed 2009-02-13 LTE-UEConTest_SIG - 2009-02-13
0050 - F Rel-8 8.0.1 8.1.0 Batch 2 - New E-UTRA test case - 7.2.3.21 AM RLC / RLC re-establishment at inter eNB HO RP-43 RP-090224 approved R5 R5-41b R5-086341 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0060 - F Rel-8 8.0.1 8.1.0 Correction to E-UTRA RLC test case 7.2.3.1 RP-43 RP-090278 approved R5 R5-42 R5-090102 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0061 - F Rel-8 8.0.1 8.1.0 Correction to E-UTRA RLC test case 7.2.3.2 RP-43 RP-090278 approved R5 R5-42 R5-090103 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0062 - F Rel-8 8.0.1 8.1.0 Batch 2 -Update to test case 7.2.2.8 RP-43 RP-090278 approved R5 R5-42 R5-090124 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0063 - F Rel-8 8.0.1 8.1.0 Batch 1B -Update to test case 7.2.2.9 RP-43 RP-090278 approved R5 R5-42 R5-090125 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0064 - F Rel-8 8.0.1 8.1.0 Batch 1A -Update to test case 8.1.1.1 RP-43 RP-090278 approved R5 R5-42 R5-090128 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0065 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update to test case 8.2.4.1 RP-43 RP-090278 approved R5 R5-42 R5-090132 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0066 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.2 RP-43 RP-090278 approved R5 R5-42 R5-090133 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0067 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.6 RP-43 RP-090278 approved R5 R5-42 R5-090136 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0068 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.7 RP-43 RP-090278 approved R5 R5-42 R5-090137 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0069 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.9 RP-43 RP-090278 approved R5 R5-42 R5-090138 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0070 - F Rel-8 8.0.1 8.1.0 Batch 2 - Addition of new test case 8.4.1.8 RP-43 RP-090278 approved R5 R5-42 R5-090144 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0071 - F Rel-8 8.0.1 8.1.0 Batch 2 - Correction to Idle mode test method RP-43 RP-090278 approved R5 R5-42 R5-090145 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0072 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update to test case 8.5.4.1 RP-43 RP-090278 approved R5 R5-42 R5-090146 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0073 - F Rel-8 8.0.1 8.1.0 Batch 2 - Addition of new test case 9.2.3.2.10 RP-43 RP-090278 approved R5 R5-42 R5-090151 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0074 - F Rel-8 8.0.1 8.1.0 Batch 2 - Addition of new test case 9.2.3.2.15 RP-43 RP-090278 approved R5 R5-42 R5-090153 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0075 - F Rel-8 8.0.1 8.1.0 Removal of EMM test cases 9.2.2.2.4, 9.2.2.2.6, 9.2.2.2.7 and 9.2.2.2.8. RP-43 RP-090278 approved R5 R5-42 R5-090199 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0076 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.2.1 RP-43 RP-090278 approved R5 R5-42 R5-090201 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0077 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.2.4 RP-43 RP-090278 approved R5 R5-42 R5-090203 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0078 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.2.5 RP-43 RP-090278 approved R5 R5-42 R5-090230 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0079 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.3.6 RP-43 RP-090279 approved R5 R5-42 R5-090235 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0080 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.4.11 RP-43 RP-090279 approved R5 R5-42 R5-090236 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0081 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to MAC test case 7.1.4.3 RP-43 RP-090279 approved R5 R5-42 R5-090347 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0082 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.5 RP-43 RP-090279 approved R5 R5-42 R5-090453 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0083 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update of E-UTRA RLC (AM) test case 7.2.3.16 RP-43 RP-090279 approved R5 R5-42 R5-090455 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0084 - F Rel-8 8.0.1 8.1.0 Batch 1B: Correction to E-UTRA RLC test case 7.2.2.7 RP-43 RP-090279 approved R5 R5-42 R5-090498 agreed 2009-02-03 LTE-UEConTest_SIG - 2009-02-03
0085 - F Rel-8 8.0.1 8.1.0 Addition of a new LTE test case” 7.3.3.2 Correct functionality of EPS UP encription algorithms (SNOW 3G)” RP-43 RP-090279 approved R5 R5-42 R5-090511 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0086 - F Rel-8 8.0.1 8.1.0 Addition of a new LTE test case “7.3.3.1 Correct functionality of EPS AS encription algorithms (SNOW 3G)” RP-43 RP-090279 approved R5 R5-42 R5-090512 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0087 - F Rel-8 8.0.1 8.1.0 Addition of a new LTE test case “7.3.3.3 Correct functionality of EPS AS encription algorithms (AES)” RP-43 RP-090279 approved R5 R5-42 R5-090513 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0088 - F Rel-8 8.0.1 8.1.0 Addition of a new LTE test case “7.3.3.4 Correct functionality of EPS UP encription algorithms (AES)” RP-43 RP-090279 approved R5 R5-42 R5-090514 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0089 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.2.7 RP-43 RP-090279 approved R5 R5-42 R5-090552 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0090 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.2.8 RP-43 RP-090279 approved R5 R5-42 R5-090553 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0091 - F Rel-8 8.0.1 8.1.0 .Bacth 1:Corrections to MAC test case 7.1.3.4 RP-43 RP-090279 approved R5 R5-42 R5-090554 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0092 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.3.5 RP-43 RP-090279 approved R5 R5-42 R5-090555 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0093 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.4.15 RP-43 RP-090279 approved R5 R5-42 R5-090556 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0094 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.4.16 RP-43 RP-090279 approved R5 R5-42 R5-090557 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0095 - F Rel-8 8.0.1 8.1.0 Update of 36.523-1 Reference list RP-43 RP-090279 approved R5 R5-42 R5-090570 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0096 - F Rel-8 8.0.1 8.1.0 Batch 2: Update of LTE TC 8.1.2.3 RRC - RRC Connection Establishment in RRC Idle state: return to idle state after T300 timeout RP-43 RP-090279 approved R5 R5-42 R5-090605 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0097 - F Rel-8 8.0.1 8.1.0 Batch 2: Addition of EMM TC 9.2.1.2.4 for Successful combined attach procedure, EPS service only / CS domain not available. RP-43 RP-090279 approved R5 R5-42 R5-090607 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0098 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to EMM test case 9.1.3.1 RP-43 RP-090279 approved R5 R5-42 R5-090611 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0099 - F Rel-8 8.0.1 8.1.0 Batch 1B: Correction to E-UTRA RLC test case 7.2.2.3 RP-43 RP-090280 approved R5 R5-42 R5-090631 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0100 - F Rel-8 8.0.1 8.1.0 Batch 1B: Update of E-UTRAN test case 6.1.1.1 RP-43 RP-090280 approved R5 R5-42 R5-090645 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0101 - F Rel-8 8.0.1 8.1.0 Batch-1B: Introduction of a new EMM test case, 9.2.3.1.4 Normal tracking area update / list of equivalent PLMNs in the TRACKING AREA UPDATE ACCEPT message RP-43 RP-090280 approved R5 R5-42 R5-090649 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0102 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.2.2 RP-43 RP-090280 approved R5 R5-42 R5-090651 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0103 - F Rel-8 8.0.1 8.1.0 Batch 1: Addition of new MAC test case 7.1.3.9 : MAC reset RP-43 RP-090280 approved R5 R5-42 R5-090653 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0104 - F Rel-8 8.0.1 8.1.0 Batch 1: Addition of new MAC test case 7.1.4.12 : MAC reset RP-43 RP-090280 approved R5 R5-42 R5-090654 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0105 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update of E-UTRA MAC test case: 7.1.3.3 RP-43 RP-090280 approved R5 R5-42 R5-090655 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0106 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update of E-UTRA MAC test case: 7.1.2.9 RP-43 RP-090280 approved R5 R5-42 R5-090656 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0107 - F Rel-8 8.0.1 8.1.0 Batch 1B - New E-UTRA PDCP test case - 7.3.1.2 Maintenance of PDCP sequence numbers (user plane, RLC UM) RP-43 RP-090280 approved R5 R5-42 R5-090665 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0108 - F Rel-8 8.0.1 8.1.0 Batch 1B - Correction to E-UTRA PDCP test case 7.3.1.1 RP-43 RP-090280 approved R5 R5-42 R5-090666 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0109 - F Rel-8 8.0.1 8.1.0 Batch 1B - New E-UTRA PDCP test case - 7.3.1.3 Maintenance of PDCP sequence numbers (user plane, RLC UM, long PDCP SN (12 bits)) RP-43 RP-090280 approved R5 R5-42 R5-090667 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0110 - F Rel-8 8.0.1 8.1.0 Batch 1B -Update to test case 7.2.2.4 RP-43 RP-090280 approved R5 R5-42 R5-090669 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0111 - F Rel-8 8.0.1 8.1.0 Batch 1A -Update to test case 7.2.3.3 RP-43 RP-090280 approved R5 R5-42 R5-090670 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0112 - F Rel-8 8.0.1 8.1.0 Batch 1A -Update to test case 7.2.3.4 RP-43 RP-090280 approved R5 R5-42 R5-090671 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0113 - F Rel-8 8.0.1 8.1.0 Removal of TC 7.3.5.1 RP-43 RP-090280 approved R5 R5-42 R5-090672 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0114 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.17 RP-43 RP-090280 approved R5 R5-42 R5-090674 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0115 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.15 RP-43 RP-090280 approved R5 R5-42 R5-090675 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0116 - F Rel-8 8.0.1 8.1.0 Batch 1B - Update of test case 8.2.2.1 RP-43 RP-090280 approved R5 R5-42 R5-090676 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0117 - F Rel-8 8.0.1 8.1.0 Update of RRC batch 1B test case 8.2.2.2 RRC Connection Reconfiguration / SRB/DRB Reconfiguration: Success RP-43 RP-090280 approved R5 R5-42 R5-090677 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0118 - F Rel-8 8.0.1 8.1.0 Batch-1: Update to RRC part 3 test case 8.3.3.1 RP-43 RP-090280 approved R5 R5-42 R5-090678 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0119 - F Rel-8 8.0.1 8.1.0 Batch 1A - TC 9.1.2.1 Authentication accepted - Update of conformance requirements RP-43 RP-090280 approved R5 R5-42 R5-090679 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0120 - F Rel-8 8.0.1 8.1.0 Batch 1A - TC 9.3.2.1 Paging procedure revisited RP-43 RP-090280 approved R5 R5-42 R5-090680 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0121 - F Rel-8 8.0.1 8.1.0 Batch 1A -Update to test case 6.1.2.5 RP-43 RP-090281 approved R5 R5-42 R5-090685 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0122 - F Rel-8 8.0.1 8.1.0 Update of TC 7.3.6.1 PDCP Discard RP-43 RP-090281 approved R5 R5-42 R5-090688 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0123 - F Rel-8 8.0.1 8.1.0 Addition of new TC 7.3.5.4 RP-43 RP-090281 approved R5 R5-42 R5-090689 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0124 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update of LTE TC 8.5.1.3 RRC - RRC Connection Re-establishment: Failure: T311 Expiry RP-43 RP-090281 approved R5 R5-42 R5-090690 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0125 - F Rel-8 8.0.1 8.1.0 Batch 2 -Update to test case 8.1.2.5 RP-43 RP-090281 approved R5 R5-42 R5-090691 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0126 - F Rel-8 8.0.1 8.1.0 Batch 1A -Update to test case 8.1.2.7 RP-43 RP-090281 approved R5 R5-42 R5-090692 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0127 - F Rel-8 8.0.1 8.1.0 Batch 1A -Update to test case 8.1.3.5 RP-43 RP-090281 approved R5 R5-42 R5-090693 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0128 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.2.4.3 RP-43 RP-090281 approved R5 R5-42 R5-090694 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0129 - F Rel-8 8.0.1 8.1.0 Batch 1B - Update to test case 8.2.4.5 RP-43 RP-090281 approved R5 R5-42 R5-090695 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0130 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update of test case 8.2.4.1 RP-43 RP-090281 approved R5 R5-42 R5-090707 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0131 - F Rel-8 8.0.1 8.1.0 Batch 2: Update of RRC part1 TC 8.1.3.6 RRC Connection Release: redirection from E-UTRAN to UTRAN RP-43 RP-090281 approved R5 R5-42 R5-090709 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0132 - F Rel-8 8.0.1 8.1.0 Batch 2: Update of RRC part3 TC 8.3.1.7 Measurement configuration control and reporting / intra E-UTRAN measurements: blacklisting RP-43 RP-090281 approved R5 R5-42 R5-090710 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0133 - F Rel-8 8.0.1 8.1.0 Corrections to LTE idle mode test cases RP-43 RP-090281 approved R5 R5-42 R5-090711 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0134 - F Rel-8 8.0.1 8.1.0 Batch 1B: Update of test case 6.1.2.6 RP-43 RP-090281 approved R5 R5-42 R5-090712 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0135 - F Rel-8 8.0.1 8.1.0 Batch 2: Update of LTE TC 8.1.2.2 RRC, Reject with wait time RP-43 RP-090281 approved R5 R5-42 R5-090713 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0136 - F Rel-8 8.0.1 8.1.0 Update to test case 8.1.3.1 RP-43 RP-090281 approved R5 R5-42 R5-090714 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0137 - F Rel-8 8.0.1 8.1.0 Batch 1B: update of E-UTRA PDCP test case 7.3.6.1 RP-43 RP-090281 approved R5 R5-42 R5-090715 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0138 - F Rel-8 8.0.1 8.1.0 Batch 1B: update of E-UTRA PDCP test case 7.3.6.1 RP-43 RP-090281 approved R5 R5-42 R5-090716 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0139 - F Rel-8 8.0.1 8.1.0 Batch 2 - Update to test case 8.3.1.8 RP-43 RP-090281 approved R5 R5-42 R5-090717 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0140 - F Rel-8 8.0.1 8.1.0 Batch-2: Update to RRC part 3 test case 8.3.1.3 RP-43 RP-090281 approved R5 R5-42 R5-090720 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0141 - F Rel-8 8.0.1 8.1.0 Batch-2: Update to RRC part 3 test case 8.3.1.5 RP-43 RP-090282 approved R5 R5-42 R5-090721 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0142 - F Rel-8 8.0.1 8.1.0 Batch 2: Addition of new EMM TC 9.2.1.2.3: Successful combined attach procedure, EPS service only / MSC temporarily not reachable RP-43 RP-090282 approved R5 R5-42 R5-090722 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0143 - F Rel-8 8.0.1 8.1.0 Bacth 1:Corrections to MAC test case 7.1.2.3 RP-43 RP-090282 approved R5 R5-42 R5-090730 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0144 - F Rel-8 8.0.1 8.1.0 Batch 2 - Addition of new test case 9.2.1.2.6 RP-43 RP-090282 approved R5 R5-42 R5-090732 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0145 - F Rel-8 8.0.1 8.1.0 Batch 2 - Addition of new test case 9.2.3.2.6 RP-43 RP-090282 approved R5 R5-42 R5-090733 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0146 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.4.2 RP-43 RP-090282 approved R5 R5-42 R5-090734 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0147 - F Rel-8 8.0.1 8.1.0 Batch 1:Corrections to MAC test case 7.1.3.2 RP-43 RP-090282 approved R5 R5-42 R5-090735 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0148 - F Rel-8 8.0.1 8.1.0 Batch 2: Update of RRC part1 TC 8.1.3.4 RRC Connection Release: redirection to another E-UTRAN frequency RP-43 RP-090282 approved R5 R5-42 R5-090736 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0149 - F Rel-8 8.0.1 8.1.0 Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.18 RP-43 RP-090282 approved R5 R5-42 R5-090740 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0150 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of 9.1.2.1 test procedure sequence and editorials RP-44 RP-090447 approved R5 R5-43 R5-092052 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0151 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update of TC 9.1.2.3 Authentication not accepted by the network, GUTI used, authentication reject and re-authentication RP-44 RP-090447 approved R5 R5-43 R5-092053 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0152 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update TC 9.1.2.4 Authentication not accepted by the UE MAC code failure RP-44 RP-090447 approved R5 R5-43 R5-092054 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0153 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - New TC 9.1.2.5 Authentication not accepted by the UE, SQN failure RP-44 RP-090447 approved R5 R5-43 R5-092055 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0154 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of RRC test case 9.3.1.1 RP-44 RP-090447 approved R5 R5-43 R5-092061 agreed 2009-02-05 LTE-UEConTest_SIG - 2009-02-05
0155 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN (9.2.3.3.1) RP-44 RP-090447 approved R5 R5-43 R5-092076 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0156 - F Rel-8 8.1.0 8.2.0 Batch 2: Addition of 8.1.3.9 RRC Redirection from E-UTRAN to HRPD RP-44 RP-090447 approved R5 R5-43 R5-092077 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0157 - F Rel-8 8.1.0 8.2.0 Batch 2: Addition of 8.1.3.10 RRC Redirection from E-UTRAN to CDMA2000-1XRTT RP-44 RP-090447 approved R5 R5-43 R5-092078 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0158 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.3.1 RP-44 RP-090447 approved R5 R5-43 R5-092107 agreed 2009-02-13 LTE-UEConTest_SIG - 2009-02-13
0159 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.1 RP-44 RP-090447 approved R5 R5-43 R5-092108 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0160 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.4 RP-44 RP-090447 approved R5 R5-43 R5-092109 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0161 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.5 RP-44 RP-090447 approved R5 R5-43 R5-092110 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0162 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.8 RP-44 RP-090447 approved R5 R5-43 R5-092112 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0163 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.10 RP-44 RP-090447 approved R5 R5-43 R5-092113 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0164 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.13 RP-44 RP-090447 approved R5 R5-43 R5-092114 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0165 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Proposal to remove E-UTRA RLC test case 7.2.3.19 RP-44 RP-090447 approved R5 R5-43 R5-092115 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0166 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update of test case 8.5.1.5 RP-44 RP-090447 approved R5 R5-43 R5-092181 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0167 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of test case 8.2.3.1 RP-44 RP-090447 approved R5 R5-43 R5-092185 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0168 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.1 RP-44 RP-090447 approved R5 R5-43 R5-092190 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0169 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.2 RP-44 RP-090447 approved R5 R5-43 R5-092191 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0170 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.18 RP-44 RP-090447 approved R5 R5-43 R5-092192 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0171 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.18 RP-44 RP-090447 approved R5 R5-43 R5-092200 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0172 - F Rel-8 8.1.0 8.2.0 Addition of new RRC test case 8.3.2.9 RP-44 RP-090447 approved R5 R5-43 R5-092213 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0173 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 6.1.2.15 RP-44 RP-090447 approved R5 R5-43 R5-092228 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0174 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update to test case 6.1.2.4 RP-44 RP-090447 approved R5 R5-43 R5-092229 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0175 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 6.1.2.5 RP-44 RP-090447 approved R5 R5-43 R5-092230 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0176 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update to test case 8.1.1.1 RP-44 RP-090447 approved R5 R5-43 R5-092234 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0177 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.1.3.5 RP-44 RP-090447 approved R5 R5-43 R5-092242 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0178 - F Rel-8 8.1.0 8.2.0 GCF Priority-2: A new EMM test case, 9.2.3.1.8 UE receives an indication that the RRC connection was released with cause 'load balancing TAU required'' RP-44 RP-090447 approved R5 R5-43 R5-092245 agreed 2009-02-03 LTE-UEConTest_SIG - 2009-02-03
0179 - F Rel-8 8.1.0 8.2.0 Introduction of new EMM test cases, 9.2.3.1.10 and 9.2.3.1.11 Normal tracking area update / Rejected RP-44 RP-090447 approved R5 R5-43 R5-092247 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0180 - F Rel-8 8.1.0 8.2.0 Introduction of 9.2.3.1.12 ' Normal tracking area update / rejected / EPS service not allowed' RP-44 RP-090447 approved R5 R5-43 R5-092248 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0181 - F Rel-8 8.1.0 8.2.0 Introduction of 9.2.3.1.13 'Normal tracking area update / rejected / UE identity cannot be derived by the network' RP-44 RP-090447 approved R5 R5-43 R5-092249 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0182 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of a new test case 6.1.2.11 Inter-frequency cell reselection RP-44 RP-090447 approved R5 R5-43 R5-092250 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0183 - F Rel-8 8.1.0 8.2.0 Introduction of 9.2.3.1.14 ' Normal tracking area update / rejected / UE implicitly detached' RP-44 RP-090447 approved R5 R5-43 R5-092251 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0184 - F Rel-8 8.1.0 8.2.0 Introduction of 9.2.3.1.15 ' Normal tracking area update / rejected / PLMN not allowed' RP-44 RP-090447 approved R5 R5-43 R5-092252 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0185 - F Rel-8 8.1.0 8.2.0 Introduction of 9.2.3.1.16 ' Normal tracking area update / rejected / Tracking area not allowed' RP-44 RP-090447 approved R5 R5-43 R5-092253 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0186 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update of RRC part1 TC 8.1.3.4 RRC Connection Release: redirection to another E-UTRAN frequency RP-44 RP-090447 approved R5 R5-43 R5-092258 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0187 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update of RRC part1 TC 8.1.3.6 RRC Connection Release: redirection from E-UTRAN to UTRAN RP-44 RP-090447 approved R5 R5-43 R5-092260 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0188 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Correction to idle mode test cases 6.1.2.3 and 6.1.2.6 RP-44 RP-090447 approved R5 R5-43 R5-092262 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0189 - F Rel-8 8.1.0 8.2.0 LTE-SIG:TDD related updates in RRC sections RP-44 RP-090447 approved R5 R5-43 R5-092272 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0190 - F Rel-8 8.1.0 8.2.0 ""GCF priority 1 - Update of the LTE test caseö 7.3.3.1^^Correct functionality of EPS AS encription algorithms (SNOW 3G)ö"" RP-44 RP-090447 approved R5 R5-43 R5-092276 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0191 - F Rel-8 8.1.0 8.2.0 GCF priority 1 - Update of test caseö 7.3.3.2 Correct functionality of EPS UP encription algorithms (SNOW 3G)ö RP-44 RP-090447 approved R5 R5-43 R5-092278 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0192 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.2.4.2 RP-44 RP-090447 approved R5 R5-43 R5-092280 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0193 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.2.4.3 RP-44 RP-090447 approved R5 R5-43 R5-092281 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0194 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.2.4.5 RP-44 RP-090447 approved R5 R5-43 R5-092283 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0195 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.2.4.6 RP-44 RP-090447 approved R5 R5-43 R5-092284 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0196 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.2.4.7 RP-44 RP-090447 approved R5 R5-43 R5-092285 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0197 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.3.1.8 RP-44 RP-090447 approved R5 R5-43 R5-092288 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0198 - F Rel-8 8.1.0 8.2.0 Addition of new test case 9.2.1.2.8 RP-44 RP-090447 approved R5 R5-43 R5-092295 agreed 2009-02-06 LTE-UEConTest_SIG - 2009-02-06
0199 - F Rel-8 8.1.0 8.2.0 Addition of new test case 9.2.1.2.9 RP-44 RP-090447 approved R5 R5-43 R5-092296 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0200 - F Rel-8 8.1.0 8.2.0 Addition of new test case 9.2.1.2.10 RP-44 RP-090447 approved R5 R5-43 R5-092297 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0201 - F Rel-8 8.1.0 8.2.0 Addition of new test case 9.2.3.2.12 RP-44 RP-090447 approved R5 R5-43 R5-092299 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0202 - F Rel-8 8.1.0 8.2.0 Addition of new test case 9.3.1.4 RP-44 RP-090447 approved R5 R5-43 R5-092300 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0203 - F Rel-8 8.1.0 8.2.0 Addition of new test case to test case 10.X.X RP-44 RP-090447 approved R5 R5-43 R5-092301 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0204 - F Rel-8 8.1.0 8.2.0 GCF Priority 1: Update E-UTRA PDCP TC 7.3.4.1 RP-44 RP-090447 approved R5 R5-43 R5-092327 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0205 - F Rel-8 8.1.0 8.2.0 GCF Priority 1: Update E-UTRA PDCP TC 7.3.4.2 RP-44 RP-090447 approved R5 R5-43 R5-092328 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0206 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Update E-UTRA PDCP TC 7.3.5.2 RP-44 RP-090447 approved R5 R5-43 R5-092329 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0207 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Update E-UTRA PDCP TC 7.3.5.3 RP-44 RP-090447 approved R5 R5-43 R5-092330 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0208 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Update E-UTRA PDCP TC 7.3.5.5 RP-44 RP-090447 approved R5 R5-43 R5-092331 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0209 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.6 RP-44 RP-090447 approved R5 R5-43 R5-092367 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0210 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of new test case 6.2.2.3 RP-44 RP-090447 approved R5 R5-43 R5-092396 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0211 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of new test case 6.2.3.7 RP-44 RP-090447 approved R5 R5-43 R5-092397 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0212 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of new test case 6.2.3.8 RP-44 RP-090447 approved R5 R5-43 R5-092398 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0213 - F Rel-8 8.1.0 8.2.0 ""GCF Priority 2 - Addition of new LTE test case 7.2.2.11 UM RLC / RLC re-establishment procedure"" RP-44 RP-090447 approved R5 R5-43 R5-092406 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0214 - F Rel-8 8.1.0 8.2.0 GCF Priority 2:Corrections to EMM test case 9.1.3.2 RP-44 RP-090447 approved R5 R5-43 R5-092417 agreed 2009-02-04 LTE-UEConTest_SIG - 2009-02-04
0215 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.3.4 RP-44 RP-090447 approved R5 R5-43 R5-092418 agreed 2009-02-13 LTE-UEConTest_SIG - 2009-02-13
0216 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.3.5 RP-44 RP-090447 approved R5 R5-43 R5-092419 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0217 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.4.1 RP-44 RP-090447 approved R5 R5-43 R5-092420 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0218 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Attach / Abnormal case / Access barred because of access class barring or NAS signalling connection establishment rejected by the network RP-44 RP-090447 approved R5 R5-43 R5-092421 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0219 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Corrections to EMM test case 9.4.1 RP-44 RP-090447 approved R5 R5-43 R5-092422 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0220 - F Rel-8 8.1.0 8.2.0 GCF Priority 2:Corrections to EMM test case 9.4.3 RP-44 RP-090447 approved R5 R5-43 R5-092423 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0221 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.1.2 RP-44 RP-090447 approved R5 R5-43 R5-092430 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0222 - F Rel-8 8.1.0 8.2.0 Update of RSRP / RSRQ measurement result checking to the RRC part 3 test cases RP-44 RP-090447 approved R5 R5-43 R5-092451 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0223 - F Rel-8 8.1.0 8.2.0 GCF Priority 2-Correction of the EMM test case 9.2.3.1.4 RP-44 RP-090447 approved R5 R5-43 R5-092471 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0224 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.2.1 RP-44 RP-090447 approved R5 R5-43 R5-092480 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0225 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.2.2 RP-44 RP-090447 approved R5 R5-43 R5-092481 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0226 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.2.5 RP-44 RP-090447 approved R5 R5-43 R5-092484 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0227 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.2.7 RP-44 RP-090447 approved R5 R5-43 R5-092485 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0228 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.2.8 RP-44 RP-090447 approved R5 R5-43 R5-092486 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0229 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Update of 10.2.1 for Dedicated EPS bearer context activation / Success RP-44 RP-090447 approved R5 R5-43 R5-092500 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0230 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Addition of TC 10.4.1 for EPS bearer context deactivation / Success RP-44 RP-090447 approved R5 R5-43 R5-092501 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0231 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Addition of TC 10.5.1 for UE requested PDN connectivity accepted by the network RP-44 RP-090447 approved R5 R5-43 R5-092502 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0232 - F Rel-8 8.1.0 8.2.0 GCF priority TBC: Addition of TC 10.5.2 for UE requested PDN connectivity accepted by the network / no PDN address allocated RP-44 RP-090447 approved R5 R5-43 R5-092504 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0233 - F Rel-8 8.1.0 8.2.0 GCF priority 3: Addition of TC 10.5.3 for UE requested PDN connectivity not accepted RP-44 RP-090447 approved R5 R5-43 R5-092505 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0234 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Addition of ESM TC 10.6.1 for UE requested PDN disconnect procedure accepted by the network RP-44 RP-090447 approved R5 R5-43 R5-092506 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0235 - F Rel-8 8.1.0 8.2.0 GCF Priority 3: Addition of ESM TC 10.6.2 for UE requested PDN disconnect procedure not accepted by the network RP-44 RP-090447 approved R5 R5-43 R5-092507 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0236 - F Rel-8 8.1.0 8.2.0 GCF priority 2 - Update of 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area RP-44 RP-090447 approved R5 R5-43 R5-092510 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0237 - F Rel-8 8.1.0 8.2.0 GCF priority 1: Update of EMM TC 9.3.1.2 Service Request initiated by UE for uplink signalling RP-44 RP-090447 approved R5 R5-43 R5-092512 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0238 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Update of 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area RP-44 RP-090447 approved R5 R5-43 R5-092513 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0239 - F Rel-8 8.1.0 8.2.0 GCF priority 1: Update of 9.2.1.1.1 Attach Procedure / Success (valid GUTI) RP-44 RP-090447 approved R5 R5-43 R5-092514 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0240 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Update of 9.2.1.1.5 Attach Procedure/ Success / ATTACH ACCEPT includes the PDN address assigned to the UE RP-44 RP-090447 approved R5 R5-43 R5-092515 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0241 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Update of 9.2.1.1.9 Attach / rejected / IMSI invalid RP-44 RP-090447 approved R5 R5-43 R5-092516 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0242 - F Rel-8 8.1.0 8.2.0 GCF priority 2: Update of 9.2.1.1.10 Attach / rejected / illegal ME RP-44 RP-090447 approved R5 R5-43 R5-092517 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0243 - F Rel-8 8.1.0 8.2.0 GCF priority TBC: Update of 9.2.1.1.12 Attach / rejected / GPRS services not allowed RP-44 RP-090447 approved R5 R5-43 R5-092518 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0244 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of RLC section RP-44 RP-090447 approved R5 R5-43 R5-092539 agreed 2009-02-23 LTE-UEConTest_SIG - 2009-02-23
0245 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of a new test case 6.2.3.5 Inter-RAT Cell Reselection / from E-UTRA RRC_IDLE to UTRA_Idle RP-44 RP-090447 approved R5 R5-43 R5-092567 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0246 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Inter-RAT cell Selection / from E-UTRA RRC_IDLE to UTRA_Idle, serving cell becomes non-suitable (SServingCell<0,barred) RP-44 RP-090447 approved R5 R5-43 R5-092569 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0247 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Inter-RAT cell Selection / from E-UTRA RRC_IDLE to GSM_Idle/GPRS Packet_idle, serving cell becomes non-suitable (SServingCell<0,barred) RP-44 RP-090447 approved R5 R5-43 R5-092570 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0248 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - New E-UTRA MAC test case - 7.1.7.1.1 DL-SCH Transport Block Size support / DCI format 1 / RA type 0 RP-44 RP-090447 approved R5 R5-43 R5-092571 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0249 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - New E-UTRA MAC test case 7.1.7.1.2 - DL-SCH Transport Block Size selection / DCI format 1 / RA type 1 RP-44 RP-090447 approved R5 R5-43 R5-092575 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0250 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - New E-UTRA MAC test case 7.1.7.2.1 - UL-SCH Transport Block Size selection / DCI format 0 RP-44 RP-090447 approved R5 R5-43 R5-092577 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0251 - F Rel-8 8.1.0 8.2.0 GCF priority 2: New MAC test case: 7.1.6.1 DRX Operation / (short cycle not configured) /Parameters configured by RRC (radio resource configuration) RP-44 RP-090447 approved R5 R5-43 R5-092578 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0252 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - New RRC part1 TC 8.1.3.8 RRC Connection Release: redirection from E-UTRAN to GERAN RP-44 RP-090447 approved R5 R5-43 R5-092579 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0253 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update of test case 8.2.1.3 RP-44 RP-090447 approved R5 R5-43 R5-092580 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0254 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: Attach Procedure / Success (last visited TAI, TAI list and equivalent PLMN list handling) 9.2.1.1.1a RP-44 RP-090447 approved R5 R5-43 R5-092583 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0255 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of test case 8.2.1.1 RP-44 RP-090447 approved R5 R5-43 R5-092584 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0256 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of new EMM test case 9.3.1.7a RP-44 RP-090447 approved R5 R5-43 R5-092589 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0257 - F Rel-8 8.1.0 8.2.0 GCF priority 2 - Update of 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area RP-44 RP-090447 approved R5 R5-43 R5-092593 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0258 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.1.1 RP-44 RP-090447 approved R5 R5-43 R5-092595 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0259 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.4.12 RP-44 RP-090447 approved R5 R5-43 R5-092596 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0260 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update to test case 8.2.4.1 RP-44 RP-090447 approved R5 R5-43 R5-092597 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0261 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of new test case 8.3.2.1 RP-44 RP-090447 approved R5 R5-43 R5-092700 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0262 - F Rel-8 8.1.0 8.2.0 GCF Priority-1: Correction to 9.2.3.1.1 'Normal tracking area update / accepted' RP-44 RP-090447 approved R5 R5-43 R5-092701 agreed 2009-02-11 LTE-UEConTest_SIG - 2009-02-11
0263 - F Rel-8 8.1.0 8.2.0 GCF Priority-1: Correction to 9.2.3.1.5'Periodic tracking area update / accepted' RP-44 RP-090447 approved R5 R5-43 R5-092702 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0264 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of E-UTRAN test case 6.1.2.7 for Cell reselection: Equivalent PLMN RP-44 RP-090447 approved R5 R5-43 R5-092703 agreed 2009-02-12 LTE-UEConTest_SIG - 2009-02-12
0265 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update to RRC test cases RP-44 RP-090447 approved R5 R5-43 R5-092706 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0266 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: New MAC test case 7.1.4.14 RP-44 RP-090447 approved R5 R5-43 R5-092712 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0267 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.1.2.5 RP-44 RP-090447 approved R5 R5-43 R5-092713 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0268 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.1.2.7 RP-44 RP-090447 approved R5 R5-43 R5-092714 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0269 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Addition of RRC test case 8.3.2.6 RP-44 RP-090447 approved R5 R5-43 R5-092715 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0270 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.7 RP-44 RP-090447 approved R5 R5-43 R5-092716 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0271 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - New E-UTRA MAC test case 7.1.7.1.4 - DL-SCH Transport Block Size selection / DCI format 1A / RA type 2 / Distributed VRB RP-44 RP-090447 approved R5 R5-43 R5-092717 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0272 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - New E-UTRA MAC test case 7.1.7.1.3 - DL-SCH Transport Block Size selection / DCI format 1A / RA type 2 / Localised VRB RP-44 RP-090447 approved R5 R5-43 R5-092718 agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0273 - F Rel-8 8.1.0 8.2.0 GCF priority 2: New MAC test case: 7.1.6.2 DRX Operation / Parameters (short cycle not configured) / DRX command MAC control element reception RP-44 RP-090447 approved R5 R5-43 R5-092730 agreed 2009-02-03 LTE-UEConTest_SIG - 2009-02-03
0274 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Updates to E-UTRAN Idle Mode test case 6.1.2.9 RP-44 RP-090447 approved R5 R5-43 R5-092731 agreed 2009-02-03 LTE-UEConTest_SIG - 2009-02-03
0275 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Updates to E-UTRAN Idle Mode test case 6.1.2.8 RP-44 RP-090447 approved R5 R5-43 R5-092732 agreed 2009-02-03 LTE-UEConTest_SIG - 2009-02-03
0276 - F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update to idle mode test cases RP-44 RP-090447 approved R5 R5-43 R5-092741 agreed 2009-02-09 LTE-UEConTest_SIG - 2009-02-09
0277 - F Rel-8 8.1.0 8.2.0 Addition of new idle mode test case for ignoring CSG cells in cell selection when Allowed CSG list is empty or not supported RP-44 RP-090447 approved R5 R5-43 R5-092751 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0278 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: New idle mode test case 6.2.3.1 RP-44 RP-090447 approved R5 R5-43 R5-092752 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0279 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.3.1.10 RP-44 RP-090447 approved R5 R5-43 R5-092755 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0280 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.3.2.3 RP-44 RP-090447 approved R5 R5-43 R5-092756 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0281 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Updates to E-UTRAN test case 6.1.1.1 RP-44 RP-090447 approved R5 R5-43 R5-092758 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0282 - F Rel-8 8.1.0 8.2.0 GCF Priority 2: New idle mode test case 6.2.3.2 RP-44 RP-090447 approved R5 R5-43 R5-092760 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0283 - F Rel-8 8.1.0 8.2.0 Move common test procedure from sections 6.0.1, 6.0.2, 6.0.3 to TS 36.508 RP-44 RP-090447 approved R5 R5-43 R5-092761 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0284 - F Rel-8 8.1.0 8.2.0 Batch 2 - Addition of new RRC test case 8.3.2.7 RP-44 RP-090447 approved R5 R5-43 R5-092762 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0285 - F Rel-8 8.1.0 8.2.0 Batch 2 - Addition of new RRC test case 8.3.2.8 RP-44 RP-090447 approved R5 R5-43 R5-092763 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0286 - F Rel-8 8.1.0 8.2.0 LTE-SIG:TDD related updates in MAC sections RP-44 RP-090447 approved R5 R5-43 R5-092764 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0287 - F Rel-8 8.1.0 8.2.0 GCF Priority-1: Correction to 9.2.2.2.1 'NW initiated detach / re-attach required' RP-44 RP-090447 approved R5 R5-43 R5-092768 agreed 2009-02-10 LTE-UEConTest_SIG - 2009-02-10
0288 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update to test case 8.3.1.9 RP-44 RP-090447 approved R5 R5-43 R5-092784 agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0289 - F Rel-8 8.1.0 8.2.0 GCF Priority 1:Corrections to MAC test case 7.1.2.4 RP-44 RP-090448 approved R5 R5-43 R5-092483 email agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0290 4 F Rel-8 8.1.0 8.2.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.3 RP-44 RP-090448 approved R5 R5-43 R5-092528 email agreed 2009-02-02 LTE-UEConTest_SIG - 2009-02-02
0291 - F Rel-8 8.1.0 8.2.0 GCF priority 2: A/Gb mode READY state to S1 mode cell reselection and E-UTRAN - GERAN RAU (9.2.3.4.1, 9.2.3.4.2) RP-44 RP-090448 approved R5 R5-43 R5-092785 email agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0292 - F Rel-8 8.1.0 8.2.0 GCF Priority 2 - Update of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed RP-44 RP-090448 approved R5 R5-43 R5-092786 email agreed 2009-02-01 LTE-UEConTest_SIG - 2009-02-01
0293 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.2.6 RP-45 RP-090802 approved R5 R5-44 R5-094075 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0294 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.3.1 RP-45 RP-090802 approved R5 R5-44 R5-094076 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0295 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.3.3 RP-45 RP-090802 approved R5 R5-44 R5-094078 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0296 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.3.4 RP-45 RP-090802 approved R5 R5-44 R5-094079 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0297 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.3.5 RP-45 RP-090802 approved R5 R5-44 R5-094080 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0298 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.3.6 RP-45 RP-090802 approved R5 R5-44 R5-094081 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0299 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.3.7 RP-45 RP-090802 approved R5 R5-44 R5-094082 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0300 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.1 RP-45 RP-090802 approved R5 R5-44 R5-094083 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0301 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.6 RP-45 RP-090802 approved R5 R5-44 R5-094085 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0302 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.7 RP-45 RP-090802 approved R5 R5-44 R5-094086 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0303 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.8 RP-45 RP-090802 approved R5 R5-44 R5-094087 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0304 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.11 RP-45 RP-090802 approved R5 R5-44 R5-094088 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0305 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.13 RP-45 RP-090802 approved R5 R5-44 R5-094089 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0306 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.15 RP-45 RP-090802 approved R5 R5-44 R5-094090 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0307 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of PDCP test case 7.3.1.1 RP-45 RP-090802 approved R5 R5-44 R5-094091 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0308 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of RRC test case 8.2.1.1 RP-45 RP-090802 approved R5 R5-44 R5-094092 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0309 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of MAC test case 7.1.4.16 RP-45 RP-090802 approved R5 R5-44 R5-094093 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0310 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of Idle Mode test case 6.1.2.3 RP-45 RP-090802 approved R5 R5-44 R5-094094 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0311 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.1.3.4 RP-45 RP-090802 approved R5 R5-44 R5-094095 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0312 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.1.3.6 RP-45 RP-090802 approved R5 R5-44 R5-094096 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0313 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new test case 10.7.1 RP-45 RP-090802 approved R5 R5-44 R5-094101 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0314 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new test case 10.7.2 RP-45 RP-090802 approved R5 R5-44 R5-094102 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0315 - F Rel-8 8.2.1 8.3.0 Addition of new test case 6.2.2.5 RP-45 RP-090802 approved R5 R5-44 R5-094114 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0316 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update to test case 8.3.1.9 RP-45 RP-090802 approved R5 R5-44 R5-094121 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0317 - F Rel-8 8.2.1 8.3.0 Remove TC 8.4.1.8 from TS 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-094122 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0318 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new test case 8.4.2.4 RP-45 RP-090802 approved R5 R5-44 R5-094124 agreed 2009-07-27 LTE-UEConTest_SIG - 2009-07-27
0319 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - New EMM TC 9.1.4.2 RP-45 RP-090802 approved R5 R5-44 R5-094187 agreed 2009-08-04 LTE-UEConTest_SIG - 2009-08-04
0320 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Removal of EMM TC 9.1.2.2 RP-45 RP-090802 approved R5 R5-44 R5-094189 agreed 2009-08-04 LTE-UEConTest_SIG - 2009-08-04
0321 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.10 RP-45 RP-090802 approved R5 R5-44 R5-094195 agreed 2009-08-04 LTE-UEConTest_SIG - 2009-08-04
0322 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RLC test case 7.2.3.21 RP-45 RP-090802 approved R5 R5-44 R5-094196 agreed 2009-08-05 LTE-UEConTest_SIG - 2009-08-05
0323 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.3.2.6 RP-45 RP-090802 approved R5 R5-44 R5-094201 agreed 2009-08-05 LTE-UEConTest_SIG - 2009-08-05
0324 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Add new RRC test case 8.4.1.2 RP-45 RP-090802 approved R5 R5-44 R5-094202 agreed 2009-08-05 LTE-UEConTest_SIG - 2009-08-05
0325 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Add new RRC test case 8.4.1.4 RP-45 RP-090802 approved R5 R5-44 R5-094203 agreed 2009-08-05 LTE-UEConTest_SIG - 2009-08-05
0326 - F Rel-8 8.2.1 8.3.0 GCF Priority 3 - Remove RRC test case 8.1.3.3 RP-45 RP-090802 approved R5 R5-44 R5-094205 agreed 2009-08-05 LTE-UEConTest_SIG - 2009-08-05
0327 - F Rel-8 8.2.1 8.3.0 Removal of the GUTI reallocation procedures test cases RP-45 RP-090802 approved R5 R5-44 R5-094284 agreed 2009-08-11 LTE-UEConTest_SIG - 2009-08-11
0328 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - TDD formulation update in 7.1.6.1 DRX Operation / (short cycle not configured) /Parameters configured by RRC (radio resource configuration) RP-45 RP-090802 approved R5 R5-44 R5-094289 agreed 2009-08-11 LTE-UEConTest_SIG - 2009-08-11
0329 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - TDD formulation update in 7.1.6.2 DRX Operation / Parameters (short cycle not configured) / DRX command MAC control element reception RP-45 RP-090802 approved R5 R5-44 R5-094290 agreed 2009-08-11 LTE-UEConTest_SIG - 2009-08-11
0330 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 RP-45 RP-090802 approved R5 R5-44 R5-094366 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0331 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 RP-45 RP-090802 approved R5 R5-44 R5-094369 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0332 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Corrections to E-UTRAN test cases 6.1.2.8 and 6.1.2.9 RP-45 RP-090802 approved R5 R5-44 R5-094372 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0333 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update to test case 9.2.2.1.6 RP-45 RP-090802 approved R5 R5-44 R5-094387 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0334 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of discard timer value to be consistent with test tolerances RP-45 RP-090802 approved R5 R5-44 R5-094392 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0335 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition new test case 6.2.3.3 RP-45 RP-090802 approved R5 R5-44 R5-094399 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0336 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.4.6 RP-45 RP-090802 approved R5 R5-44 R5-094426 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0337 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.4.10 RP-45 RP-090802 approved R5 R5-44 R5-094428 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0338 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Corrections to MAC test case 7.1.4.16 RP-45 RP-090802 approved R5 R5-44 R5-094432 agreed 2009-08-13 LTE-UEConTest_SIG - 2009-08-13
0339 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.3.1.1 RP-45 RP-090802 approved R5 R5-44 R5-094520 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0340 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.3.1.3 RP-45 RP-090802 approved R5 R5-44 R5-094521 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0341 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.3.1.5 RP-45 RP-090802 approved R5 R5-44 R5-094523 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0342 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of RRC test case 8.3.3.1 RP-45 RP-090802 approved R5 R5-44 R5-094525 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0343 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of EMM part TC 9.1.3.1 NAS security mode command accepted by the UE RP-45 RP-090802 approved R5 R5-44 R5-094577 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0344 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of MAC TC 7.1.3.2 DL SPS RP-45 RP-090802 approved R5 R5-44 R5-094627 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0345 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of MAC TC 7.1.4.2 UL SPS RP-45 RP-090802 approved R5 R5-44 R5-094628 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0346 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.3.9 RP-45 RP-090802 approved R5 R5-44 R5-094629 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0347 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.1 RP-45 RP-090802 approved R5 R5-44 R5-094635 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0348 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.2.1.1.1 RP-45 RP-090802 approved R5 R5-44 R5-094636 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0349 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of MAC test case 7.1.4.3 RP-45 RP-090802 approved R5 R5-44 R5-094660 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0350 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to RLC section RP-45 RP-090802 approved R5 R5-44 R5-094662 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0351 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of RLC test case 7.2.3.9 RP-45 RP-090802 approved R5 R5-44 R5-094664 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0352 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new EMM test case 9.2.3.3.5 RP-45 RP-090802 approved R5 R5-44 R5-094666 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0353 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.3.2.8 RP-45 RP-090802 approved R5 R5-44 R5-094674 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0354 - F Rel-8 8.2.1 8.3.0 GCF Priority 3 - Update of RRC test case 8.3.2.9 RP-45 RP-090802 approved R5 R5-44 R5-094676 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0355 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 RP-45 RP-090802 approved R5 R5-44 R5-094707 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0356 - B Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 6.2.2.3 RP-45 RP-090802 approved R5 R5-44 R5-094762 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0357 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 6.2.3.7 RP-45 RP-090802 approved R5 R5-44 R5-094776 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0358 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 6.2.3.8 RP-45 RP-090802 approved R5 R5-44 R5-094788 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0359 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.1.3.9 RP-45 RP-090802 approved R5 R5-44 R5-094798 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0360 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.1.3.10 RP-45 RP-090802 approved R5 R5-44 R5-094814 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0361 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.3.2.7 RP-45 RP-090802 approved R5 R5-44 R5-094817 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0362 - B Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of RRC test case 8.3.2.8 RP-45 RP-090802 approved R5 R5-44 R5-094823 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0363 - B Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of EMM TC 9.2.1.1.9 Attach / rejected / IMSI invalid RP-45 RP-090802 approved R5 R5-44 R5-094833 agreed 2009-08-14 LTE-UEConTest_SIG - 2009-08-14
0364 2 B Rel-8 8.2.1 8.3.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.1 RP-45 RP-090802 approved R5 R5-44 R5-094866 agreed 2009-08-17 LTE-UEConTest_SIG - 2009-08-17
0365 2 B Rel-8 8.2.1 8.3.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.2 RP-45 RP-090802 approved R5 R5-44 R5-094867 agreed 2009-08-17 LTE-UEConTest_SIG - 2009-08-17
0366 2 B Rel-8 8.2.1 8.3.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.3 RP-45 RP-090802 approved R5 R5-44 R5-094868 agreed 2009-08-17 LTE-UEConTest_SIG - 2009-08-17
0367 2 B Rel-8 8.2.1 8.3.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.4 RP-45 RP-090802 approved R5 R5-44 R5-094869 agreed 2009-08-17 LTE-UEConTest_SIG - 2009-08-17
0368 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.2 RP-45 RP-090802 approved R5 R5-44 R5-094876 agreed 2009-08-20 LTE-UEConTest_SIG - 2009-08-20
0369 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of 9.1.2.4 RP-45 RP-090802 approved R5 R5-44 R5-095004 agreed 2009-08-24 LTE-UEConTest_SIG - 2009-08-24
0370 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of 9.1.2.5 RP-45 RP-090802 approved R5 R5-44 R5-095005 agreed 2009-08-24 LTE-UEConTest_SIG - 2009-08-24
0371 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of MAC TC 7.1.4.14 TTI Bundling RP-45 RP-090802 approved R5 R5-44 R5-095008 agreed 2009-08-24 LTE-UEConTest_SIG - 2009-08-24
0372 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Various corrections to RLC section of 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-095028 agreed 2009-08-24 LTE-UEConTest_SIG - 2009-08-24
0373 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new SMS over SGs test case 11.1.1 RP-45 RP-090802 approved R5 R5-44 R5-095032 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0374 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction to 9.2.2.2.2 NW initiated detach / IMSI detach RP-45 RP-090802 approved R5 R5-44 R5-095036 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0375 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of PDCP status report RP-45 RP-090802 approved R5 R5-44 R5-095037 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0376 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of PDCP handover test procedure RP-45 RP-090802 approved R5 R5-44 R5-095038 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0377 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of 9.1.2.3 RP-45 RP-090802 approved R5 R5-44 R5-095041 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0378 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.2.2.1.1 RP-45 RP-090802 approved R5 R5-44 R5-095065 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0379 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.1 RP-45 RP-090802 approved R5 R5-44 R5-095066 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0380 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.2 RP-45 RP-090802 approved R5 R5-44 R5-095067 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0381 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.3 RP-45 RP-090802 approved R5 R5-44 R5-095069 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0382 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.2.2 RP-45 RP-090802 approved R5 R5-44 R5-095070 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0383 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of EMM test case 9.3.1.7a RP-45 RP-090802 approved R5 R5-44 R5-095073 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0384 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.4.1 RP-45 RP-090802 approved R5 R5-44 R5-095075 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0385 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.4.8 RP-45 RP-090802 approved R5 R5-44 R5-095076 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0386 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.4.13 RP-45 RP-090802 approved R5 R5-44 R5-095077 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0387 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.4.5 RP-45 RP-090802 approved R5 R5-44 R5-095078 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0388 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Various corrections to RLC section of 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-095086 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0389 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - New EMM TC 9.3.1.7 RP-45 RP-090802 approved R5 R5-44 R5-095087 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0390 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update to test case 9.2.1.1.2 RP-45 RP-090802 approved R5 R5-44 R5-095088 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0391 - F Rel-8 8.2.1 8.3.0 Update to GCF Priority 2 test case 9.2.1.1.7 RP-45 RP-090802 approved R5 R5-44 R5-095089 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0392 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update to test case 9.2.2.1.1 RP-45 RP-090802 approved R5 R5-44 R5-095090 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0393 - F Rel-8 8.2.1 8.3.0 Update to preamble in L2 UM test cases RP-45 RP-090802 approved R5 R5-44 R5-095094 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0394 - F Rel-8 8.2.1 8.3.0 Add reference to test procedure for Idle Mode section RP-45 RP-090802 approved R5 R5-44 R5-095097 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0395 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC part TC 7.1.2.1 RP-45 RP-090802 approved R5 R5-44 R5-095103 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0396 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to MAC test case 7.1.4.11 RP-45 RP-090802 approved R5 R5-44 R5-095104 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0397 - F Rel-8 8.2.1 8.3.0 Addition new test case 6.2.3.13 RP-45 RP-090802 approved R5 R5-44 R5-095105 agreed 2009-08-25 LTE-UEConTest_SIG - 2009-08-25
0398 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of 9.1.2.1 RP-45 RP-090802 approved R5 R5-44 R5-095109 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0399 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.3.1 RP-45 RP-090802 approved R5 R5-44 R5-095110 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0400 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of EMM TC 9.2.1.1.12 Attach / rejected / EPS services not allowed RP-45 RP-090802 approved R5 R5-44 R5-095112 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0401 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Corrections to test case 9.2.1.1.13 Attach / rejected / PLMN not allowed RP-45 RP-090802 approved R5 R5-44 R5-095113 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0402 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of EMM 9.2.1.1.17 TC Attach / rejected / no suitable cells in tracking area RP-45 RP-090802 approved R5 R5-44 R5-095116 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0403 - F Rel-8 8.2.1 8.3.0 GCF Priority 3 - Correction to EMM TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable RP-45 RP-090802 approved R5 R5-44 R5-095118 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0404 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Various corrections to other section of 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-095120 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0405 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Various corrections to RRC Part1 section of 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-095121 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0406 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of MAC TC 7.1.4.4 SR RP-45 RP-090802 approved R5 R5-44 R5-095125 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0407 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of 9.3.2.1 RP-45 RP-090802 approved R5 R5-44 R5-095126 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0408 - F Rel-8 8.2.1 8.3.0 Priority 2 - Update of test case 6.2.2.1 RP-45 RP-090802 approved R5 R5-44 R5-095127 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0409 2 F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 RP-45 RP-090802 approved R5 R5-44 R5-095131 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0410 2 F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 RP-45 RP-090802 approved R5 R5-44 R5-095132 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0411 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.5 RP-45 RP-090802 approved R5 R5-44 R5-095133 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0412 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of cell reselection test case 6.1.2.15 RP-45 RP-090802 approved R5 R5-44 R5-095135 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0413 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update of PDCP test case handover / In-order delivery and duplicate elimination in the downlink RP-45 RP-090802 approved R5 R5-44 R5-095136 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0414 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of test case 11.1.3 MO-SMS over SGs in idle mode RP-45 RP-090802 approved R5 R5-44 R5-095139 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0415 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction to 9.2.3.1.2 Normal tracking area update / accepted / 'Active' flag set RP-45 RP-090802 approved R5 R5-44 R5-095140 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0416 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed RP-45 RP-090802 approved R5 R5-44 R5-095141 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0417 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Correction of EMM TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area RP-45 RP-090802 approved R5 R5-44 R5-095148 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0418 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new test case 9.2.3.3.6 for E-UTRAN RRC connection failure / reselection of UTRAN cell / NAS signaling to release old S1 interface connection RP-45 RP-090802 approved R5 R5-44 R5-095149 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0419 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Update to test case 10.8.1 RP-45 RP-090802 approved R5 R5-44 R5-095150 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0420 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new SMS over SGs test case 11.1.2 RP-45 RP-090802 approved R5 R5-44 R5-095151 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0421 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Various corrections to Idle Mode section of 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-095161 agreed 2009-08-26 LTE-UEConTest_SIG - 2009-08-26
0422 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.4 RP-45 RP-090802 approved R5 R5-44 R5-095164 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0423 - F Rel-8 8.2.1 8.3.0 GCF Priority 4 - New TC 8.1.3.7 RRC Connection Release: redirection from UTRAN to E-UTRAN RP-45 RP-090802 approved R5 R5-44 R5-095172 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0424 1 F Rel-8 8.2.1 8.3.0 GCF Priority 3 - Update to test case 9.2.2.1.2 RP-45 RP-090802 approved R5 R5-44 R5-095173 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0425 1 F Rel-8 8.2.1 8.3.0 GCF Priority 3 - Correction to 9.2.1.2.1 ''Combined attach procedure / Success / EPS and non-EPS services'' RP-45 RP-090802 approved R5 R5-44 R5-095175 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0426 - F Rel-8 8.2.1 8.3.0 GCF Priority 3 - to EMM TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection RP-45 RP-090802 approved R5 R5-44 R5-095177 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0427 - F Rel-8 8.2.1 8.3.0 GCF Priority 3 - New EMM TC 9.2.3.2.1a Combined tracking area update / successful / check of last visited TAI and handling of TAI list, LAI and TMSI RP-45 RP-090802 approved R5 R5-44 R5-095178 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0428 - F Rel-8 8.2.1 8.3.0 GCF Priority 3 - Addition of new test case 6.2.2.4 RP-45 RP-090802 approved R5 R5-44 R5-095179 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0429 3 F Rel-8 8.2.1 8.3.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.2.1 RP-45 RP-090802 approved R5 R5-44 R5-095188 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0430 - F Rel-8 8.2.1 8.3.0 GCF Priority 2 - Addition of new test case 8.4.2.2 RP-45 RP-090802 approved R5 R5-44 R5-095207 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0431 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to RLC test case 7.2.3.7 RP-45 RP-090802 approved R5 R5-44 R5-095208 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0432 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Corrections to PDCP test cases 7.5.3.2 and 7.5.3.3 RP-45 RP-090802 approved R5 R5-44 R5-095217 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0433 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Various corrections to RRC Part2 section of 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-095219 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0434 - F Rel-8 8.2.1 8.3.0 GCF Priority 1 - Various corrections to RRC Part 3 section of 36.523-1 RP-45 RP-090802 approved R5 R5-44 R5-095220 agreed 2009-08-27 LTE-UEConTest_SIG - 2009-08-27
0435 - F Rel-8 8.3.2 8.4.0 6.2.3.21 Inter-RAT Cell Reselection / from GPRS Packet_Transfer (NCO mode) to E_UTRA TS 36.523-1 GP-44 GP-092405 approved G3new G3new-44 GP-092405 agreed 2009-11-19 LTE-UEConTest_SIG - 2009-11-19
0436 - F Rel-8 8.3.2 8.4.0 Removal of TC 8.1.2.10 from TS 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-095444 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0437 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Various corrections to RRC Part 2 section of 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-095446 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0438 - F Rel-8 8.3.2 8.4.0 Removal of TC 8.2.1.2 from TS 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-095447 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0439 - F Rel-8 8.3.2 8.4.0 Removal of TC 8.2.1.4 from TS 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-095448 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0440 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 8.2.4.5 RP-46 RP-091122 approved R5 R5-45 R5-095450 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0441 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update to test case 8.2.4.9 RP-46 RP-091122 approved R5 R5-45 R5-095451 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0442 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 9.2.3.1.9a RP-46 RP-091122 approved R5 R5-45 R5-095462 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0443 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 9.3.1.16 RP-46 RP-091122 approved R5 R5-45 R5-095467 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0444 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update test case 6.1.2.11 RP-46 RP-091122 approved R5 R5-45 R5-095505 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0445 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction for Measurement test cases RP-46 RP-091122 approved R5 R5-45 R5-095507 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0446 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of RLC test case 7.2.3.14 RP-46 RP-091122 approved R5 R5-45 R5-095521 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0447 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of EMM test case 9.2.3.3.5 RP-46 RP-091122 approved R5 R5-45 R5-095524 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0448 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of EMM test case 9.3.1.7a RP-46 RP-091122 approved R5 R5-45 R5-095525 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0449 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of E-UTRAN test case 8.3.1.11 RP-46 RP-091122 approved R5 R5-45 R5-095597 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0450 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of EMM test case 9.2.3.1.5 RP-46 RP-091122 approved R5 R5-45 R5-095609 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0451 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Removal of TC 8.4.2.6 RP-46 RP-091122 approved R5 R5-45 R5-095621 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0452 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction to test case 6.1.1.1 RP-46 RP-091122 approved R5 R5-45 R5-095774 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0453 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update to test case 9.2.1.1.25 RP-46 RP-091122 approved R5 R5-45 R5-095783 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0454 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 9.2.2.1.1 RP-46 RP-091122 approved R5 R5-45 R5-095784 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0455 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update to test case 9.2.2.1.2 RP-46 RP-091122 approved R5 R5-45 R5-095785 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0456 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 9.2.2.1.6 RP-46 RP-091122 approved R5 R5-45 R5-095786 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0457 - F Rel-8 8.3.2 8.4.0 Addition of new DSMIPv6 test case for Discovery of the Home Agent via DNS RP-46 RP-091132 approved R5 R5-45 R5-095795 agreed 2009-10-27 DSMIPv6_UEConTest - 2009-10-27
0458 - F Rel-8 8.3.2 8.4.0 Addition of new DSMIPv6 test case for Security association establishment without Home Agent reallocation procedure RP-46 RP-091132 approved R5 R5-45 R5-095796 agreed 2009-10-27 DSMIPv6_UEConTest - 2009-10-27
0459 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new RRC test case 8.4.5.4 RP-46 RP-091122 approved R5 R5-45 R5-095802 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0460 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new RRC test case 8.4.7.3 RP-46 RP-091122 approved R5 R5-45 R5-095803 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0461 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new RRC test case 8.4.7.4 RP-46 RP-091122 approved R5 R5-45 R5-095804 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0462 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction of TC 9.2.1.1.1 Attach Procedure / Success (valid GUTI) RP-46 RP-091122 approved R5 R5-45 R5-095884 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0463 - F Rel-8 8.3.2 8.4.0 GCF Priority x - Proposed removal of TC 9.3.1.2 Service Request initiated by UE for uplink signalling RP-46 RP-091122 approved R5 R5-45 R5-095885 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0464 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Proposed removal of TC 9.2.1.1.5 Attach Procedure / Success / ATTACH ACCEPT message includes the PDN address assigned to the UE RP-46 RP-091122 approved R5 R5-45 R5-095886 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0465 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.3.3.6 E-UTRAN RRC connection failure / reselection of UTRAN cell / NAS signaling to release old S1 interface connection RP-46 RP-091122 approved R5 R5-45 R5-095901 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0466 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.6 RP-46 RP-091122 approved R5 R5-45 R5-095937 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0467 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of TC 9-1-2-5 for IP handling over U-plane RP-46 RP-091122 approved R5 R5-45 R5-095963 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0468 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of TC 9-1-2-1 for IP handling over U-plane RP-46 RP-091122 approved R5 R5-45 R5-095972 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0469 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of TC 9-3-1-7 for IP handling over U-plane RP-46 RP-091122 approved R5 R5-45 R5-095976 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0470 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of TC 9-1-2-4 for IP handling over U-plane RP-46 RP-091122 approved R5 R5-45 R5-095979 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0471 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Test Case 9.1.4.2 Clause title formatting error RP-46 RP-091122 approved R5 R5-45 R5-095980 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0472 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction to RRC test case 8.5.1.1 RP-46 RP-091122 approved R5 R5-45 R5-095997 agreed 2009-10-27 LTE-UEConTest_SIG - 2009-10-27
0473 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.2.3.5 RP-46 RP-091122 approved R5 R5-45 R5-096009 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0474 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Cell number allignment in Test case 9.1.3.1 RP-46 RP-091122 approved R5 R5-45 R5-096024 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0475 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Cell number allignment in Test case 9.1.3.2 RP-46 RP-091122 approved R5 R5-45 R5-096027 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0476 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Cell number allignment in Test case 9.4.1 RP-46 RP-091122 approved R5 R5-45 R5-096029 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0477 - F Rel-8 8.3.2 8.4.0 GCF Priority 2: Cell number allignment in Test case 9.4.3 RP-46 RP-091122 approved R5 R5-45 R5-096031 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0478 - F Rel-8 8.3.2 8.4.0 GCF Priority 2: Correction to Test case 7.1.4.2 RP-46 RP-091122 approved R5 R5-45 R5-096034 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0479 - F Rel-8 8.3.2 8.4.0 GCF Priority 2: Correction to Test case 7.1.4.14 RP-46 RP-091122 approved R5 R5-45 R5-096036 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0480 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - update test case 8.5.1.3 RP-46 RP-091122 approved R5 R5-45 R5-096149 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0481 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of RLC test case 7.2.3.13 RP-46 RP-091122 approved R5 R5-45 R5-096156 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0482 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of TC 9-1-2-3 for IP handling over U-plane RP-46 RP-091122 approved R5 R5-45 R5-096160 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0483 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 and Priority 2- EMM Successful Attach consistent description RP-46 RP-091122 approved R5 R5-45 R5-096161 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0484 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction test cases 8.3.2.1, 8.3.2.7 RP-46 RP-091122 approved R5 R5-45 R5-096178 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0485 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Various editorial corrections to RLC section RP-46 RP-091122 approved R5 R5-45 R5-096192 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0486 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update to Idle Mode test case 6.1.2.2 RP-46 RP-091122 approved R5 R5-45 R5-096193 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0487 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Updated to test case 6.1.2.6 RP-46 RP-091122 approved R5 R5-45 R5-096194 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0488 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction to test case 6.3.6 RP-46 RP-091122 approved R5 R5-45 R5-096196 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0489 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction to test case 6.1.2.7 RP-46 RP-091122 approved R5 R5-45 R5-096197 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0490 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.9 RP-46 RP-091122 approved R5 R5-45 R5-096401 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0491 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 & 3 - Correction to test cases 9.2.1.1.9 and 9.2.1.1.12 RP-46 RP-091122 approved R5 R5-45 R5-096414 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0492 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Update of MAC TC 7.1.7.1.1 DL-SCH TBS selection/DCI format 1/RA type0 RP-46 RP-091122 approved R5 R5-45 R5-096421 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0493 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Update of MAC TC 7.1.7.1.2 DL-SCH TBS selection/DCI format 1/RA type1 RP-46 RP-091122 approved R5 R5-45 R5-096422 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0494 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Update of MAC TC 7.1.7.1.3 DL-SCH TBS selection/DCI format 1A/RA type2/Localized VRB RP-46 RP-091122 approved R5 R5-45 R5-096423 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0495 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Update of MAC TC 7.1.7.1.4 DL-SCH TBS selection/DCI format 1A/RA type2/Distributed VRB RP-46 RP-091122 approved R5 R5-45 R5-096424 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0496 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Update of MAC TC 7.1.7.2.1 UL-SCH TBS selection/DCI format 0 RP-46 RP-091122 approved R5 R5-45 R5-096425 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0497 1 F Rel-8 8.3.2 8.4.0 GCF Priority 1: Update of E-UTRA MAC test case 7.1.4.7 RP-46 RP-091122 approved R5 R5-45 R5-096426 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0498 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Update of E-UTRA MAC test case 7.1.3.7 RP-46 RP-091122 approved R5 R5-45 R5-096428 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0499 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 9.2.1.1.7 RP-46 RP-091122 approved R5 R5-45 R5-096429 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0500 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6' Normal tracking area update / UE with ISR active moves to E-UTRAN ' RP-46 RP-091122 approved R5 R5-45 R5-096435 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0501 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Introduction of 9.2.3.1.17 Normal tracking area update / rejected / Roaming not allowed in this tracking area RP-46 RP-091122 approved R5 R5-45 R5-096436 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0502 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Introduction of 9.2.3.1.18 Normal tracking area update / rejected / EPS services not allowed in this PLMN RP-46 RP-091122 approved R5 R5-45 R5-096437 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0503 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Addition of new test case 9.2.1.1.24: Attach / Abnormal case / Change of cell into a new tracking area RP-46 RP-091122 approved R5 R5-45 R5-096443 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0504 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Addition of new test case 9.2.1.1.26: Attach / Abnormal case / Detach procedure collision RP-46 RP-091122 approved R5 R5-45 R5-096444 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0505 - F Rel-8 8.3.2 8.4.0 GCF Priority 2: Correction to Test case 7.1.3.2 RP-46 RP-091122 approved R5 R5-45 R5-096445 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0506 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Correction to EMM test case 9.3.1.1 RP-46 RP-091122 approved R5 R5-45 R5-096446 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0507 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of test cases 9.2.1.1.9, 9.2.1.1.10, 9.2.1.1.11 Attach / rejected / IMSI invalid / Illegal UE / EPS and non-EPS services not allowed RP-46 RP-091122 approved R5 R5-45 R5-096451 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0508 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.3.2.1 Combined tracking area update / successful RP-46 RP-091122 approved R5 R5-45 R5-096452 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0509 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN RP-46 RP-091122 approved R5 R5-45 R5-096454 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0510 - F Rel-8 8.3.2 8.4.0 Disabling PHR and periodic BSR for L2 test cases in 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-096459 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0511 - F Rel-8 8.3.2 8.4.0 Correction of test case 6.1.2.13 RP-46 RP-091122 approved R5 R5-45 R5-096466 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0512 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 RP-46 RP-091122 approved R5 R5-45 R5-096467 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0513 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.10 RP-46 RP-091122 approved R5 R5-45 R5-096468 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0514 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.3 for Measurement configuration control and reporting / SON / ANR: CGI reporting of GERAN cell RP-46 RP-091122 approved R5 R5-45 R5-096470 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0515 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.2 :Measurement configuration control and reporting / SON / ANR: CGI reporting of UTRAN cell RP-46 RP-091122 approved R5 R5-45 R5-096471 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0516 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA RP-46 RP-091122 approved R5 R5-45 R5-096472 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0517 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) RP-46 RP-091122 approved R5 R5-45 R5-096476 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0518 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update of RRC test case 8.2.1.7 RP-46 RP-091122 approved R5 R5-45 R5-096479 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0519 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update to test case 7.2.3.4 RP-46 RP-091122 approved R5 R5-45 R5-096481 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0520 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction of TC 8.5.4.1 UE capability transfer / Success RP-46 RP-091122 approved R5 R5-45 R5-096482 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0521 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of PDCP test case 7.3.3.1 : Ciphering and Deciphering: Correct functionality of EPS AS encription algorithms (SNOW 3G) RP-46 RP-091122 approved R5 R5-45 R5-096483 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0522 - F Rel-8 8.3.2 8.4.0 GCF Priority 1: Correction to RRC test case 8.2.1.1 RP-46 RP-091122 approved R5 R5-45 R5-096484 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0523 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of EMM test case 9.2.3.1.1 RP-46 RP-091122 approved R5 R5-45 R5-096485 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0524 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Various corrections to Idle Mode section of 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-096487 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0525 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 8.1.2.5 RP-46 RP-091122 approved R5 R5-45 R5-096488 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0526 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 8.1.2.7 RP-46 RP-091122 approved R5 R5-45 R5-096489 agreed 2009-10-28 LTE-UEConTest_SIG - 2009-10-28
0527 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Various corrections to RRC Part 3 section of 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-096491 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0528 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Correction to E-UTRA DRB test case 12.2 RP-46 RP-091122 approved R5 R5-45 R5-096492 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0529 3 F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA RP-46 RP-091122 approved R5 R5-45 R5-096493 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0530 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of applicabilty entry for DRB test case 12.3 RP-46 RP-091122 approved R5 R5-45 R5-096494 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0531 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of the test case 6.2.3.3 RP-46 RP-091122 approved R5 R5-45 R5-096495 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0532 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of Idle Mode Operations test case 6.1.2.5 Cell reselection for inter-band operation RP-46 RP-091122 approved R5 R5-45 R5-096496 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0533 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of Idle Mode Operations test case 6.6.2.3.7 RP-46 RP-091122 approved R5 R5-45 R5-096497 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0534 - F Rel-8 8.3.2 8.4.0 GCF Priority 2: Correction to the MAC DRX test cases preamble RP-46 RP-091122 approved R5 R5-45 R5-096502 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0535 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.1.1.13 Attach / rejected / PLMN not allowed RP-46 RP-091122 approved R5 R5-45 R5-096505 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0536 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed RP-46 RP-091122 approved R5 R5-45 R5-096506 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0537 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area RP-46 RP-091122 approved R5 R5-45 R5-096507 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0538 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - New TC 9.2.1.1.16 Attach / rejected / EPS services not allowed in this PLMN RP-46 RP-091122 approved R5 R5-45 R5-096508 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0539 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area RP-46 RP-091122 approved R5 R5-45 R5-096509 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0540 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 9.2.1.2.4 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable RP-46 RP-091122 approved R5 R5-45 R5-096510 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0541 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 10.2.1 Dedicated EPS bearer context activation / Success RP-46 RP-091122 approved R5 R5-45 R5-096511 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0542 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 10.3.1 EPS bearer context modification / Success RP-46 RP-091122 approved R5 R5-45 R5-096512 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0543 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 10.6.1 UE requested PDN disconnect procedure accepted by the network RP-46 RP-091122 approved R5 R5-45 R5-096514 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0544 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of RRC test case 8.3.2.7 : Measurement configuration control and reporting / inter-RAT measurements: event B2 (measurement HRPD cells) RP-46 RP-091122 approved R5 R5-45 R5-096605 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0545 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of RRC test case 8.3.2.6 RP-46 RP-091122 approved R5 R5-45 R5-096606 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0546 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of RRC test case 8.4.1.4 RP-46 RP-091122 approved R5 R5-45 R5-096610 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0547 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update of RRC test case 8.4.1.2 RP-46 RP-091122 approved R5 R5-45 R5-096611 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0548 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 8.4.2.2 RP-46 RP-091122 approved R5 R5-45 R5-096612 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0549 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 8.4.2.4 RP-46 RP-091122 approved R5 R5-45 R5-096613 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0550 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 6.2.3.6 RP-46 RP-091122 approved R5 R5-45 R5-096615 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0551 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update to test case 8.1.1.2 RP-46 RP-091122 approved R5 R5-45 R5-096616 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0552 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 8.2.4.4 RP-46 RP-091122 approved R5 R5-45 R5-096617 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0553 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Update to test case 8.1.3.5 RP-46 RP-091122 approved R5 R5-45 R5-096618 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0554 - F Rel-8 8.3.2 8.4.0 GCF Priority 2: Updates to TAU/RAU procedure for inter-system cell re-selection between A/Gb and S1 modes RP-46 RP-091122 approved R5 R5-45 R5-096619 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0555 - F Rel-8 8.3.2 8.4.0 GCF Priority 2: Updates to Attach Procedure / Success (last visited TAI, TAI list and equivalent PLMN list handling) RP-46 RP-091122 approved R5 R5-45 R5-096620 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0556 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction to TC 8.1.3.8 RP-46 RP-091122 approved R5 R5-45 R5-096621 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0557 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update test case 8.3.1.4 RP-46 RP-091122 approved R5 R5-45 R5-096622 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0558 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of RRC test case 8.2.2.1 RP-46 RP-091122 approved R5 R5-45 R5-096627 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0559 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of RRC test case 8.2.2.2 RP-46 RP-091122 approved R5 R5-45 R5-096628 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0560 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Various corrections to EMM section of 36.523-1 RP-46 RP-091122 approved R5 R5-45 R5-096629 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0561 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 9.2.1.2.5 RP-46 RP-091122 approved R5 R5-45 R5-096630 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0562 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update to test case 9.2.1.2.6 RP-46 RP-091122 approved R5 R5-45 R5-096631 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0563 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 9.2.1.2.7 RP-46 RP-091122 approved R5 R5-45 R5-096632 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0564 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 9.2.1.2.11 RP-46 RP-091122 approved R5 R5-45 R5-096633 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0565 1 F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 9.2.1.2.13 RP-46 RP-091122 approved R5 R5-45 R5-096634 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0566 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 9.2.1.2.15 RP-46 RP-091122 approved R5 R5-45 R5-096635 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0567 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test cases 9.2.3.1.23 and 9.2.3.1.24 RP-46 RP-091122 approved R5 R5-45 R5-096636 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0568 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 9.2.3.1.25 RP-46 RP-091122 approved R5 R5-45 R5-096637 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0569 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 9.2.3.2.9 RP-46 RP-091122 approved R5 R5-45 R5-096638 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0570 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update to test case 9.3.1.4 RP-46 RP-091122 approved R5 R5-45 R5-096639 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0571 - F Rel-8 8.3.2 8.4.0 GCF Priority 1 - Update of RLC test case 7.2.3.9 RP-46 RP-091122 approved R5 R5-45 R5-096643 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0572 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 8.3.3.4 RP-46 RP-091122 approved R5 R5-45 R5-096645 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0573 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 8.3.3.5 RP-46 RP-091122 approved R5 R5-45 R5-096646 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0574 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 10.7.3 RP-46 RP-091122 approved R5 R5-45 R5-096647 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0575 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 10.7.4 RP-46 RP-091122 approved R5 R5-45 R5-096648 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0576 - F Rel-8 8.3.2 8.4.0 GCF Priority TBC - Addition of new test case 10.7.5 RP-46 RP-091122 approved R5 R5-45 R5-096649 agreed 2009-10-29 LTE-UEConTest_SIG - 2009-10-29
0577 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 10.8.2 RP-46 RP-091122 approved R5 R5-45 R5-096650 agreed 2009-10-30 LTE-UEConTest_SIG - 2009-10-30
0578 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 10.8.3 RP-46 RP-091122 approved R5 R5-45 R5-096651 agreed 2009-10-30 LTE-UEConTest_SIG - 2009-10-30
0579 - F Rel-8 8.3.2 8.4.0 GCF Priority TBC - Addition of new test case 10.8.4 RP-46 RP-091122 approved R5 R5-45 R5-096652 agreed 2009-10-30 LTE-UEConTest_SIG - 2009-10-30
0580 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 10.8.5 RP-46 RP-091122 approved R5 R5-45 R5-096653 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0581 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 10.8.6 RP-46 RP-091122 approved R5 R5-45 R5-096654 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0582 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 10.8.7 RP-46 RP-091122 approved R5 R5-45 R5-096655 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0583 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 10.5.1 UE requested PDN connectivity procedure accepted by the network RP-46 RP-091122 approved R5 R5-45 R5-096656 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0584 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Addition of test case 11.1.4 MO-SMS over SGs in active mode RP-46 RP-091122 approved R5 R5-45 R5-096657 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0585 - F Rel-8 8.3.2 8.4.0 GCF Priority 2 - Correction of TC 10.4.1 EPS bearer context deactivation / Success RP-46 RP-091122 approved R5 R5-45 R5-096658 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0586 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of EMM test case 9.1.2.6 RP-46 RP-091122 approved R5 R5-45 R5-096660 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0587 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new EMM test case 9.1.5.2 RP-46 RP-091122 approved R5 R5-45 R5-096661 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0588 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new EMM test case 9.2.1.1.18 RP-46 RP-091122 approved R5 R5-45 R5-096662 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0589 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of EMM test case 9.2.1.2.12 RP-46 RP-091122 approved R5 R5-45 R5-096663 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0590 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of EMM test case 9.2.2.2.14 RP-46 RP-091122 approved R5 R5-45 R5-096665 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0591 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of EMM test case 9.2.3.1.26 RP-46 RP-091122 approved R5 R5-45 R5-096666 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0592 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of EMM test case 9.2.3.1.27 RP-46 RP-091122 approved R5 R5-45 R5-096667 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0593 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of EMM test case 9.2.3.1.28 RP-46 RP-091122 approved R5 R5-45 R5-096668 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0594 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of EMM test case 9.3.1.15 RP-46 RP-091122 approved R5 R5-45 R5-096669 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0595 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of new test case 9.3.1.17 RP-46 RP-091122 approved R5 R5-45 R5-096670 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0596 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Correction of TC 9.2.1.2.2 Combined attach procedure / Success / EPS services only / IMSI unknown in HSS RP-46 RP-091122 approved R5 R5-45 R5-096671 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0597 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Correction of TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable RP-46 RP-091122 approved R5 R5-45 R5-096672 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0598 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Introduction of 9.2.3.1.19 Normal tracking area update / rejected / No Suitable Cells in tracking Area RP-46 RP-091122 approved R5 R5-45 R5-096673 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0599 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Update of E-UTRAN test case 9.2.1.1.20 RP-46 RP-091122 approved R5 R5-45 R5-096692 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0600 - F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Correction of TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection RP-46 RP-091122 approved R5 R5-45 R5-096693 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0601 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Addition of new test case 9.2.1.1.21: Attach / Abnormal case / success after several attempts due to no network response RP-46 RP-091122 approved R5 R5-45 R5-096694 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0602 - F Rel-8 8.3.2 8.4.0 GCF Priority 3: Addition of new test case 9.2.1.1.22: : Attach / Abnormal case / unssuccesful attach after 5 attempts RP-46 RP-091122 approved R5 R5-45 R5-096695 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0603 1 F Rel-8 8.3.2 8.4.0 GCF Priority 3 - Addition of test case 13.3.1.1 RP-46 RP-091122 approved R5 R5-45 R5-096697 agreed 2009-11-24 LTE-UEConTest_SIG - 2009-11-24
0604 - B Rel-8 8.4.0 - CR 36.523-1-0604 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection - - - G3new G3new-45 GP-100096 withdrawn 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0604 - F Rel-8 8.4.0 8.5.0 Addition of new DSMIPv6 test case for Registration of a new IPv6 CoA (Binding Update/Acknowledgment procedure in IPv6 network) RP-47 RP-100181 approved R5 R5-46 R5-100058 agreed 2010-01-14 DSMIPv6_UEConTest - 2010-01-14
0605 - B Rel-8 8.4.0 - CR 36.523-1-0605 6.2.3.22: Inter-RAT Autonomous Cell Reselection failure GPRS Packet_transfer to E-UTRA (NC0 mode) - - - G3new G3new-45 GP-100098 revised 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0605 - F Rel-8 8.4.0 8.5.0 Addition of new DSMIPv6 test case for Re-registration of IPv6 CoA RP-47 RP-100181 approved R5 R5-46 R5-100059 agreed 2010-01-14 DSMIPv6_UEConTest - 2010-01-14
0605 1 B Rel-8 8.4.0 8.5.0 CR 36.523-1-0605 6.2.3.22: Inter-RAT Autonomous Cell Reselection failure GPRS Packet_transfer to E-UTRA (NC0 mode) GP-45 GP-100543 approved G3new G3new-45 GP-100543 agreed 2010-03-04 LTE-UEConTest_SIG - 2010-03-04
0606 - F Rel-8 8.4.0 8.5.0 Addition of new DSMIPv6 test case for Return to home link RP-47 RP-100181 approved R5 R5-46 R5-100060 agreed 2010-01-14 DSMIPv6_UEConTest - 2010-01-14
0607 - F Rel-8 8.4.0 8.5.0 Addition of new DSMIPv6 test case for Dual-Stack Mobile IPv6 detach in IPv6 network RP-47 RP-100181 approved R5 R5-46 R5-100061 agreed 2010-01-14 DSMIPv6_UEConTest - 2010-01-14
0608 - F Rel-8 8.4.0 - GCF priority 2 - Correction of test case 10.5.1 for UE requested PDN connectivity accepted by the network RP-47 RP-100143 reissued R5 R5-46 R5-100089 agreed 2010-02-01 LTE-UEConTest_SIG - 2010-02-01
0608 - F Rel-8 8.4.0 8.5.0 GCF priority 2 - Correction of test case 10.5.1 for UE requested PDN connectivity accepted by the network RP-47 RP-100316 approved R5 R5-46 R5-100089 agreed 2010-02-01 LTE-UEConTest_SIG - 2010-02-01
0609 - F Rel-8 8.4.0 - GCF priority 3 - Correction of test case 9.2.1.2.2 for Combined attach procedure / Success / EPS services only / IMSI unknown in HSS RP-47 RP-100143 reissued R5 R5-46 R5-100096 agreed 2010-02-02 LTE-UEConTest_SIG - 2010-02-02
0609 - F Rel-8 8.4.0 8.5.0 GCF priority 3 - Correction of test case 9.2.1.2.2 for Combined attach procedure / Success / EPS services only / IMSI unknown in HSS RP-47 RP-100316 approved R5 R5-46 R5-100096 agreed 2010-02-02 LTE-UEConTest_SIG - 2010-02-02
0610 - F Rel-8 8.4.0 - GCF priority 2: correction of test case 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN RP-47 RP-100143 reissued R5 R5-46 R5-100100 agreed 2010-02-02 LTE-UEConTest_SIG - 2010-02-02
0610 - F Rel-8 8.4.0 8.5.0 GCF priority 2: correction of test case 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN RP-47 RP-100316 approved R5 R5-46 R5-100100 agreed 2010-02-02 LTE-UEConTest_SIG - 2010-02-02
0611 - F Rel-8 8.4.0 - Update of test case 9.2.3.1.28 RP-47 RP-100143 reissued R5 R5-46 R5-100173 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0611 - F Rel-8 8.4.0 8.5.0 Update of test case 9.2.3.1.28 RP-47 RP-100316 approved R5 R5-46 R5-100173 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0612 - F Rel-8 8.4.0 - Update of test case 9.1.5.2 RP-47 RP-100143 reissued R5 R5-46 R5-100175 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0612 - F Rel-8 8.4.0 8.5.0 Update of test case 9.1.5.2 RP-47 RP-100316 approved R5 R5-46 R5-100175 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0613 - F Rel-8 8.4.0 - Update of test case 9.1.2.6 RP-47 RP-100143 reissued R5 R5-46 R5-100176 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0613 - F Rel-8 8.4.0 8.5.0 Update of test case 9.1.2.6 RP-47 RP-100316 approved R5 R5-46 R5-100176 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0614 - F Rel-8 8.4.0 - Priority 2-Update of the case 6.2.2.1 RP-47 RP-100143 reissued R5 R5-46 R5-100182 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0614 - F Rel-8 8.4.0 8.5.0 Priority 2-Update of the case 6.2.2.1 RP-47 RP-100316 approved R5 R5-46 R5-100182 agreed 2010-02-06 LTE-UEConTest_SIG - 2010-02-06
0615 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.2.3 RP-47 RP-100143 reissued R5 R5-46 R5-100242 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0615 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.2.3 RP-47 RP-100316 approved R5 R5-46 R5-100242 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0616 - F Rel-8 8.4.0 - Correcction to MAC TBS selection TCs not to use RS power boosting RP-47 RP-100143 reissued R5 R5-46 R5-100263 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0616 - F Rel-8 8.4.0 8.5.0 Correcction to MAC TBS selection TCs not to use RS power boosting RP-47 RP-100316 approved R5 R5-46 R5-100263 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0617 - F Rel-8 8.4.0 - GCF Priority 1 - Update to test case 7.2.2.9 RP-47 RP-100143 reissued R5 R5-46 R5-100270 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0617 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update to test case 7.2.2.9 RP-47 RP-100316 approved R5 R5-46 R5-100270 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0618 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 8.1.1.2 RP-47 RP-100143 reissued R5 R5-46 R5-100271 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0618 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 8.1.1.2 RP-47 RP-100316 approved R5 R5-46 R5-100271 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0619 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.2.4.2 RP-47 RP-100143 reissued R5 R5-46 R5-100274 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0619 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.2.4.2 RP-47 RP-100316 approved R5 R5-46 R5-100274 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0620 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 8.2.4.4 RP-47 RP-100143 reissued R5 R5-46 R5-100275 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0620 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 8.2.4.4 RP-47 RP-100316 approved R5 R5-46 R5-100275 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0621 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.2.4.5 RP-47 RP-100143 reissued R5 R5-46 R5-100276 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0621 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.2.4.5 RP-47 RP-100316 approved R5 R5-46 R5-100276 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0622 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.2.4.6 RP-47 RP-100143 reissued R5 R5-46 R5-100277 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0622 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.2.4.6 RP-47 RP-100316 approved R5 R5-46 R5-100277 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0623 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.2.4.7 RP-47 RP-100143 reissued R5 R5-46 R5-100278 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0623 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.2.4.7 RP-47 RP-100316 approved R5 R5-46 R5-100278 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0624 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 8.2.4.9 RP-47 RP-100143 reissued R5 R5-46 R5-100279 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0624 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 8.2.4.9 RP-47 RP-100316 approved R5 R5-46 R5-100279 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0625 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.3.1.9 RP-47 RP-100143 reissued R5 R5-46 R5-100281 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0625 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.3.1.9 RP-47 RP-100316 approved R5 R5-46 R5-100281 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0626 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.3.2.3 RP-47 RP-100143 reissued R5 R5-46 R5-100283 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0626 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.3.2.3 RP-47 RP-100316 approved R5 R5-46 R5-100283 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0627 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.4.2.2 RP-47 RP-100143 reissued R5 R5-46 R5-100284 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0627 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.4.2.2 RP-47 RP-100316 approved R5 R5-46 R5-100284 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0628 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.4.2.4 RP-47 RP-100143 reissued R5 R5-46 R5-100285 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0628 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.4.2.4 RP-47 RP-100316 approved R5 R5-46 R5-100285 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0629 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 9.2.1.2.5 RP-47 RP-100143 reissued R5 R5-46 R5-100287 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0629 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 9.2.1.2.5 RP-47 RP-100316 approved R5 R5-46 R5-100287 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0630 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 9.2.1.2.6 RP-47 RP-100143 reissued R5 R5-46 R5-100288 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0630 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 9.2.1.2.6 RP-47 RP-100316 approved R5 R5-46 R5-100288 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0631 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 9.2.1.2.7 RP-47 RP-100143 reissued R5 R5-46 R5-100289 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0631 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 9.2.1.2.7 RP-47 RP-100316 approved R5 R5-46 R5-100289 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0632 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 9.2.1.2.8 RP-47 RP-100143 reissued R5 R5-46 R5-100290 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0632 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 9.2.1.2.8 RP-47 RP-100316 approved R5 R5-46 R5-100290 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0633 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 9.2.3.2.9 RP-47 RP-100143 reissued R5 R5-46 R5-100293 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0633 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 9.2.3.2.9 RP-47 RP-100316 approved R5 R5-46 R5-100293 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0634 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 9.3.1.4 RP-47 RP-100143 reissued R5 R5-46 R5-100294 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0634 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 9.3.1.4 RP-47 RP-100316 approved R5 R5-46 R5-100294 agreed 2010-02-09 LTE-UEConTest_SIG - 2010-02-09
0635 - F Rel-8 8.4.0 - GCF Priority 1- Update of MAC test cases 7.1.4.6, 7.1.4.7, 7.1.4.8 RP-47 RP-100143 reissued R5 R5-46 R5-100383 agreed 2010-02-10 LTE-UEConTest_SIG - 2010-02-10
0635 - F Rel-8 8.4.0 8.5.0 GCF Priority 1- Update of MAC test cases 7.1.4.6, 7.1.4.7, 7.1.4.8 RP-47 RP-100316 approved R5 R5-46 R5-100383 agreed 2010-02-10 LTE-UEConTest_SIG - 2010-02-10
0636 - F Rel-8 8.4.0 - GCF Priority 2 - Correction to remark in 6.2.2.1, 6.2.2.2 and 6.2.3.2 RP-47 RP-100143 reissued R5 R5-46 R5-100415 agreed 2010-02-10 LTE-UEConTest_SIG - 2010-02-10
0636 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Correction to remark in 6.2.2.1, 6.2.2.2 and 6.2.3.2 RP-47 RP-100316 approved R5 R5-46 R5-100415 agreed 2010-02-10 LTE-UEConTest_SIG - 2010-02-10
0637 - F Rel-8 8.4.0 - GCF Priority 2 - Correction to test case 6.1.2.6 RP-47 RP-100143 reissued R5 R5-46 R5-100416 agreed 2010-02-10 LTE-UEConTest_SIG - 2010-02-10
0637 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Correction to test case 6.1.2.6 RP-47 RP-100316 approved R5 R5-46 R5-100416 agreed 2010-02-10 LTE-UEConTest_SIG - 2010-02-10
0638 - F Rel-8 8.4.0 - GCF Priority 2: Update to test case 9.2.3.1.4 RP-47 RP-100143 reissued R5 R5-46 R5-100443 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0638 - F Rel-8 8.4.0 8.5.0 GCF Priority 2: Update to test case 9.2.3.1.4 RP-47 RP-100316 approved R5 R5-46 R5-100443 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0639 - F Rel-8 8.4.0 - Correction of test case 8.3.1.3 RP-47 RP-100143 reissued R5 R5-46 R5-100462 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0639 - F Rel-8 8.4.0 8.5.0 Correction of test case 8.3.1.3 RP-47 RP-100316 approved R5 R5-46 R5-100462 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0640 - F Rel-8 8.4.0 8.5.0 Addition of new DSMIPv6 test case for Registration of a new IPv4 CoA (Binding Update/Acknowledgment procedure in IPv4 network) RP-47 RP-100181 approved R5 R5-46 R5-100467 agreed 2010-02-11 DSMIPv6_UEConTest - 2010-02-11
0641 - F Rel-8 8.4.0 8.5.0 Addition of new DSMIPv6 test case for Re-registration of IPv4 CoA RP-47 RP-100181 approved R5 R5-46 R5-100468 agreed 2010-02-11 DSMIPv6_UEConTest - 2010-02-11
0642 - F Rel-8 8.4.0 8.5.0 Addition of new DSMIPv6 test case for Dual-Stack Mobile IPv6 detach in IPv4 network RP-47 RP-100181 approved R5 R5-46 R5-100469 agreed 2010-02-11 DSMIPv6_UEConTest - 2010-02-11
0643 - F Rel-8 8.4.0 - GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.1 RP-47 RP-100143 reissued R5 R5-46 R5-100470 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0643 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.1 RP-47 RP-100316 approved R5 R5-46 R5-100470 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0644 - F Rel-8 8.4.0 - Update to P3 EMM test case 9.2.2.1.2 RP-47 RP-100143 reissued R5 R5-46 R5-100471 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0644 - F Rel-8 8.4.0 8.5.0 Update to P3 EMM test case 9.2.2.1.2 RP-47 RP-100316 approved R5 R5-46 R5-100471 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0645 - F Rel-8 8.4.0 - GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.6 RP-47 RP-100143 reissued R5 R5-46 R5-100472 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0645 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.6 RP-47 RP-100316 approved R5 R5-46 R5-100472 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0646 - F Rel-8 8.4.0 - Removal of TC 10.5.2 RP-47 RP-100143 reissued R5 R5-46 R5-100475 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0646 - F Rel-8 8.4.0 8.5.0 Removal of TC 10.5.2 RP-47 RP-100316 approved R5 R5-46 R5-100475 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0647 - F Rel-8 8.4.0 - GCF priority 1 - Update of RRC test case 8.2.2.1 RP-47 RP-100143 reissued R5 R5-46 R5-100488 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0647 - F Rel-8 8.4.0 8.5.0 GCF priority 1 - Update of RRC test case 8.2.2.1 RP-47 RP-100316 approved R5 R5-46 R5-100488 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0648 - F Rel-8 8.4.0 - GCF priority 1 - Update of RRC test case 8.2.2.2 RP-47 RP-100143 reissued R5 R5-46 R5-100489 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0648 - F Rel-8 8.4.0 8.5.0 GCF priority 1 - Update of RRC test case 8.2.2.2 RP-47 RP-100316 approved R5 R5-46 R5-100489 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0649 - F Rel-8 8.4.0 - GCF priority 1 - Update of RRC test case 8.2.3.1 RP-47 RP-100143 reissued R5 R5-46 R5-100492 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0649 - F Rel-8 8.4.0 8.5.0 GCF priority 1 - Update of RRC test case 8.2.3.1 RP-47 RP-100316 approved R5 R5-46 R5-100492 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0650 - F Rel-8 8.4.0 - GCF Priority 1: Clarification to UE initial state for test case 7.1.2.6 RP-47 RP-100143 reissued R5 R5-46 R5-100500 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0650 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Clarification to UE initial state for test case 7.1.2.6 RP-47 RP-100316 approved R5 R5-46 R5-100500 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0651 - F Rel-8 8.4.0 - GCF Priority 2 - Clarification to UE initial state RP-47 RP-100143 reissued R5 R5-46 R5-100501 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0651 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Clarification to UE initial state RP-47 RP-100316 approved R5 R5-46 R5-100501 agreed 2010-02-11 LTE-UEConTest_SIG - 2010-02-11
0652 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRA RLC test case 7.2.3.21 RP-47 RP-100143 reissued R5 R5-46 R5-100537 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0652 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRA RLC test case 7.2.3.21 RP-47 RP-100316 approved R5 R5-46 R5-100537 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0653 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 RP-47 RP-100143 reissued R5 R5-46 R5-100577 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0653 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 RP-47 RP-100316 approved R5 R5-46 R5-100577 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0654 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.7 RP-47 RP-100143 reissued R5 R5-46 R5-100582 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0654 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.7 RP-47 RP-100316 approved R5 R5-46 R5-100582 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0655 - F Rel-8 8.4.0 - GCF Priority 3 - Correction to P3 EMM test case 9.2.1.2.12 RP-47 RP-100143 reissued R5 R5-46 R5-100592 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0655 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Correction to P3 EMM test case 9.2.1.2.12 RP-47 RP-100316 approved R5 R5-46 R5-100592 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0656 - F Rel-8 8.4.0 - GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.1 RP-47 RP-100143 reissued R5 R5-46 R5-100625 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0656 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.1 RP-47 RP-100316 approved R5 R5-46 R5-100625 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0657 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.2.5.2 RP-47 RP-100143 reissued R5 R5-46 R5-100638 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0657 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.2.5.2 RP-47 RP-100316 approved R5 R5-46 R5-100638 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0658 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.2.6 RP-47 RP-100143 reissued R5 R5-46 R5-100639 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0658 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.2.6 RP-47 RP-100316 approved R5 R5-46 R5-100639 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0659 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.2.7 RP-47 RP-100143 reissued R5 R5-46 R5-100642 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0659 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.2.7 RP-47 RP-100316 approved R5 R5-46 R5-100642 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0660 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.2 RP-47 RP-100143 reissued R5 R5-46 R5-100651 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0660 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.2 RP-47 RP-100316 approved R5 R5-46 R5-100651 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0661 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.3 RP-47 RP-100143 reissued R5 R5-46 R5-100652 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0661 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.3 RP-47 RP-100316 approved R5 R5-46 R5-100652 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0662 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.5 RP-47 RP-100143 reissued R5 R5-46 R5-100657 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0662 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.5 RP-47 RP-100316 approved R5 R5-46 R5-100657 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0663 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.6 RP-47 RP-100143 reissued R5 R5-46 R5-100659 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0663 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.6 RP-47 RP-100316 approved R5 R5-46 R5-100659 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0664 - F Rel-8 8.4.0 - GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.2 RP-47 RP-100143 reissued R5 R5-46 R5-100671 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0664 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.2 RP-47 RP-100316 approved R5 R5-46 R5-100671 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0665 - F Rel-8 8.4.0 - GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.3 RP-47 RP-100143 reissued R5 R5-46 R5-100676 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0665 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.3 RP-47 RP-100316 approved R5 R5-46 R5-100676 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0666 - F Rel-8 8.4.0 - Priority 2 - Incorrect ATTACH procedure to UTRAN and GERAN cells RP-47 RP-100143 reissued R5 R5-46 R5-100738 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0666 - F Rel-8 8.4.0 8.5.0 Priority 2 - Incorrect ATTACH procedure to UTRAN and GERAN cells RP-47 RP-100316 approved R5 R5-46 R5-100738 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0667 - F Rel-8 8.4.0 - GCF Priority x - Clarification to E-UTRA Radio Bearer Tests section RP-47 RP-100143 reissued R5 R5-46 R5-100741 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0667 - F Rel-8 8.4.0 8.5.0 GCF Priority x - Clarification to E-UTRA Radio Bearer Tests section RP-47 RP-100316 approved R5 R5-46 R5-100741 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0668 - F Rel-8 8.4.0 - Priority 3 - TC 9.2.3.1.15 Normal tracking area update / rejected / PLMN not allowed - problems with Test procedure sequence RP-47 RP-100143 reissued R5 R5-46 R5-100742 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0668 - F Rel-8 8.4.0 8.5.0 Priority 3 - TC 9.2.3.1.15 Normal tracking area update / rejected / PLMN not allowed - problems with Test procedure sequence RP-47 RP-100316 approved R5 R5-46 R5-100742 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0669 - F Rel-8 8.4.0 - GCF Priority 3 - Adding new TC 9.1.5.1 EMM Information Procedure RP-47 RP-100143 reissued R5 R5-46 R5-100745 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0669 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Adding new TC 9.1.5.1 EMM Information Procedure RP-47 RP-100316 approved R5 R5-46 R5-100745 agreed 2010-02-12 LTE-UEConTest_SIG - 2010-02-12
0670 - F Rel-8 8.4.0 - GCF Priority 2 - Update of MAC test case 7.1.4.3 RP-47 RP-100143 reissued R5 R5-46 R5-100777 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0670 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update of MAC test case 7.1.4.3 RP-47 RP-100316 approved R5 R5-46 R5-100777 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0671 - F Rel-8 8.4.0 - Priority ALL - Update of section 6 Idle Mode Operations to comply with RAN5 PRD13 RP-47 RP-100143 reissued R5 R5-46 R5-101011 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0671 - F Rel-8 8.4.0 8.5.0 Priority ALL - Update of section 6 Idle Mode Operations to comply with RAN5 PRD13 RP-47 RP-100316 approved R5 R5-46 R5-101011 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0672 - F Rel-8 8.4.0 - Priority ALL - Update of section 9.1.x and 9.2.1.x to indicate on which cell events are to be observed in multi cell environment RP-47 RP-100143 reissued R5 R5-46 R5-101012 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0672 - F Rel-8 8.4.0 8.5.0 Priority ALL - Update of section 9.1.x and 9.2.1.x to indicate on which cell events are to be observed in multi cell environment RP-47 RP-100316 approved R5 R5-46 R5-101012 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0673 - F Rel-8 8.4.0 - GCF Priority 2 - Removal of test case 9.2.3.2.3 RP-47 RP-100143 reissued R5 R5-46 R5-101013 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0673 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Removal of test case 9.2.3.2.3 RP-47 RP-100316 approved R5 R5-46 R5-101013 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0674 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 9.2.3.2.3 RP-47 RP-100143 reissued R5 R5-46 R5-101014 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0674 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 9.2.3.2.3 RP-47 RP-100316 approved R5 R5-46 R5-101014 agreed 2010-02-22 LTE-UEConTest_SIG - 2010-02-22
0675 2 F Rel-8 8.4.0 - GCF Priority 2 - Correction of RRC test cases 8.3.1.3 and 8.3.1.5 RP-47 RP-100143 reissued R5 R5-46 R5-101032 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0675 2 F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Correction of RRC test cases 8.3.1.3 and 8.3.1.5 RP-47 RP-100316 approved R5 R5-46 R5-101032 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0676 1 F Rel-8 8.4.0 - GCF Priority 3 - Correction of RRC test cases 8.3.1.7 and 8.3.1.11 RP-47 RP-100143 reissued R5 R5-46 R5-101033 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0676 1 F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Correction of RRC test cases 8.3.1.7 and 8.3.1.11 RP-47 RP-100316 approved R5 R5-46 R5-101033 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0677 - F Rel-8 8.4.0 - Correction of test case 6.2.3.13 RP-47 RP-100143 reissued R5 R5-46 R5-101038 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0677 - F Rel-8 8.4.0 8.5.0 Correction of test case 6.2.3.13 RP-47 RP-100316 approved R5 R5-46 R5-101038 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0678 - F Rel-8 8.4.0 - Correction for Measurement related test cases RP-47 RP-100143 reissued R5 R5-46 R5-101039 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0678 - F Rel-8 8.4.0 8.5.0 Correction for Measurement related test cases RP-47 RP-100316 approved R5 R5-46 R5-101039 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0679 - F Rel-8 8.4.0 - GCF priority 2 - Update of RRC test case 8.2.1.3 RP-47 RP-100143 reissued R5 R5-46 R5-101053 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0679 - F Rel-8 8.4.0 8.5.0 GCF priority 2 - Update of RRC test case 8.2.1.3 RP-47 RP-100316 approved R5 R5-46 R5-101053 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0680 - F Rel-8 8.4.0 - Priority ALL - Update of section 7 Layer 2 to comply with RAN5 PRD13 RP-47 RP-100143 reissued R5 R5-46 R5-101056 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0680 - F Rel-8 8.4.0 8.5.0 Priority ALL - Update of section 7 Layer 2 to comply with RAN5 PRD13 RP-47 RP-100316 approved R5 R5-46 R5-101056 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0681 - F Rel-8 8.4.0 - GCF Priority 1 - Various corrections to Idle Mode section 6.1 of 36.523-1 RP-47 RP-100143 reissued R5 R5-46 R5-101057 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0681 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Various corrections to Idle Mode section 6.1 of 36.523-1 RP-47 RP-100316 approved R5 R5-46 R5-101057 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0682 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN PDPC test case 7.1.4.4 RP-47 RP-100143 reissued R5 R5-46 R5-101062 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0682 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN PDPC test case 7.1.4.4 RP-47 RP-100316 approved R5 R5-46 R5-101062 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0683 - F Rel-8 8.4.0 - GCF Priority 1:Update of MAC TC 7.1.2.5 RP-47 RP-100143 reissued R5 R5-46 R5-101063 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0683 - F Rel-8 8.4.0 8.5.0 GCF Priority 1:Update of MAC TC 7.1.2.5 RP-47 RP-100316 approved R5 R5-46 R5-101063 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0684 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.2.6 RP-47 RP-100143 reissued R5 R5-46 R5-101064 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0684 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.2.6 RP-47 RP-100316 approved R5 R5-46 R5-101064 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0685 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.2.9 RP-47 RP-100143 reissued R5 R5-46 R5-101065 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0685 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.2.9 RP-47 RP-100316 approved R5 R5-46 R5-101065 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0686 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.3.9 RP-47 RP-100143 reissued R5 R5-46 R5-101066 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0686 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.3.9 RP-47 RP-100316 approved R5 R5-46 R5-101066 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0687 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.4.8 RP-47 RP-100143 reissued R5 R5-46 R5-101067 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0687 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.4.8 RP-47 RP-100316 approved R5 R5-46 R5-101067 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0688 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.4.11 RP-47 RP-100143 reissued R5 R5-46 R5-101068 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0688 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.4.11 RP-47 RP-100316 approved R5 R5-46 R5-101068 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0689 - F Rel-8 8.4.0 - GCF Priority 3 - Corrections to TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) RP-47 RP-100143 reissued R5 R5-46 R5-101069 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0689 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Corrections to TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) RP-47 RP-100316 approved R5 R5-46 R5-101069 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0690 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 RP-47 RP-100143 reissued R5 R5-46 R5-101070 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0690 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 RP-47 RP-100316 approved R5 R5-46 R5-101070 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0691 - F Rel-8 8.4.0 - New priority 3 test case: Periodic Location Updating Procedure (PLU Timer handling, non-cell reselection to GERAN) RP-47 RP-100143 reissued R5 R5-46 R5-101074 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0691 - F Rel-8 8.4.0 8.5.0 New priority 3 test case: Periodic Location Updating Procedure (PLU Timer handling, non-cell reselection to GERAN) RP-47 RP-100316 approved R5 R5-46 R5-101074 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0692 - F Rel-8 8.4.0 - GCF Priority 3 - Addition of new test case 9.2.3.3.4 RP-47 RP-100143 reissued R5 R5-46 R5-101075 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0692 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Addition of new test case 9.2.3.3.4 RP-47 RP-100316 approved R5 R5-46 R5-101075 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0693 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.3.4 RP-47 RP-100143 reissued R5 R5-46 R5-101076 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0693 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.3.4 RP-47 RP-100316 approved R5 R5-46 R5-101076 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0694 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.4.15 RP-47 RP-100143 reissued R5 R5-46 R5-101077 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0694 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.4.15 RP-47 RP-100316 approved R5 R5-46 R5-101077 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0695 - F Rel-8 8.4.0 - GCF Priority 1 - Update of MAC Procedures part TC 7.1.2.2 RP-47 RP-100143 reissued R5 R5-46 R5-101078 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0695 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of MAC Procedures part TC 7.1.2.2 RP-47 RP-100316 approved R5 R5-46 R5-101078 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0696 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to MAC test case 7.1.4.10 RP-47 RP-100143 reissued R5 R5-46 R5-101079 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0696 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to MAC test case 7.1.4.10 RP-47 RP-100316 approved R5 R5-46 R5-101079 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0697 - F Rel-8 8.4.0 - GCF Priority 1 - Update to test case 8.2.4.1 RP-47 RP-100143 reissued R5 R5-46 R5-101081 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0697 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update to test case 8.2.4.1 RP-47 RP-100316 approved R5 R5-46 R5-101081 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0698 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.3.1.8 RP-47 RP-100143 reissued R5 R5-46 R5-101082 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0698 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.3.1.8 RP-47 RP-100316 approved R5 R5-46 R5-101082 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0699 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.3.1.10 RP-47 RP-100143 reissued R5 R5-46 R5-101083 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0699 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.3.1.10 RP-47 RP-100316 approved R5 R5-46 R5-101083 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0700 - F Rel-8 8.4.0 - GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.4 RP-47 RP-100143 reissued R5 R5-46 R5-101084 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0700 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.4 RP-47 RP-100316 approved R5 R5-46 R5-101084 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0701 - F Rel-8 8.4.0 - GCF Priority 1 - Update of Acknowledged Mode Procedures part TC 7.2.3.15^^AM RLC / Re-ordering of RLC PDU segments"" RP-47 RP-100143 reissued R5 R5-46 R5-101085 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0701 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of Acknowledged Mode Procedures part TC 7.2.3.15^^AM RLC / Re-ordering of RLC PDU segments"" RP-47 RP-100316 approved R5 R5-46 R5-101085 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0702 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.14 RP-47 RP-100143 reissued R5 R5-46 R5-101086 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0702 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.14 RP-47 RP-100316 approved R5 R5-46 R5-101086 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0703 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.4 RP-47 RP-100143 reissued R5 R5-46 R5-101087 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0703 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.4 RP-47 RP-100316 approved R5 R5-46 R5-101087 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0704 - F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.1 RP-47 RP-100143 reissued R5 R5-46 R5-101088 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0704 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.1 RP-47 RP-100316 approved R5 R5-46 R5-101088 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0705 1 F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.7 RP-47 RP-100143 reissued R5 R5-46 R5-101089 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0705 1 F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.7 RP-47 RP-100316 approved R5 R5-46 R5-101089 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0706 2 F Rel-8 8.4.0 - GCF Priority 1 - Update of RLC test case 7.2.3.18 RP-47 RP-100143 reissued R5 R5-46 R5-101090 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0706 2 F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of RLC test case 7.2.3.18 RP-47 RP-100316 approved R5 R5-46 R5-101090 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0707 - F Rel-8 8.4.0 - GCF priority 2 - EPS bearer context ID values and RRC messages carrying ESM messages for EPS bearer context (de)activation and modification RP-47 RP-100143 reissued R5 R5-46 R5-101092 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0707 - F Rel-8 8.4.0 8.5.0 GCF priority 2 - EPS bearer context ID values and RRC messages carrying ESM messages for EPS bearer context (de)activation and modification RP-47 RP-100316 approved R5 R5-46 R5-101092 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0708 - F Rel-8 8.4.0 - GCF priority 3 - Small correction to TC 9.2.1.1.11 Attach / rejected / EPS services and non-EPS services not allowed RP-47 RP-100143 reissued R5 R5-46 R5-101093 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0708 - F Rel-8 8.4.0 8.5.0 GCF priority 3 - Small correction to TC 9.2.1.1.11 Attach / rejected / EPS services and non-EPS services not allowed RP-47 RP-100316 approved R5 R5-46 R5-101093 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0709 - F Rel-8 8.4.0 - GCF priority 2 - Correction of test case 9.2.1.1.15 for Attach / rejected / roaming not allowed in this tracking area RP-47 RP-100143 reissued R5 R5-46 R5-101094 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0709 - F Rel-8 8.4.0 8.5.0 GCF priority 2 - Correction of test case 9.2.1.1.15 for Attach / rejected / roaming not allowed in this tracking area RP-47 RP-100316 approved R5 R5-46 R5-101094 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0710 - F Rel-8 8.4.0 - GCF Priority 2 - Update test case 8.5.1.3 RP-47 RP-100143 reissued R5 R5-46 R5-101098 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0710 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update test case 8.5.1.3 RP-47 RP-100316 approved R5 R5-46 R5-101098 agreed 2010-02-23 LTE-UEConTest_SIG - 2010-02-23
0711 - F Rel-8 8.4.0 - GCF priority 1 - Update of RRC test case 8.2.1.1 RP-47 RP-100143 reissued R5 R5-46 R5-101105 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0711 - F Rel-8 8.4.0 8.5.0 GCF priority 1 - Update of RRC test case 8.2.1.1 RP-47 RP-100316 approved R5 R5-46 R5-101105 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0712 - F Rel-8 8.4.0 - GCF Priority 2 - Correction to EUTRAN RLC test case 7.2.2.10 RP-47 RP-100143 reissued R5 R5-46 R5-101108 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0712 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Correction to EUTRAN RLC test case 7.2.2.10 RP-47 RP-100316 approved R5 R5-46 R5-101108 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0713 - F Rel-8 8.4.0 - GCF priority 2 - Correction of test case 9.2.1.2.4 for Successful combined attach procedure, EPS service only / CS domain not available RP-47 RP-100143 reissued R5 R5-46 R5-101110 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0713 - F Rel-8 8.4.0 8.5.0 GCF priority 2 - Correction of test case 9.2.1.2.4 for Successful combined attach procedure, EPS service only / CS domain not available RP-47 RP-100316 approved R5 R5-46 R5-101110 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0714 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRA PDCP test case 7.3.4.1 and 7.3.4.2 RP-47 RP-100143 reissued R5 R5-46 R5-101113 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0714 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRA PDCP test case 7.3.4.1 and 7.3.4.2 RP-47 RP-100316 approved R5 R5-46 R5-101113 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0715 - F Rel-8 8.4.0 - GCF Priority 1 - Enhancement test case 8.1.2.1 RP-47 RP-100143 reissued R5 R5-46 R5-101114 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0715 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Enhancement test case 8.1.2.1 RP-47 RP-100316 approved R5 R5-46 R5-101114 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0716 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to EMM test cases to bring the UE to stable state at the end of expected sequence RP-47 RP-100143 reissued R5 R5-46 R5-101117 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0716 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to EMM test cases to bring the UE to stable state at the end of expected sequence RP-47 RP-100316 approved R5 R5-46 R5-101117 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0717 - F Rel-8 8.4.0 - GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA RP-47 RP-100143 reissued R5 R5-46 R5-101118 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0717 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA RP-47 RP-100316 approved R5 R5-46 R5-101118 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0718 - F Rel-8 8.4.0 - GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA RP-47 RP-100143 reissued R5 R5-46 R5-101119 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0718 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA RP-47 RP-100316 approved R5 R5-46 R5-101119 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0719 - F Rel-8 8.4.0 - GCF Priority 2: Update of MAC TC 7.1.3.2 RP-47 RP-100143 reissued R5 R5-46 R5-101120 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0719 - F Rel-8 8.4.0 8.5.0 GCF Priority 2: Update of MAC TC 7.1.3.2 RP-47 RP-100316 approved R5 R5-46 R5-101120 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0720 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to EPC test case 9.2.1.1.1 RP-47 RP-100143 reissued R5 R5-46 R5-101121 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0720 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to EPC test case 9.2.1.1.1 RP-47 RP-100316 approved R5 R5-46 R5-101121 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0721 - F Rel-8 8.4.0 - Priority 2 - section 9 alignment IP handling at wrong place - Missing security activation - Editorial changes RP-47 RP-100143 reissued R5 R5-46 R5-101122 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0721 - F Rel-8 8.4.0 8.5.0 Priority 2 - section 9 alignment IP handling at wrong place - Missing security activation - Editorial changes RP-47 RP-100316 approved R5 R5-46 R5-101122 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0722 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.15 RP-47 RP-100143 reissued R5 R5-46 R5-101125 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0722 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.15 RP-47 RP-100316 approved R5 R5-46 R5-101125 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0723 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.9 RP-47 RP-100143 reissued R5 R5-46 R5-101126 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0723 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.9 RP-47 RP-100316 approved R5 R5-46 R5-101126 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0724 - F Rel-8 8.4.0 - GCF Priority 1 - Correction of RRC test case 8.3.3.1 RP-47 RP-100143 reissued R5 R5-46 R5-101130 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0724 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction of RRC test case 8.3.3.1 RP-47 RP-100316 approved R5 R5-46 R5-101130 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0725 1 F Rel-8 8.4.0 - GCF Priority 1 - Correction to MAC test cases to bring the UE to stable state at the end of expected sequence RP-47 RP-100143 reissued R5 R5-46 R5-101131 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0725 1 F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to MAC test cases to bring the UE to stable state at the end of expected sequence RP-47 RP-100316 approved R5 R5-46 R5-101131 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0726 - F Rel-8 8.4.0 - GCF Priority 1 - Correction to RRC test cases to bring the UE to stable state at the end of expected sequence RP-47 RP-100143 reissued R5 R5-46 R5-101132 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0726 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to RRC test cases to bring the UE to stable state at the end of expected sequence RP-47 RP-100316 approved R5 R5-46 R5-101132 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0727 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 10.7.1 RP-47 RP-100143 reissued R5 R5-46 R5-101133 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0727 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 10.7.1 RP-47 RP-100316 approved R5 R5-46 R5-101133 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0728 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 10.7.2 RP-47 RP-100143 reissued R5 R5-46 R5-101134 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0728 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 10.7.2 RP-47 RP-100316 approved R5 R5-46 R5-101134 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0729 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 10.8.1 RP-47 RP-100143 reissued R5 R5-46 R5-101135 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0729 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 10.8.1 RP-47 RP-100316 approved R5 R5-46 R5-101135 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0730 - F Rel-8 8.4.0 - GCF Priority 4 - Addition of new RRC test case 8.4.7.1 RP-47 RP-100143 reissued R5 R5-46 R5-101141 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0730 - F Rel-8 8.4.0 8.5.0 GCF Priority 4 - Addition of new RRC test case 8.4.7.1 RP-47 RP-100316 approved R5 R5-46 R5-101141 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0731 - F Rel-8 8.4.0 - GCF Priority 4 - Addition of new RRC test case 8.3.2.10 RP-47 RP-100143 reissued R5 R5-46 R5-101142 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0731 - F Rel-8 8.4.0 8.5.0 GCF Priority 4 - Addition of new RRC test case 8.3.2.10 RP-47 RP-100316 approved R5 R5-46 R5-101142 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0732 - F Rel-8 8.4.0 - General note for test cases with statistical behaviour RP-47 RP-100143 reissued R5 R5-46 R5-101145 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0732 - F Rel-8 8.4.0 8.5.0 General note for test cases with statistical behaviour RP-47 RP-100316 approved R5 R5-46 R5-101145 agreed 2010-02-24 LTE-UEConTest_SIG - 2010-02-24
0733 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 10.7.3 RP-47 RP-100143 reissued R5 R5-46 R5-101148 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0733 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 10.7.3 RP-47 RP-100316 approved R5 R5-46 R5-101148 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0734 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 10.7.4 RP-47 RP-100143 reissued R5 R5-46 R5-101149 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0734 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 10.7.4 RP-47 RP-100316 approved R5 R5-46 R5-101149 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0735 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 10.8.2 RP-47 RP-100143 reissued R5 R5-46 R5-101151 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0735 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 10.8.2 RP-47 RP-100316 approved R5 R5-46 R5-101151 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0736 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 10.8.3 RP-47 RP-100143 reissued R5 R5-46 R5-101152 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0736 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 10.8.3 RP-47 RP-100316 approved R5 R5-46 R5-101152 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0737 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 10.8.5 RP-47 RP-100143 reissued R5 R5-46 R5-101154 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0737 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 10.8.5 RP-47 RP-100316 approved R5 R5-46 R5-101154 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0738 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 10.8.6 RP-47 RP-100143 reissued R5 R5-46 R5-101155 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0738 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 10.8.6 RP-47 RP-100316 approved R5 R5-46 R5-101155 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0739 - F Rel-8 8.4.0 - GCF Priority 3 - Update to test case 10.8.7 RP-47 RP-100143 reissued R5 R5-46 R5-101156 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0739 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update to test case 10.8.7 RP-47 RP-100316 approved R5 R5-46 R5-101156 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0740 - F Rel-8 8.4.0 - GCF Priority 3: New PUSCH-Hopping test case 7.1.5.2:Predefined intra-TTI PUSCH hopping (N_sb=1) RP-47 RP-100143 reissued R5 R5-46 R5-101158 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0740 - F Rel-8 8.4.0 8.5.0 GCF Priority 3: New PUSCH-Hopping test case 7.1.5.2:Predefined intra-TTI PUSCH hopping (N_sb=1) RP-47 RP-100316 approved R5 R5-46 R5-101158 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0741 - F Rel-8 8.4.0 - GCF Priority 3: New PUSCH-Hopping test case 7.1.5.4: Predefined inter-TTI PUSCH hopping (N_sb=1) RP-47 RP-100143 reissued R5 R5-46 R5-101160 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0741 - F Rel-8 8.4.0 8.5.0 GCF Priority 3: New PUSCH-Hopping test case 7.1.5.4: Predefined inter-TTI PUSCH hopping (N_sb=1) RP-47 RP-100316 approved R5 R5-46 R5-101160 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0742 1 F Rel-8 8.4.0 - GCF priority 3 - New test case 8.1.1.6 RRC / BCCH modification in connected mode RP-47 RP-100143 reissued R5 R5-46 R5-101162 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0742 1 F Rel-8 8.4.0 8.5.0 GCF priority 3 - New test case 8.1.1.6 RRC / BCCH modification in connected mode RP-47 RP-100316 approved R5 R5-46 R5-101162 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0743 - F Rel-8 8.4.0 - GCF Priority 3 - New TC 8.5.2.1 RRC Connection Reject: redirection from UTRAN to E-UTRAN RP-47 RP-100143 reissued R5 R5-46 R5-101163 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0743 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - New TC 8.5.2.1 RRC Connection Reject: redirection from UTRAN to E-UTRAN RP-47 RP-100316 approved R5 R5-46 R5-101163 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0744 - F Rel-8 8.4.0 - GCF Priority 3 - addition of new EMM test case 9.2.1.2.14 RP-47 RP-100143 reissued R5 R5-46 R5-101164 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0744 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - addition of new EMM test case 9.2.1.2.14 RP-47 RP-100316 approved R5 R5-46 R5-101164 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0745 - F Rel-8 8.4.0 - Update of test case 9.3.1.15 RP-47 RP-100143 reissued R5 R5-46 R5-101165 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0745 - F Rel-8 8.4.0 8.5.0 Update of test case 9.3.1.15 RP-47 RP-100316 approved R5 R5-46 R5-101165 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0746 - F Rel-8 8.4.0 - Update of test case 9.2.1.1.18 RP-47 RP-100143 reissued R5 R5-46 R5-101166 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0746 - F Rel-8 8.4.0 8.5.0 Update of test case 9.2.1.1.18 RP-47 RP-100316 approved R5 R5-46 R5-101166 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0747 - F Rel-8 8.4.0 - GCF Priority 3: Update to test case 9.2.3.1.6 RP-47 RP-100143 reissued R5 R5-46 R5-101167 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0747 - F Rel-8 8.4.0 8.5.0 GCF Priority 3: Update to test case 9.2.3.1.6 RP-47 RP-100316 approved R5 R5-46 R5-101167 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0748 - F Rel-8 8.4.0 - GCF priority 3 - Correction of test case 10.5.3 for UE requested PDN connectivity procedure not accepted RP-47 RP-100143 reissued R5 R5-46 R5-101168 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0748 - F Rel-8 8.4.0 8.5.0 GCF priority 3 - Correction of test case 10.5.3 for UE requested PDN connectivity procedure not accepted RP-47 RP-100316 approved R5 R5-46 R5-101168 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0749 - F Rel-8 8.4.0 - GCF Priority 3 - Addition of new multi-layer test case 13.1.3 RP-47 RP-100143 reissued R5 R5-46 R5-101169 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0749 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Addition of new multi-layer test case 13.1.3 RP-47 RP-100316 approved R5 R5-46 R5-101169 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0750 - F Rel-8 8.4.0 - GCF Priority 3 - Addition of new test case 13.4.1.2 RP-47 RP-100143 reissued R5 R5-46 R5-101170 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0750 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Addition of new test case 13.4.1.2 RP-47 RP-100316 approved R5 R5-46 R5-101170 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0751 - F Rel-8 8.4.0 - GCF Priority 3 - Update of Multi-layer Procedures part TC 13.3.1.1 Intra System Connection Reestablishment / Radio Link Recovery while T310 is running RP-47 RP-100143 reissued R5 R5-46 R5-101171 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0751 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - Update of Multi-layer Procedures part TC 13.3.1.1 Intra System Connection Reestablishment / Radio Link Recovery while T310 is running RP-47 RP-100316 approved R5 R5-46 R5-101171 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0752 - F Rel-8 8.4.0 - GCF Priority 3 - update of test case 13.3.1.2 RP-47 RP-100143 reissued R5 R5-46 R5-101172 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0752 - F Rel-8 8.4.0 8.5.0 GCF Priority 3 - update of test case 13.3.1.2 RP-47 RP-100316 approved R5 R5-46 R5-101172 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0753 - F Rel-8 8.4.0 - GCF Priority 2 : Correction to MAC test case 7.1.6.1 RP-47 RP-100143 reissued R5 R5-46 R5-101173 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0753 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 : Correction to MAC test case 7.1.6.1 RP-47 RP-100316 approved R5 R5-46 R5-101173 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0754 - F Rel-8 8.4.0 - GCF Priority 2 : Correction to MAC test cases 7.1.6.2 RP-47 RP-100143 reissued R5 R5-46 R5-101174 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0754 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 : Correction to MAC test cases 7.1.6.2 RP-47 RP-100316 approved R5 R5-46 R5-101174 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0755 2 F Rel-8 8.4.0 - GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.10 RP-47 RP-100143 reissued R5 R5-46 R5-101175 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0755 2 F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.10 RP-47 RP-100316 approved R5 R5-46 R5-101175 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0756 - F Rel-8 8.4.0 - Update to GCF Priority 1 layer 2 UM test cases to increase the drx-Inactivity Timer to psf200 RP-47 RP-100143 reissued R5 R5-46 R5-101177 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0756 - F Rel-8 8.4.0 8.5.0 Update to GCF Priority 1 layer 2 UM test cases to increase the drx-Inactivity Timer to psf200 RP-47 RP-100316 approved R5 R5-46 R5-101177 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0757 - F Rel-8 8.4.0 - GCF Priority 1 - Enhancement and update to MAC test case 7.1.4.6 RP-47 RP-100143 reissued R5 R5-46 R5-101179 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0757 - F Rel-8 8.4.0 8.5.0 GCF Priority 1 - Enhancement and update to MAC test case 7.1.4.6 RP-47 RP-100316 approved R5 R5-46 R5-101179 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0758 - F Rel-8 8.4.0 - GCF Priority 1: Update of MAC TC 7.1.3.6 RP-47 RP-100143 reissued R5 R5-46 R5-101183 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0758 - F Rel-8 8.4.0 8.5.0 GCF Priority 1: Update of MAC TC 7.1.3.6 RP-47 RP-100316 approved R5 R5-46 R5-101183 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0759 - F Rel-8 8.4.0 - Update of test case and section titles RP-47 RP-100143 reissued R5 R5-46 R5-101186 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0759 - F Rel-8 8.4.0 8.5.0 Update of test case and section titles RP-47 RP-100316 approved R5 R5-46 R5-101186 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0760 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.1.2.7 RP-47 RP-100143 reissued R5 R5-46 R5-101189 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0760 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.1.2.7 RP-47 RP-100316 approved R5 R5-46 R5-101189 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0761 - F Rel-8 8.4.0 - GCF Priority 2 - Update to test case 8.1.2.5 RP-47 RP-100143 reissued R5 R5-46 R5-101190 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0761 - F Rel-8 8.4.0 8.5.0 GCF Priority 2 - Update to test case 8.1.2.5 RP-47 RP-100316 approved R5 R5-46 R5-101190 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0762 - F Rel-8 8.4.0 - Corrections related to UE mode of operation and UE capability for CS fallback and SMS over SGs RP-47 RP-100143 reissued R5 R5-46 R5-101191 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0762 - F Rel-8 8.4.0 8.5.0 Corrections related to UE mode of operation and UE capability for CS fallback and SMS over SGs RP-47 RP-100316 approved R5 R5-46 R5-101191 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0763 - F Rel-8 8.4.0 - GCF priority 3 - Correction of test case 10.6.2 for UE requested PDN disconnect procedure not accepted by the network RP-47 RP-100143 reissued R5 R5-46 R5-101192 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0763 - F Rel-8 8.4.0 8.5.0 GCF priority 3 - Correction of test case 10.6.2 for UE requested PDN disconnect procedure not accepted by the network RP-47 RP-100316 approved R5 R5-46 R5-101192 agreed 2010-02-25 LTE-UEConTest_SIG - 2010-02-25
0764 - F Rel-9 9.0.0 9.1.0 CR 36.523-1-0764 New Test case 6.2.3.28- Inter-RAT Cell Reselection from GPRS Packet_transfer to E-UTRA Cell (Network Assisted Cell Change) GP-46 GP-100625 approved G3new G3new-46 GP-091808 agreed 2010-04-25 LTE-UEConTest_SIG - 2010-04-25
0765 - F Rel-9 9.0.0 9.1.0 CR 36.523-1-0765 New Test Case 6.2.3.30 - Inter-RAT Cell Reselection failure from GPRS Packet transfer to E-UTRA (Network Assisted Cell Change) GP-46 GP-100626 approved G3new G3new-46 GP-091807 agreed 2010-04-25 LTE-UEConTest_SIG - 2010-04-25
0766 - F Rel-9 9.0.0 9.1.0 CR 36.523-1-0766 New Test Case 6.2.2.6 - Inter-RAT Cell selection / From GSM_Idle/GPRS Packet_idle to E-UTRA_RRC_IDLE / Serving cell becomes non-suitable (ServingCell<0) GP-46 GP-100649 approved G3new G3new-46 GP-091809 agreed 2010-04-25 LTE-UEConTest_SIG - 2010-04-25
0767 - F Rel-9 9.0.0 9.1.0 CR 36.523-1-0767 New Test Case 6.2.2.7 - Inter-RAT Cell selection / From GSM_Idle/GPRS Packet_idle to E-UTRA_RRC_IDLE ,when the serving cell is barred. GP-46 GP-100650 approved G3new G3new-46 GP-091810 agreed 2010-04-25 LTE-UEConTest_SIG - 2010-04-25
0768 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction of Minimum Cell Configuration RP-48 RP-100524 approved R5 R5-47 R5-103077 agreed 2010-04-30 DSMIPv6_UEConTest - 2010-04-30
0769 - F Rel-9 9.0.0 9.1.0 GCF Priority 3: New TC 9.3.1.5 Service request / Rejected / Illegal ME RP-48 RP-100510 approved R5 R5-47 R5-103086 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0770 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 RP-48 RP-100510 approved R5 R5-47 R5-103087 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0771 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Correction to MAC test case 7.1.4.10 RP-48 RP-100510 approved R5 R5-47 R5-103088 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0772 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update of TC 9.1.5.1 EMM Information Procedure RP-48 RP-100510 approved R5 R5-47 R5-103089 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0773 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to TC 9.1.2.4 Authentication not accepted by the UE / MAC code failure RP-48 RP-100510 approved R5 R5-47 R5-103090 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0774 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to TC 9.1.2.5 Authentication not accepted by the UE / SQN failure RP-48 RP-100510 approved R5 R5-47 R5-103091 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0775 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction of SIB in RRC TCs 8.4.2.2 and 8.4.2.4 RP-48 RP-100510 approved R5 R5-47 R5-103093 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0776 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Update to test case 6.1.2.6 RP-48 RP-100510 approved R5 R5-47 R5-103130 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0777 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Correction to PDSCH power allocation of MAC TBS selection TCs RP-48 RP-100510 approved R5 R5-47 R5-103131 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0778 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Correction of test case 6.2.3.13 RP-48 RP-100510 approved R5 R5-47 R5-103132 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0779 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new test case 8.3.2.2 RP-48 RP-100510 approved R5 R5-47 R5-103135 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0780 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Update test case 8.3.2.4 RP-48 RP-100510 approved R5 R5-47 R5-103136 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0781 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new test case 8.3.2.5 RP-48 RP-100510 approved R5 R5-47 R5-103137 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0782 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Correction for test case 13.4.1.2 RP-48 RP-100510 approved R5 R5-47 R5-103139 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0783 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Addition of new test case 13.4.2.1 RP-48 RP-100510 approved R5 R5-47 R5-103140 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0784 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Update test case 6.1.2.11 & 6.1.2.15 RP-48 RP-100510 approved R5 R5-47 R5-103141 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0785 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 Addition of new test case 14.1 RP-48 RP-100510 approved R5 R5-47 R5-103144 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0786 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 Addition of new test case 14.2 RP-48 RP-100510 approved R5 R5-47 R5-103145 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0787 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: New MAC TBS test case 7.1.7.1.6:DCI format 2A / RA type 1 RP-48 RP-100510 approved R5 R5-47 R5-103157 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0788 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: New MAC TBS test case 7.1.7.1.5:DCI format 2A / RA type 0 RP-48 RP-100510 approved R5 R5-47 R5-103158 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0789 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: Correction to E-UTRA DRB test case 12.3.1 RP-48 RP-100510 approved R5 R5-47 R5-103159 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0790 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: Correction to E-UTRA DRB test case 12.3.2 RP-48 RP-100510 approved R5 R5-47 R5-103160 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0791 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: Correction to E-UTRA DRB test case 12.3.3 RP-48 RP-100510 approved R5 R5-47 R5-103161 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0792 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: Correction to E-UTRA DRB test case 12.3.4 RP-48 RP-100510 approved R5 R5-47 R5-103162 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0793 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: Correction to generic test procedure 12.1.2 for E-UTRA DRB MIMO test cases RP-48 RP-100510 approved R5 R5-47 R5-103163 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0794 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: New PUSCH-Hopping test case 7.1.5.1: Inter-TTI PUSCH hopping by uplink grant RP-48 RP-100510 approved R5 R5-47 R5-103228 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0795 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: New PUSCH-Hopping test case 7.1.5.3: Predefined intra-TTI PUSCH hopping (N_sb=2/3/4) RP-48 RP-100510 approved R5 R5-47 R5-103230 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0796 - F Rel-9 9.0.0 9.1.0 GCF Priority 4: New PUSCH-Hopping test case 7.1.5.5: Predefined inter-TTI PUSCH hopping (N_sb=2/3/4) RP-48 RP-100510 approved R5 R5-47 R5-103231 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0797 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Update to test case 8.1.2.7 RP-48 RP-100510 approved R5 R5-47 R5-103240 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0798 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update to test case 9.2.3.1.23 RP-48 RP-100510 approved R5 R5-47 R5-103241 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0799 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Clarification of the cells where the messages are observed in EMM test cases RP-48 RP-100510 approved R5 R5-47 R5-103242 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0800 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Update to test case 10.7.5 RP-48 RP-100510 approved R5 R5-47 R5-103243 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0801 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Update to test case 10.8.4 RP-48 RP-100510 approved R5 R5-47 R5-103244 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0803 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update of RRC part TC 8.5.1.2 Radio link failure / T301 expiry RP-48 RP-100510 approved R5 R5-47 R5-103271 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0804 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Addition of new EPS mobility management procedure test case 9.3.2.2a CS SERVICE NOTIFICATION / Connected mode RP-48 RP-100510 approved R5 R5-47 R5-103272 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0805 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update Multi-layer test cases 13.3.1.1 RP-48 RP-100510 approved R5 R5-47 R5-103273 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0806 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correct the Test Purpose 2 of PDCP part TC 7.3.1.2 and 7.3.1.3 RP-48 RP-100510 approved R5 R5-47 R5-103276 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0807 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Correct PDCP part TC 7.3.1.1 RP-48 RP-100510 approved R5 R5-47 R5-103277 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0808 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new EPS mobility management procedure test case 9.2.3.2.7 RP-48 RP-100510 approved R5 R5-47 R5-103278 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0809 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to test case 7.1.3.9 RP-48 RP-100510 approved R5 R5-47 R5-103302 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0810 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to E-UTRA MAC test case 7.1.2.1 RP-48 RP-100510 approved R5 R5-47 R5-103303 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0811 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EMM test case 9.2.3.1.1 RP-48 RP-100510 approved R5 R5-47 R5-103304 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0812 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EMM test case 9.2.1.1.1 RP-48 RP-100510 approved R5 R5-47 R5-103307 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0813 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EMM test case 9.2.2.2.1 RP-48 RP-100510 approved R5 R5-47 R5-103308 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0814 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EUTRA MAC test cases 7.1.7.1 test cases RP-48 RP-100510 approved R5 R5-47 R5-103313 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0815 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EUTRA PDCP test case 7.3.6.1 RP-48 RP-100510 approved R5 R5-47 R5-103321 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0816 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EUTRA RRC test case 8.5.1.5 RP-48 RP-100510 approved R5 R5-47 R5-103323 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0817 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EPC test case 9.2.2.1.1 RP-48 RP-100510 approved R5 R5-47 R5-103327 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0818 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Adding UE pre-conditions for UE to be configured for combined EPS/IMSI attach in 9.2.3.2.x combined TAU test cases RP-48 RP-100510 approved R5 R5-47 R5-103341 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0819 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to generic test procedure reference in Idle mode section RP-48 RP-100510 approved R5 R5-47 R5-103364 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0820 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to TC 8.1.3.7 RRC connection release / Redirection from UTRAN to E-UTRAN RP-48 RP-100510 approved R5 R5-47 R5-103365 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0821 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Correction to TC 8.5.2.1 RRC Connection Reject / Redirection from UTRAN to E-UTRAN RP-48 RP-100510 approved R5 R5-47 R5-103367 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0822 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - New TC 9.3.1.18 Service Reject CSG not authorized RP-48 RP-100510 approved R5 R5-47 R5-103394 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0823 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new test case 8.4.3.2 RP-48 RP-100510 approved R5 R5-47 R5-103413 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0824 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new test case 8.4.3.3 RP-48 RP-100510 approved R5 R5-47 R5-103414 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0825 - F Rel-9 9.0.0 9.1.0 Priority 4 - Addition of test case 9.2.3.2.17 RP-48 RP-100510 approved R5 R5-47 R5-103416 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0826 - F Rel-9 9.0.0 9.1.0 Priority 4 - Addition of new test case 9.2.3.2.4 RP-48 RP-100510 approved R5 R5-47 R5-103418 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0827 - F Rel-9 9.0.0 9.1.0 Priority 4 - Addition of new test case 9.2.3.2.14 RP-48 RP-100510 approved R5 R5-47 R5-103419 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0828 - F Rel-9 9.0.0 9.1.0 Priority 4 - Addition of new test case 9.2.3.2.8 RP-48 RP-100510 approved R5 R5-47 R5-103420 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0829 - F Rel-9 9.0.0 9.1.0 Priority 3 - update of test case 9.2.2.2.14 RP-48 RP-100510 approved R5 R5-47 R5-103421 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0830 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - New TC 9.2.3.3.2 Iu mode to S1 mode intersystem change / ISR is active / Expiry of T3312 in E-UTRAN or T3412 in UTRAN and further intersystem change RP-48 RP-100510 approved R5 R5-47 R5-103456 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0831 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - New test case 6.1.2.10 Cell reselection in shared network environment RP-48 RP-100510 approved R5 R5-47 R5-103457 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0832 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - New Test case 6.1.2.12 Cell reselection / Cell-specific reselection parameters provided by the network in a neighbouring cell list RP-48 RP-100510 approved R5 R5-47 R5-103458 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0833 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - addition of new test case 6.1.1.4: PLMN selection in shared network environment / Automatic mode RP-48 RP-100510 approved R5 R5-47 R5-103459 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0834 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Addition of new EMM test case 9.2.2.1.7 RP-48 RP-100510 approved R5 R5-47 R5-103463 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0835 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Addition of new EMM test case 9.2.2.1.8 RP-48 RP-100510 approved R5 R5-47 R5-103464 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0836 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Addition of new EMM test case 9.2.2.1.9 RP-48 RP-100510 approved R5 R5-47 R5-103465 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0837 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 Correction to test case 6.1.2.3, 6.2.3.1 & 6.2.3.6 RP-48 RP-100510 approved R5 R5-47 R5-103486 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0838 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 to 3 - Correction to RRC part 3 test cases RP-48 RP-100510 approved R5 R5-47 R5-103498 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0839 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Update of RRC test case 8.2.4.5 RP-48 RP-100510 approved R5 R5-47 R5-103513 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0840 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - New EMM test case 9.2.2.1.3 RP-48 RP-100510 approved R5 R5-47 R5-103514 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0841 - F Rel-9 9.0.0 9.1.0 Addition of new DSMIPv6 test case for Discovery of the Home Agent address via DHCPv6 RP-48 RP-100524 approved R5 R5-47 R5-103573 agreed 2010-04-30 DSMIPv6_UEConTest - 2010-04-30
0842 - F Rel-9 9.0.0 9.1.0 Addition of new DSMIPv6 test case for Security association establishment with Home Agent reallocation procedure RP-48 RP-100524 approved R5 R5-47 R5-103579 agreed 2010-04-30 DSMIPv6_UEConTest - 2010-04-30
0843 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Corrections to C2K TCs 8.3.2.7, 8.3.2.8 and 8.3.2.9 RP-48 RP-100510 approved R5 R5-47 R5-103646 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0844 - F Rel-9 9.0.0 9.1.0 Addition of new DSMIPv6 test case for Discovery of the Home Agent address via IKEv2 during tunnel setup to ePDG RP-48 RP-100524 approved R5 R5-47 R5-103649 agreed 2010-04-30 DSMIPv6_UEConTest - 2010-04-30
0845 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of test case 8.2.4.10 RRC Connection Reconfiguration / Handover (between FDD and TDD) RP-48 RP-100510 approved R5 R5-47 R5-103676 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0846 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Correction to MAC, RRC and EMM test cases to bring the UE to stable state at the end of test RP-48 RP-100510 approved R5 R5-47 R5-103696 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0847 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EUTRA MAC test case 7.1.4.8 RP-48 RP-100510 approved R5 R5-47 R5-103697 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0848 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to test case 7.1.4.11 RP-48 RP-100510 approved R5 R5-47 R5-103698 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0849 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Update of RRC test cases 8.2.2.1 RP-48 RP-100510 approved R5 R5-47 R5-103802 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0850 - F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EUTRA RLC test case 7.2.3.10 RP-48 RP-100510 approved R5 R5-47 R5-103803 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0851 - F Rel-9 9.0.0 9.1.0 GCF priority 2 - Correction to test case 6.1.1.1 RP-48 RP-100510 approved R5 R5-47 R5-103804 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0852 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EUTRA RLC test case 7.2.2.8 RP-48 RP-100510 approved R5 R5-47 R5-103805 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0853 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EUTRA RLC test case 7.2.2.10 RP-48 RP-100510 approved R5 R5-47 R5-103806 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0854 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EUTRA RLC test case 7.2.3.13 RP-48 RP-100510 approved R5 R5-47 R5-103807 agreed 2010-04-30 LTE-UEConTest_SIG - 2010-04-30
0855 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Update to test case 8.1.2.5 RP-48 RP-100510 approved R5 R5-47 R5-103808 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0856 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EPC test case 9.1.3.2 RP-48 RP-100510 approved R5 R5-47 R5-103809 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0857 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Adding UE pre-conditions for UE to be configured for EPS attach in 9.2.1.1.x EPS attach test cases RP-48 RP-100510 approved R5 R5-47 R5-103810 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0858 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Adding UE pre-conditions for UE to be configured for EPS attach in 9.2.3.1.x TAU test cases RP-48 RP-100510 approved R5 R5-47 R5-103811 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0859 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Adding UE pre-conditions for UE to be configured for EPS attach in 9.2.2.x detach test cases RP-48 RP-100510 approved R5 R5-47 R5-103814 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0860 - F Rel-9 9.0.0 9.1.0 GCF Priority 2: Adding UE pre-conditions for UE to be configured for combined EPS/IMSI attach in 9.2.1.2.x combined attach test cases RP-48 RP-100510 approved R5 R5-47 R5-103815 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0861 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to EPS test case 9.4.1 RP-48 RP-100529 approved R5 R5-47 R5-103818 agreed 2010-05-01 IMS_EMER_LTE_UEConTest - 2010-05-01
0862 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to 'SMS over SGs' test case 11.1.1 RP-48 RP-100510 approved R5 R5-47 R5-103820 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0863 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to 'SMS over SGs' test case 11.1.2 RP-48 RP-100510 approved R5 R5-47 R5-103821 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0864 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction to 'SMS over SGs' test case 11.1.3 RP-48 RP-100510 approved R5 R5-47 R5-103822 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0865 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update test case 8.3.3.3 RP-48 RP-100510 approved R5 R5-47 R5-103828 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0866 - F Rel-9 9.0.0 9.1.0 GCF Priority 3: New EMM test case, 9.2.1.1.23: Attach / Abnormal case / Repeated rejects for network failures RP-48 RP-100510 approved R5 R5-47 R5-103830 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0867 - F Rel-9 9.0.0 9.1.0 GCF Priority 3: New TC 9.3.1.6 Service request / Rejected / EPS services not allowed RP-48 RP-100510 approved R5 R5-47 R5-103831 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0868 - F Rel-9 9.0.0 9.1.0 Priority 3 - update of test case 9.2.1.1.24 RP-48 RP-100510 approved R5 R5-47 R5-103832 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0869 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Addition of new test case 13.1.5 RP-48 RP-100510 approved R5 R5-47 R5-103836 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0870 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update of Multilayer Procedures part TC 13.1.3 RP-48 RP-100510 approved R5 R5-47 R5-103838 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0871 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new test case 8.2.1.5 RP-48 RP-100510 approved R5 R5-47 R5-103840 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0872 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new test case 8.2.1.6 RP-48 RP-100510 approved R5 R5-47 R5-103841 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0873 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - New TC 9.2.1.1.4 Attach Procedure Success Request for obtaining the IPv4 address of the home agent RP-48 RP-100510 approved R5 R5-47 R5-103842 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0874 - F Rel-9 9.0.0 9.1.0 Priority 4 - Addition of new test case 9.2.3.2.16 RP-48 RP-100510 approved R5 R5-47 R5-103843 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0875 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Update RRC test case 8.2.4.6 RP-48 RP-100510 approved R5 R5-47 R5-103848 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0876 - F Rel-9 9.0.0 9.1.0 Addition of UE end state for 15 EMM test cases and termination of ongoing signalling procedure for 3 EMM test cases RP-48 RP-100510 approved R5 R5-47 R5-103849 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0877 - F Rel-9 9.0.0 9.1.0 GCF Priority 1 - Correction to MAC test case 7.1.4.5 RP-48 RP-100510 approved R5 R5-47 R5-103872 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0878 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of Multi-layer Procedures part test case 13.1.7 RP-48 RP-100510 approved R5 R5-47 R5-103873 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0879 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Addition of new test case 9.2.3.2.2 for combined tracking area update / successful for EPS services only / IMSI unknown in HSS RP-48 RP-100510 approved R5 R5-47 R5-103876 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0880 1 F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EUTRA RLC test case 7.2.3.6 RP-48 RP-100510 approved R5 R5-47 R5-103800 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0881 1 F Rel-9 9.0.0 9.1.0 GCF Priority 1: Correction to EUTRA RLC test case 7.2.3.7 RP-48 RP-100510 approved R5 R5-47 R5-103801 agreed 2010-05-01 LTE-UEConTest_SIG - 2010-05-01
0882 1 F Rel-9 9.0.0 9.1.0 GCF Priority 2: Correction to EMM test case 9.2.3.1.2 RP-48 RP-100510 approved R5 R5-47 R5-103817 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0883 - F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Update of General tests part TC 11.1.4 RP-48 RP-100510 approved R5 R5-47 R5-103819 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0884 1 F Rel-9 9.0.0 9.1.0 GCF priority 3 - Inter-RAT PLMN Selection/ Selection of correct PLMN and RAT in shared network environment, Automatic mode RP-48 RP-100510 approved R5 R5-47 R5-103824 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0885 1 F Rel-9 9.0.0 9.1.0 GCF priority 4 - New test case 6.2.1.4 Inter-RAT PLMN Selection/ Selection of correct RAT from the OPLMN list/ Manual mode RP-48 RP-100510 approved R5 R5-47 R5-103825 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0886 - F Rel-9 9.0.0 9.1.0 GCF priority 3 - New test case 6.2.1.1 Inter-RAT PLMN Selection /Selection of correct RAT for OPLMN/Automatic mode RP-48 RP-100510 approved R5 R5-47 R5-103826 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0887 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update test case 8.2.4.8, 8.5.1.2 and 8.5.1.4 RP-48 RP-100510 approved R5 R5-47 R5-103827 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0888 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update RRC test case 8.3.1.4 RP-48 RP-100510 approved R5 R5-47 R5-103829 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0889 1 F Rel-9 9.0.0 9.1.0 GCF Priority 2 - Correction of EMM test case 9.1.2.3 RP-48 RP-100510 approved R5 R5-47 R5-103833 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0890 - F Rel-9 9.0.0 9.1.0 GCF Priority 3 - Update of Multilayer Procedures part TC 13.3.1.2 RP-48 RP-100510 approved R5 R5-47 R5-103837 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0891 - F Rel-9 9.0.0 9.1.0 GCF Priority 4 - Update of RRC part TC 8.1.1.3 RRC / Paging for connection in idle mode /Multiple paging records RP-48 RP-100510 approved R5 R5-47 R5-103839 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0892 1 F Rel-9 9.0.0 9.1.0 GCF Priority 4 - New TC 13.1.8 Connected CSFB to GSM with Redirection MO call RP-48 RP-100510 approved R5 R5-47 R5-103844 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0893 - B Rel-8 8.5.0 8.6.0 Removal of technical content in 36.523-1 v8.5.0 and substitution with pointer to the next Release RP-48 RP-100511 approved R5 R5-47 R5-103229o agreed 2010-04-30 TEI8_Test - 2010-04-30
0894 - F Rel-9 9.0.0 9.1.0 GCF priority 3 - New test case 6.2.1.2 Inter-RAT PLMN Selection /Selection of correct RAT for UPLMN/Automatic mode RP-48 RP-100510 approved R5 R5-47 R5-103823 agreed 2010-05-02 LTE-UEConTest_SIG - 2010-05-02
0895 - F Rel-9 9.0.0 9.1.0 Correction to MAC and RLC handover test cases to set IE ""statusReportRequired"" to FALSE RP-48 RP-100510 approved R5 R5-47 R5-103816 agreed 2010-04-30 LTE-UEConTest_SIG This record corrected from previous erroneous entry of 36.521-3 CR0200. 2010-04-30
0896 - B Rel-9 9.1.1 - CR 36.523-1-0896 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection - - - G3new G3new-47 GP-101175 revised 2010-08-24 LTE-UEConTest_SIG - 2010-08-24
0896 1 B Rel-9 9.1.1 9.2.0 CR 36.523-1-0896 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection GP-47 GP-101510 approved G3new G3new-47 GP-101510 agreed 2010-09-02 LTE-UEConTest_SIG - 2010-09-02
0897 - B Rel-9 9.1.1 - CR 36.523-1-0897 6.2.3.20: Redirection to E-UTRA upon the release of the CS connection and no suitable cell available - - - G3new G3new-47 GP-101177 revised 2010-08-24 LTE-UEConTest_SIG - 2010-08-24
0897 1 B Rel-9 9.1.1 9.2.0 CR 36.523-1-0897 6.2.3.20: Redirection to E-UTRA upon the release of the CS connection and no suitable cell available GP-47 GP-101521 approved G3new G3new-47 GP-101521 agreed 2010-09-02 LTE-UEConTest_SIG - 2010-09-02
0898 - B Rel-9 9.1.1 - CR 36.523-1-0898 New test case 6.2.3.14 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are higher than the serving cell) - - - G3new G3new-47 GP-101184 revised 2010-08-24 LTE-UEConTest_SIG - 2010-08-24
0898 1 B Rel-9 9.1.1 9.2.0 CR 36.523-1-0898 New test case 6.2.3.14 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are higher than the serving cell) GP-47 GP-101502 approved G3new G3new-47 GP-101502 agreed 2010-09-01 LTE-UEConTest_SIG - 2010-09-01
0899 - B Rel-9 9.1.1 - CR 36.523-1-0899 New test case 6.2.3.15 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are lower than the serving cell) - - - G3new G3new-47 GP-101185 revised 2010-08-31 LTE-UEConTest_SIG - 2010-08-31
0899 1 B Rel-9 9.1.1 9.2.0 CR 36.523-1-0899 New test case 6.2.3.15 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are lower than the serving cell) GP-47 GP-101503 approved G3new G3new-47 GP-101503 agreed 2010-09-01 LTE-UEConTest_SIG - 2010-09-01
0900 - B Rel-9 9.1.1 - CR 36.523-1-0900 Correction related to GERAN priority, in existing Inter-RAT cell reselection TC between GERAN and E-UTRA - - - G3new G3new-47 GP-101207 withdrawn 2010-08-24 LTE-UEConTest_SIG - 2010-08-24
0901 - F Rel-9 9.1.1 - CR 36.523-1-0901 New Test Case 6.2.3.29 - Inter-RAT cell reselection from GPRS packet_transfer NC1 mode to E-UTRA / Network assisted cell change. - - - G3new G3new-47 GP-101210 revised 2010-08-31 LTE-UEConTest_SIG - 2010-08-31
0901 1 F Rel-9 9.1.1 - CR 36.523-1-0901 New Test Case 6.2.3.29 - Inter-RAT cell reselection from GPRS packet_transfer NC1 mode to E-UTRA / Network assisted cell change. - - - G3new G3new-47 GP-101561 withdrawn - LTE-UEConTest_SIG - 2010-09-06
0902 - F Rel-9 9.1.1 - CR 36.523-1-0902 New Test case 6.2.3.27- Inter-RAT Cell selection from GPRS Packet_transfer to E-UTRA Cell (NC2 mode). - - - G3new G3new-47 GP-101211 revised 2010-08-31 LTE-UEConTest_SIG - 2010-08-31
0902 1 F Rel-9 9.1.1 9.2.0 CR 36.523-1-0902 New Test case 6.2.3.27- Inter-RAT Cell selection from GPRS Packet_transfer to E-UTRA Cell (NC2 mode). GP-47 GP-101562 approved G3new G3new-47 GP-101562 agreed 2010-09-01 LTE-UEConTest_SIG - 2010-09-01
0903 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Corrections to EUTRA idle mode test cases RP-49 RP-100817 approved R5 R5-48 R5-104073 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0904 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Review of detach at switch/power off procedure in EMM test cases RP-49 RP-100817 approved R5 R5-48 R5-104083 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0905 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Review of switch/power off procedure RP-49 RP-100817 approved R5 R5-48 R5-104084 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0906 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to remove special configurations for UM Bearer test cases RP-49 RP-100817 approved R5 R5-48 R5-104107 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0907 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EUTRA RRC test case 8.1.2.7 RP-49 RP-100817 approved R5 R5-48 R5-104130 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0908 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to Generic E-UTRA radio bearer test procedure 12.1.1 and 12.1.2 RP-49 RP-100817 approved R5 R5-48 R5-104136 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0909 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EMM test case 9.2.3.1.2 RP-49 RP-100817 approved R5 R5-48 R5-104142 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0910 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to MAC test case 7.1.2.8 RP-49 RP-100817 approved R5 R5-48 R5-104144 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0911 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EUTRA RRC test case 8.1.2.5 RP-49 RP-100817 approved R5 R5-48 R5-104145 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0912 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.3 RP-49 RP-100817 approved R5 R5-48 R5-104147 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0913 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.1 RP-49 RP-100817 approved R5 R5-48 R5-104148 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0914 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.6 RP-49 RP-100817 approved R5 R5-48 R5-104149 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0915 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.1 RP-49 RP-100817 approved R5 R5-48 R5-104150 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0917 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.6 RP-49 RP-100817 approved R5 R5-48 R5-104157 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0918 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.11 RP-49 RP-100817 approved R5 R5-48 R5-104162 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0919 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of ESM test case 10.8.1 RP-49 RP-100817 approved R5 R5-48 R5-104168 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0920 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new test case 6.1.2.14 RP-49 RP-100817 approved R5 R5-48 R5-104173 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0921 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new test case 9.2.3.2.5 RP-49 RP-100817 approved R5 R5-48 R5-104178 agreed 2010-09-01 LTE-UEConTest_SIG - 2010-09-01
0922 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Update to test case 13.1.5 RP-49 RP-100817 approved R5 R5-48 R5-104182 agreed 2010-08-23 LTE-UEConTest_SIG - 2010-08-23
0923 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of EMM test case 9.2.1.1.17 RP-49 RP-100817 approved R5 R5-48 R5-104238 agreed 2010-08-24 LTE-UEConTest_SIG - 2010-08-24
0924 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Update of TC 8.1.2.5 RP-49 RP-100817 approved R5 R5-48 R5-104265 agreed 2010-09-01 LTE-UEConTest_SIG - 2010-09-01
0925 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 Update test case 8.3.2.5 RP-49 RP-100817 approved R5 R5-48 R5-104283 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0926 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Correction of test cases 14.1 & 14.2 RP-49 RP-100817 approved R5 R5-48 R5-104286 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0927 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new test case 14.3 RP-49 RP-100817 approved R5 R5-48 R5-104287 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0928 - F Rel-9 9.1.1 9.2.0 Update of DSMIPv6 test cases RP-49 RP-100831 approved R5 R5-48 R5-104389 agreed 2010-08-16 DSMIPv6_UEConTest - 2010-08-16
0929 - F Rel-9 9.1.1 9.2.0 Removal of DSMIPv6 test case 15.3 RP-49 RP-100831 approved R5 R5-48 R5-104390 agreed 2010-08-16 DSMIPv6_UEConTest - 2010-08-16
0930 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - update of test case 7.2.3.4 RP-49 RP-100817 approved R5 R5-48 R5-104399 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0931 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Update to EMM test case 9.2.2.1.1 RP-49 RP-100817 approved R5 R5-48 R5-104512 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0932 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Update of TC 7.1.4.16 RP-49 RP-100817 approved R5 R5-48 R5-104535 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0933 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction of RRC test case 8.5.4.1 RP-49 RP-100817 approved R5 R5-48 R5-104632 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0934 - F Rel-9 9.1.1 9.2.0 GCF priority 4 - Addition of new test case 8.2.4.12 RP-49 RP-100817 approved R5 R5-48 R5-104637 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0935 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test cases 7.1.7.1.1, 7.1.7.1.2, 7.1.7.1.3, 7.1.7.1.4 RP-49 RP-100817 approved R5 R5-48 R5-104708 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0936 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.7.2.1 RP-49 RP-100817 approved R5 R5-48 R5-104709 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0937 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.4 RP-49 RP-100817 approved R5 R5-48 R5-104710 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0938 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.9 RP-49 RP-100817 approved R5 R5-48 R5-104711 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0939 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to GCF WI-081 LTE Testcases 7.1.4.11, 7.1.4.14 RP-49 RP-100817 approved R5 R5-48 R5-104712 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0940 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to ETURA RRC test case 8.2.4.1 RP-49 RP-100817 approved R5 R5-48 R5-104713 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0941 - F Rel-9 9.1.1 9.2.0 Correction to GCF WI-082 EMM Testcase 9.1.2.1 RP-49 RP-100817 approved R5 R5-48 R5-104714 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0942 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Corrections to EUTRA GERAN idle mode test cases RP-49 RP-100817 approved R5 R5-48 R5-104715 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0943 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Corrections to idle mode test case 6.2.2.1 RP-49 RP-100817 approved R5 R5-48 R5-104716 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0944 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Review of detach at switch/power off procedure in Idle Mode test cases RP-49 RP-100817 approved R5 R5-48 R5-104717 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0945 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to Inter RAT HRPD test case 6.2.2.3 RP-49 RP-100817 approved R5 R5-48 R5-104718 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0946 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to Inter RAT HRPD test case 6.2.3.7 RP-49 RP-100817 approved R5 R5-48 R5-104719 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0947 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to Inter RAT HRPD test case 6.2.3.8 RP-49 RP-100817 approved R5 R5-48 R5-104720 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0948 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Addition of new test case 6.2.3.4 RP-49 RP-100817 approved R5 R5-48 R5-104721 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0949 - F Rel-9 9.1.1 9.2.0 Addition of modified value tag after System Information modification RP-49 RP-100817 approved R5 R5-48 R5-104722 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0950 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EUTRA RLC test case 7.2.3.21 RP-49 RP-100817 approved R5 R5-48 R5-104723 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0951 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to GCF Priority 2 Inter RAT HRPD test case 8.1.3.9 RP-49 RP-100817 approved R5 R5-48 R5-104724 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0952 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to TC 8.1.3.5 RP-49 RP-100817 approved R5 R5-48 R5-104725 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0953 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of EMM test case 9.2.1.1.9 and 9.2.1.1.10 RP-49 RP-100817 approved R5 R5-48 R5-104728 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0954 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of EMM test case 9.2.1.1.20 RP-49 RP-100817 approved R5 R5-48 R5-104729 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0955 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - update of test case 9.2.3.1.8 RP-49 RP-100817 approved R5 R5-48 R5-104730 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0956 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of EMM test case 9.2.1.2.1 RP-49 RP-100817 approved R5 R5-48 R5-104731 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0957 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Correction of test case 9.2.1.1.1a about reference cell information RP-49 RP-100817 approved R5 R5-48 R5-104732 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0958 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of ESM test case 10.6.1 RP-49 RP-100817 approved R5 R5-48 R5-104733 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0959 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to ESM test case 10.5.1 RP-49 RP-100817 approved R5 R5-48 R5-104734 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0960 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to ESM test case 10.4.1 RP-49 RP-100817 approved R5 R5-48 R5-104735 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0961 - F Rel-9 9.1.1 9.2.0 Add test case for RRC connection establishment of emergency call RP-49 RP-100834 approved R5 R5-48 R5-104736 agreed 2010-08-13 IMS_EMER_LTE_UEConTest - 2010-08-13
0962 - F Rel-9 9.1.1 9.2.0 GCF Priority 3: Correction to test case 7.1.5.2 RP-49 RP-100817 approved R5 R5-48 R5-104742 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0963 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Correction to test case 7.1.5.4 RP-49 RP-100817 approved R5 R5-48 R5-104743 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0964 - F Rel-9 9.1.1 9.2.0 GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.5 RP-49 RP-100817 approved R5 R5-48 R5-104744 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0965 - F Rel-9 9.1.1 9.2.0 GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.6 RP-49 RP-100817 approved R5 R5-48 R5-104745 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0966 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Addition of new EPS mobility management procedure test case 9.3.2.2a Paging for CS fallback / Connected mode RP-49 RP-100817 approved R5 R5-48 R5-104746 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0967 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - update of test case 9.2.1.1.12 RP-49 RP-100817 approved R5 R5-48 R5-104747 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0968 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - update of test case 9.3.1.15 RP-49 RP-100817 approved R5 R5-48 R5-104748 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0969 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - update of test case 9.2.3.1.23 RP-49 RP-100817 approved R5 R5-48 R5-104749 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0970 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Correction of ESM test case 10.5.3 RP-49 RP-100817 approved R5 R5-48 R5-104750 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0971 - F Rel-9 9.1.1 9.2.0 GFC Prirotity 3 and 4: Correction of generic test procedure used in MIMO DRB test cases RP-49 RP-100818 approved R5 R5-48 R5-104751 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0972 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Addition of new Multilayer Procedures test case 13.1.4 Call setup from E-UTRAN RRC_IDLE / CS fallback to UTRAN with Handover / MT call RP-49 RP-100818 approved R5 R5-48 R5-104752 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0973 - F Rel-9 9.1.1 9.2.0 Addition of new LTE test case 13.1.2 CS fallback UTRAN with redirection / MO call RP-49 RP-100818 approved R5 R5-48 R5-104753 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0974 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Addition of New TC for cell reselection when 1xRTT is higher priority RP-49 RP-100818 approved R5 R5-48 R5-104754 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0975 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Addition of New TC for cell reselection when 1xRTT is lower priority RP-49 RP-100818 approved R5 R5-48 R5-104755 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0976 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new test case 6.1.1.6 RP-49 RP-100818 approved R5 R5-48 R5-104756 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0977 - F Rel-9 9.1.1 9.2.0 GCF Priority 4: Correction to test case 7.1.5.1 RP-49 RP-100818 approved R5 R5-48 R5-104757 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0978 - F Rel-9 9.1.1 9.2.0 GCF Priority 4: Correction to test case 7.1.5.3 RP-49 RP-100818 approved R5 R5-48 R5-104758 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0979 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Correction to test case 7.1.5.5 RP-49 RP-100818 approved R5 R5-48 R5-104759 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0980 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new test case 8.1.2.6 RP-49 RP-100818 approved R5 R5-48 R5-104760 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0981 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Update of TC 8.2.1.5 RP-49 RP-100818 approved R5 R5-48 R5-104761 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0982 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Update of TC 8.2.1.6 RP-49 RP-100818 approved R5 R5-48 R5-104762 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0983 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Correction to TC 8.2.4.8 RP-49 RP-100818 approved R5 R5-48 R5-104763 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0984 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Update of TC 8.3.1.6 RP-49 RP-100818 approved R5 R5-48 R5-104764 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0985 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EUTRA RRC Test Case 8.2.4.7 RP-49 RP-100818 approved R5 R5-48 R5-104765 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0986 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new EMM test case 9.2.1.1.3 RP-49 RP-100818 approved R5 R5-48 R5-104768 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
0987 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new test case 9.2.3.2.11 RP-49 RP-100818 approved R5 R5-48 R5-104769 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0988 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Update to test case 9.2.3.2.15 RP-49 RP-100818 approved R5 R5-48 R5-104770 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0989 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Addition of new test case 9.3.1.12a RP-49 RP-100818 approved R5 R5-48 R5-104771 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0990 - F Rel-9 9.1.1 9.2.0 GCF Priority X: Addition of New TC for Inter-RAT Cell reselection from E-UTRA idle non-CSG cell to a UTRA CSG cell RP-49 RP-100818 approved R5 R5-48 R5-104773 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0991 - F Rel-9 9.1.1 9.2.0 GCF Priority X: Addition of New TC for Inter-RAT CSG Cell Reselection from E-UTRA CSG cell to UTRA CSG cell RP-49 RP-100818 approved R5 R5-48 R5-104774 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0992 - F Rel-9 9.1.1 9.2.0 GCF Priority X: Introduction of new ESM test case 10.9.1 for UE routing of uplinks packets RP-49 RP-100818 approved R5 R5-48 R5-104776 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0993 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.1.2.3 RP-49 RP-100818 approved R5 R5-48 R5-104777 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0994 - F Rel-9 9.1.1 9.2.0 GCF priority 1 - Cell detection timing related correction to test case 6.1.2.4 RP-49 RP-100818 approved R5 R5-48 R5-104778 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0995 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.1.2.5 RP-49 RP-100818 approved R5 R5-48 R5-104779 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0996 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.1.2.11 RP-49 RP-100818 approved R5 R5-48 R5-104780 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0997 - F Rel-9 9.1.1 9.2.0 GCF priority 1 - Cell detection timing related correction to test case 6.1.2.15 RP-49 RP-100818 approved R5 R5-48 R5-104781 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0998 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.2.2.1 RP-49 RP-100818 approved R5 R5-48 R5-104782 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
0999 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.2.2.2 RP-49 RP-100818 approved R5 R5-48 R5-104783 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1000 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.2.3.1 RP-49 RP-100818 approved R5 R5-48 R5-104784 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1001 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.2.3.2 RP-49 RP-100818 approved R5 R5-48 R5-104785 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1002 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.2.3.3 RP-49 RP-100818 approved R5 R5-48 R5-104786 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1003 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 6.2.3.5 RP-49 RP-100818 approved R5 R5-48 R5-104787 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1004 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 8.1.2.5 RP-49 RP-100818 approved R5 R5-48 R5-104788 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1005 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 8.4.2.2 RP-49 RP-100818 approved R5 R5-48 R5-104789 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1006 - F Rel-9 9.1.1 9.2.0 GCF priority 2 - Cell detection timing related correction to test case 8.4.2.4 RP-49 RP-100818 approved R5 R5-48 R5-104790 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1007 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to test case 6.1.2.2 RP-49 RP-100818 approved R5 R5-48 R5-104791 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1008 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EUTRA Idle mode test case 6.1.2.6 RP-49 RP-100818 approved R5 R5-48 R5-104792 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1009 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.1.2.2 RP-49 RP-100818 approved R5 R5-48 R5-104793 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1010 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to EUTRA PDCP test cases 7.3.5.2, 7.3.5.3, 7.3.5.4, 7.3.5.5 RP-49 RP-100818 approved R5 R5-48 R5-104794 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1011 - F Rel-9 9.1.1 9.2.0 Correction to Generic E-UTRA radio bearer test procedure RP-49 RP-100818 approved R5 R5-48 R5-104795 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1012 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Update test cases in clause 8.5.1 RP-49 RP-100818 approved R5 R5-48 R5-104797 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1013 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Update of MAC test case 7.1.4.3 RP-49 RP-100818 approved R5 R5-48 R5-104798 agreed 2010-08-27 LTE-UEConTest_SIG - 2010-08-27
1014 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - New TC 6.3.3 Inter-RAT cell reselection / From UTRA_Idle to E-UTRA RRC_IDLE CSG cell RP-49 RP-100818 approved R5 R5-48 R5-105000 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1015 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to GCF Priority 1 MAC test cases for AP#47.05 RP-49 RP-100818 approved R5 R5-48 R5-105001 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1016 - F Rel-9 9.2.1 - CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) - - - G3new G3new-48 GP-101674 revised 2010-10-26 LTE-UEConTest_SIG - 2010-10-26
1016 - F Rel-9 9.1.1 9.2.0 CR 36.523-1-1016 New Test Case 6.2.3.23 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE CONTINUE) GP-47 GP-101603 approved G3new G3new-47 GP-101603 agreed 2010-09-02 LTE-UEConTest_SIG - 2010-09-02
1016 1 F Rel-9 9.2.1 - CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) - - - G3new G3new-48 GP-101726 revised 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1016 2 F Rel-9 9.2.1 9.3.0 CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) GP-48 GP-101734 approved G3new G3new-48 GP-101734 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1017 - F Rel-9 9.2.1 - CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) - - - G3new G3new-48 GP-101675 revised 2010-10-26 LTE-UEConTest_SIG - 2010-10-26
1017 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction of new test cases in 8.3.3 RP-49 RP-100818 approved R5 R5-48 R5-105002 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1017 1 F Rel-9 9.2.1 - CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) - - - G3new G3new-48 GP-101727 revised 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1017 2 F Rel-9 9.2.1 9.3.0 CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) GP-48 GP-101735 approved G3new G3new-48 GP-101735 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1018 - F Rel-9 9.2.1 - CR 36.523-1-1018 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN - - - G3new G3new-48 GP-101701 revised 2010-10-26 LTE-UEConTest_SIG - 2010-10-26
1018 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Update to test case 8.1.2.9 RP-49 RP-100818 approved R5 R5-48 R5-105004 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1018 1 F Rel-9 9.2.1 9.3.0 CR 36.523-1-1018 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN GP-48 GP-101745 approved G3new G3new-48 GP-101745 agreed 2010-11-11 LTE-UEConTest_SIG - 2010-11-11
1019 - F Rel-9 9.2.1 - CR 36.523-1-1019 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode. - - - G3new G3new-48 GP-101703 revised 2010-10-26 LTE-UEConTest_SIG - 2010-10-26
1019 - F Rel-9 9.1.1 9.2.0 36523-1: Update of attach procedure specification RP-49 RP-100818 approved R5 R5-48 R5-105005 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1019 1 F Rel-9 9.2.1 9.3.0 CR 36.523-1-1019 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode. GP-48 GP-101732 approved G3new G3new-48 GP-101732 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1020 - B Rel-9 9.2.1 - CR 36.523-1-1020 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.19,6.2.3.20,6.2.3.21 and 6.2.3.22 - - - G3new G3new-48 GP-101709 withdrawn 2010-10-27 LTE-UEConTest_SIG - 2010-10-27
1020 - F Rel-9 9.1.1 9.2.0 GCF Priority 4 - Update of TC 8.1.2.8 RP-49 RP-100818 approved R5 R5-48 R5-105006 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1021 - F Rel-9 9.2.1 - CR 36.523-1-1021 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (Priority of E-UTRA cells is lower than the serving cell) - - - G3new G3new-48 GP-101715 withdrawn 2010-10-27 LTE-UEConTest_SIG - 2010-10-27
1021 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction of EUTRA MAC test case 7.1.4.5 RP-49 RP-100818 approved R5 R5-48 R5-105007 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1022 - F Rel-9 9.2.1 - CR 36.523-1-1022 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) - - - G3new G3new-48 GP-101716 revised 2010-10-27 LTE-UEConTest_SIG - 2010-10-27
1022 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of EUTRA test case 8.5.1.3 RP-49 RP-100818 approved R5 R5-48 R5-105009 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1022 1 F Rel-9 9.2.1 - CR 36.523-1-1022 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) - - - G3new G3new-48 GP-101737 withdrawn 2010-11-10 LTE-UEConTest_SIG - 2010-11-10
1023 - F Rel-9 9.2.1 - CR 36.523-1-1023 Modifications to test cas 6.2.2.6 and 6.2.2.7 - - - G3new G3new-48 GP-101718 revised 2010-10-27 LTE-UEConTest_SIG - 2010-10-27
1023 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to ETURA RRC test case 8.5.1.1 RP-49 RP-100818 approved R5 R5-48 R5-105010 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1023 1 F Rel-9 9.2.1 9.3.0 CR 36.523-1-1023 Modifications to test cas 6.2.2.6 and 6.2.2.7 GP-48 GP-101729 approved G3new G3new-48 GP-101729 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1024 - F Rel-9 9.2.1 - CR 36.523-1-1024 Correction to GERAN-EUTRAN Inter-RAT testcases 6.2.3.19,6.2.3.21 and 6.2.3.22 - - - G3new G3new-48 GP-101725 revised 2010-11-04 LTE-UEConTest_SIG - 2010-11-04
1024 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction of EUTRA test case 8.3.1.3 RP-49 RP-100818 approved R5 R5-48 R5-105011 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1024 1 F Rel-9 9.2.1 9.3.0 CR 36.523-1-1024 Correction to GERAN-EUTRAN Inter-RAT testcases 6.2.3.19,6.2.3.21 and 6.2.3.22 GP-48 GP-101744 approved G3new G3new-48 GP-101744 agreed 2010-11-10 LTE-UEConTest_SIG - 2010-11-10
1025 - F Rel-9 9.2.1 9.3.0 CR 36.523-1-1025 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle to E-UTRAN /based on H_PRIO criteria GP-48 GP-101728 approved G3new G3new-48 GP-101728 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1025 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - Correction to ESM test case 10.7.2 RP-49 RP-100818 approved R5 R5-48 R5-105012 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1026 - F Rel-9 9.1.1 9.2.0 Harmonising EMM test case pre-test conditions specification RP-49 RP-100818 approved R5 R5-48 R5-105070 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1027 - F Rel-9 9.1.1 9.2.0 GCF Priority 3 - update of test case 9.2.3.2.9 RP-49 RP-100818 approved R5 R5-48 R5-105014 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1028 - F Rel-9 9.1.1 9.2.0 GCF Priority 2 - update of test case 9.2.3.1.2 RP-49 RP-100818 approved R5 R5-48 R5-105015 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1029 - F Rel-9 9.1.1 9.2.0 GCF Priority 1+2: Correction to RLC test cases for AP#47.05 RP-49 RP-100818 approved R5 R5-48 R5-105016 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1030 - F Rel-9 9.1.1 9.2.0 GCF Priority x - Correction to 36.523-1 Test Case 8.3.1.5 RP-49 RP-100818 approved R5 R5-48 R5-105071 agreed 2010-08-13 LTE-UEConTest_SIG - 2010-08-13
1031 - F Rel-9 9.1.1 9.2.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.18 RP-49 RP-100818 approved R5 R5-48 R5-105054 agreed 2010-08-16 LTE-UEConTest_SIG - 2010-08-16
1032 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.13 RP-50 RP-101143 approved R5 R5-49 R5-106114 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1033 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to TC 7.2.3.2 RP-50 RP-101143 approved R5 R5-49 R5-106156 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1034 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to TC 9.2.3.1.5 RP-50 RP-101143 approved R5 R5-49 R5-106160 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1035 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to TC 7.3.5.4 RP-50 RP-101143 approved R5 R5-49 R5-106164 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1036 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction of test cases in 6.2.3.4 RP-50 RP-101143 approved R5 R5-49 R5-106177 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1037 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction of test cases in 8.3.2.1, 8.3.2.3, 8.3.2.5 and 8.3.2.6 RP-50 RP-101143 approved R5 R5-49 R5-106182 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1038 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Correction of test cases in 8.3.3 RP-50 RP-101143 approved R5 R5-49 R5-106183 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1039 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Corrections to test case 9.2.1.2.2 RP-50 RP-101143 approved R5 R5-49 R5-106186 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1040 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Corrections to test case 9.2.2.1.7 RP-50 RP-101143 approved R5 R5-49 R5-106187 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1041 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Corrections to test case 9.2.2.2.1 RP-50 RP-101143 approved R5 R5-49 R5-106188 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1042 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Corrections to test case 9.2.3.2.2. RP-50 RP-101143 approved R5 R5-49 R5-106189 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1043 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Corrections to test case 9.3.1.17 RP-50 RP-101143 approved R5 R5-49 R5-106190 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1044 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Corrections to test case 7.1.4.1 RP-50 RP-101143 approved R5 R5-49 R5-106204 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1045 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test cases 9.2.1.1.13, 9.2.1.1.15 and 9.2.1.1.17 RP-50 RP-101143 approved R5 R5-49 R5-106214 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1046 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.1.1.7 RP-50 RP-101143 approved R5 R5-49 R5-106216 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1047 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.1.2.1 RP-50 RP-101143 approved R5 R5-49 R5-106226 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1048 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.1.2.4 RP-50 RP-101143 approved R5 R5-49 R5-106227 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1049 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.3.1.4 RP-50 RP-101143 approved R5 R5-49 R5-106229 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1050 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Editorial correction to test case 6.1.1.6 RP-50 RP-101143 approved R5 R5-49 R5-106268 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1051 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Update to test case 6.2.2.5 RP-50 RP-101143 approved R5 R5-49 R5-106269 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1052 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Update to test case 8.1.2.6 RP-50 RP-101143 approved R5 R5-49 R5-106274 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1053 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Update to test case 8.1.2.8 RP-50 RP-101143 approved R5 R5-49 R5-106275 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1054 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Update to test case 8.1.2.9 RP-50 RP-101143 approved R5 R5-49 R5-106276 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1055 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Update to test case 8.1.3.5 RP-50 RP-101143 approved R5 R5-49 R5-106277 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1056 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Update to test case 9.2.1.2.15 and 9.3.1.12a RP-50 RP-101143 approved R5 R5-49 R5-106280 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1057 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Update to test cases 10.8.2, 10.8.4 and 10.8.6 RP-50 RP-101143 approved R5 R5-49 R5-106284 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1058 - F Rel-9 9.2.1 9.3.0 CR to 36.523-1: Correction to UTRA cell minimum power level RP-50 RP-101143 approved R5 R5-49 R5-106294 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1059 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Corrections to ESM test case 10.6.2 RP-50 RP-101143 approved R5 R5-49 R5-106326 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1060 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Corrections to RRC test case 8.2.4.6 RP-50 RP-101143 approved R5 R5-49 R5-106333 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1061 - F Rel-9 9.2.1 9.3.0 GCF Priority 1-4 - Editorial corrections to EUTRA RRC test cases RP-50 RP-101143 approved R5 R5-49 R5-106335 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1062 - F Rel-9 9.2.1 9.3.0 GCF Priority 1-4 - Editorial corrections to EMM test cases RP-50 RP-101143 approved R5 R5-49 R5-106336 agreed 2010-11-09 LTE-UEConTest_SIG - 2010-11-09
1063 - F Rel-9 9.2.1 9.3.0 Update test case 8.1.2.11 with IMS emergency session setup RP-50 RP-101153 approved R5 R5-49 R5-106524 agreed 2010-11-09 IMS_EMER_LTE_UEConTest - 2010-11-09
1064 - F Rel-9 9.2.1 9.3.0 Update references with IMS RP-50 RP-101153 approved R5 R5-49 R5-106525 agreed 2010-11-09 IMS_EMER_LTE_UEConTest - 2010-11-09
1065 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction of test cases in 6.1.2 RP-50 RP-101143 approved R5 R5-49 R5-106555 agreed 2010-11-16 LTE-UEConTest_SIG - 2010-11-16
1066 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.8 RP-50 RP-101143 approved R5 R5-49 R5-106556 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1067 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.12 RP-50 RP-101143 approved R5 R5-49 R5-106557 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1068 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.13 RP-50 RP-101143 approved R5 R5-49 R5-106558 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1069 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Making compressed mode configuration optional for FDD and removal of compressed mode requirement for TDD for InterRAT HO test cases 8.4.2.2 RP-50 RP-101143 approved R5 R5-49 R5-106559 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1070 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Making compressed mode configuration optional for FDD and removal of compressed mode requirement for TDD for InterRAT HO test cases 8.4.2.4 RP-50 RP-101143 approved R5 R5-49 R5-106560 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1071 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Update of MAC test case 7.1.4.13 RP-50 RP-101143 approved R5 R5-49 R5-106563 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1072 - F Rel-9 9.2.1 9.3.0 Resolve timing issue in P1 RLC TCs RP-50 RP-101143 approved R5 R5-49 R5-106564 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1073 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to TC 7.2.3.9 RP-50 RP-101143 approved R5 R5-49 R5-106565 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1074 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Update of Radio Bearer test procedure used by TC 12.2.1 RP-50 RP-101143 approved R5 R5-49 R5-106566 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1075 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to Idle mode test case 6.1.2.7 RP-50 RP-101143 approved R5 R5-49 R5-106567 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1076 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction of test cases in 6.1.2.8 and 6.1.2.9 RP-50 RP-101143 approved R5 R5-49 R5-106568 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1077 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction of test cases in 6.2.2.1 and 6.2.2.2 RP-50 RP-101144 approved R5 R5-49 R5-106569 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1078 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EUTRA RRC test case 8.1.3.5 RP-50 RP-101144 approved R5 R5-49 R5-106570 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1079 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction of test cases in 8.3.1.8 ~ 8.3.1.11 RP-50 RP-101144 approved R5 R5-49 R5-106572 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1080 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Update to test case 8.4.2.2 and 8.4.2.4 RP-50 RP-101144 approved R5 R5-49 R5-106573 agreed 2010-11-22 LTE-UEConTest_SIG - 2010-11-22
1081 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to contents for message Extended Service Request RP-50 RP-101144 approved R5 R5-49 R5-106574 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1082 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.1.2.3 RP-50 RP-101144 approved R5 R5-49 R5-106575 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1083 - F Rel-9 9.2.1 9.3.0 Add test case for RRC connection establishment of emergency call / Limited Service RP-50 RP-101153 approved R5 R5-49 R5-106595 agreed 2010-11-19 IMS_EMER_LTE_UEConTest - 2010-11-19
1084 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.2.4.1 RP-50 RP-101144 approved R5 R5-49 R5-106598 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1085 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.2.2.2 RP-50 RP-101144 approved R5 R5-49 R5-106600 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1086 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.3.2.1 RP-50 RP-101144 approved R5 R5-49 R5-106601 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1087 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Corrections to test case 7.1.5.1 and 7.1.5.2 RP-50 RP-101144 approved R5 R5-49 R5-106602 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1088 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Addition new test case 6.1.2.13 RP-50 RP-101144 approved R5 R5-49 R5-106603 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1089 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.1.1.1a RP-50 RP-101144 approved R5 R5-49 R5-106604 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1090 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Various corrections to EMM section 9 of 36.523-1 RP-50 RP-101144 approved R5 R5-49 R5-106605 agreed 2010-11-22 LTE-UEConTest_SIG - 2010-11-22
1092 - F Rel-9 9.2.1 9.3.0 GCF Priority 3: Correction to multi-layer test cases 13.1.4 and 13.1.5 RP-50 RP-101144 approved R5 R5-49 R5-106607 agreed 2010-11-17 LTE-UEConTest_SIG - 2010-11-17
1093 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Update to test case 8.1.1.3 RP-50 RP-101144 approved R5 R5-49 R5-106608 agreed 2010-11-22 LTE-UEConTest_SIG - 2010-11-22
1094 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to TC 7.3.3.1, 7.3.3.2, 7.3.3.3 and 7.3.3.4 RP-50 RP-101144 approved R5 R5-49 R5-106619 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1095 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Update to test case 8.1.1.4 RP-50 RP-101144 approved R5 R5-49 R5-106621 agreed 2010-11-22 LTE-UEConTest_SIG - 2010-11-22
1096 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Correction of test cases in 8.3.1.6 RP-50 RP-101144 approved R5 R5-49 R5-106622 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1097 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Update to test case 9.2.3.2.5, 9.2.3.2.11, and 9.3.1.12a RP-50 RP-101144 approved R5 R5-49 R5-106623 agreed 2010-11-22 LTE-UEConTest_SIG - 2010-11-22
1098 - F Rel-9 9.2.1 9.3.0 9.2.1.3.3 Attach GCF Priority 4 - Addition of new test case 9.2.3.2.13 RP-50 RP-101144 approved R5 R5-49 R5-106624 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1099 - F Rel-9 9.2.1 9.3.0 GCF Priority 4: Addition of a new test case 9.2.3.2.1b RP-50 RP-101144 approved R5 R5-49 R5-106625 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1100 - F Rel-9 9.2.1 9.3.0 Addition of system information combination in Idle Mode test cases RP-50 RP-101144 approved R5 R5-49 R5-106626 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1101 - F Rel-9 9.2.1 9.3.0 Addition of system information combination in EMM test cases RP-50 RP-101144 approved R5 R5-49 R5-106627 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1102 - F Rel-9 9.2.1 9.3.0 Addition of system information combination in RRC test cases RP-50 RP-101144 approved R5 R5-49 R5-106628 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1103 - F Rel-9 9.2.1 9.3.0 Addition of system information combination in Multilayer test cases RP-50 RP-101144 approved R5 R5-49 R5-106629 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1104 - F Rel-9 9.2.0 9.3.0 Clarification of measurements requirements for Inter-RAT RP-50 RP-101159 approved R5 R5-49 R5-106630 agreed 2010-11-18 LTEimp-eDL_UEConTest - 2010-11-18
1105 - F Rel-9 9.2.1 9.3.0 GCF Priority X - Addition new test case 6.2.3.31 RP-50 RP-101144 approved R5 R5-49 R5-106631 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1106 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 – Correction to EUTRA MAC test case 7.1.4.8 RP-50 RP-101144 approved R5 R5-49 R5-106632 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1107 - F Rel-9 9.2.1 9.3.0 GCF Priority TBD - Addition of new idle mode test case for inter-freq cell reselection based on CSG autonomous search RP-50 RP-101144 approved R5 R5-49 R5-106635 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1108 - F Rel-9 9.2.1 9.3.0 GCF Priority TBD - Correction to TC 16.1.1.1 Inter-RAT Cell reselection from E-UTRA idle non-CSG cell to a UTRA CSG cell RP-50 RP-101144 approved R5 R5-49 R5-106636 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1109 - F Rel-9 9.2.1 9.3.0 GCF Priority TBD - Movement of TC 16.1.1.2 to section 6.3.8 RP-50 RP-101144 approved R5 R5-49 R5-106637 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1110 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - Addition of new TC 6.3.4 Inter-RAT cell reselection / From UTRA CELL_PCH state to E-UTRA RRC_IDLE CSG cell RP-50 RP-101144 approved R5 R5-49 R5-106638 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1112 - F Rel-9 9.2.1 9.3.0 GCF Pririty 4 -Making measurement and reporting optional for FDD and removal compressed mode requirement for TDD for Redirection test cases 8.1.3.7 RP-50 RP-101144 approved R5 R5-49 R5-106641 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1113 - F Rel-9 9.2.1 9.3.0 Periodic RI Reporting using PUCCH / Category 1 UE / Transmission mode 3/4 RP-50 RP-101144 approved R5 R5-49 R5-106642 agreed 2010-11-21 LTE-UEConTest_SIG - 2010-11-21
1114 - F Rel-9 9.2.1 9.3.0 GCF Priority X - Addition of new test case 8.1.2.10 RP-50 RP-101144 approved R5 R5-49 R5-106875 agreed 2010-12-01 LTE-UEConTest_SIG - 2010-12-01
1115 - F Rel-9 9.2.1 9.3.0 GCF priority X: New test case 9.2.1.2.1c Combined attach procedure / Success / EPS and CS Fallback not preferred RP-50 RP-101144 approved R5 R5-49 R5-106877 agreed 2010-12-01 LTE-UEConTest_SIG - 2010-12-01
1116 - F Rel-9 9.2.1 9.3.0 GCF Priority X - Addition of new test case 13.1.X RP-50 RP-101144 approved R5 R5-49 R5-106647 agreed 2010-11-22 LTE-UEConTest_SIG - 2010-11-22
1117 - F Rel-9 9.2.1 9.3.0 GCF Priority 4 - New test case 6.1.1.2 PLMN selection of 'Other PLMN/access technology combinations' / Automatic mode RP-50 RP-101144 approved R5 R5-49 R5-106655 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1118 - F Rel-9 9.2.1 9.3.0 Cell detection timing related correction to test case 6.2.2.3, 6.2.2.4, 6.2.3.7 and 6.2.3.8 RP-50 RP-101144 approved R5 R5-49 R5-106876 agreed 2010-12-01 LTE-UEConTest_SIG - 2010-12-01
1119 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to TC 7.2.3.10 RP-50 RP-101144 approved R5 R5-49 R5-106657 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1120 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Corrections and enhancements to EUTRA PDCP test cases 7.3.3.1, 7.3.3.3, 7.3.4.1 and 7.3.4.2 RP-50 RP-101144 approved R5 R5-49 R5-106659 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1121 - F Rel-9 9.2.1 9.3.0 GCF Priority 3 - Correction to test case 8.1.2.2 RP-50 RP-101144 approved R5 R5-49 R5-106660 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1122 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Corrections to E-UTRA RRC test case 8.1.2.7 RP-50 RP-101144 approved R5 R5-49 R5-106661 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1123 - F Rel-9 9.2.1 9.3.0 GCF Priority 4: Addition of a new test case 9.2.1.2.1b RP-50 RP-101144 approved R5 R5-49 R5-106662 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1124 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.16 RP-50 RP-101144 approved R5 R5-49 R5-106666 agreed 2010-11-18 LTE-UEConTest_SIG - 2010-11-18
1125 - F Rel-9 9.2.1 9.3.0 GCF Priority 1-4 - Editorial corrections to various ESM test cases RP-50 RP-101144 approved R5 R5-49 R5-106676 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1126 - F Rel-9 9.2.1 9.3.0 GCF Priority 1-4 - Editorial corrections to EUTRA Idle Mode test cases RP-50 RP-101144 approved R5 R5-49 R5-106678 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1127 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Corrections to E-UTRA PDCP test case 7.3.5.5 RP-50 RP-101144 approved R5 R5-49 R5-106679 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1128 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 – Correction to EUTRA RLC test case 7.2.3.16 RP-50 RP-101144 approved R5 R5-49 R5-106680 agreed 2010-11-19 LTE-UEConTest_SIG - 2010-11-19
1129 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Update to test case 9.2.3.3.1 and 9.2.3.3.4 RP-50 RP-101144 approved R5 R5-49 R5-106681 agreed 2010-11-22 LTE-UEConTest_SIG - 2010-11-22
1131 - F Rel-9 9.2.1 9.3.0 GCF priority X: New test case 9.2.3.2.1c Combined tracking area update / Success / CS Fallback not preferred RP-50 RP-101144 approved R5 R5-49 R5-106707 agreed 2010-11-21 LTE-UEConTest_SIG - 2010-11-21
1132 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EUTRA RLC test case 7.2.3.21 RP-50 RP-101255 approved R5 R5-49 - - 2010-12-01 LTE-UEConTest_SIG - 2010-12-01
1133 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction of ESM test case 10.3.1 RP-50 RP-101143 approved R5 R5-49 R5-106062 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1134 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Update of RRC test case 8.2.2.2 RP-50 RP-101143 approved R5 R5-49 R5-106094 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1135 - F Rel-9 9.2.1 9.3.0 GCF Priority 1 - Correction to EMM test case 9.2.3.1.1 RP-50 RP-101143 approved R5 R5-49 R5-106107 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1136 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to ESM test case 10.4.1 RP-50 RP-101143 approved R5 R5-49 R5-106108 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1137 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to EMM test case 9.2.3.1.2 RP-50 RP-101143 approved R5 R5-49 R5-106109 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1138 - F Rel-9 9.2.1 9.3.0 GCF Priority 2 - Correction to ESM test case 10.7.2 RP-50 RP-101143 approved R5 R5-49 R5-106111 agreed 2010-11-05 LTE-UEConTest_SIG - 2010-11-05
1139 - F Rel-9 9.3.0 - CR 36.523-1-1139 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) - - - G3new G3new-49 GP-110020 revised 2011-02-10 LTE-UEConTest_SIG - 2011-02-10
1139 1 F Rel-9 9.3.0 9.4.0 CR 36.523-1-1139 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) GP-49 GP-110417 approved G3new G3new-49 GP-110417 agreed 2011-03-01 LTE-UEConTest_SIG - 2011-03-01
1140 - F Rel-9 9.3.0 - CR 36.523-1-1140 New test case 6.2.3.18 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (blacklisted E-UTRA cells) - - - G3new G3new-49 GP-110021 revised 2011-02-10 LTE-UEConTest_SIG - 2011-02-10
1140 1 F Rel-9 9.3.0 9.4.0 CR 36.523-1-1140 New test case 6.2.3.18 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (blacklisted E-UTRA cells) GP-49 GP-110418 approved G3new G3new-49 GP-110418 agreed 2011-03-01 LTE-UEConTest_SIG - 2011-03-01
1141 - F Rel-9 9.3.0 - CR 36.523-1-1141 New Test Case 6.2.3.29 - Inter-RAT cell Reselection from GPRS packet_transfer to E-UTRA in CCN mode (PACKET MEASUREMENT ORDER) - - - G3new G3new-49 GP-110044 revised 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1141 1 F Rel-9 9.3.0 9.4.0 CR 36.523-1-1141 New Test Case 6.2.3.29 - Inter-RAT cell Reselection from GPRS packet_transfer to E-UTRA in CCN mode (PACKET MEASUREMENT ORDER) GP-49 GP-110419 approved G3new G3new-49 GP-110419 agreed 2011-03-01 LTE-UEConTest_SIG - 2011-03-01
1142 - F Rel-9 9.3.0 9.4.0 CR 36.523-1-1142 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle to E-UTRAN /based on H_PRIO criteria GP-49 GP-110046 approved G3new G3new-49 GP-110046 agreed 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1143 - F Rel-9 9.3.0 9.4.0 CR 36.523-1-1143 Modifications to test cas 6.2.2.6 and 6.2.2.7 GP-49 GP-110047 approved G3new G3new-49 GP-110047 agreed 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1144 - F Rel-9 9.3.0 9.4.0 CR 36.523-1-1144 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode. GP-49 GP-110048 approved G3new G3new-49 GP-110048 agreed 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1145 - F Rel-9 9.3.0 9.4.0 CR 36.523-1-1145 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) GP-49 GP-110049 approved G3new G3new-49 GP-110049 agreed 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1146 - F Rel-9 9.3.0 9.4.0 CR 36.523-1-1146 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) GP-49 GP-110050 approved G3new G3new-49 GP-110050 agreed 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1147 - F Rel-9 9.3.0 9.4.0 CR 36.523-1-1147 Correction to GERAN-EUTRAN Inter-RAT testcases 6.2.3.19,6.2.3.21 and 6.2.3.22 GP-49 GP-110051 approved G3new G3new-49 GP-110051 agreed 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1148 - F Rel-9 9.3.0 - CR 36.523-1-1148 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN - - - G3new G3new-49 GP-110052 revised 2011-02-13 LTE-UEConTest_SIG - 2011-02-13
1148 1 F Rel-9 9.3.0 9.4.0 CR 36.523-1-1148 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN GP-49 GP-110405 approved G3new G3new-49 GP-110405 agreed 2011-03-01 LTE-UEConTest_SIG - 2011-03-01
1149 - B Rel-9 9.3.0 - CR 36.523-1-1149 Addition of new Test case 8.4.4.1 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell - - - G3new G3new-49 GP-110059 revised 2011-02-17 LTE-UEConTest_SIG - 2011-02-17
1149 1 B Rel-9 9.3.0 9.4.0 CR 36.523-1-1149 Addition of new Test case 8.4.4.1 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell GP-49 GP-110107 approved G3new G3new-49 GP-110107 agreed 2011-03-01 LTE-UEConTest_SIG - 2011-03-01
1150 - B Rel-9 9.3.0 - CR 36.523-1-1150 Addition of new Test case 8.4.4.2 Inter-RAT PS Handover failure from GPRS Packet_transfer to E-UTRA cell - - - G3new G3new-49 GP-110060 revised 2011-02-17 LTE-UEConTest_SIG - 2011-02-17
1150 1 B Rel-9 9.3.0 9.4.0 CR 36.523-1-1150 Addition of new Test case 8.4.4.2 Inter-RAT PS Handover failure from GPRS Packet_transfer to E-UTRA cell GP-49 GP-110108 approved G3new G3new-49 GP-110108 agreed 2011-03-01 LTE-UEConTest_SIG - 2011-03-01
1151 - B Rel-9 9.3.0 - CR 36.523-1-1151 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.28 and 6.2.3.30. - - - G3new G3new-49 GP-110094 revised 2011-02-21 LTE-UEConTest_SIG - 2011-02-21
1151 1 B Rel-9 9.3.0 9.4.0 CR 36.523-1-1151 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.28 and 6.2.3.30. GP-49 GP-110420 approved G3new G3new-49 GP-110420 agreed 2011-03-01 LTE-UEConTest_SIG - 2011-03-01
1152 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to system information in 6.1.2.7 and 6.1.2.11 RP-51 RP-110162 approved R5 R5-50 R5-110137 agreed 2011-02-01 LTE-UEConTest_SIG - 2011-02-01
1153 - F Rel-9 9.3.0 9.4.0 GCF priority 3: Correction of UTRA cell in Idle and EMM test cases RP-51 RP-110162 approved R5 R5-50 R5-110156 agreed 2011-02-01 LTE-UEConTest_SIG - 2011-02-01
1154 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EUTRA test case 8.3.2.3 RP-51 RP-110162 approved R5 R5-50 R5-110192 agreed 2011-02-07 LTE-UEConTest_SIG - 2011-02-07
1155 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.12 RP-51 RP-110162 approved R5 R5-50 R5-110194 agreed 2011-02-07 LTE-UEConTest_SIG - 2011-02-07
1156 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 Correction of test case in 6.2.3.4 and 6.3.4 RP-51 RP-110162 approved R5 R5-50 R5-110205 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1157 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 Correction of test case in 8.1.1.6 RP-51 RP-110162 approved R5 R5-50 R5-110207 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1158 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 Correction of test case in 8.1.2.2 and 8.1.2.8 RP-51 RP-110162 approved R5 R5-50 R5-110208 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1159 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 Correction of test case in 8.1.3.4, 8.1.3.6 and 8.1.3.8 RP-51 RP-110162 approved R5 R5-50 R5-110209 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1160 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 Correction of test case in 8.3.1.11 RP-51 RP-110162 approved R5 R5-50 R5-110211 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1161 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Enhancement to EUTRA MAC test case 7.1.4.6 RP-51 RP-110162 approved R5 R5-50 R5-110220 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1162 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to EUTRA PDCP test cases 7.3.4.1 and 7.3.4.2 RP-51 RP-110162 approved R5 R5-50 R5-110223 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1163 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Update to test cases 8.1.2.6 and 8.1.2.9 RP-51 RP-110162 approved R5 R5-50 R5-110230 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1164 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Correction on TC numbering and update to test case 8.1.2.10 RP-51 RP-110162 approved R5 R5-50 R5-110231 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1165 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Update to test cases 8.4.2.2 and 8.4.2.4 RP-51 RP-110162 approved R5 R5-50 R5-110232 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1166 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Update to test case 9.2.1.2.11 RP-51 RP-110162 approved R5 R5-50 R5-110234 agreed 2011-02-08 LTE-UEConTest_SIG - 2011-02-08
1167 - F Rel-9 9.3.0 9.4.0 Correction to TC 6.2.1.1 RP-51 RP-110162 approved R5 R5-50 R5-110273 agreed 2011-02-09 LTE-UEConTest_SIG - 2011-02-09
1168 - F Rel-9 9.3.0 9.4.0 Correction to TC 6.2.1.2 RP-51 RP-110162 approved R5 R5-50 R5-110274 agreed 2011-02-09 LTE-UEConTest_SIG - 2011-02-09
1169 - F Rel-9 9.3.0 9.4.0 Correction to TC 8.1.3.6 RP-51 RP-110162 approved R5 R5-50 R5-110277 agreed 2011-02-09 LTE-UEConTest_SIG - 2011-02-09
1170 - F Rel-9 9.3.0 9.4.0 Correction to TC 9.2.3.3.1 RP-51 RP-110162 approved R5 R5-50 R5-110280 agreed 2011-02-09 LTE-UEConTest_SIG - 2011-02-09
1171 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to TC 9.2.1.1.26 RP-51 RP-110162 approved R5 R5-50 R5-110305 agreed 2011-02-10 LTE-UEConTest_SIG - 2011-02-10
1172 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Update of EMM test case 9.3.1.7a RP-51 RP-110162 approved R5 R5-50 R5-110329 agreed 2011-02-10 LTE-UEConTest_SIG - 2011-02-10
1173 - F Rel-9 9.3.0 9.4.0 Addition of new test case on Service request for mobile originating 1xCS fallback emergency call RP-51 RP-110174 approved R5 R5-50 R5-110341 agreed 2011-02-10 IMS_EMER_GPRS_EPS_UEConTest - 2011-02-10
1174 - F Rel-9 9.3.0 9.4.0 Addition of new test case on emergency call in non-allowed CSG cell RP-51 RP-110174 approved R5 R5-50 R5-110342 agreed 2011-02-10 IMS_EMER_GPRS_EPS_UEConTest - 2011-02-10
1175 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTR-1XRTT test case 6.2.2.4 RP-51 RP-110162 approved R5 R5-50 R5-110386 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1176 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTR-1XRTT test case 6.2.3.9 RP-51 RP-110162 approved R5 R5-50 R5-110387 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1177 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTR-1XRTT test case 6.2.3.10 RP-51 RP-110162 approved R5 R5-50 R5-110388 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1178 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTR-1XRTT test cases 8.4.7.3 RP-51 RP-110162 approved R5 R5-50 R5-110389 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1179 - F Rel-9 9.3.0 9.4.0 GCF Priority 3: Correction to EUTR-1XRTT test cases 8.4.7.4 RP-51 RP-110162 approved R5 R5-50 R5-110390 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1180 - F Rel-9 9.3.0 9.4.0 GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.5 RP-51 RP-110162 approved R5 R5-50 R5-110392 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1181 - F Rel-9 9.3.0 9.4.0 GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.6 RP-51 RP-110162 approved R5 R5-50 R5-110393 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1182 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to EMM test case 9.2.1.1.2 RP-51 RP-110162 approved R5 R5-50 R5-110400 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1183 - F Rel-9 9.3.0 9.4.0 Addition of new test case 11.2.5 RP-51 RP-110174 approved R5 R5-50 R5-110440 agreed 2011-02-11 IMS_EMER_GPRS_EPS_UEConTest - 2011-02-11
1184 - F Rel-9 9.3.0 9.4.0 Addition of new test case 11.2.4 RP-51 RP-110174 approved R5 R5-50 R5-110442 agreed 2011-02-11 IMS_EMER_GPRS_EPS_UEConTest - 2011-02-11
1185 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Addition of new Multilayer Procedures test case 13.4.1.3 RP-51 RP-110162 approved R5 R5-50 R5-110450 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1186 - F Rel-9 9.3.0 9.4.0 New TC 11.2.6 Normal tracking area update for emergency bearer services Local emergency list sent RP-51 RP-110174 approved R5 R5-50 R5-110477 agreed 2011-02-11 IMS_EMER_GPRS_EPS_UEConTest - 2011-02-11
1187 - F Rel-9 9.3.0 9.4.0 GCF Priority 1..4 - Editorial corrections to EMM test cases RP-51 RP-110162 approved R5 R5-50 R5-110486 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1188 - F Rel-9 9.3.0 9.4.0 GCF P3 : Corrections to DL and UL SPS grant test cases RP-51 RP-110162 approved R5 R5-50 R5-110504 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1189 - F Rel-9 9.3.0 9.4.0 Correction to GCF WI-081 MAC test case 7.1.4.4 RP-51 RP-110162 approved R5 R5-50 R5-110514 agreed 2011-02-11 LTE-UEConTest_SIG - 2011-02-11
1190 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction of Idle testcase 6.2.3.5 RP-51 RP-110162 approved R5 R5-50 R5-110602 agreed 2011-02-14 LTE-UEConTest_SIG - 2011-02-14
1191 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction of Idle testcase 6.2.3.13 RP-51 RP-110162 approved R5 R5-50 R5-110603 agreed 2011-02-14 LTE-UEConTest_SIG - 2011-02-14
1192 - F Rel-9 9.3.0 9.4.0 GCF Priority 9 - Correction of Idle testcase 6.2.3.31 RP-51 RP-110162 approved R5 R5-50 R5-110604 agreed 2011-02-14 LTE-UEConTest_SIG - 2011-02-14
1193 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to GCF WI-081 UTRAN - LTE Testcase 6.2.3.3 RP-51 RP-110162 approved R5 R5-50 R5-110677 agreed 2011-02-21 LTE-UEConTest_SIG - 2011-02-21
1194 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.1 RP-51 RP-110163 approved R5 R5-50 R5-110711 agreed 2011-02-22 LTE-UEConTest_SIG - 2011-02-22
1195 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.5 RP-51 RP-110163 approved R5 R5-50 R5-110712 agreed 2011-02-22 LTE-UEConTest_SIG - 2011-02-22
1196 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to E-UTRA MAC test case 7.1.3.3 RP-51 RP-110163 approved R5 R5-50 R5-110713 agreed 2011-02-22 LTE-UEConTest_SIG - 2011-02-22
1197 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.3.3.1 RP-51 RP-110163 approved R5 R5-50 R5-110717 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1198 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.10 RP-51 RP-110163 approved R5 R5-50 R5-110718 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1199 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 Correction of test cases in 8.3.3 RP-51 RP-110163 approved R5 R5-50 R5-110719 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1200 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EUTRA Idle Mode test case 6.2.3.5 RP-51 RP-110163 approved R5 R5-50 R5-110721 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1201 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to Idle mode test cases RP-51 RP-110163 approved R5 R5-50 R5-110722 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1202 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Update of idle mode TC 6.1.2.7 RP-51 RP-110163 approved R5 R5-50 R5-110723 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1203 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EUTRA PDCP test cases 7.3.5.2 and 7.3.5.4 RP-51 RP-110163 approved R5 R5-50 R5-110724 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1204 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EUTRA RRC test case 8.1.2.7 RP-51 RP-110163 approved R5 R5-50 R5-110725 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1205 - F Rel-9 9.3.0 9.4.0 GCF priority 2: Correction of sysinfo combination in EMM and ESM test cases RP-51 RP-110163 approved R5 R5-50 R5-110726 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1206 - F Rel-9 9.3.0 9.4.0 GCF Priority 2-Correction to TC-9.2.1.1.1a RP-51 RP-110163 approved R5 R5-50 R5-110728 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1207 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Addition of new TC 6.3.2 Inter-RAT cell reselection / From GSM_Idle/GPRS Packet_Idle to E-UTRA idle CSG cell RP-51 RP-110163 approved R5 R5-50 R5-110730 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1208 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Update to test case 6.3.3 and 6.3.4 RP-51 RP-110163 approved R5 R5-50 R5-110731 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1209 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Addition of new test case 6.2.2.x for Inter-RAT Cell Selection RP-51 RP-110163 approved R5 R5-50 R5-110732 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1210 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.1.1.6 RP-51 RP-110163 approved R5 R5-50 R5-110733 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1211 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.3.2.7 RP-51 RP-110163 approved R5 R5-50 R5-110734 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1212 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.7 RP-51 RP-110163 approved R5 R5-50 R5-110735 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1213 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.4 RP-51 RP-110163 approved R5 R5-50 R5-110737 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1214 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.23 RP-51 RP-110163 approved R5 R5-50 R5-110738 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1215 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.9 RP-51 RP-110163 approved R5 R5-50 R5-110739 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1216 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.25 RP-51 RP-110163 approved R5 R5-50 R5-110740 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1217 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.16 RP-51 RP-110163 approved R5 R5-50 R5-110741 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1218 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test cases 9.3.2.2 and 9.3.2.2a RP-51 RP-110163 approved R5 R5-50 R5-110742 agreed 2011-02-23 LTE-UEConTest_SIG - 2011-02-23
1219 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.3.1.15 RP-51 RP-110163 approved R5 R5-50 R5-110751 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1220 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.3.1.3 RP-51 RP-110163 approved R5 R5-50 R5-110752 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1221 - F Rel-9 9.3.0 9.4.0 Correction to TC 9.2.1.1.25 RP-51 RP-110163 approved R5 R5-50 R5-110753 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1222 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to test case 9.3.1.6 RP-51 RP-110163 approved R5 R5-50 R5-110754 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1223 - F Rel-9 9.3.0 9.4.0 GCF Priority 3- TC 9.2.3.2.1a RP-51 RP-110163 approved R5 R5-50 R5-110755 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1224 - F Rel-9 9.3.0 9.4.0 GCF Priority 3-Correction to TC 13.1.4 RP-51 RP-110163 approved R5 R5-50 R5-110756 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1225 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to MultiLayer test case 13.3.1.1 RP-51 RP-110163 approved R5 R5-50 R5-110758 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1226 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to Multilayer test case 13.1.3 RP-51 RP-110163 approved R5 R5-50 R5-110760 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1227 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Addition of E-UTRAN test case 6.1.1.3 for Cell reselection of ePLMN in manual mode RP-51 RP-110163 approved R5 R5-50 R5-110764 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1228 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Addition of E-UTRAN test case 6.1.2.1 for Cell selection in forbidden Tracking Area RP-51 RP-110163 approved R5 R5-50 R5-110765 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1229 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Correction to test case 6.2.1.3 RP-51 RP-110163 approved R5 R5-50 R5-110767 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1230 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Update to test case 6.3.7 and 6.3.8 RP-51 RP-110163 approved R5 R5-50 R5-110768 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1231 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 Correction of test case in 8.1.3.7 RP-51 RP-110163 approved R5 R5-50 R5-110769 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1232 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Correction to EUTRA RRC test case 8.1.2.6 RP-51 RP-110163 approved R5 R5-50 R5-110770 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1233 - F Rel-9 9.3.0 9.4.0 Correction to TC 9.2.3.2.1c RP-51 RP-110163 approved R5 R5-50 R5-110771 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1234 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.10 RP-51 RP-110163 approved R5 R5-50 R5-110772 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1235 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.9 RP-51 RP-110163 approved R5 R5-50 R5-110773 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1236 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EMM test case 9.3.1.7a RP-51 RP-110163 approved R5 R5-50 R5-110774 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1237 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EMM test case 9.3.1.7 RP-51 RP-110163 approved R5 R5-50 R5-110775 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1238 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.14 RP-51 RP-110163 approved R5 R5-50 R5-110776 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1239 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.13 RP-51 RP-110163 approved R5 R5-50 R5-110777 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1240 - F Rel-9 9.3.0 9.4.0 GCF Priority 4: Correction test case 9.2.1.2.1b, 9.2.1.2.1c and 9.2.3.2.1b to check the signalled MS Radio Access capability RP-51 RP-110163 approved R5 R5-50 R5-110778 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1241 - F Rel-9 9.3.0 9.4.0 GCF Priority 4: Correction to ESM test case 10.9.1 RP-51 RP-110163 approved R5 R5-50 R5-110779 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1242 - F Rel-9 9.3.0 9.4.0 GCF Priority 4: New TC 13.1.9 Call setup from E-UTRA RRC_IDLE - CS fallback to GSM with CCO without NACC - MO call RP-51 RP-110163 approved R5 R5-50 R5-110781 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1243 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to TCs 9.2.1.2.1 and 13.1.7 RP-51 RP-110163 approved R5 R5-50 R5-110783 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1244 - F Rel-9 9.3.0 9.4.0 Priority X Addition new test case 6.2.3.32 RP-51 RP-110163 approved R5 R5-50 R5-110790 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1245 - F Rel-9 9.3.0 9.4.0 Correction to TC 6.3.7 RP-51 RP-110163 approved R5 R5-50 R5-110791 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1246 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Update to EUTRA RLC test cases 7.2.3.6, 7.2.3.7, 7.2.3.8 and 7.2.3.17 RP-51 RP-110163 approved R5 R5-50 R5-110792 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1247 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EMM test case 9.2.2.2.2 RP-51 RP-110163 approved R5 R5-50 R5-110793 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1248 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Update of EMM test case 9.2.3.3.6 RP-51 RP-110163 approved R5 R5-50 R5-110794 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1249 - F Rel-9 9.3.0 9.4.0 GCF Priority X: Adding test case 9.2.1.2.1d Combined attach procedure / Success / EPS and CS Fallback not preferred/data centric UE RP-51 RP-110163 approved R5 R5-50 R5-110796 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1250 - F Rel-9 9.3.0 9.4.0 GCF Priority X - Update to test case 13.1.15 RP-51 RP-110163 approved R5 R5-50 R5-110797 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1251 - F Rel-9 9.3.0 9.4.0 Update to chapter '4.3 Repetition of tests' to clarify re-testing in test cases, where HARQ retransmissions are not tolerated RP-51 RP-110163 approved R5 R5-50 R5-110798 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1252 - F Rel-9 9.3.0 9.4.0 Introduction of new test case 11.2.1 for CT1 aspects of emergency calls RP-51 RP-110174 approved R5 R5-50 R5-110813 agreed 2011-02-24 IMS_EMER_GPRS_EPS_UEConTest - 2011-02-24
1253 - F Rel-9 9.3.0 9.4.0 Priority 2 -4: Adjusting the power levels of multiple cell, multiple RAT EMM test cases RP-51 RP-110163 approved R5 R5-50 R5-110877 agreed 2011-03-08 LTE-UEConTest_SIG - 2011-03-08
1254 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to SMS test cases 11.1.1, 11.1.2, 11.1.3, 11.1.4 RP-51 RP-110163 approved R5 R5-50 R5-110830 agreed 2011-02-24 LTE-UEConTest_SIG - 2011-02-24
1255 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to E-UTRA RLC test case 7.2.3.16 RP-51 RP-110163 approved R5 R5-50 R5-110876 agreed 2011-03-08 LTE-UEConTest_SIG - 2011-03-08
1256 - F Rel-9 9.3.0 9.4.0 GCF Priority 2 - Correction to EUTRA IDLE MODE test case 6.1.2.9 RP-51 RP-110162 approved R5 R5-50 R5-110062 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1257 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to MultiLayer test case 13.4.1.2 RP-51 RP-110162 approved R5 R5-50 R5-110072 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1258 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.1.2.6 RP-51 RP-110162 approved R5 R5-50 R5-110077 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1259 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to ESM test case 10.8.2 RP-51 RP-110162 approved R5 R5-50 R5-110078 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1260 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.1.2.3 RP-51 RP-110162 approved R5 R5-50 R5-110081 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1261 - F Rel-9 9.3.0 9.4.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.9 RP-51 RP-110162 approved R5 R5-50 R5-110083 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1262 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.2.1.9 RP-51 RP-110162 approved R5 R5-50 R5-110085 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1263 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.24 RP-51 RP-110162 approved R5 R5-50 R5-110086 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1264 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.11 RP-51 RP-110162 approved R5 R5-50 R5-110087 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1265 - F Rel-9 9.3.0 9.4.0 GCF Priority 3 - Correction to MultiLayer test case 13.3.1.2 RP-51 RP-110162 approved R5 R5-50 R5-110091 agreed 2011-01-19 LTE-UEConTest_SIG - 2011-01-19
1266 - F Rel-9 9.3.0 9.4.0 CGF Priority 4 - Correction to EUTRA DRB test case 12.3.2 RP-51 RP-110162 approved R5 R5-50 R5-110097 agreed 2011-01-25 LTE-UEConTest_SIG - 2011-01-25
1267 - F Rel-9 9.3.0 9.4.0 GCF Priority 4 - Correction of cell number description for test case 6.1.1.6 RP-51 RP-110162 approved R5 R5-50 R5-110122 agreed 2011-01-30 LTE-UEConTest_SIG - 2011-01-30
1268 - F Rel-9 9.3.0 9.4.0 GCF priority 2-4: correction of EMM, RRC, Idle mode TC postamble in connected mode RP-51 RP-110162 approved R5 R5-50 R5-110133 agreed 2011-01-31 LTE-UEConTest_SIG - 2011-01-31
1269 - F Rel-9 9.3.0 - Addition of new idle mode test case for manual CSG ID selection accross PLMNs RP-51 RP-110179 withdrawn R5 R5-50 R5-110814 agreed 2011-02-24 EHNB-LTE_UEConTest showed wrong spec number (and wrong CR number) -> RP-110363 2011-02-24
1269 - F Rel-9 9.3.0 9.4.0 Addition of new idle mode test case for manual CSG ID selection accross PLMNs RP-51 RP-110363 approved R5 R5-50 R5-110814 agreed 2011-02-24 EHNB-LTE_UEConTest - 2011-02-24
1270 - F Rel-9 9.3.0 - Addition of new idle mode test case for inter-freq cell reselection to hybrid cell based on CSG autonomous search RP-51 RP-110179 reissued R5 R5-50 R5-110815 agreed 2011-02-24 EHNB-LTE_UEConTest showed wrong spec number (and wrong CR number) -> RP-110363 2011-02-24
1270 - F Rel-9 9.3.0 9.4.0 Addition of new idle mode test case for inter-freq cell reselection to hybrid cell based on CSG autonomous search RP-51 RP-110363 approved R5 R5-50 R5-110815 agreed 2011-02-24 EHNB-LTE_UEConTest - 2011-02-24
1271 - B Rel-9 9.4.0 - CR 36.523-1-1271 Addition of new Test case 8.4.4.4 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (CCN mode) - - - G3new G3new-50 GP-110531 withdrawn 2011-05-03 LTE-UEConTest_SIG - 2011-05-03
1272 - B Rel-9 9.4.0 - CR 36.523-1-1272 Addition of new Test case 8.4.4.5 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (NC2 mode) - - - G3new G3new-50 GP-110532 withdrawn 2011-05-03 LTE-UEConTest_SIG - 2011-05-03
1273 - F Rel-9 9.4.0 - CR 36.523-1-1273 Modification of tc 6.2.3.19 - - - G3new G3new-50 GP-110552 revised 2011-05-06 LTE-UEConTest_SIG - 2011-05-06
1273 1 F Rel-9 9.4.0 9.5.0 CR 36.523-1-1273 Modification of tc 6.2.3.19 GP-50 GP-110839 approved G3new G3new-50 GP-110839 agreed 2011-05-17 LTE-UEConTest_SIG - 2011-05-17
1274 - F Rel-9 9.4.0 9.5.0 CR 36.523-1-1274 Removal of LTE TC 6.2.3.2 specification due to duplication GP-50 GP-110571 approved G3new G3new-50 GP-110571 agreed 2011-05-06 LTE-UEConTest_SIG - 2011-05-06
1275 - F Rel-9 9.4.0 9.5.0 CR 36.523-1-1275 Removal of Test Case 8.4.4.2 GP-50 GP-110575 approved G3new G3new-50 GP-110575 agreed 2011-05-08 LTE-UEConTest_SIG - 2011-05-08
1276 - F Rel-9 9.4.0 - CR 36.523-1-1276 Addition of new Test Case 8.4.4.3 - Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (NC1 mode) - - - G3new G3new-50 GP-110548 withdrawn 2011-05-09 LTE-UEConTest_SIG - 2011-05-09
1277 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.2.4.7 RP-52 RP-110648 approved R5 R5-51 R5-112079 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1278 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.1.1.2 RP-52 RP-110648 approved R5 R5-51 R5-112080 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1279 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EUTRA Idle mode test case 6.1.1.1 RP-52 RP-110648 approved R5 R5-51 R5-112082 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1280 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EUTRA PDCP test cases 7.3.4.1 and 7.3.4.2 RP-52 RP-110648 approved R5 R5-51 R5-112083 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1281 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Correction to EUTRA RRC test case 8.5.1.4 RP-52 RP-110648 approved R5 R5-51 R5-112085 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1283 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EUTRA Idle mode test case 6.1.2.6 RP-52 RP-110648 approved R5 R5-51 R5-112088 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1284 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EMM test case 9.2.1.1.1a RP-52 RP-110648 approved R5 R5-51 R5-112089 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1285 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.3 RP-52 RP-110648 approved R5 R5-51 R5-112090 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1286 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.15 RP-52 RP-110648 approved R5 R5-51 R5-112093 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1287 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EMM test case 9.2.3.1.5 RP-52 RP-110648 approved R5 R5-51 R5-112094 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1288 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EMM test case 9.2.1.1.12 RP-52 RP-110648 approved R5 R5-51 R5-112095 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1289 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.2 RP-52 RP-110648 approved R5 R5-51 R5-112096 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1290 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.13 RP-52 RP-110648 approved R5 R5-51 R5-112097 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1291 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.4 RP-52 RP-110648 approved R5 R5-51 R5-112098 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1292 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EMM test cases 9.2.1.2.1, 9.2.2.2.2 RP-52 RP-110648 approved R5 R5-51 R5-112105 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1293 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to ESM test case 10.3.1 RP-52 RP-110648 approved R5 R5-51 R5-112106 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1294 - F Rel-9 9.4.0 9.5.0 Removal of ESM test case 10.6.2 RP-52 RP-110648 approved R5 R5-51 R5-112107 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1295 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EMM test case 9.3.1.7 and 9.3.1.7a RP-52 RP-110648 approved R5 R5-51 R5-112109 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1296 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to update reference to 36.508 table 6.4.2.7A-1 and 6.4.2.7A-2 RP-52 RP-110648 approved R5 R5-51 R5-112118 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1297 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Correction to EMM test cases 9.2.3.2.5, 9.2.3.2.6 and 9.2.3.2.7 RP-52 RP-110648 approved R5 R5-51 R5-112121 agreed 2011-04-18 LTE-UEConTest_SIG - 2011-04-18
1298 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to specific message content for RRC Connection Reconfiguration message (Handover test cases) RP-52 RP-110648 approved R5 R5-51 R5-112122 agreed 2011-04-19 LTE-UEConTest_SIG - 2011-04-19
1299 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to GCF WI-081 MAC Testcase 7.1.2.9 RP-52 RP-110648 approved R5 R5-51 R5-112145 agreed 2011-04-26 LTE-UEConTest_SIG - 2011-04-26
1300 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - remove the message contents from 14.1, 14.2 and 14.3 RP-52 RP-110648 approved R5 R5-51 R5-112162 agreed 2011-04-26 LTE-UEConTest_SIG - 2011-04-26
1301 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EUTRA RLC test case 7.2.2.10 RP-52 RP-110648 approved R5 R5-51 R5-112205 agreed 2011-04-27 LTE-UEConTest_SIG - 2011-04-27
1302 - F Rel-9 9.4.0 9.5.0 GCF priority 4: Correction of UTRA cell in EMM test case 9.2.3.2.8 RP-52 RP-110648 approved R5 R5-51 R5-112208 agreed 2011-04-27 LTE-UEConTest_SIG - 2011-04-27
1303 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correcting usage of generic test procedure 36.508 cl. 6.4.2.8 RP-52 RP-110648 approved R5 R5-51 R5-112257 agreed 2011-04-28 LTE-UEConTest_SIG - 2011-04-28
1304 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Correction to Multilayer test cases 13.2.1, 13.4.1.2, 13.4.1.3 RP-52 RP-110648 approved R5 R5-51 R5-112262 agreed 2011-04-28 LTE-UEConTest_SIG - 2011-04-28
1305 - F Rel-9 9.4.0 9.5.0 GCF priority 1 - Correction to EUTRA MAC test case 7.1.4.13 RP-52 RP-110648 approved R5 R5-51 R5-112266 agreed 2011-04-28 LTE-UEConTest_SIG - 2011-04-28
1306 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Update of EMM test case 9.2.1.1.4 RP-52 RP-110648 approved R5 R5-51 R5-112276 agreed 2011-04-28 LTE-UEConTest_SIG - 2011-04-28
1307 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Editorial correction to EMM test case 9.2.1.1.26 RP-52 RP-110648 approved R5 R5-51 R5-112287 agreed 2011-04-28 LTE-UEConTest_SIG - 2011-04-28
1308 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Correction to TC 8.1.3.7 RP-52 RP-110648 approved R5 R5-51 R5-112304 agreed 2011-04-28 LTE-UEConTest_SIG - 2011-04-28
1309 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Update of EMM TC 9.2.1.2.13 RP-52 RP-110648 approved R5 R5-51 R5-112351 agreed 2011-04-29 LTE-UEConTest_SIG - 2011-04-29
1310 - F Rel-9 9.4.0 9.5.0 Update of HeNB enhancements test case 6.3.9 RP-52 RP-110665 approved R5 R5-51 R5-112390 agreed 2011-04-29 EHNB-LTE_UEConTest - 2011-04-29
1311 - F Rel-9 9.4.0 9.5.0 Update of HeNB enhancements test case 6.4.2 RP-52 RP-110665 approved R5 R5-51 R5-112391 agreed 2011-04-29 EHNB-LTE_UEConTest - 2011-04-29
1312 - F Rel-9 9.4.0 9.5.0 Update of idle mode section Table 6.0.1-2 RP-52 RP-110665 approved R5 R5-51 R5-112392 agreed 2011-04-29 EHNB-LTE_UEConTest - 2011-04-29
1313 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.5 RP-52 RP-110648 approved R5 R5-51 R5-112434 agreed 2011-04-29 LTE-UEConTest_SIG - 2011-04-29
1314 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.1 RP-52 RP-110648 approved R5 R5-51 R5-112483 agreed 2011-04-29 LTE-UEConTest_SIG - 2011-04-29
1315 - F Rel-9 9.4.0 9.5.0 GCF Priority 3: Update of TC 8.3.1.4 RP-52 RP-110648 approved R5 R5-51 R5-112534 agreed 2011-04-29 LTE-UEConTest_SIG - 2011-04-29
1316 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 – Correction to test case 9.2.3.1.25 RP-52 RP-110648 approved R5 R5-51 R5-112569 agreed 2011-05-05 LTE-UEConTest_SIG - 2011-05-05
1317 - F Rel-9 9.4.0 9.5.0 GCF priority 1 – Correction to EUTRA MAC test case 7.1.4.10 RP-52 RP-110648 approved R5 R5-51 R5-112753 agreed 2011-05-24 LTE-UEConTest_SIG - 2011-05-24
1318 - F Rel-9 9.4.0 9.5.0 New TC 6.4.6 Inter-RAT cell reselection / From UTRA CELL_PCH to E-UTRA RRC_IDLE member hybrid cell RP-52 RP-110665 approved R5 R5-51 R5-112594 agreed 2011-05-09 EHNB-LTE_UEConTest - 2011-05-09
1319 - F Rel-9 9.4.0 9.5.0 New TC 6.4.7 Inter-RAT cell reselection / From GERAN to E-UTRA RRC_IDLE member hybrid cell RP-52 RP-110665 approved R5 R5-51 R5-112595 agreed 2011-05-09 EHNB-LTE_UEConTest - 2011-05-09
1320 - F Rel-9 9.4.0 9.5.0 GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.13 RP-52 RP-110648 approved R5 R5-51 R5-112602 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1321 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.6 RP-52 RP-110648 approved R5 R5-51 R5-112603 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1322 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.6 RP-52 RP-110648 approved R5 R5-51 R5-112604 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1323 - F Rel-9 9.4.0 9.5.0 GCF priority 1 - Modification to EUTRA RLC test case 7.2.3.9 RP-52 RP-110648 approved R5 R5-51 R5-112605 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1324 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.18 RP-52 RP-110648 approved R5 R5-51 R5-112606 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1325 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 Correction of CSG test cases RP-52 RP-110648 approved R5 R5-51 R5-112607 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1326 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EUTRA PDCP test cases 7.3.5.2 RP-52 RP-110648 approved R5 R5-51 R5-112608 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1327 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Review of detach at switch/power off procedure in EMM test cases and Emergency calls over IMS test case 11.2.3 RP-52 RP-110648 approved R5 R5-51 R5-112610 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1328 - F Rel-9 9.4.0 - GCF Priority 2 - Correction to EMM test case 9.2.3.1.2 RP-52 RP-110649 reissued R5 R5-51 R5-112611 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1328 - F Rel-9 9.4.0 9.5.0 Correction to EMM test case 9.2.3.1.2 RP-52 RP-110915 approved R5 - R5-112611 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1329 - F Rel-9 9.4.0 - GCF Priority 3 Correction of Measurement configuration test cases RP-52 RP-110649 reissued R5 R5-51 R5-112614 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1329 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction of Measurement configuration test cases RP-52 RP-110915 approved R5 - R5-112614 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1330 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test cases 9.2.1.2.5, 9.2.1.2.6 and 9.2.1.2.7 RP-52 RP-110649 reissued R5 R5-51 R5-112615 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1330 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.5, 9.2.1.2.6 and 9.2.1.2.7 RP-52 RP-110915 approved R5 - R5-112615 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1331 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test cases 9.3.1.4 & 9.3.1.5 RP-52 RP-110649 reissued R5 R5-51 R5-112616 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1331 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test cases 9.3.1.4 & 9.3.1.5 RP-52 RP-110915 approved R5 - R5-112616 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1332 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test case 9.2.3.1.14 RP-52 RP-110649 reissued R5 R5-51 R5-112617 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1332 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.14 RP-52 RP-110915 approved R5 - R5-112617 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1333 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test case 9.2.3.1.15 RP-52 RP-110649 reissued R5 R5-51 R5-112618 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1333 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.15 RP-52 RP-110915 approved R5 - R5-112618 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1334 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test case 9.2.3.2.3 RP-52 RP-110649 reissued R5 R5-51 R5-112619 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1334 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.3.2.3 RP-52 RP-110915 approved R5 - R5-112619 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1335 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test case 9.2.3.2.9 RP-52 RP-110649 reissued R5 R5-51 R5-112620 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1335 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.3.2.9 RP-52 RP-110915 approved R5 - R5-112620 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1336 - F Rel-9 9.4.0 - GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.3 RP-52 RP-110649 reissued R5 R5-51 R5-112754 agreed 2011-05-24 LTE-UEConTest_SIG - 2011-05-24
1336 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.3 RP-52 RP-110915 approved R5 - R5-112754 - 2011-05-25 LTE-UEConTest_SIG - 2011-06-03
1337 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test case 9.2.1.2.8 RP-52 RP-110649 reissued R5 R5-51 R5-112622 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1337 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.8 RP-52 RP-110915 approved R5 - R5-112622 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1338 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test case 9.2.1.2.9 RP-52 RP-110649 reissued R5 R5-51 R5-112623 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1338 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.9 RP-52 RP-110915 approved R5 - R5-112623 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1339 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to EMM test case 9.2.3.2.12 RP-52 RP-110649 reissued R5 R5-51 R5-112624 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1339 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to EMM test case 9.2.3.2.12 RP-52 RP-110915 approved R5 - R5-112624 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1340 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to time requirements at cell reselection in EMM test cases RP-52 RP-110649 reissued R5 R5-51 R5-112625 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1340 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to time requirements at cell reselection in EMM test cases RP-52 RP-110915 approved R5 - R5-112625 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1341 - F Rel-9 9.4.0 - GCF Priority 3 - Addition of new test case 9.2.3.1.22 RP-52 RP-110649 reissued R5 R5-51 R5-112626 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1341 - F Rel-9 9.4.0 9.5.0 Addition of new test case 9.2.3.1.22 RP-52 RP-110915 approved R5 - R5-112626 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1342 - F Rel-9 9.4.0 - Addition of GCF Priority 3 EMM test case 9.2.2.1.4 RP-52 RP-110649 reissued R5 R5-51 R5-112628 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1342 - F Rel-9 9.4.0 9.5.0 Addition of GCF Priority 3 EMM test case 9.2.2.1.4 RP-52 RP-110915 approved R5 - R5-112628 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1343 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to Multilayer test case 13.1.3 and 13.1.15 RP-52 RP-110649 reissued R5 R5-51 R5-112629 agreed 2011-05-10 LTE-UEConTest_SIG - 2011-05-10
1343 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Correction to Multilayer test case 13.1.3 and 13.1.15 RP-52 RP-110915 approved R5 - R5-112629 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1344 - F Rel-9 9.4.0 - GCF Priority 3 - New Multi Layer TC 13.4.2.4 Inter-system mobility / Service based redirection from UTRA to E-UTRA RP-52 RP-110649 reissued R5 R5-51 R5-112630 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1344 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - New Multi Layer TC 13.4.2.4 Inter-system mobility / Service based redirection from UTRA to E-UTRA RP-52 RP-110915 approved R5 - R5-112630 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1345 - F Rel-9 9.4.0 - GCF Priority 3 - Addition of new test case 13.4.2.2 RP-52 RP-110649 reissued R5 R5-51 R5-112631 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1345 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Addition of new test case 13.4.2.2 RP-52 RP-110915 approved R5 - R5-112631 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1346 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to test case 13.1.4 RP-52 RP-110649 reissued R5 R5-51 R5-112632 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1346 - F Rel-9 9.4.0 9.5.0 GCF Priority 3- Correction to test case 13.1.4 RP-52 RP-110915 approved R5 - R5-112632 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1347 - F Rel-9 9.4.0 - GCF Priority 3 - Addition of new test case 8.4.3.1 Inter-RAT handover / From E-UTRA to GPRS / PS HO RP-52 RP-110649 reissued R5 R5-51 R5-112634 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1347 - F Rel-9 9.4.0 9.5.0 GCF Prio 3: Addition of new test case 8.4.3.1 Inter-RAT handover / From E-UTRA to GPRS / PS HO RP-52 RP-110915 approved R5 - R5-112634 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1348 - F Rel-9 9.4.0 - GCF Priority 3 - Addition of new test case 13.3.2.1 RP-52 RP-110649 reissued R5 R5-51 R5-112636 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1348 - F Rel-9 9.4.0 9.5.0 GCF Priority 3 - Addition of new test case 13.3.2.1 RP-52 RP-110915 approved R5 - R5-112636 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1349 - F Rel-9 9.4.0 - Correction to EMM test case to allow execution of all RAT specific branches using a single MRAT device RP-52 RP-110649 reissued R5 R5-51 R5-112638 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1349 - F Rel-9 9.4.0 9.5.0 Correction to EMM test case to allow execution of all RAT specific branches using a single MRAT device RP-52 RP-110915 approved R5 - R5-112638 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1350 - F Rel-9 9.4.0 - GCF Priority 4 Addition new test case 9.2.3.1.9 RP-52 RP-110649 reissued R5 R5-51 R5-112639 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1350 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Addition new test case 9.2.3.1.9 RP-52 RP-110915 approved R5 - R5-112639 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1351 - F Rel-9 9.4.0 - GCF Priority 4 - Corrections to Extended Service Request message in 9.2.3.2.1b and 13.1.8 RP-52 RP-110649 reissued R5 R5-51 R5-112640 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1351 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Corrections to Extended Service Request message in 9.2.3.2.1b and 13.1.8 RP-52 RP-110915 approved R5 - R5-112640 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1352 - F Rel-9 9.4.0 - GCF priority 4 - Addition of EMM test case 9.2.3.1.20 RP-52 RP-110649 reissued R5 R5-51 R5-112641 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1352 - F Rel-9 9.4.0 9.5.0 GCF priority 4 - Addition of EMM test case 9.2.3.1.20 RP-52 RP-110915 approved R5 - R5-112641 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1353 - F Rel-9 9.4.0 - GCF Priority 4 - Add new test case 13.4.3.1 RP-52 RP-110649 reissued R5 R5-51 R5-112642 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1353 - F Rel-9 9.4.0 9.5.0 GCF Priority 4 - Add new test case 13.4.3.1 RP-52 RP-110915 approved R5 - R5-112642 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1354 - F Rel-9 9.4.0 - GCF Priority 1 - Correction to EMM test case 9.2.1.1.1 RP-52 RP-110649 reissued R5 R5-51 R5-112643 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1354 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Correction to EMM test case 9.2.1.1.1 RP-52 RP-110915 approved R5 - R5-112643 - 2011-05-25 LTE-UEConTest_SIG - 2011-06-03
1355 - F Rel-9 9.4.0 9.5.0 Add new test case 11.2.2 RP-52 RP-110660 approved R5 R5-51 R5-112654 agreed 2011-05-11 IMS_EMER_GPRS_EPS_UEConTest - 2011-05-11
1356 - F Rel-9 9.4.0 9.5.0 Addition of new test case on Attach for emergency bearer services / Rejected / No suitable cells in tracking area / Emergency call using the CS domain RP-52 RP-110660 approved R5 R5-51 R5-112657 agreed 2011-05-11 IMS_EMER_GPRS_EPS_UEConTest - 2011-05-11
1357 - F Rel-9 9.4.0 9.5.0 Update of IMS Emergency TC 11.2.6 RP-52 RP-110660 approved R5 R5-51 R5-112658 agreed 2011-05-11 IMS_EMER_GPRS_EPS_UEConTest - 2011-05-11
1358 - F Rel-9 9.4.0 9.5.0 New TC for IMS Emergency 11.2.7 RP-52 RP-110660 approved R5 R5-51 R5-112659 agreed 2011-05-11 IMS_EMER_GPRS_EPS_UEConTest - 2011-05-11
1359 - F Rel-9 9.4.0 - GCF Priority 4 - Update of TC 13.1.9 MO call CS fallback to GSM with CCO without NACC RP-52 RP-110649 reissued R5 R5-51 R5-112660 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1359 - F Rel-9 9.4.0 9.5.0 Priority 4: Update of TC 13_1_9 MO call CS fallback to GSM with CCO without NACC RP-52 RP-110915 approved R5 - R5-112660 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1360 - F Rel-9 9.4.0 - GCF Priority 4 - New TC 13.1.10 MT call CS fallback to GSM with CCO without NACC PS service susspension RP-52 RP-110649 reissued R5 R5-51 R5-112661 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1360 - F Rel-9 9.4.0 9.5.0 Priority 4: New TC 13_1_10 MT call CS fallback to GSM with CCO without NACC PS service susspension RP-52 RP-110915 approved R5 - R5-112661 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1361 - F Rel-9 9.4.0 - GCF Priority X Correction of test case in 6.2.2.8 RP-52 RP-110649 reissued R5 R5-51 R5-112666 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1361 - F Rel-9 9.4.0 9.5.0 GCF Priority X - Correction of test case in 6.2.2.8 RP-52 RP-110915 approved R5 - R5-112666 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1362 - F Rel-9 9.4.0 - GCF Priority X - Addition of new test case 13.1.2a RP-52 RP-110649 reissued R5 R5-51 R5-112667 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1362 - F Rel-9 9.4.0 9.5.0 GCF Priority X - Addition of new test case 13.1.2a RP-52 RP-110915 approved R5 - R5-112667 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1363 - F Rel-9 9.4.0 - GCF Priority X - Addition of new test case 13.1.16 RP-52 RP-110649 reissued R5 R5-51 R5-112668 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1363 - F Rel-9 9.4.0 9.5.0 GCF Priority X - Addition of new test case 13.1.16 RP-52 RP-110915 approved R5 - R5-112668 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1364 - F Rel-9 9.4.0 - Update test case 8.1.2.11 RP-52 RP-110649 reissued R5 R5-51 R5-112671 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1364 - F Rel-9 9.4.0 9.5.0 Update test case 8.1.2.11 RP-52 RP-110915 approved R5 - R5-112671 - 2011-05-20 IMS_EMER_LTE_UEConTest - 2011-06-03
1365 - F Rel-9 9.4.0 - Update test case 8.1.2.12 RP-52 RP-110649 reissued R5 R5-51 R5-112672 agreed 2011-05-11 LTE-UEConTest_SIG - 2011-05-11
1365 - F Rel-9 9.4.0 9.5.0 Update test case 8.1.2.12 RP-52 RP-110915 approved R5 - R5-112672 - 2011-05-20 IMS_EMER_LTE_UEConTest - 2011-06-03
1366 - F Rel-9 9.4.0 9.5.0 GCF Priority X Addition new test case 6.4.3 RP-52 RP-110665 approved R5 R5-51 R5-112678 agreed 2011-05-12 EHNB-LTE_UEConTest - 2011-05-12
1367 - F Rel-9 9.4.0 9.5.0 GCF Priority X Addition new test case 6.4.4 RP-52 RP-110665 approved R5 R5-51 R5-112679 agreed 2011-05-12 EHNB-LTE_UEConTest - 2011-05-12
1368 - F Rel-9 9.4.0 9.5.0 GCF Priority X Addition new test case 6.4.5 RP-52 RP-110665 approved R5 R5-51 R5-112680 agreed 2011-05-12 EHNB-LTE_UEConTest - 2011-05-12
1369 - F Rel-9 9.4.0 9.5.0 Addition of new HeNB test case for intra-frequency SI acquisition RP-52 RP-110665 approved R5 R5-51 R5-112682 agreed 2011-05-12 EHNB-LTE_UEConTest - 2011-05-12
1370 - F Rel-9 9.4.0 9.5.0 GCF Priority X - Addition of new test case 6.4.1 RP-52 RP-110665 approved R5 R5-51 R5-112750 agreed 2011-05-24 EHNB-LTE_UEConTest - 2011-05-24
1371 - F Rel-9 9.4.0 - GCF Priority X - Add new test case 9.2.2.1.10 RP-52 RP-110649 reissued R5 R5-51 R5-112757 agreed 2011-05-24 LTE-UEConTest_SIG - 2011-05-24
1371 - F Rel-9 9.4.0 9.5.0 GCF Priority X - Add new test case 9.2.2.1.10 RP-52 RP-110915 approved R5 - R5-112757 - 2011-05-25 LTE-UEConTest_SIG - 2011-06-03
1372 - F Rel-9 9.4.0 - GCF priority 4 - Update Multi-layer Procedures test case 13.1.7 RP-52 RP-110649 reissued R5 R5-51 R5-112687 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1372 - F Rel-9 9.4.0 9.5.0 GCF priority 4 - Update Multi-layer Procedures test case 13.1.7 RP-52 RP-110915 approved R5 - R5-112687 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1373 - F Rel-9 9.4.0 - GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.11 RP-52 RP-110649 reissued R5 R5-51 R5-112688 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1373 - F Rel-9 9.4.0 9.5.0 GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.11 RP-52 RP-110915 approved R5 - R5-112688 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1374 - F Rel-9 9.4.0 - GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.12 RP-52 RP-110649 reissued R5 R5-51 R5-112689 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1374 - F Rel-9 9.4.0 9.5.0 GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.12 RP-52 RP-110915 approved R5 - R5-112689 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1375 - F Rel-9 9.4.0 - GCF Priority 2 - Correction to EUTRA Idle mode test case 6.3.6 RP-52 RP-110649 reissued R5 R5-51 R5-112690 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1375 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Correction to EUTRA Idle mode test case 6.3.6 RP-52 RP-110915 approved R5 - R5-112690 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1376 - F Rel-9 9.4.0 9.5.0 Addition of a new TC for MCCH information acquisition/UE is switched on RP-52 RP-110666 approved R5 R5-51 R5-112693 agreed 2011-05-12 MBMS_LTE-UEConTest - 2011-05-12
1377 - F Rel-9 9.4.0 9.5.0 Addition of a new TC for MCCH information acquisition/ when cell reselection to a cell in a new MBMS area RP-52 RP-110666 approved R5 R5-51 R5-112749 agreed 2011-05-24 MBMS_LTE-UEConTest - 2011-05-24
1378 - F Rel-9 9.4.0 9.5.0 Addition of a new TC for MCCH information acquisition/ UE handover to a cell in a new MBMS area RP-52 RP-110666 approved R5 R5-51 R5-112695 agreed 2011-05-12 MBMS_LTE-UEConTest - 2011-05-12
1379 - F Rel-9 9.4.0 - GCF Priority 3 - Correction to test case 13.1.2 RP-52 RP-110649 reissued R5 R5-51 R5-112701 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1379 - F Rel-9 9.4.0 9.5.0 GCF Priority 3- Correction to test case 13.1.2 RP-52 RP-110915 approved R5 - R5-112701 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1380 - F Rel-9 9.4.0 9.5.0 GCF priority 4 - Addition of EMM test case 9.2.3.3.3 RP-52 RP-110876 approved ZTE Corporation R5-51 R5-112756 agreed 2011-06-01 LTE-UEConTest_SIG - 2011-06-01
1381 - F Rel-9 9.4.0 - GCF priority 4 - Update Multi-layer Procedures test case 13.3.1.2 RP-52 RP-110649 reissued R5 R5-51 R5-112703 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1381 - F Rel-9 9.4.0 9.5.0 GCF priority 4 - Update Multi-layer Procedures test case 13.3.1.2 RP-52 RP-110915 approved R5 - R5-112703 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1382 - F Rel-9 9.4.0 - GCF Priority 2 - Corrections to EUTRA RRC test case 8.4.1.2 RP-52 RP-110649 reissued R5 R5-51 R5-112705 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1382 - F Rel-9 9.4.0 9.5.0 GCF Priority 2 - Corrections to EUTRA RRC test case 8.4.1.2 RP-52 RP-110915 approved R5 - R5-112705 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1383 - F Rel-9 9.4.0 - GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.17 RP-52 RP-110649 reissued R5 R5-51 R5-112755 agreed 2011-05-24 LTE-UEConTest_SIG - 2011-05-24
1383 - F Rel-9 9.4.0 9.5.0 GCF Priority 1 - Corrections to EUTRA RLC test case 7.2.3.17 RP-52 RP-110915 approved R5 - R5-112755 - 2011-05-25 LTE-UEConTest_SIG - 2011-06-03
1385 - F Rel-9 9.4.0 - GCF Priority 2: Update of test case 9.2.3.4.1 RP-52 RP-110649 reissued R5 R5-51 R5-112720 agreed 2011-05-12 LTE-UEConTest_SIG - 2011-05-12
1385 - F Rel-9 9.4.0 9.5.0 GCF Priority 2: Update of test case 9.2.3.4.1 RP-52 RP-110915 approved R5 - R5-112720 - 2011-05-20 LTE-UEConTest_SIG - 2011-06-03
1386 - F Rel-9 9.6.0 - CR 36.523-1-1386 Corrections to GERAN – LTE Tests - - - G3new G3new-51 GP-111045 revised 2011-08-23 GELTE - 2011-08-23
1386 - B Rel-9 9.4.0 9.5.0 CR 36.523-1-1386 Addition of new Test case 8.4.4.2 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (CCN mode) GP-50 GP-110831 approved G3new G3new-50 GP-110831 agreed 2011-05-17 LTE-UEConTest_SIG - 2011-05-17
1386 1 F Rel-9 9.5.0 9.6.0 CR 36.523-1-1386 Corrections to GERAN – LTE Tests GP-51 GP-111104 approved G3new G3new-51 GP-111104 agreed 2011-08-30 GELTE - 2011-08-30
1387 - B Rel-9 9.6.0 - CR 36.523-1-1387 Addition of new Test case 13.4.2.5 Inter-system mobility / Service based redirection from GSM/GPRS to E-UTRA - - - G3new G3new-51 GP-111055 withdrawn 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1387 - B Rel-9 9.4.0 9.5.0 CR 36.523-1-1387 Addition of new Test case 8.4.4.3 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (NC2 mode) GP-50 GP-110832 approved G3new G3new-50 GP-110832 agreed 2011-05-17 LTE-UEConTest_SIG - 2011-05-17
1388 - B Rel-9 9.6.0 - CR 36.523-1-1388 Correction to the test procedure 6.2.3.22 - - - G3new G3new-51 GP-111057 rejected 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1389 - F Rel-9 9.5.0 9.6.0 GCF Priority 3: Correction of EMM TC 9.2.3.2.1a RP-53 RP-111139 approved R5 R5-52 R5-113031 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1390 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to Idle mode test case 6.2.2.7 RP-53 RP-111139 approved R5 R5-52 R5-113101 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1391 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 -Correction to EUTRA RRC test case 8.1.3.6 RP-53 RP-111139 approved R5 R5-52 R5-113102 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1392 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to EUTRA RRC test cases 8.2.4.1, 8.2.4.4 and 8.2.4.7 RP-53 RP-111139 approved R5 R5-52 R5-113104 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1393 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to EUTRA RRC test case 8.3.1.6 RP-53 RP-111139 approved R5 R5-52 R5-113105 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1394 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.7 RP-53 RP-111139 approved R5 R5-52 R5-113106 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1395 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.3.3.1 RP-53 RP-111139 approved R5 R5-52 R5-113107 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1396 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.2.4.7 RP-53 RP-111139 approved R5 R5-52 R5-113108 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1397 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to ESM test cases 10.2.1 and 10.4.1 RP-53 RP-111139 approved R5 R5-52 R5-113110 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1398 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to ESM test cases 10.8.5 and 10.8.6 RP-53 RP-111139 approved R5 R5-52 R5-113111 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1399 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.11 RP-53 RP-111139 approved R5 R5-52 R5-113113 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1400 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.16 RP-53 RP-111139 approved R5 R5-52 R5-113114 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1401 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test cases 9.2.3.1.9a and 9.2.3.1.23 RP-53 RP-111139 approved R5 R5-52 R5-113115 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1402 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.2 RP-53 RP-111139 approved R5 R5-52 R5-113116 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1403 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.4 RP-53 RP-111139 approved R5 R5-52 R5-113117 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1404 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.11 RP-53 RP-111139 approved R5 R5-52 R5-113118 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1405 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.25 RP-53 RP-111139 approved R5 R5-52 R5-113121 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1406 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.12 RP-53 RP-111139 approved R5 R5-52 R5-113124 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1407 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to several EUTRA RLC test cases RP-53 RP-111139 approved R5 R5-52 R5-113129 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1408 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.9 RP-53 RP-111139 approved R5 R5-52 R5-113131 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1409 - F Rel-9 9.5.0 9.6.0 GCF Priority TBD - Update of test case 6.3.1 Inter-frequency cell reselection / From E-UTRA RRC_IDLE non-CSG cell to E-UTRA RRC_IDLE CSG cell RP-53 RP-111139 approved R5 R5-52 R5-113170 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1410 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Correction to ESM test case 10.4.1 RP-53 RP-111139 approved R5 R5-52 R5-113188 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1411 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.7 RP-53 RP-111139 approved R5 R5-52 R5-113189 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1412 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to Multilayer test case 13.3.1.2 RP-53 RP-111139 approved R5 R5-52 R5-113190 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1413 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Update of EMM test case 9.2.2.1.9 RP-53 RP-111139 approved R5 R5-52 R5-113240 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1414 - F Rel-9 9.5.0 9.6.0 Update of IMS emergency test case 11.2.3 RP-53 RP-111145 approved R5 R5-52 R5-113270 agreed 2011-08-13 IMS_EMER_GPRS_EPS_UEConTest - 2011-08-13
1415 - F Rel-9 9.5.0 9.6.0 Update of the case 11.2.4 RP-53 RP-111145 approved R5 R5-52 R5-113293 agreed 2011-08-13 IMS_EMER_GPRS_EPS_UEConTest - 2011-08-13
1416 - F Rel-9 9.5.0 9.6.0 Update of test case 11.2.5 RP-53 RP-111145 approved R5 R5-52 R5-113294 agreed 2011-08-13 IMS_EMER_GPRS_EPS_UEConTest - 2011-08-13
1417 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Update test case 9.1.2.3, 9.2.1.1.9, 9.2.1.1.11, 9.2.1.1.25, 9.2.1.2.12, 9.2.2.1.2, 9.2.2.1.3, 9.2.2.1.8, 9.2.2.1.9, 9.2.3.2.4, 9.3.1.6 and 9.3.1.16 RP-53 RP-111139 approved R5 R5-52 R5-113300 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1418 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to testcase 13.3.2.1 RP-53 RP-111139 approved R5 R5-52 R5-113325 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1420 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Corrections to TC 6.3.2 Inter-RAT reselection from GERAN to E-UTRA CSG cell RP-53 RP-111139 approved R5 R5-52 R5-113331 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1421 - F Rel-9 9.5.0 9.6.0 Corrections to TC 6.4.7 Inter-RAT reselection from GERAN to E-UTRA Hybrid cell RP-53 RP-111147 approved R5 R5-52 R5-113332 agreed 2011-08-13 EHNB-LTE_UEConTest - 2011-08-13
1422 - F Rel-9 9.5.0 9.6.0 Corrections to HeNB Section 6.3 TCs RP-53 RP-111139 approved R5 R5-52 R5-113333 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1423 - F Rel-9 9.5.0 9.6.0 Priority 4: Correction to TC 13.1.9 MO call CS fallback to GSM with CCO without NACC RP-53 RP-111139 approved R5 R5-52 R5-113360 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1424 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to test case 9.3.1.17 RP-53 RP-111139 approved R5 R5-52 R5-113364 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1425 - F Rel-9 9.5.0 9.6.0 GCF priority 3 - Update to Multi Layer Procedure test case 13.3.1.1 RP-53 RP-111139 approved R5 R5-52 R5-113374 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1426 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to test case 9.2.1.2.5 RP-53 RP-111139 approved R5 R5-52 R5-113482 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1427 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.15 RP-53 RP-111139 approved R5 R5-52 R5-113539 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1428 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Editorial correction to EUTRA RRC test case 8.3.2.4 RP-53 RP-111139 approved R5 R5-52 R5-113573 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1429 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 / 4 - Editorial corrections to EUTRA MAC test cases 7.1.5.x RP-53 RP-111139 approved R5 R5-52 R5-113575 agreed 2011-08-13 LTE-UEConTest_SIG - 2011-08-13
1430 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to GCF WI-091 MAC Testcase 7.1.4.15 RP-53 RP-111139 approved R5 R5-52 R5-113672 agreed 2011-08-25 LTE-UEConTest_SIG - 2011-08-25
1431 - F Rel-9 9.5.0 9.6.0 GCF Priority 1: Correction to RLC AM test case 7.2.3.6 RP-53 RP-111139 approved R5 R5-52 R5-113673 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1432 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 RP-53 RP-111139 approved R5 R5-52 R5-113674 agreed 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1433 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 & 3 :Corrections to test cases 9.2.3.1.1, 9.2.3.1.9a & 9.2.3.1.27, to make suitable for single frequency operation RP-53 RP-111139 approved R5 R5-52 R5-113675 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1434 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Correction to Idle mode test case 6.1.2.6 RP-53 RP-111139 approved R5 R5-52 R5-113676 agreed 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1435 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 Complete SIBs Reading for TC 6.2.2.1_2_3_4 RP-53 RP-111139 approved R5 R5-52 R5-113677 agreed 2011-08-25 LTE-UEConTest_SIG - 2011-08-25
1436 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 Complete SIBs Reading for TC 6.2.3 RP-53 RP-111139 approved R5 R5-52 R5-113678 agreed 2011-08-25 LTE-UEConTest_SIG - 2011-08-25
1437 - F Rel-9 9.5.0 9.6.0 GCF Priority 2: Correction to DRX test cases 7.1.6.1 and 7.1.6.2 RP-53 RP-111139 approved R5 R5-52 R5-113679 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1438 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 Complete SIBs Reading for TC 8.4.2.2.4 RP-53 RP-111139 approved R5 R5-52 R5-113680 agreed 2011-08-25 LTE-UEConTest_SIG - 2011-08-25
1439 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 & 3: Update of EMM test cases to cater for bands with single frequency operation RP-53 RP-111139 approved R5 R5-52 R5-113681 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1440 - F Rel-9 9.5.0 - GCF Priority 2 - Update of EMM test cases 9.2.1.2.1 - - - - - - - 2011-08-26 LTE-UEConTest_SIG document not provided 2011-09-18
1440 1 F Rel-9 9.5.0 - GCF Priority 2 - Update of EMM test cases 9.2.1.2.1 RP-53 RP-111307 revised R5 R5-52 R5-113682 agreed 2011-08-26 LTE-UEConTest_SIG no CR number shown 2011-08-26
1440 2 F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Update of EMM test case 9.2.1.2.1 RP-53 RP-111344 approved Qualcomm Incorporated - - - 2011-09-13 LTE-UEConTest_SIG - 2011-09-16
1441 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Correction to GCF WI-082 EMM LTE MRAT Testcase 9.2.3.1.18/ RP-53 RP-111139 approved R5 R5-52 R5-113685 agreed 2011-08-25 LTE-UEConTest_SIG - 2011-08-25
1442 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 Complete SIBs Reading for TC 6.3.2.3.7.8 RP-53 RP-111139 approved R5 R5-52 R5-113687 agreed 2011-08-25 LTE-UEConTest_SIG - 2011-08-25
1443 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Update of test case 6.2.1.1 RP-53 RP-111140 approved R5 R5-52 R5-113688 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1444 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Update of test case 6.2.3.32 RP-53 RP-111140 approved R5 R5-52 R5-113689 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1445 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EUTRA MAC test case 7.1.4.14 RP-53 RP-111140 approved R5 R5-52 R5-113690 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1446 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.2.4.12 RP-53 RP-111140 approved R5 R5-52 R5-113691 agreed 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1447 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.1.5.1 RP-53 RP-111140 approved R5 R5-52 R5-113692 agreed 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1448 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test cases 9.3.1.4 and 9.3.1.5 RP-53 RP-111140 approved R5 R5-52 R5-113693 agreed 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1449 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction of test case 9.2.3.1.9a RP-53 RP-111140 approved R5 R5-52 R5-113694 agreed 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1450 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to location update message contents RP-53 RP-111140 approved R5 R5-52 R5-113695 agreed 2011-08-23 LTE-UEConTest_SIG - 2011-08-23
1451 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Update of EMM test cases to cater for bands with single frequency and LTE only operation RP-53 RP-111140 approved R5 R5-52 R5-113696 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1452 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to the value of timer T3402 in EMM test case 9.2.3.1.26 RP-53 RP-111140 approved R5 R5-52 R5-113699 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1453 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to ESM test cases 10.7.3 and 10.8.3 RP-53 RP-111140 approved R5 R5-52 R5-113701 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1454 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to GCF WI-081 Idle Mode Testcase 6.1.1.2 RP-53 RP-111140 approved R5 R5-52 R5-113702 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1455 - F Rel-9 9.5.0 9.6.0 GCF Priority 4: Correction to Rank Indication test case 7.1.8.1 RP-53 RP-111140 approved R5 R5-52 R5-113703 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1456 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to EUTRA RRC test case 8.1.2.8 RP-53 RP-111140 approved R5 R5-52 R5-113704 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1457 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to 8.1.2.13 RP-53 RP-111140 approved R5 R5-52 R5-113705 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1458 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 – Update to test cases 8.2.1.5 and 8.2.1.6 RP-53 RP-111140 approved R5 R5-52 R5-113706 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1459 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to EUTRA RRC Test Case 8.4.3.3 RP-53 RP-111140 approved R5 R5-52 R5-113707 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1460 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Addition of EUTRA RRC Test Case 8.4.1.5 RP-53 RP-111140 approved R5 R5-52 R5-113708 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1461 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.17 RP-53 RP-111140 approved R5 R5-52 R5-113709 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1462 - F Rel-9 9.5.0 9.6.0 GCF Priority 4: Correction test case 9.2.1.2.1b to check the signalled MS Radio Access capability RP-53 RP-111140 approved R5 R5-52 R5-113710 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1463 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to GCF WI-082 ESM Testcase 10.8.7 RP-53 RP-111140 approved R5 R5-52 R5-113711 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1464 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EUTRA MAC test cases 7.1.7.1.5 and 7.1.7.1.6 RP-53 RP-111140 approved R5 R5-52 R5-113849 agreed 2011-09-08 LTE-UEConTest_SIG - 2011-09-08
1465 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to ESM test case 10.9.1 RP-53 RP-111140 approved R5 R5-52 R5-113713 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1466 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Correction to ESM test case 10.3.1 RP-53 RP-111140 approved R5 R5-52 R5-113714 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1467 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Update to test case 13.1.15 RP-53 RP-111140 approved R5 R5-52 R5-113715 agreed 2011-08-28 LTE-UEConTest_SIG - 2011-08-28
1468 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Update of test case 13.1.11 RP-53 RP-111140 approved R5 R5-52 R5-113716 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1469 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Update of test case 13.1.12 RP-53 RP-111140 approved R5 R5-52 R5-113717 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1470 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Update of test case 13.1.13 RP-53 RP-111140 approved R5 R5-52 R5-113718 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1471 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Update of test case 13.1.7 RP-53 RP-111140 approved R5 R5-52 R5-113719 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1472 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Update of test case 13.1.8 RP-53 RP-111140 approved R5 R5-52 R5-113720 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1473 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Add new test case 13.4.3.2 RP-53 RP-111140 approved R5 R5-52 R5-113721 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1474 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Update test case 13.4.3.1 RP-53 RP-111140 approved R5 R5-52 R5-113722 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1475 - F Rel-9 9.5.0 9.6.0 GCF Priority 4 - Add new test case 13.4.3.4 RP-53 RP-111140 approved R5 R5-52 R5-113723 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1476 - F Rel-9 9.5.0 9.6.0 New E-UTRA MAC test case for padding BSR RP-53 RP-111140 approved R5 R5-52 R5-113848 agreed 2011-09-08 LTE-UEConTest_SIG - 2011-09-08
1477 - F Rel-9 9.5.0 9.6.0 Update test case 8.1.2.12 RP-53 RP-111140 approved R5 R5-52 R5-113728 agreed 2011-08-24 LTE-UEConTest_SIG - 2011-08-24
1478 - F Rel-9 9.5.0 9.6.0 Addition of new test case for e1xCSFB / MT call RP-53 RP-111140 approved R5 R5-52 R5-113729 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1479 - F Rel-9 9.5.0 9.6.0 Addition of new test case for e1xCSFB / MO call RP-53 RP-111140 approved R5 R5-52 R5-113730 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1480 - F Rel-9 9.5.0 9.6.0 GCF Priority X - Update to test case 6.4.1 RP-53 RP-111147 approved R5 R5-52 R5-113754 agreed 2011-08-28 EHNB-LTE_UEConTest - 2011-08-28
1481 - F Rel-9 9.5.0 9.6.0 Various updates to Rel-9 HeNB enhancements test cases RP-53 RP-111147 approved R5 R5-52 R5-113755 agreed 2011-08-26 EHNB-LTE_UEConTest - 2011-08-26
1482 - F Rel-9 9.5.0 9.6.0 GCF Priority X Correction of TC 6.4.3.4.5.6.7 RP-53 RP-111147 approved R5 R5-52 R5-113756 agreed 2011-08-25 EHNB-LTE_UEConTest - 2011-08-25
1483 - F Rel-9 9.5.0 9.6.0 GCF Priority X Addition new test case 8.3.4.2 RP-53 RP-111147 approved R5 R5-52 R5-113757 agreed 2011-08-25 EHNB-LTE_UEConTest - 2011-08-25
1484 - F Rel-9 9.5.0 9.6.0 GCF Priority X Addition new test case 8.3.4.4 RP-53 RP-111147 approved R5 R5-52 R5-113758 agreed 2011-08-25 EHNB-LTE_UEConTest - 2011-08-25
1485 - F Rel-9 9.5.0 9.6.0 Addition of new HeNB test case for Inter-frequency SI acquisition member Hybrid Cell RP-53 RP-111147 approved R5 R5-52 R5-113759 agreed 2011-08-28 EHNB-LTE_UEConTest - 2011-08-28
1486 - F Rel-9 9.5.0 9.6.0 Addition of a new eMBMS test case 17.2.1: UE Acquire the MBMS data based on the SIB13 and MCCH message /MCCH and MTCH are on the same MCH RP-53 RP-111148 approved R5 R5-52 R5-113762 agreed 2011-08-25 MBMS_LTE-UEConTest - 2011-08-25
1487 - F Rel-9 9.5.0 9.6.0 Addition of a new eMBMS test case 17.2.2: UE Acquire the MBMS data based on the SIB13 and MCCH message /MCCH and MTCH are on different MCHs RP-53 RP-111148 approved R5 R5-52 R5-113763 agreed 2011-08-25 MBMS_LTE-UEConTest - 2011-08-25
1488 - F Rel-9 9.5.0 9.6.0 Addition of a new eMBMS test case 17.2.3: UE Acquire the MBMS data based on the SIB13 and MCCH message /MCCH and MTCH are on different MCHs RP-53 RP-111148 approved R5 R5-52 R5-113764 agreed 2011-08-25 MBMS_LTE-UEConTest - 2011-08-25
1489 - F Rel-9 9.5.0 9.6.0 Addition of a new eMBMS test case 17.2.4: Reception of PDCCH DCI format 0 and PHICH in MBSFN subframes RP-53 RP-111148 approved R5 R5-52 R5-113765 agreed 2011-08-25 MBMS_LTE-UEConTest - 2011-08-25
1490 - F Rel-9 9.5.0 9.6.0 Addition of a new TC for MCCH information acquisition/ UE is receiving an MBMS service RP-53 RP-111148 approved R5 R5-52 R5-113766 agreed 2011-08-25 MBMS_LTE-UEConTest - 2011-08-25
1491 - F Rel-9 9.5.0 9.6.0 Addition of a new TC for MCCH information acquisition/ /UE is not receiving MBMS data RP-53 RP-111148 approved R5 R5-52 R5-113767 agreed 2011-08-25 MBMS_LTE-UEConTest - 2011-08-25
1492 - F Rel-9 9.5.0 9.6.0 GCF Priority X - Addition of new test case 8.2.1.8 RP-53 RP-111140 approved R5 R5-52 R5-113783 agreed 2011-08-28 LTE-UEConTest_SIG - 2011-08-28
1493 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Correction to GCF WI-081 Idle Mode Interband Testcase 6.1.2.5 RP-53 RP-111140 approved R5 R5-52 R5-113792 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1494 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Correction to GCF WI-091 MAC Testcase 7.1.4.16 RP-53 RP-111140 approved R5 R5-52 R5-113793 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1495 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Correction to EMM test cases RP-53 RP-111140 approved R5 R5-52 R5-113850 agreed 2011-09-08 LTE-UEConTest_SIG - 2011-09-08
1496 - F Rel-9 9.5.0 9.6.0 Clarification of LTE only branch in EMM TCs RP-53 RP-111140 approved R5 R5-52 R5-113805 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1497 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.2.1.2.3 RP-53 RP-111140 approved R5 R5-52 R5-113806 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1498 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 & 3 - Update of EMM test cases 9.2.2.1.6, 9.2.2.1.7, 9.2.2.1.8 and 9.2.2.1.9 RP-53 RP-111140 approved R5 R5-52 R5-113807 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1499 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.3.1.6 RP-53 RP-111140 approved R5 R5-52 R5-113808 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1500 - F Rel-9 9.5.0 9.6.0 GCF Priority 2 - Correction to GCF WI-082 EMM Testcase 9.2.3.3.5 RP-53 RP-111140 approved R5 R5-52 R5-113809 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1501 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.4 RP-53 RP-111140 approved R5 R5-52 R5-113810 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1502 - F Rel-9 9.5.0 9.6.0 GCF Priority 2, 3 & 4 - Update of EMM test cases 9.2.2.2.2, 9.3.1.3, 9.3.1.12a, 9.3.2.2 and 9.3.2.2a RP-53 RP-111140 approved R5 R5-52 R5-113811 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1503 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Addition of new test case 13.3.2.2 RP-53 RP-111140 approved R5 R5-52 R5-113812 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1504 - F Rel-9 9.5.0 9.6.0 GCF Priority 1 & 2 - Update of LTE-C2k test cases 8.4.5.4, 8.4.7.3 and 8.4.7.4 RP-53 RP-111140 approved R5 R5-52 R5-113813 agreed 2011-08-26 LTE-UEConTest_SIG - 2011-08-26
1505 - F Rel-9 9.5.0 9.6.0 GCF Priority 3 - Correction to WI-082 EUTRA EMM Testcase 9.2.3.1.22 RP-53 RP-111140 approved R5 R5-52 R5-113836 agreed 2011-08-28 LTE-UEConTest_SIG - 2011-08-28
1506 - F Rel-9 9.6.0 9.7.0 CR 36523-1-1506 Correction to 6.2.3.22 GP-52 GP-111502 approved G3new G3new-52 GP-111502 agreed 2011-11-08 GELTE - 2011-11-08
1507 - B Rel-9 9.6.0 9.7.0 CR 36523-1-1507 Addition of new Test case 13.4.2.5 Inter-system mobility / Service based redirection from GSM/GPRS to E-UTRA GP-52 GP-111525 approved G3new G3new-52 GP-111525 agreed 2011-10-25 TEI_Test - 2011-10-25
1508 - F Rel-9 9.6.0 - CR 36523-1-1508 Handling of Data transfer completion in E-UTRA TC 8.4.4.x - - - G3new G3new-52 GP-111536 withdrawn 2011-10-21 LTE-UEConTest_SIG - 2011-10-21
1509 - F Rel-9 9.6.0 9.7.0 CR 36523-1-1509 Moving the TCs under section 8.4.4 to void GP-52 GP-111539 approved G3new G3new-52 GP-111539 agreed 2011-10-25 LTE-UEConTest_SIG - 2011-10-25
1510 - F Rel-9 9.6.0 9.7.0 CR 36523-1-1510 Addition of new Test case 13.4.2.6 to 13.4.2.8 GP-52 GP-111540 approved G3new G3new-52 GP-111540 agreed 2011-10-25 LTE-UEConTest_SIG - 2011-10-25
1511 - F Rel-9 9.6.0 9.7.0 GCF Priority U2 - Correction to EUTRA RRC test case 8.3.3.2 RP-54 RP-111580 approved R5 R5-53 R5-115138 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1512 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to test case 6.1.2.13 RP-54 RP-111580 approved R5 R5-53 R5-115164 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1513 - F Rel-9 9.6.0 9.7.0 GCF Priority g1 - Correction to GERAN CSFB test cases RP-54 RP-111580 approved R5 R5-53 R5-115167 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1514 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Removal of test case 14.3 RP-54 RP-111580 approved R5 R5-53 R5-115176 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1515 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Correction to Idle Mode Testcase 6.1.1.4 RP-54 RP-111580 approved R5 R5-53 R5-115228 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1516 - F Rel-9 9.6.0 9.7.0 GCF Priority 3: Correction to EMM test cases 9.2.2.2.2, 9.3.1.3, 9.3.2.2, 9.3.2.2a RP-54 RP-111580 approved R5 R5-53 R5-115230 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1517 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.7 RP-54 RP-111580 approved R5 R5-53 R5-115239 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1518 - F Rel-9 9.6.0 9.7.0 Correction to parameter ' sf-AllocEnd-r9' in MBMS test cases RP-54 RP-111593 approved R5 R5-53 R5-115244 agreed 2011-11-06 MBMS_LTE-UEConTest - 2011-11-06
1519 - F Rel-9 9.6.0 9.7.0 Editorial correction to test case 8.1.3.10 RP-54 RP-111580 approved R5 R5-53 R5-115245 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1520 - F Rel-9 9.6.0 9.7.0 Update of test cases 8.4.7.3, 8.4.7.4, 8.4.7.5 and 8.4.7.6 RP-54 RP-111580 approved R5 R5-53 R5-115272 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1521 - F Rel-9 9.6.0 9.7.0 GCF Priority X Addition new test case 6.1.2.2a RP-54 RP-111580 approved R5 R5-53 R5-115305 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1522 - F Rel-9 9.6.0 9.7.0 GCF Priority X Correction for test cases 8.3.4.1_2_3_4 RP-54 RP-111580 approved R5 R5-53 R5-115311 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1523 - F Rel-9 9.6.0 9.7.0 Update of TC 11.2.6 IMS Emergency CT1 aspects RP-54 RP-111591 approved R5 R5-53 R5-115314 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1524 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.25 RP-54 RP-111580 approved R5 R5-53 R5-115355 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1525 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Correction to EMM test case 9.2.3.3.5 RP-54 RP-111580 approved R5 R5-53 R5-115361 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1526 - F Rel-9 9.6.0 9.7.0 Correction to GCF P3 EMM test case 9.3.1.17 RP-54 RP-111580 approved R5 R5-53 R5-115370 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1527 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Correction to EUTRA Idle Mode test case 6.1.1.3 RP-54 RP-111580 approved R5 R5-53 R5-115448 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1528 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Removal of test case 6.1.2.1 RP-54 RP-111580 approved R5 R5-53 R5-115455 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1529 - F Rel-9 9.6.0 9.7.0 GCF Priority X: Addition of new test case 8.3.1.9a RP-54 RP-111591 approved R5 R5-53 R5-115511 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1530 - F Rel-9 9.6.0 9.7.0 Update of TC 11.2.4 IMS Emergency CT1 aspects RP-54 RP-111591 approved R5 R5-53 R5-115532 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1531 - F Rel-9 9.6.0 9.7.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.10 RP-54 RP-111580 approved R5 R5-53 R5-115539 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1532 - F Rel-9 9.6.0 9.7.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.3 RP-54 RP-111580 approved R5 R5-53 R5-115547 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1533 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 (and lower) - Corrections to various EMM test cases RP-54 RP-111580 approved R5 R5-53 R5-115560 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1534 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 (and lower) - Corrections to ESM test cases 10.3.1 and 10.9.1 RP-54 RP-111580 approved R5 R5-53 R5-115561 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1535 - F Rel-9 9.6.0 9.7.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.9 RP-54 RP-111580 approved R5 R5-53 R5-115564 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1536 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Editorial Correction to EUTRA RLC test case 7.2.3.13 RP-54 RP-111580 approved R5 R5-53 R5-115576 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1537 - F Rel-9 9.6.0 9.7.0 CGF Priority 1 - Correction to EUTRA MAC test case 7.1.7.2.1 RP-54 RP-111580 approved R5 R5-53 R5-115620 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1538 - F Rel-9 9.6.0 9.7.0 GCF Priority 1 - Correction to RRC test case 8.5.4.1 RP-54 RP-111580 approved R5 R5-53 R5-115622 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1539 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 Correction for test cases 6.1.2.13 and 6.1.2.15 RP-54 RP-111580 approved R5 R5-53 R5-115624 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1540 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Correction to Idle Mode test case 6.1.1.1 RP-54 RP-111580 approved R5 R5-53 R5-115625 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1541 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Correction to EMM test case 9.2.3.3.5 RP-54 RP-111580 approved R5 R5-53 R5-115626 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1542 - F Rel-9 9.6.0 9.7.0 GCF Priority 2: Corrections to equivalent PLMN test case 9.2.3.1.4 RP-54 RP-111580 approved R5 R5-53 R5-115627 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1543 - F Rel-9 9.6.0 9.7.0 GCF Priority 2: Corrections to test case 9.2.3.1.16 RP-54 RP-111580 approved R5 R5-53 R5-115628 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1544 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Corrections to Idle mode Shared network test cases RP-54 RP-111580 approved R5 R5-53 R5-115629 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1545 - F Rel-9 9.6.0 9.7.0 GCF Priority 3: Addition of new idle mode test case for Manual support for CSG ID selection RP-54 RP-111580 approved R5 R5-53 R5-115630 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1546 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to test case 6.2.3.13 RP-54 RP-111580 approved R5 R5-53 R5-115631 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1547 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to EMM test case 9.2.3.2.1a RP-54 RP-111580 approved R5 R5-53 R5-115634 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1548 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to EMM test case 9.1.5.1 RP-54 RP-111580 approved R5 R5-53 R5-115635 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1549 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Update of EMM test case 9.3.1.15 RP-54 RP-111580 approved R5 R5-53 R5-115636 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1550 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Update to test case 9.2.3.1.23 RP-54 RP-111580 approved R5 R5-53 R5-115637 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1551 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to ESM test cases 10.8.5 RP-54 RP-111580 approved R5 R5-53 R5-115638 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1552 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update to test case 6.1.2.14 RP-54 RP-111580 approved R5 R5-53 R5-115639 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1553 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Correction to GCF WI-081 Idle Mode Testcase 6.1.1.3 RP-54 RP-111580 approved R5 R5-53 R5-115640 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1554 - F Rel-9 9.6.0 9.7.0 Removal of TC 11.2.9 RP-54 RP-111591 approved R5 R5-53 R5-115642 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1555 - F Rel-9 9.6.0 9.7.0 GCF Prio 3: Corrections to TC 8.4.3.1 RP-54 RP-111580 approved R5 R5-53 R5-115644 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1556 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 Correction for test cases 6.2.3.13 and 6.2.3.31 RP-54 RP-111580 approved R5 R5-53 R5-115645 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1557 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update to EUTRA RRC test case 8.3.1.6 RP-54 RP-111580 approved R5 R5-53 R5-115646 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1558 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Correction to EMM test case 9.2.3.1.17 RP-54 RP-111580 approved R5 R5-53 R5-115647 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1559 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Correction to EMM test cases 9.3.1.12a RP-54 RP-111580 approved R5 R5-53 R5-115648 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1560 - F Rel-9 9.6.0 9.7.0 GCF Priority 4: Correction to test case 9.2.1.2.1d RP-54 RP-111580 approved R5 R5-53 R5-115649 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1561 - F Rel-9 9.6.0 9.7.0 GCF priority 4: Minor correction to test case 9.2.1.2.1c RP-54 RP-111581 approved R5 R5-53 R5-115650 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1562 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Add new test case 13.4.3.3 RP-54 RP-111581 approved R5 R5-53 R5-115651 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1563 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Add new test case 13.4.3.5 RP-54 RP-111581 approved R5 R5-53 R5-115652 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1564 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update test case 13.4.3.2 RP-54 RP-111581 approved R5 R5-53 R5-115653 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1565 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update test case 13.4.3.1 RP-54 RP-111581 approved R5 R5-53 R5-115654 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1566 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update test case 13.4.3.4 RP-54 RP-111581 approved R5 R5-53 R5-115655 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1567 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Correction to EMM test case 9.2.3.3.5a RP-54 RP-111581 approved R5 R5-53 R5-115656 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1568 - F Rel-9 9.6.0 9.7.0 GCF priority X - new test case 6.1.1.3a for Cell reselection of ePLMN in manual mode / between FDD and TDD RP-54 RP-111581 approved R5 R5-53 R5-115792 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1569 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Correction to EUTRA RRC test case 8.2.4.8 RP-54 RP-111581 approved R5 R5-53 R5-115662 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1570 - F Rel-9 9.6.0 9.7.0 Update of TC 11.2.7 IMS Emergency CT1 aspects RP-54 RP-111591 approved R5 R5-53 R5-115672 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1571 - F Rel-9 9.6.0 9.7.0 Update of test case 11.2.1 RP-54 RP-111591 approved R5 R5-53 R5-115673 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1572 - F Rel-9 9.6.0 9.7.0 Update of test case 11.2.3 RP-54 RP-111591 approved R5 R5-53 R5-115675 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1573 - F Rel-9 9.6.0 9.7.0 Update of test case 11.2.4 RP-54 RP-111591 approved R5 R5-53 R5-115676 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1574 - F Rel-9 9.6.0 9.7.0 GCF Priority U1: Correction to TC 6.3.7 Inter-RAT Cell reselection from E-UTRA idle non-CSG cell to a UTRA CSG cell RP-54 RP-111581 approved R5 R5-53 R5-115677 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1575 - F Rel-9 9.6.0 9.7.0 GCF Priority U1 - Correction to EUTRA RRC testc ase 8.4.1.4 RP-54 RP-111581 approved R5 R5-53 R5-115678 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1576 - F Rel-9 9.6.0 9.7.0 Addition of new Rel-9 test case 6.2.3.7a RP-54 RP-111581 approved R5 R5-53 R5-115680 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1577 - F Rel-9 9.6.0 9.7.0 Addition of new Rel-9 test case 6.2.3.8a RP-54 RP-111581 approved R5 R5-53 R5-115681 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1578 - F Rel-9 9.6.0 9.7.0 Addition of new new Rel-9 test case 6.2.3.9a RP-54 RP-111581 approved R5 R5-53 R5-115682 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1579 - F Rel-9 9.6.0 9.7.0 Addition of new Rel-9 test case 6.2.3.10a RP-54 RP-111581 approved R5 R5-53 R5-115683 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1580 - F Rel-9 9.6.0 9.7.0 GCF Priority X Addition new test case 6.1.2.3a RP-54 RP-111581 approved R5 R5-53 R5-115684 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1581 - F Rel-9 9.6.0 9.7.0 GCF Priority X Addition new test case 6.1.2.17 RP-54 RP-111581 approved R5 R5-53 R5-115685 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1582 - F Rel-9 9.6.0 9.7.0 GCF Priority X Addition new test case 6.1.2.18 RP-54 RP-111581 approved R5 R5-53 R5-115686 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1583 - F Rel-9 9.6.0 9.7.0 GCF Priority U2: Correction to TC 6.3.3 Inter-RAT cell reselection / From UTRA_Idle to E-UTRA RRC_IDLE CSG cell RP-54 RP-111581 approved R5 R5-53 R5-115687 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1584 - F Rel-9 9.6.0 9.7.0 GCF priority x - Add new test case 6.1.1.1a RP-54 RP-111581 approved R5 R5-53 R5-115794 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1585 - F Rel-9 9.6.0 9.7.0 GCF Priority X - Addition of new test case 8.5.1.x RP-54 RP-111581 approved R5 R5-53 R5-115691 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1586 - F Rel-9 9.6.0 9.7.0 GCF Priority X - Addition of new test case 8.1.2.x RP-54 RP-111581 approved R5 R5-53 R5-115692 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1587 - F Rel-9 9.6.0 9.7.0 GCF Priority X: Addition of new test case 8.3.1.11a RP-54 RP-111581 approved R5 R5-53 R5-115693 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1588 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update of test cases 13.1.11 RP-54 RP-111581 approved R5 R5-53 R5-115709 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1589 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update of test cases 13.1.12 RP-54 RP-111581 approved R5 R5-53 R5-115710 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1590 - F Rel-9 9.6.0 9.7.0 GCF Priority 4 - Update of test cases 13.1.13 RP-54 RP-111581 approved R5 R5-53 R5-115711 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1591 - F Rel-9 9.6.0 9.7.0 Addition of new test case for e1xCSFB emergency call RP-54 RP-111581 approved R5 R5-53 R5-115712 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1592 - F Rel-9 9.6.0 9.7.0 Addition of new test case for 1xCSFB emergency call RP-54 RP-111581 approved R5 R5-53 R5-115713 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1593 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.26 RP-54 RP-111581 approved R5 R5-53 R5-115720 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1594 - F Rel-9 9.6.0 9.7.0 Maximum bandwidth config for MAC TBS test cases in band 25 RP-54 RP-111581 approved R5 R5-53 R5-115722 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1595 - F Rel-9 9.6.0 9.7.0 GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.5 RP-54 RP-111581 approved R5 R5-53 R5-115726 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1596 - F Rel-9 9.6.0 9.7.0 Addition of a new TC for Cell reselection / interband operation / Between FDD and TDD RP-54 RP-111581 approved R5 R5-53 R5-115793 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1597 - F Rel-9 9.6.0 9.7.0 Update of test case 6.2.3.8 and 6.2.3.10 RP-54 RP-111581 approved R5 R5-53 R5-115753 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1598 - F Rel-9 9.6.0 9.7.0 PLMN selection in shared network environment / Automatic mode / between FDD and TDD RP-54 RP-111581 approved R5 R5-53 R5-115795 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1599 - F Rel-9 9.6.0 9.7.0 Inter-frequency cell reselection according to cell reselection priority provided by SIBs / Between FDD and TDD RP-54 RP-111581 approved R5 R5-53 R5-115796 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1600 - F Rel-9 9.6.0 9.7.0 Addition of new test case 6.2.3.1a RP-54 RP-111581 approved R5 R5-53 R5-115797 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1602 - F Rel-9 9.6.0 9.7.0 GCF Priority 4: Modification on the Event A3 timeToTrigger value in TC 8.3.1.6 RP-54 RP-111581 approved R5 R5-53 R5-115763 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1603 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Update of EMM test case 9.2.2.1.7 RP-54 RP-111581 approved R5 R5-53 R5-115798 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1604 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Correction to EMM test cases 9.2.3.1.22 RP-54 RP-111581 approved R5 R5-53 R5-115766 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1605 - F Rel-9 9.6.0 9.7.0 GCF Priority 3 - Update of EMM test cases 9.2.3.1.26 Preamble RP-54 RP-111581 approved R5 R5-53 R5-115767 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1606 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Update of EMM test cases 9.2.3.2.3 RP-54 RP-111581 approved R5 R5-53 R5-115768 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1607 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Update test case 9.2.3.1.6 RP-54 RP-111581 approved R5 R5-53 R5-115769 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1608 - F Rel-9 9.6.0 9.7.0 Update test case 11.2.2 RP-54 RP-111591 approved R5 R5-53 R5-115771 agreed 2011-11-06 IMS_EMER_GPRS_EPS_UEConTest - 2011-11-06
1609 - F Rel-9 9.6.0 9.7.0 GCF Priority 2 - Correction to Idle mode test case 6.2.2.5 RP-54 RP-111581 approved R5 R5-53 R5-115774 agreed 2011-11-06 LTE-UEConTest_SIG - 2011-11-06
1610 - F Rel-9 9.7.0 9.8.0 GCF Priority 1 - Correction of test case 7.1.2.6 RP-55 RP-120180 approved R5 R5-54 R5-120125 agreed 2012-01-19 LTE-UEConTest_SIG - 2012-01-19
1611 - F Rel-9 9.7.0 9.8.0 GCF Priority X Correction of test case 6.1.2.2a RP-55 RP-120180 approved R5 R5-54 R5-120156 agreed 2012-01-20 LTE-UEConTest_SIG - 2012-01-20
1612 - F Rel-9 9.7.0 9.8.0 GCF Priority X Correction of test case 6.1.2.18 RP-55 RP-120180 approved R5 R5-54 R5-120158 agreed 2012-01-20 LTE-UEConTest_SIG - 2012-01-20
1613 - F Rel-9 9.7.0 9.8.0 GCF Priority 2: Modification on TC 8.1.3.4 RRC connection release / Redirection to another E-UTRAN frequency RP-55 RP-120180 approved R5 R5-54 R5-120174 agreed 2012-01-20 LTE-UEConTest_SIG - 2012-01-20
1614 - F Rel-9 9.7.0 9.8.0 GCF priority c1: Correction of measurement gap offset RP-55 RP-120180 approved R5 R5-54 R5-120236 agreed 2012-01-20 LTE-UEConTest_SIG - 2012-01-20
1615 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 - Correction to EMM test case 9.2.3.1.4 RP-55 RP-120180 approved R5 R5-54 R5-120265 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1616 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 - Correction to EUTRA Idlemode testcase 6.1.2.13 RP-55 RP-120180 approved R5 R5-54 R5-120267 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1617 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.3.2 RP-55 RP-120180 approved R5 R5-54 R5-120268 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1618 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 - Correction to EUTRA MAC testcase 7.1.4.7a RP-55 RP-120180 approved R5 R5-54 R5-120269 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1619 - F Rel-9 9.7.0 9.8.0 GCF Priority 1 - Correction to EUTRA RLC testcase 7.2.3.8 RP-55 RP-120180 approved R5 R5-54 R5-120270 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1620 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EUTRA testcase 8.3.1.11 RP-55 RP-120180 approved R5 R5-54 R5-120271 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1621 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Correction to EUTRA RRC test case 8.3.3.2 and 8.3.3.3 RP-55 RP-120180 approved R5 R5-54 R5-120272 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1622 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Correction to EMM test case 9.2.3.1.6 RP-55 RP-120180 approved R5 R5-54 R5-120273 agreed 2012-01-23 LTE-UEConTest_SIG - 2012-01-23
1623 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.4 RP-55 RP-120180 approved R5 R5-54 R5-120356 agreed 2012-01-25 LTE-UEConTest_SIG - 2012-01-25
1624 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.23 RP-55 RP-120180 approved R5 R5-54 R5-120357 agreed 2012-01-25 LTE-UEConTest_SIG - 2012-01-25
1625 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.16 RP-55 RP-120180 approved R5 R5-54 R5-120398 agreed 2012-01-26 LTE-UEConTest_SIG - 2012-01-26
1626 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.23 RP-55 RP-120180 approved R5 R5-54 R5-120400 agreed 2012-01-26 LTE-UEConTest_SIG - 2012-01-26
1627 - F Rel-9 9.7.0 9.8.0 Update of IMS emergency call test case 11.2.1 RP-55 RP-120192 approved R5 R5-54 R5-120403 agreed 2012-01-26 IMS_EMER_GPRS_EPS_UEConTest - 2012-01-26
1628 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Update to test case 8.2.1.8 RP-55 RP-120180 approved R5 R5-54 R5-120440 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1629 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Addition of new test case 8.3.1.3a RP-55 RP-120180 approved R5 R5-54 R5-120441 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1630 - F Rel-9 9.7.0 9.8.0 Clarification on specifying parameter values without taking into account uncertainties RP-55 RP-120180 approved R5 R5-54 R5-120482 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1631 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.13 RP-55 RP-120180 approved R5 R5-54 R5-120490 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1632 - F Rel-9 9.7.0 9.8.0 GCF Priority X Correction of test case 6.1.2.17 RP-55 RP-120180 approved R5 R5-54 R5-120494 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1633 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 - Correction to EUTRA RRC test case 8.3.2.3 RP-55 RP-120180 approved R5 R5-54 R5-120528 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1634 - F Rel-9 9.7.0 9.8.0 GCF Priority 4: Correction to ESM test case 10.3.1 RP-55 RP-120180 approved R5 R5-54 R5-120541 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1635 - F Rel-9 9.7.0 9.8.0 GCF Priority 4: Correction to ESM test case 10.9.1 RP-55 RP-120180 approved R5 R5-54 R5-120542 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1636 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - Correction to EUTRA Idle Mode test case 6.2.1.3 RP-55 RP-120180 approved R5 R5-54 R5-120584 agreed 2012-01-27 LTE-UEConTest_SIG - 2012-01-27
1637 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 : Update of inter band cell reselection test case 6.1.2.5 to cater for bands with single frequency operation RP-55 RP-120180 approved R5 R5-54 R5-120622 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1638 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 - Correction to EMM test case 9.2.3.1.6 RP-55 RP-120180 approved R5 R5-54 R5-120623 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1639 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 - Correction to EMM test case 9.2.3.2.1a RP-55 RP-120180 approved R5 R5-54 R5-120624 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1640 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 (and lower) - Correction of TAI list fields in EMM test cases RP-55 RP-120180 approved R5 R5-54 R5-120625 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1641 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 : Update of EMM test cases 9.2.3.1.17 and 9.2.3.1.19 RP-55 RP-120180 approved R5 R5-54 R5-120627 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1642 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 : Update of EMM authentication test case 9.1.2.6 to cater for bands with single frequency operation RP-55 RP-120180 approved R5 R5-54 R5-120628 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1643 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.26 RP-55 RP-120180 approved R5 R5-54 R5-120629 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1644 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to EMM test case 9.2.3.3.4 RP-55 RP-120180 approved R5 R5-54 R5-120630 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1645 - F Rel-10 9.7.0 10.0.0 Addition of new MDT test case for 'Logged MDT / Intra-frequency measurement, logging and reporting / E-UTRA handover' RP-55 RP-120199 approved R5 R5-54 R5-120631 agreed 2012-02-07 MDT_UMTSLTE-UEConTest - 2012-02-07
1646 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 - Correction to EMM test case 9.2.1.1.18 RP-55 RP-120180 approved R5 R5-54 R5-120633 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1647 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 - Update to test case 13.4.3.3 RP-55 RP-120180 approved R5 R5-54 R5-120635 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1648 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 - Update to test case 13.4.3.5 RP-55 RP-120180 approved R5 R5-54 R5-120636 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1649 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 - Update test case 13.4.3.2 RP-55 RP-120180 approved R5 R5-54 R5-120637 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1650 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 - Update to test case 14.1 and 14.2 RP-55 RP-120180 approved R5 R5-54 R5-120638 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1651 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 Correction of test case 6.2.3.3 RP-55 RP-120180 approved R5 R5-54 R5-120639 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1652 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - update of E-UTRA Idle mode test case 6.2.2.5 RP-55 RP-120180 approved R5 R5-54 R5-120640 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1653 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - update of E-UTRA RRC test case 8.1.3.7 RP-55 RP-120180 approved R5 R5-54 R5-120641 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1654 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - update of E-UTRA RRC test case 8.3.2.4 RP-55 RP-120180 approved R5 R5-54 R5-120642 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1655 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Correction to EMM test case 9.2.3.3.1 RP-55 RP-120180 approved R5 R5-54 R5-120643 - 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1656 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Correction to EMM test case 9.2.1.2.1b RP-55 RP-120180 approved R5 R5-54 R5-120644 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1657 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - update of E-UTRA Multi-Layer test case 13.4.2.1 RP-55 RP-120180 approved R5 R5-54 R5-120645 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1658 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - update of E-UTRA Multi-Layer test case 13.4.2.4 RP-55 RP-120180 approved R5 R5-54 R5-120646 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1659 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Correction to Multilayer test case 13.1.2 RP-55 RP-120180 approved R5 R5-54 R5-120647 agreed 2012-02-07 LTE-UEConTest_SIG - 2012-02-07
1660 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA RRC test case 8.3.2.3 RP-55 RP-120180 approved R5 R5-54 R5-120649 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1661 - F Rel-9 9.7.0 9.8.0 8.1.3.12a RRC connection release / Success / With priority information / Inter-band / Between FDD and TDD RP-55 RP-120180 approved R5 R5-54 R5-120650 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1662 - F Rel-9 9.7.0 9.8.0 8.1.3.11a RRC connection release / Redirection to another E-UTRAN band / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120651 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1663 - F Rel-9 9.7.0 9.8.0 8.2.4.13a RRC connection reconfiguration / Handover / Success (with measurement) / Inter-band / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120652 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1664 - F Rel-9 9.7.0 9.8.0 8.2.4.14a RRC connection reconfiguration / Handover / Failure / Re-establishment successful / Inter-band / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120653 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1665 - F Rel-9 9.7.0 9.8.0 8.2.4.15a RRC connection reconfiguration / Handover / Failure / Re-establishment failure / Inter-band / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120654 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1666 - F Rel-9 9.7.0 9.8.0 8.3.1.14a Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A2 and A3 (inter-band measurements) / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120657 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1667 - F Rel-9 9.7.0 9.8.0 8.3.1.15a Measurement configuration control and reporting / Intra E-UTRAN measurements / Inter-band handover / IE measurement configuration not present / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120658 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1668 - F Rel-9 9.7.0 9.8.0 8.3.1.16a Measurement configuration control and reporting / Intra E-UTRAN measurements / Continuation of the measurements after RRC connection re-establishment / Inter-band / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120659 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1669 - F Rel-9 9.7.0 9.8.0 GCF Priority u2 - Correction to EUTRA RRC test case 8.3.3.3 RP-55 RP-120181 approved R5 R5-54 R5-120660 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1670 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA RRC test case 8.4.2.2 RP-55 RP-120181 approved R5 R5-54 R5-120661 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1671 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA RRC test case 8.4.2.4 RP-55 RP-120181 approved R5 R5-54 R5-120662 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1672 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.1.2 RP-55 RP-120181 approved R5 R5-54 R5-120663 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1673 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.1.3 RP-55 RP-120181 approved R5 R5-54 R5-120664 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1674 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.1.15 RP-55 RP-120181 approved R5 R5-54 R5-120665 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1675 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.4.3.1 RP-55 RP-120181 approved R5 R5-54 R5-120666 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1676 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.4.3.2 RP-55 RP-120181 approved R5 R5-54 R5-120667 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1677 - F Rel-9 9.7.0 9.8.0 GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.4.3.4 RP-55 RP-120181 approved R5 R5-54 R5-120668 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1678 - F Rel-9 9.7.0 9.8.0 GCF Priority M1 - update of E-UTRA RRC test case 8.3.2.5 RP-55 RP-120181 approved R5 R5-54 R5-120669 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1679 - F Rel-9 9.7.0 9.8.0 GCF Priority M1 - update of E-UTRA RRC test case 8.3.2.6 RP-55 RP-120181 approved R5 R5-54 R5-120670 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1680 - F Rel-9 9.7.0 9.8.0 GCF Priority g1 - Correction to EUTRA Idlemode test case 6.2.3.1 RP-55 RP-120181 approved R5 R5-54 R5-120671 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1681 - F Rel-9 9.7.0 9.8.0 GCF Priority X Correction of test case 6.1.2.3a RP-55 RP-120181 approved R5 R5-54 R5-120673 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1682 - F Rel-9 9.7.0 9.8.0 GCF Priority X Addition of new test case 6.2.3.3a RP-55 RP-120181 approved R5 R5-54 R5-120674 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1683 - F Rel-9 9.7.0 9.8.0 GCF Priority X Addition of new test case 6.2.3.5a RP-55 RP-120181 approved R5 R5-54 R5-120675 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1684 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Addition of new test case 6.2.3.x RP-55 RP-120181 approved R5 R5-54 R5-120676 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1685 - F Rel-9 9.7.0 9.8.0 Update of test case 11.2.4 RP-55 RP-120192 approved R5 R5-54 R5-120695 agreed 2012-02-08 IMS_EMER_GPRS_EPS_UEConTest - 2012-02-08
1686 - F Rel-9 9.7.0 9.8.0 Update of test case 11.2.5 RP-55 RP-120192 approved R5 R5-54 R5-120696 agreed 2012-02-08 IMS_EMER_GPRS_EPS_UEConTest - 2012-02-08
1687 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Update of TC 11.2.8 to include IMS procedures RP-55 RP-120192 approved R5 R5-54 R5-120697 agreed 2012-02-08 IMS_EMER_GPRS_EPS_UEConTest - 2012-02-08
1688 - F Rel-9 9.7.0 9.8.0 Update test case 11.2.2 RP-55 RP-120192 approved R5 R5-54 R5-120698 agreed 2012-02-08 IMS_EMER_GPRS_EPS_UEConTest - 2012-02-08
1689 - F Rel-9 9.7.0 9.8.0 GCF Priority x - Update test case 8.1.2.11 RP-55 RP-120184 approved R5 R5-54 R5-120699 agreed 2012-02-08 TEI9_Test - 2012-02-08
1690 - F Rel-9 9.7.0 9.8.0 GCF Priority x - Update test case 8.1.2.12 RP-55 RP-120184 approved R5 R5-54 R5-120700 agreed 2012-02-08 TEI9_Test - 2012-02-08
1691 - F Rel-9 9.7.0 9.8.0 GCF Priority x : Update of titles of test cases 8.3.1.9a and 8.3.1.11a RP-55 RP-120181 approved R5 R5-54 R5-120701 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1693 - F Rel-9 9.7.0 9.8.0 Addition of new test 11.2.10 RP-55 RP-120192 approved R5 R5-54 R5-120703 agreed 2012-02-08 IMS_EMER_GPRS_EPS_UEConTest - 2012-02-08
1694 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Addition of new test case 8.3.2.3a RP-55 RP-120181 approved R5 R5-54 R5-120705 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1695 - F Rel-9 9.7.0 9.8.0 GCF Priority 4 (and higher) - Editorial corrections to various EMM test cases RP-55 RP-120181 approved R5 R5-54 R5-120707 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1696 - F Rel-9 9.7.0 9.8.0 Addition of new Rel-9 test case 13.4.4.1 RP-55 RP-120181 approved R5 R5-54 R5-120708 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1697 - F Rel-9 9.7.0 9.8.0 Addition of new Rel-9 test case 13.4.4.2 RP-55 RP-120181 approved R5 R5-54 R5-120709 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1698 - F Rel-9 9.7.0 9.8.0 GCF Priority X - update of E-UTRA Multi-Layer test case 13.1.2a RP-55 RP-120181 approved R5 R5-54 R5-120710 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1699 - F Rel-9 9.7.0 9.8.0 Modification of TC 8.4.7.1: Inter-RAT handover / SRVCC from E-UTRA to 1xRTT(CS) / Speech RP-55 RP-120181 approved R5 R5-54 R5-120711 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1700 - F Rel-9 9.7.0 9.8.0 Addition for new 13.4.4.3 LTE-CDMA2000-HRPD interworking test case RP-55 RP-120181 approved R5 R5-54 R5-120712 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1701 - F Rel-9 9.7.0 9.8.0 Addition for new 13.4.4.4 LTE-CDMA2000-HRPD interworking test case RP-55 RP-120181 approved R5 R5-54 R5-120713 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1702 - F Rel-9 9.7.0 9.8.0 8.3.1.12a Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A3 (inter-band measurements) / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120714 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1703 - F Rel-9 9.7.0 9.8.0 8.3.1.13a Measurement configuration control and reporting / Intra E-UTRAN measurements / Periodic reporting (intra-frequency and inter-band measurements) / Between FDD and TDD RP-55 RP-120181 approved R5 R5-54 R5-120715 agreed 2012-02-08 LTE-UEConTest_SIG - 2012-02-08
1704 - F Rel-10 9.7.0 10.0.0 Addition of a new TC 17.3.1 for MBMS Counting / UE not receiving MBMS service RP-55 RP-120203 approved R5 R5-54 R5-120724 agreed 2012-02-09 MBMS_LTE_enh-UEConTest - 2012-02-09
1705 - F Rel-10 9.7.0 10.0.0 CA / RRC connection reconfiguration / Carrier Aggregation / SCell addition/ modification/release / Success RP-55 RP-120200 approved R5 R5-54 R5-120727 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1706 - F Rel-10 9.7.0 10.0.0 CA / RRC connection reconfiguration / Carrier Aggregation / SCell SI change / Success RP-55 RP-120200 approved R5 R5-54 R5-120728 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1707 - F Rel-10 9.7.0 10.0.0 CA / RRC connection reconfiguration / SCell addition without UL RP-55 RP-120200 approved R5 R5-54 R5-120729 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1708 - F Rel-10 9.7.0 10.0.0 CA / RRC connection reconfiguration / Handover / Success / SCell addition RP-55 RP-120200 approved R5 R5-54 R5-120730 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1709 - F Rel-10 9.7.0 10.0.0 CA / RRC connection reconfiguration / Handover / Success / SCell becomes PCell RP-55 RP-120200 approved R5 R5-54 R5-120731 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1710 - F Rel-10 9.7.0 10.0.0 CA / Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A6 RP-55 RP-120200 approved R5 R5-54 R5-120732 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1711 - F Rel-10 9.7.0 10.0.0 CA / Measurement configuration control and reporting / Intra E-UTRAN measurements / Additional measurement reporting RP-55 RP-120200 approved R5 R5-54 R5-120733 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1712 - F Rel-10 9.7.0 10.0.0 Addition of new Rel-10 test case 7.1.3.11 CA / Correct HARQ process handling / DCCH and DTCH / Pcell and Scell RP-55 RP-120200 approved R5 R5-54 R5-120734 agreed 2012-02-09 LTE_CA-UEConTest - 2012-02-09
1713 - F Rel-10 9.7.0 10.0.0 Addition of new MDT test case for 'Logged MDT / Intra-frequency measurement, logging and reporting / Limiting area scope' RP-55 RP-120199 approved R5 R5-54 R5-120738 agreed 2012-02-09 MDT_UMTSLTE-UEConTest - 2012-02-09
1714 - F Rel-10 9.7.0 10.0.0 New Logged MDT test case 8.6.2.1 (Intra-frequency measurement, logging and reporting) RP-55 RP-120199 approved R5 R5-54 R5-120739 agreed 2012-02-09 MDT_UMTSLTE-UEConTest - 2012-02-09
1715 - F Rel-10 9.7.0 10.0.0 New Logged MDT test case 8.6.2.2 (Inter-frequency measurement, logging and reporting) RP-55 RP-120199 approved R5 R5-54 R5-120740 agreed 2012-02-09 MDT_UMTSLTE-UEConTest - 2012-02-09
1716 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Addition of new test case 8.6.4.y RP-55 RP-120199 approved R5 R5-54 R5-120741 agreed 2012-02-09 MDT_UMTSLTE-UEConTest - 2012-02-09
1717 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Addition of new test case 8.6.4.z RP-55 RP-120199 approved R5 R5-54 R5-120742 agreed 2012-02-09 MDT_UMTSLTE-UEConTest - 2012-02-09
1718 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Addition of new test case 8.6.x.y RP-55 RP-120199 approved R5 R5-54 R5-120743 agreed 2012-02-09 MDT_UMTSLTE-UEConTest - 2012-02-09
1719 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Addition of new test case 8.6.x.z RP-55 RP-120199 approved R5 R5-54 R5-120744 agreed 2012-02-09 MDT_UMTSLTE-UEConTest - 2012-02-09
1720 - F Rel-9 9.7.0 9.8.0 Addition of new Rel-9 test case 18.1.1 RP-55 RP-120181 approved R5 R5-54 R5-120751 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1721 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 : Introduction of new equivalent , 6.1.2.x test cases to cater for bands with single frequency operation RP-55 RP-120181 approved R5 R5-54 R5-120757 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1722 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 : Introduction of new equivalent 6.1.1.x test cases to cater for bands with single frequency operation RP-55 RP-120181 approved R5 R5-54 R5-120758 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1723 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - Correction to EUTRA RRC test case 8.1.3.7 RP-55 RP-120181 approved R5 R5-54 R5-120760 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1724 - F Rel-9 9.7.0 9.8.0 GCF Priority U1 - Correction to EUTRA RRC test cases 8.4.1.2 and 8.4.1.4 RP-55 RP-120181 approved R5 R5-54 R5-120764 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1725 - F Rel-9 9.7.0 9.8.0 GCF Priority 2 - Correction to EMM test case 9.2.3.2.1 RP-55 RP-120181 approved R5 R5-54 R5-120765 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1726 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Update to test case 9.2.3.3.2 RP-55 RP-120181 approved R5 R5-54 R5-120766 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1727 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Update to test case 9.2.3.3.3 RP-55 RP-120181 approved R5 R5-54 R5-120767 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1728 - F Rel-9 9.7.0 9.8.0 GCF Priority u1 - Update to test case 9.2.3.3.5 RP-55 RP-120181 approved R5 R5-54 R5-120768 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1729 - F Rel-9 9.7.0 9.8.0 GCF Priority X - Update of test cases 6.2.2.3, 6.2.3.7, 6.2.3.7a, 6.2.3.8, 6.2.3.8a, 6.2.3.9, 6.2.3.9a, 6.2.3.10, 6.2.3.10a RP-55 RP-120181 approved R5 R5-54 R5-120769 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1730 - F Rel-10 9.7.0 10.0.0 Addition of a new Rel-10 test case 17.3.2 RP-55 RP-120203 approved R5 R5-54 R5-120770 agreed 2012-02-09 MBMS_LTE_enh-UEConTest - 2012-02-09
1731 - F Rel-9 9.7.0 9.8.0 GCF Priority 3 - Correction to Idle Mode test case 6.1.2.13 RP-55 RP-120181 approved R5 R5-54 R5-120771 agreed 2012-02-09 LTE-UEConTest_SIG - 2012-02-09
1732 - F Rel-9 9.7.0 9.8.0 GCF Priority UX – Correction to EUTRA to UTRA Handover testcases RP-55 RP-120181 approved R5 R5-54 R5-120776 agreed 2012-02-10 LTE-UEConTest_SIG - 2012-02-10
1733 - F Rel-9 9.7.0 - CR 36.523-1-1733 Correction to Idle Mode in test case 6.2.1.6 - - - G3new G3new-53 GP-120005 revised 2012-02-01 LTE-UEConTest_SIG - 2012-02-01
1733 - F Rel-10 10.0.0 10.1.0 CR 36.523-1-1733 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.15 GP-54 GP-120496 approved G3new G3new-54 GP-120496 agreed 2012-05-03 LTE-UEConTest_SIG - 2012-05-03
1733 1 F Rel-9 9.7.0 9.8.0 CR 36.523-1-1733 Correction to Idle Mode in test case 6.2.1.6 GP-53 GP-120370 approved G3new G3new-53 GP-120370 agreed 2012-02-28 LTE-UEConTest_SIG - 2012-02-28
1734 - F Rel-9 9.7.0 - CR 36.523-1-1734 Correction to Idle Mode in test case 6.2.3.14 - - - G3new G3new-53 GP-120006 revised 2012-02-01 LTE-UEConTest_SIG - 2012-02-01
1734 - F Rel-10 10.0.0 10.1.0 CR 36.523-1-1734 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.16 GP-54 GP-120497 approved G3new G3new-54 GP-120497 agreed 2012-05-03 LTE-UEConTest_SIG - 2012-05-03
1734 1 F Rel-9 9.7.0 9.8.0 CR 36.523-1-1734 Correction to Idle Mode in test case 6.2.3.14 GP-53 GP-120371 approved G3new G3new-53 GP-120371 agreed 2012-02-28 LTE-UEConTest_SIG - 2012-02-28
1735 - F Rel-9 9.7.0 - CR 36.523-1-1735 Correction to Idle Mode in test case 6.2.3.15 - - - G3new G3new-53 GP-120007 revised 2012-02-01 LTE-UEConTest_SIG - 2012-02-01
1735 - F Rel-10 10.0.0 10.1.0 CR 36.523-1-1735 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.17 GP-54 GP-120523 approved G3new G3new-54 GP-120523 agreed 2012-05-03 LTE-UEConTest_SIG - 2012-05-03
1735 1 F Rel-9 9.7.0 9.8.0 CR 36.523-1-1735 Correction to Idle Mode in test case 6.2.3.15 GP-53 GP-120372 approved G3new G3new-53 GP-120372 agreed 2012-02-28 LTE-UEConTest_SIG - 2012-02-28
1736 - F Rel-10 10.0.0 10.1.0 CR 36.523-1-1736 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.18 GP-54 GP-120524 approved G3new G3new-54 GP-120524 agreed 2012-05-03 LTE-UEConTest_SIG - 2012-05-03
1737 - F Rel-9 9.8.0 9.9.0 Removal of technical content in 36.523-1 v9.8.0 and substitution with pointer to the next Release RP-56 RP-120645 approved R5 R5-55 R5-121074 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1738 - F Rel-10 10.0.0 10.1.0 GCF Priority m1: Optimisation of frequency allocation RP-56 RP-120645 approved R5 R5-55 R5-121080 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1739 - F Rel-10 10.0.0 10.1.0 GCF Priority P2: Optimisation of frequency allocation RP-56 RP-120645 approved R5 R5-55 R5-121081 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1740 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to EUTRA RRC test case 8.1.3.7 RP-56 RP-120645 approved R5 R5-55 R5-121087 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1741 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to EMM test case 9.2.3.3.6 RP-56 RP-120645 approved R5 R5-55 R5-121099 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1742 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to test EUTRA-UTRA test case 13.3.2.1 RP-56 RP-120645 approved R5 R5-55 R5-121106 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1743 - F Rel-10 10.0.0 10.1.0 GCF Priority C1 - Correction to test cases 6.2.3.8 and 6.2.3.8a RP-56 RP-120645 approved R5 R5-55 R5-121108 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1744 - F Rel-10 10.0.0 10.1.0 GCF priority 3 - Correction to idle mode test case 6.1.2.13 RP-56 RP-120645 approved R5 R5-55 R5-121142 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1745 - F Rel-10 10.0.0 10.1.0 GCF Priority X - corrections to TC 13.4.4.3 RP-56 RP-120645 approved R5 R5-55 R5-121158 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1746 - F Rel-10 10.0.0 10.1.0 GCF Priority X - corrections to TC 13.4.4.4 RP-56 RP-120645 approved R5 R5-55 R5-121159 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1747 - F Rel-10 10.0.0 10.1.0 GCF priority x - Update of test case 6.1.1.1a RP-56 RP-120645 approved R5 R5-55 R5-121202 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1748 - F Rel-10 10.0.0 10.1.0 GCF Priority 2 - Update of test cases 9.3.1.4 RP-56 RP-120645 approved R5 R5-55 R5-121275 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1749 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Update of Inter-system session management test case 13.4.4.1 and 13.4.4.2 RP-56 RP-120645 approved R5 R5-55 R5-121278 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1750 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Update to test case 8.6.6.1 RP-56 RP-120735 approved R5 R5-55 R5-121289 agreed 2012-05-13 MDT_UMTSLTE-UEConTest - 2012-05-13
1751 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.2.4.13 RP-56 RP-120645 approved R5 R5-55 R5-121293 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1752 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.2.4.15 RP-56 RP-120645 approved R5 R5-55 R5-121295 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1753 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.3.1.15 RP-56 RP-120645 approved R5 R5-55 R5-121296 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1754 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.3.1.16 RP-56 RP-120645 approved R5 R5-55 R5-121297 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1755 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 Correction of test case 8.2.4.10 RP-56 RP-120645 approved R5 R5-55 R5-121394 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1756 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Update test case 8.1.2.6 RP-56 RP-120645 approved R5 R5-55 R5-121411 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1757 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Update test case 8.1.2.9 RP-56 RP-120645 approved R5 R5-55 R5-121412 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1758 - F Rel-10 10.0.0 10.1.0 GCF Priority 2 and 3 - Removal of 'Active' flag test cases RP-56 RP-120645 approved R5 R5-55 R5-121419 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1759 - F Rel-10 10.0.0 10.1.0 Changing to Void of GERAN to E-UTRAN section 8.4.4 RP-56 RP-120645 approved R5 R5-55 R5-121426 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1760 - F Rel-10 10.0.0 10.1.0 GCF Priority g1 - Correction to EUTRA test case 8.1.3.8 RP-56 RP-120645 approved R5 R5-55 R5-121437 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1761 - F Rel-10 10.0.0 10.1.0 GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.4.2 RP-56 RP-120645 approved R5 R5-55 R5-121450 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1762 - F Rel-10 10.0.0 10.1.0 GCF Priority 1 and 3 - Correction to EMM test cases 9.2.1.1.2 and 9.2.2.1.8 RP-56 RP-120645 approved R5 R5-55 R5-121465 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1763 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to multi-layer test case 13.1.5 RP-56 RP-120645 approved R5 R5-55 R5-121466 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1764 - F Rel-10 10.0.0 10.1.0 GCF priority 2: Correction to test case 9.2.1.17 RP-56 RP-120645 approved R5 R5-55 R5-121504 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1765 - F Rel-10 10.0.0 10.1.0 GCF priority G1: Correction to test case 13.4.2.2 RP-56 RP-120645 approved R5 R5-55 R5-121505 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1766 - F Rel-10 10.0.0 10.1.0 Introduction of new PWS test case 18.1.4 RP-56 RP-120658 approved R5 R5-55 R5-121511 agreed 2012-05-13 PWS-RAN-UEConTest - 2012-05-13
1767 - F Rel-10 10.0.0 10.1.0 Introduction of new Rel10 CA test case 7.1.4.21 RP-56 RP-120662 approved R5 R5-55 R5-121517 agreed 2012-05-13 LTE_CA-UEConTest - 2012-05-13
1768 - F Rel-10 10.0.0 10.1.0 GCF Priority 1, 2, 3, 4 and U1 - Correction to EMM test cases to use new PICS RP-56 RP-120645 approved R5 R5-55 R5-121541 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1769 - F Rel-10 10.0.0 10.1.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 RP-56 RP-120645 approved R5 R5-55 R5-121548 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1770 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Correction to ESM test case 10.8.7 RP-56 RP-120645 approved R5 R5-55 R5-121550 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1771 - F Rel-10 10.0.0 10.1.0 Radio Link Failure logging / Reporting at GERAN Inter-RAT handover RP-56 RP-120735 approved R5 R5-55 R5-121623 agreed 2012-05-13 MDT_UMTSLTE-UEConTest - 2012-05-13
1772 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Update test case 13.4.3.4 RP-56 RP-120645 approved R5 R5-55 R5-121632 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1773 - F Rel-10 10.0.0 10.1.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.17 RP-56 RP-120645 approved R5 R5-55 R5-121666 agreed 2012-05-13 LTE-UEConTest_SIG - 2012-05-13
1774 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to Multilayer test case 13.4.2.4 RP-56 RP-120645 approved R5 R5-55 R5-121703 agreed 2012-05-21 LTE-UEConTest_SIG - 2012-05-21
1775 - F Rel-10 10.0.0 10.1.0 GCF Priority 1 and 3 - Correction to EUTRA MAC test cases 7.1.7.1.1, 7.1.7.1.2, 7.1.7.1.3, 7.1.7.1.4, 7.1.7.1.5, 7.1.7.1.6 and 7.1.7.2.1 RP-56 RP-120645 approved R5 R5-55 R5-121738 agreed 2012-05-22 LTE-UEConTest_SIG - 2012-05-22
1776 - F Rel-10 10.0.0 10.1.0 GCF Priority 1 - Correction to EMM test case 9.2.3.1.5 RP-56 RP-120645 approved R5 R5-55 R5-121739 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1777 - F Rel-10 10.0.0 10.1.0 GCF Priority 2: Addition of equivalent EMM test cases for single frequency operation RP-56 RP-120645 approved R5 R5-55 R5-121740 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1778 - F Rel-10 10.0.0 10.1.0 GCF Priority 2: Corrections to EMM test cases to enable single frequency operation RP-56 RP-120645 approved R5 R5-55 R5-121742 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1779 - F Rel-10 10.0.0 10.1.0 GCF Priority 2 - Update to test case 10.4.1 RP-56 RP-120645 approved R5 R5-55 R5-121743 agreed 2012-05-22 LTE-UEConTest_SIG - 2012-05-22
1780 - F Rel-10 10.0.0 10.1.0 GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.3.2 RP-56 RP-120645 approved R5 R5-55 R5-121744 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1781 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Correction to EMM CSG test case 9.3.1.18 RP-56 RP-120645 approved R5 R5-55 R5-121746 agreed 2012-05-22 LTE-UEConTest_SIG - 2012-05-22
1782 - F Rel-10 10.0.0 10.1.0 GCF Priority 3 Update of TC 9.2.3.1.23 RP-56 RP-120645 approved R5 R5-55 R5-121747 agreed 2012-05-22 LTE-UEConTest_SIG - 2012-05-22
1783 - F Rel-10 10.0.0 10.1.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.23, 9.2.3.2.4, 9.2.3.2.14, 9.2.3.2.2, 9.2.3.2.17 RP-56 RP-120645 approved R5 R5-55 R5-121748 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1784 - F Rel-10 10.0.0 10.1.0 GCF Priority 3 - Correction to EMM test case 9.2.3.1.4 RP-56 RP-120645 approved R5 R5-55 R5-121749 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1785 - F Rel-10 10.0.0 10.1.0 GCF Priority 3 - Correction to EMM test case 9.2.2.1.7 RP-56 RP-120645 approved R5 R5-55 R5-121750 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1786 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Correction to EUTRA Idle Mode test cases 6.1.1.6 and 6.1.1.6a RP-56 RP-120645 approved R5 R5-55 R5-121753 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1787 - F Rel-10 10.0.0 10.1.0 GCF priority 4 - Correction to Idle Mode test case 6.1.2.12 RP-56 RP-120645 approved R5 R5-55 R5-121754 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1788 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Correction to Idle mode test case 6.1.1.6a RP-56 RP-120645 approved R5 R5-55 R5-121755 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1789 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Editorial corrections to some EMM test cases RP-56 RP-120645 approved R5 R5-55 R5-121756 agreed 2012-05-22 LTE-UEConTest_SIG - 2012-05-22
1790 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Update test case 13.4.3.1 RP-56 RP-120645 approved R5 R5-55 R5-121757 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1791 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Update test case 13.4.3.2 RP-56 RP-120645 approved R5 R5-55 R5-121758 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1792 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Update to test case 14.2 RP-56 RP-120645 approved R5 R5-55 R5-121759 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1793 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Update to EUTRA Idle Mode test case 6.2.1.2 RP-56 RP-120645 approved R5 R5-55 R5-121760 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1794 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to EUTRA Idle Mode test case 6.2.1.3 RP-56 RP-120645 approved R5 R5-55 R5-121761 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1795 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to EMM test case 9.2.1.2.11 RP-56 RP-120645 approved R5 R5-55 R5-121762 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1796 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to EMM test case 9.2.1.2.15 RP-56 RP-120645 approved R5 R5-55 R5-121763 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1797 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to EMM test case 9.2.3.3.5 RP-56 RP-120645 approved R5 R5-55 R5-121764 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1798 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to EMM test case 9.2.1.2.1d RP-56 RP-120646 approved R5 R5-55 R5-121765 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1799 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to EMM test case 9.2.3.2.1c RP-56 RP-120646 approved R5 R5-55 R5-121766 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1800 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to EUTRA Multi-Layer test case 13.1.4 RP-56 RP-120646 approved R5 R5-55 R5-121767 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1801 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to multi-layer test case 13.4.2.1 RP-56 RP-120646 approved R5 R5-55 R5-121768 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1802 - F Rel-10 10.0.0 10.1.0 GCF Priority g1 - Correction to EUTRA test case 6.2.2.2 RP-56 RP-120646 approved R5 R5-55 R5-121771 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1803 - F Rel-10 10.0.0 10.1.0 GCF Priority g1 - Correction to EUTRA test case 6.2.3.1 RP-56 RP-120646 approved R5 R5-55 R5-121772 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1804 - F Rel-10 10.0.0 10.1.0 GCF Priority g1 - Correction to EUTRA test case 8.3.2.2 RP-56 RP-120646 approved R5 R5-55 R5-121773 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1805 - F Rel-10 10.0.0 10.1.0 GCF Priority g1 - Update to test case 9.2.3.3.5a RP-56 RP-120646 approved R5 R5-55 R5-121774 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1806 - F Rel-10 10.0.0 10.1.0 GCF Priority g1 - Correction to EMM test case 9.2.3.4.1 RP-56 RP-120646 approved R5 R5-55 R5-121775 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1807 - F Rel-10 10.0.0 10.1.0 GCF Priority g2 Correction of test case 8.4.3.1 RP-56 RP-120646 approved R5 R5-55 R5-121776 agreed 2012-05-23 LTE-UEConTest_SIG - 2012-05-23
1808 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Update to test case 6.2.3.33 RP-56 RP-120646 approved R5 R5-55 R5-121780 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1809 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.1.3.12 RP-56 RP-120646 approved R5 R5-55 R5-121781 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1810 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.1.3.11 RP-56 RP-120646 approved R5 R5-55 R5-121782 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1811 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new Rel-9 EUTRA RRC test case 8.1.3.6a RP-56 RP-120646 approved R5 R5-55 R5-121783 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1812 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.2.4.14 RP-56 RP-120646 approved R5 R5-55 R5-121784 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1813 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.3.1.12 RP-56 RP-120646 approved R5 R5-55 R5-121785 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1814 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.3.1.13 RP-56 RP-120646 approved R5 R5-55 R5-121786 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1815 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.3.1.14 RP-56 RP-120646 approved R5 R5-55 R5-121787 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1816 - F Rel-10 10.0.0 10.1.0 GCF Priority C2 - Correction to test case 8.4.5.4 RP-56 RP-120646 approved R5 R5-55 R5-121788 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1817 - F Rel-10 10.0.0 10.1.0 Addition of new e1xCSFB Rel-9 test case 8.4.7.7 RP-56 RP-120646 approved R5 R5-55 R5-121789 agreed 2012-05-28 LTE-UEConTest_SIG - 2012-05-28
1818 - F Rel-10 10.0.0 10.1.0 Addition of new e1xCSFB Rel-9 test case 8.4.7.8 RP-56 RP-120646 approved R5 R5-55 R5-121790 agreed 2012-05-28 LTE-UEConTest_SIG - 2012-05-28
1819 - F Rel-10 10.0.0 10.1.0 Addition of new e1xCSFB Rel-9 test case 8.4.7.9 RP-56 RP-120646 approved R5 R5-55 R5-121791 agreed 2012-05-28 LTE-UEConTest_SIG - 2012-05-28
1820 - F Rel-10 10.0.0 10.1.0 Addition of new Rel-9 SRVCC test case 13.4.3.6 RP-56 RP-120646 approved R5 R5-55 R5-121792 agreed 2012-05-28 LTE-UEConTest_SIG - 2012-05-28
1821 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 13.4.1.4 RP-56 RP-120646 approved R5 R5-55 R5-121793 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1822 - F Rel-10 10.0.0 10.1.0 GCF Priority X Addition of new test case 13.3.1.3 RP-56 RP-120646 approved R5 R5-55 R5-121794 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1823 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Update of IMS test case 11.2.8 RP-56 RP-120655 approved R5 R5-55 R5-121807 agreed 2012-05-25 IMS_EMER_GPRS_EPS_UEConTest - 2012-05-25
1824 - F Rel-10 10.0.0 10.1.0 Add new test case 11.2.11 RP-56 RP-120655 approved R5 R5-55 R5-121808 agreed 2012-05-24 IMS_EMER_GPRS_EPS_UEConTest - 2012-05-24
1825 - F Rel-10 10.0.0 10.1.0 New UTRAN ANR/E-UTRAN test case 8.7.1 RP-56 RP-120663 approved R5 R5-55 R5-121826 agreed 2012-05-24 ANR_UTRAN-UEConTest - 2012-05-24
1826 - F Rel-10 10.0.0 10.1.0 Update of MDT test case 8.6.2.3 RP-56 RP-120735 approved R5 R5-55 R5-121828 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1827 - F Rel-10 10.0.0 10.1.0 Update of MDT test case 8.6.2.4 RP-56 RP-120735 approved R5 R5-55 R5-121829 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1828 - F Rel-10 10.0.0 10.1.0 Addition of new MDT test case 8.6.2.5 RP-56 RP-120735 approved R5 R5-55 R5-121830 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1829 - F Rel-10 10.0.0 10.1.0 Addition of new MDT test case 8.6.2.6 RP-56 RP-120735 approved R5 R5-55 R5-121831 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1830 - F Rel-10 10.0.0 10.1.0 Addition of new MDT test case 8.6.2.7 RP-56 RP-120735 approved R5 R5-55 R5-121832 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1831 - F Rel-10 10.0.0 10.1.0 Addition of new MDT test case 8.2.6.8 RP-56 RP-120735 approved R5 R5-55 R5-121833 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1832 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.6.4.5 RP-56 RP-120735 approved R5 R5-55 R5-121834 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1833 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.6.4.6 RP-56 RP-120735 approved R5 R5-55 R5-121836 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1834 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.6.5.1 RP-56 RP-120735 approved R5 R5-55 R5-121837 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1835 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.6.6.3 RP-56 RP-120735 approved R5 R5-55 R5-121839 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1836 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new test case 8.6.7.1 RP-56 RP-120735 approved R5 R5-55 R5-121840 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1837 - F Rel-10 10.0.0 10.1.0 New Logged MDT test case 8.6.3.1 RP-56 RP-120735 approved R5 R5-55 R5-121841 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1838 - F Rel-10 10.0.0 10.1.0 Radio Link Failure logging / Reporting at RRC connection establishment and reestablishment RP-56 RP-120735 approved R5 R5-55 R5-121843 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1839 - F Rel-10 10.0.0 10.1.0 Radio Link Failure logging / Reporting at E-UTRA handover RP-56 RP-120735 approved R5 R5-55 R5-121844 agreed 2012-05-24 MDT_UMTSLTE-UEConTest - 2012-05-24
1840 - F Rel-10 10.0.0 10.1.0 Correction to UE Pre-test condition for TS 36.523-1 Test Case 6.4.7 (Inter-RAT cell reselection / From GSM_Idle/GPRS Packet_Idle to E-UTRA RRC_IDLE member hybrid cell) RP-56 RP-120646 approved R5 R5-55 R5-121848 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1841 - F Rel-10 10.0.0 10.1.0 Correction of E-UTRAN<>GERAN test cases for Classmark Change RP-56 RP-120646 approved R5 R5-55 R5-121849 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1842 - F Rel-10 10.0.0 10.1.0 Addition of new PWS Rel-9 test case 18.1.7 RP-56 RP-120658 approved R5 R5-55 R5-121855 agreed 2012-05-28 PWS-RAN-UEConTest - 2012-05-28
1843 - F Rel-10 10.0.0 10.1.0 Correction of CA TC 8.2.2.3 RP-56 RP-120662 approved R5 R5-55 R5-121857 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1844 - F Rel-10 10.0.0 10.1.0 Correction of CA TC 8.2.2.4 RP-56 RP-120662 approved R5 R5-55 R5-121858 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1845 - F Rel-10 10.0.0 10.1.0 Correction of CA TC 8.2.2.5 RP-56 RP-120662 approved R5 R5-55 R5-121859 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1846 - F Rel-10 10.0.0 10.1.0 Correction of CA TC 8.2.4.17 RP-56 RP-120662 approved R5 R5-55 R5-121860 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1847 - F Rel-10 10.0.0 10.1.0 Removal of CA TC 8.2.4.16 RP-56 RP-120662 approved R5 R5-55 R5-121861 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1848 - F Rel-10 10.0.0 10.1.0 Correction of CA TC 8.3.1.17 RP-56 RP-120662 approved R5 R5-55 R5-121862 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1849 - F Rel-10 10.0.0 10.1.0 Correction of CA TC 8.3.1.18 RP-56 RP-120662 approved R5 R5-55 R5-121863 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1850 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Addition of new CA test case RP-56 RP-120662 approved R5 R5-55 R5-121865 agreed 2012-05-24 LTE_CA-UEConTest - 2012-05-24
1851 - F Rel-10 10.0.0 10.1.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.10 RP-56 RP-120646 approved R5 R5-55 R5-121869 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1852 - F Rel-10 10.0.0 10.1.0 GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.13 RP-56 RP-120646 approved R5 R5-55 R5-121870 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1853 - F Rel-10 10.0.0 10.1.0 Update to TC 6.1.1.3a RP-56 RP-120646 approved R5 R5-55 R5-121889 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1854 - F Rel-10 10.0.0 10.1.0 Update to TC 6.1.1.4a RP-56 RP-120646 approved R5 R5-55 R5-121890 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1855 - F Rel-10 10.0.0 10.1.0 Update to TC 6.1.2.15a RP-56 RP-120646 approved R5 R5-55 R5-121891 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1856 - F Rel-10 10.0.0 10.1.0 Update to TC 6.1.2.16 RP-56 RP-120646 approved R5 R5-55 R5-121892 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1857 - F Rel-10 10.0.0 10.1.0 GCF Priority X Correction of test cases 6.2.3.3a and 6.2.3.5a RP-56 RP-120646 approved R5 R5-55 R5-121893 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1858 - F Rel-10 10.0.0 10.1.0 GCF Priority 4: Modification on TC 8.1.2.9 RP-56 RP-120646 approved R5 R5-55 R5-121894 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1859 - F Rel-10 10.0.0 10.1.0 Update to TC 8.1.3.11a RP-56 RP-120646 approved R5 R5-55 R5-121895 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1860 - F Rel-10 10.0.0 10.1.0 Update to TC 8.1.3.12a RP-56 RP-120646 approved R5 R5-55 R5-121896 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1861 - F Rel-10 10.0.0 10.1.0 Update to TC 8.2.4.13a RP-56 RP-120646 approved R5 R5-55 R5-121897 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1862 - F Rel-10 10.0.0 10.1.0 Update to TC 8.2.4.14a RP-56 RP-120646 approved R5 R5-55 R5-121898 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1863 - F Rel-10 10.0.0 10.1.0 Update to TC 8.2.4.15a RP-56 RP-120646 approved R5 R5-55 R5-121899 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1864 - F Rel-10 10.0.0 10.1.0 Introduction of new Rel10 CA test case 7.1.9.1 RP-56 RP-120662 approved R5 R5-55 R5-122008 agreed 2012-06-06 LTE_CA-UEConTest - 2012-06-06
1865 - F Rel-10 10.0.0 10.1.0 Radio Link Failure logging / Reporting at CDMA2000 Inter-RAT handover RP-56 RP-120735 approved R5 R5-55 R5-122009 agreed 2012-06-06 MDT_UMTSLTE-UEConTest - 2012-06-06
1866 - F Rel-10 10.0.0 10.1.0 Immediate MDT / Reporting / Location information RP-56 RP-120735 approved R5 R5-55 R5-122010 agreed 2012-06-06 MDT_UMTSLTE-UEConTest - 2012-06-06
1867 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 RP-56 RP-120646 approved R5 R5-55 R5-122011 agreed 2012-06-06 LTE-UEConTest_SIG - 2012-06-06
1868 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Update of EMM test case 9.2.1.2.1b RP-56 RP-120646 approved R5 R5-55 R5-122012 agreed 2012-06-06 LTE-UEConTest_SIG - 2012-06-06
1869 - F Rel-10 10.0.0 10.1.0 GCF Priority X - Update of EMM test case 9.2.1.2.1c RP-56 RP-120646 approved R5 R5-55 R5-122013 agreed 2012-06-06 LTE-UEConTest_SIG - 2012-06-06
1870 - F Rel-10 10.0.0 10.1.0 Addition of new e1xCSFB Rel-9 test case 13.4.4.5 RP-56 RP-120646 approved R5 R5-55 R5-122016 agreed - LTE-UEConTest_SIG - 2012-06-14
1871 - F Rel-10 10.0.0 10.1.0 Update to TC 8.3.1.12a RP-56 RP-120646 approved R5 R5-55 R5-122100 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1872 - F Rel-10 10.0.0 10.1.0 Updates to TC 8.3.1.13a RP-56 RP-120646 approved R5 R5-55 R5-122101 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1873 - F Rel-10 10.0.0 10.1.0 Update to TC 8.3.1.14a RP-56 RP-120646 approved R5 R5-55 R5-122102 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1874 - F Rel-10 10.0.0 10.1.0 Update to TC 8.3.1.15a RP-56 RP-120646 approved R5 R5-55 R5-122103 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1875 - F Rel-10 10.0.0 10.1.0 Update to TC 8.3.1.16a RP-56 RP-120646 approved R5 R5-55 R5-122104 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1876 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to EUTRA RRC test case 8.4.2.2 RP-56 RP-120646 approved R5 R5-55 R5-122105 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1877 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to EMM test case 9.2.1.2.13 RP-56 RP-120646 approved R5 R5-55 R5-122107 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1878 - F Rel-10 10.0.0 10.1.0 GCF Priority U1 - Correction to EMM test case 9.2.3.2.9 RP-56 RP-120646 approved R5 R5-55 R5-122108 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1879 - F Rel-10 10.0.0 10.1.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.4 RP-56 RP-120646 approved R5 R5-55 R5-122113 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1880 - F Rel-10 10.0.0 10.1.0 GCF Priority u1 - Correction to EMM test case 9.2.3.3.3 RP-56 RP-120646 approved R5 R5-55 R5-122114 agreed 2012-05-24 LTE-UEConTest_SIG - 2012-05-24
1881 - F Rel-10 10.0.0 10.1.0 GCF Priority U1: Modification on TC 9.2.3.2.13 RP-56 RP-120646 approved R5 R5-55 R5-122115 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1882 - F Rel-10 10.0.0 10.1.0 GCF priority 3: Correction to EMM TC 9.2.3.1.17 RP-56 RP-120646 approved R5 R5-55 R5-122119 agreed 2012-05-25 LTE-UEConTest_SIG - 2012-05-25
1883 - B Rel-8 10.1.0 - CR 36.523-1-1883 Correction of test procedure in 6.2.3.22 - Inter-RAT Cell Reselection Failure / from GPRS Packet_Transfer (NC0 mode) to E-UTRA - - - G3new G3new-55 GP-120840 withdrawn 2012-08-21 TIGHTER - 2012-08-21
1884 - F Rel-10 10.1.0 - CR 36.523-1-1884 GCF priority g1 - Correction to Idle Mode test case 6.2.3.24 - - - G3new G3new-55 GP-120841 revised 2012-08-21 TIGHTER - 2012-08-21
1884 1 F Rel-10 10.1.0 10.2.0 CR 36.523-1-1884 GCF priority g1 - Correction to Idle Mode test case 6.2.3.24 GP-55 GP-121042 approved G3new G3new-55 GP-121042 agreed 2012-08-29 TEI10_Test - 2012-08-29
1885 - F Rel-10 10.1.0 - CR 36.523-1-1885 GCF Priority g1 - Correction to Idle mode test case 6.2.3.20 - - - G3new G3new-55 GP-120867 withdrawn 2012-08-21 LTE-UEConTest_SIG - 2012-08-21
1886 - F Rel-10 10.1.0 10.2.0 CR 36.523-1-1886 GCF Priority g1 - Correction to Idle mode test case 6.2.3.19 GP-55 GP-120868 approved G3new G3new-55 GP-120868 agreed 2012-08-21 LTE-UEConTest_SIG - 2012-08-21
1887 - F Rel-10 10.1.0 10.2.0 GCF Priority u1: Optimisation of test frequency allocation of UTRA cell RP-57 RP-121099 approved R5 R5-56 R5-123079 agreed 2012-07-23 LTE-UEConTest_SIG - 2012-07-23
1888 - F Rel-10 10.1.0 10.2.0 GCF Priority 2 - Correction to test case 9.2.3.2.1 RP-57 RP-121099 approved R5 R5-56 R5-123099 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1889 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Corrections of test case 8.1.3.12 RP-57 RP-121099 approved R5 R5-56 R5-123102 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1890 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EUTRA RRC test case 8.3.2.5 RP-57 RP-121099 approved R5 R5-56 R5-123119 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1891 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EMM test case 9.2.1.2.13 RP-57 RP-121099 approved R5 R5-56 R5-123120 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1892 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EMM test case 9.2.3.3.5a RP-57 RP-121099 approved R5 R5-56 R5-123124 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1893 - F Rel-10 10.1.0 10.2.0 GCF Priority g1 - Correction to multilayer test case 13.1.7 RP-57 RP-121099 approved R5 R5-56 R5-123126 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1894 - F Rel-10 10.1.0 10.2.0 GCF Priority g1 - Correction to EMM test case 9.2.3.4.1 RP-57 RP-121099 approved R5 R5-56 R5-123131 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1895 - F Rel-10 10.1.0 10.2.0 GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.3.2 RP-57 RP-121099 approved R5 R5-56 R5-123132 agreed 2012-07-30 LTE-UEConTest_SIG - 2012-07-30
1896 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Update to test case 6.2.3.33 RP-57 RP-121099 approved R5 R5-56 R5-123202 agreed 2012-07-31 LTE-UEConTest_SIG - 2012-07-31
1897 - F Rel-10 10.1.0 10.2.0 GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 RP-57 RP-121099 approved R5 R5-56 R5-123203 agreed 2012-07-31 LTE-UEConTest_SIG - 2012-07-31
1898 - F Rel-10 10.1.0 10.2.0 GCF Priority C1 - Correction to Rel9 EUTRA-1xRTT test case 6.2.3.10a RP-57 RP-121099 approved R5 R5-56 R5-123247 agreed 2012-08-01 LTE-UEConTest_SIG - 2012-08-01
1899 - F Rel-10 10.1.0 10.2.0 GCF Priority C1 - Correction to Rel9 EUTRA-HRPD test case 6.2.3.7a RP-57 RP-121099 approved R5 R5-56 R5-123248 agreed 2012-08-01 LTE-UEConTest_SIG - 2012-08-01
1900 - F Rel-10 10.1.0 10.2.0 GCF Priority C1 - Correction to Rel9 EUTRA-1xRTT test case 6.2.3.9a RP-57 RP-121099 approved R5 R5-56 R5-123251 agreed 2012-08-01 LTE-UEConTest_SIG - 2012-08-01
1901 - F Rel-10 10.1.0 10.2.0 GCF Priority U1 - Correction to EMM test case 9.2.1.2.13 RP-57 RP-121099 approved R5 R5-56 R5-123254 agreed 2012-08-01 LTE-UEConTest_SIG - 2012-08-01
1902 - F Rel-10 10.1.0 10.2.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 RP-57 RP-121099 approved R5 R5-56 R5-123325 agreed 2012-08-02 LTE-UEConTest_SIG - 2012-08-02
1903 - F Rel-10 10.1.0 10.2.0 GCF Priority 4: Correction to test case 6.1.2.8a RP-57 RP-121099 approved R5 R5-56 R5-123415 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1904 - F Rel-10 10.1.0 10.2.0 Enhancements to LTE CA test case 7.1.9.1 RP-57 RP-121113 approved R5 R5-56 R5-123423 agreed 2012-08-03 LTE_CA-UEConTest - 2012-08-03
1905 - F Rel-10 10.1.0 10.2.0 Update PWS Rel-9 test case 18.1.4 RP-57 RP-121110 approved R5 R5-56 R5-123424 agreed 2012-08-03 PWS-RAN_UEConTest - 2012-08-03
1906 - F Rel-10 10.1.0 10.2.0 GCF Priority 1- Correction to RRC test case 8.1.3.12a RP-57 RP-121099 approved R5 R5-56 R5-123432 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1907 - F Rel-10 10.1.0 10.2.0 GCF Priority 4 - Correction to Idle Mode test case 6.1.1.3b RP-57 RP-121099 approved R5 R5-56 R5-123433 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1908 - F Rel-11 10.1.0 11.0.0 Addition of new TC9.4.5 Integrity protection / Correct functionality of EPS NAS integrity algorithm / ZUC RP-57 RP-121122 approved R5 R5-56 R5-123436 agreed 2012-08-03 EEA3_EIA3_UEConTest - 2012-08-03
1909 - F Rel-10 10.1.0 10.2.0 GCF Priority g1: Correction to EMM TC 9.2.3.4.1 RP-57 RP-121099 approved R5 R5-56 R5-123474 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1910 - F Rel-10 10.1.0 10.2.0 Corrections of measGapConfig IE definitions in CDMA2000 related test cases RP-57 RP-121099 approved R5 R5-56 R5-123475 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1911 - F Rel-10 10.1.0 10.2.0 GCF Priority 2: Update MAC TC 7.1.4.16 RP-57 RP-121099 approved R5 R5-56 R5-123476 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1912 - F Rel-10 10.1.0 10.2.0 Update MDT TC 8.6.5.3 title RP-57 RP-121112 approved R5 R5-56 R5-123496 agreed 2012-08-03 MDT_UMTSLTE-UEConTest - 2012-08-03
1913 - F Rel-10 10.1.0 10.2.0 Update of References to specs and Releases in 36.523-1 v990 (pointer) RP-57 RP-121103 approved R5 R5-56 R5-123536 agreed 2012-08-03 TEI9_Test - 2012-08-03
1914 - F Rel-10 10.1.0 10.2.0 Update of References to specs and Releases in 36.523-1 RP-57 RP-121099 approved R5 R5-56 R5-123539 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1915 - F Rel-10 10.1.0 10.2.0 Add missing PLMN and TAC RP-57 RP-121099 approved R5 R5-56 R5-123541 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1916 - F Rel-10 10.1.0 10.2.0 GCF Priority 3 - Correction to test cases 9.3.1.4, 9.3.1.5 and 9.3.1.6 RP-57 RP-121099 approved R5 R5-56 R5-123550 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1917 - F Rel-10 10.1.0 10.2.0 Correction to UTRAN ANR E-UTRAN Inter-RAT test case 8.7.1 RP-57 RP-121114 approved R5 R5-56 R5-123554 agreed 2012-08-03 ANR_UTRAN-UEConTest - 2012-08-03
1918 - F Rel-10 10.1.0 10.2.0 GCF priority b1: Correction to test case 6.1.2.5 RP-57 RP-121099 approved R5 R5-56 R5-123565 agreed 2012-08-03 LTE-UEConTest_SIG - 2012-08-03
1919 - F Rel-10 10.1.0 10.2.0 GCF Priority U1 - Update of EMM TC 9.2.3.2.3 RP-57 RP-121099 approved R5 R5-56 R5-123586 agreed 2012-08-13 LTE-UEConTest_SIG - 2012-08-13
1920 - F Rel-10 10.1.0 10.2.0 GCF priority 1 - Correction of test case 8.5.4.1 RP-57 RP-121099 approved R5 R5-56 R5-123637 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1921 - F Rel-10 10.1.0 10.2.0 GCF Priority 1..4 - Editorial Corrections to EMM test cases RP-57 RP-121099 approved R5 R5-56 R5-123638 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1922 - F Rel-10 10.1.0 10.2.0 GCF Priority 3 - Update of EMM test case 9.2.2.1.2 RP-57 RP-121099 approved R5 R5-56 R5-123640 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1923 - F Rel-10 10.1.0 10.2.0 GCF Priority 3 - Correction to EUTRA Idle Mode test case 6.1.1.4 RP-57 RP-121099 approved R5 R5-56 R5-123641 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1924 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to Idle mode test case 6.2.1.1 RP-57 RP-121099 approved R5 R5-56 R5-123642 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1925 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to Idle mode test case 6.2.3.13 RP-57 RP-121100 approved R5 R5-56 R5-123643 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1926 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EMM test case 9.2.3.2.9 RP-57 RP-121100 approved R5 R5-56 R5-123644 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1927 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EMM test case 9.2.3.2.14 RP-57 RP-121100 approved R5 R5-56 R5-123645 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1928 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EMM test case 9.2.3.3.2 RP-57 RP-121100 approved R5 R5-56 R5-123646 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1929 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EMM test case 9.3.1.6 RP-57 RP-121100 approved R5 R5-56 R5-123647 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1930 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to EMM test cases 9.2.1.2.1b and 9.2.1.2.1.c RP-57 RP-121100 approved R5 R5-56 R5-123648 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1931 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 Update of TC 9.2.3.3.1 RP-57 RP-121100 approved R5 R5-56 R5-123649 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1932 - F Rel-10 10.1.0 10.2.0 GCF Priority U1 - Correction to EMM test case 9.2.1.2.9 RP-57 RP-121100 approved R5 R5-56 R5-123650 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1933 - F Rel-10 10.1.0 10.2.0 GCF Priority U1 - Update of EMM test case 9.2.3.2.1b RP-57 RP-121100 approved R5 R5-56 R5-123651 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1934 - F Rel-10 10.1.0 10.2.0 GCF Priority U2 - Correction to UTRA-EUTRA test case 8.4.2.4 RP-57 RP-121100 approved R5 R5-56 R5-123655 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1935 - F Rel-10 10.1.0 10.2.0 GCF Priority C1 - Correction to test cases 8.3.2.8 and 8.3.2.10 RP-57 RP-121100 approved R5 R5-56 R5-123656 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1936 - F Rel-10 10.1.0 10.2.0 GCF Priority C1 - Correction to test case 6.2.3.9 RP-57 RP-121100 approved R5 R5-56 R5-123657 agreed 2012-08-14 LTE-UEConTest_SIG - 2012-08-14
1937 - F Rel-10 10.1.0 10.2.0 GCF Priority g1 - Correction to multilayer test case 13.1.10 RP-57 RP-121100 approved R5 R5-56 R5-123659 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1938 - F Rel-10 10.1.0 10.2.0 GCF Priority g1 - Correction to multilayer test case 13.1.8 RP-57 RP-121100 approved R5 R5-56 R5-123660 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1939 - F Rel-10 10.1.0 10.2.0 GCF Priority g1 - Correction to multilayer test case 13.1.9 RP-57 RP-121100 approved R5 R5-56 R5-123661 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1940 - F Rel-10 10.1.0 10.2.0 GCF Priority 3 - Correction to EUTRA MAC test cases 7.1.3.2, 7.1.4.2 RP-57 RP-121100 approved R5 R5-56 R5-123665 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1941 - F Rel-10 10.1.0 10.2.0 Correction to Rel-9 EUTRA-HRPD Idle Mode test case 6.2.3.8a RP-57 RP-121100 approved R5 R5-56 R5-123666 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1942 - F Rel-10 10.1.0 10.2.0 GCF Priority X: Addition of New Inter band test case 6.1.2.15b RP-57 RP-121100 approved R5 R5-56 R5-123667 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1943 - F Rel-10 10.1.0 10.2.0 Correction to EUTRA Idle Mode test case 6.1.1.4a RP-57 RP-121100 approved R5 R5-56 R5-123668 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1944 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Update of test case 6.1.2.2a RP-57 RP-121100 approved R5 R5-56 R5-123669 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1945 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Addition of new test case 8.4.7.11 RP-57 RP-121100 approved R5 R5-56 R5-123671 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1946 - F Rel-10 10.1.0 10.2.0 GCF Priority X: Correction to test case 13.4.4.1 RP-57 RP-121100 approved R5 R5-56 R5-123672 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1947 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Update of 13.4.4.5 RP-57 RP-121100 approved R5 R5-56 R5-123673 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1948 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Update of 8.4.7.x test cases RP-57 RP-121100 approved R5 R5-56 R5-123674 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1949 - F Rel-10 10.1.0 10.2.0 GCF Priority x - Addition of new test case 6.2.3.4a : Inter-RAT cell reselection / From UTRA_CELL_PCH state to E-UTRA RRC_IDLE based on RSRQ+RSRP evaluation RP-57 RP-121100 approved R5 R5-56 R5-123680 agreed 2012-08-15 LTE-UEConTest_SIG - 2012-08-15
1950 - F Rel-10 10.1.0 10.2.0 Update PWS Rel-9 test case 18.1.7 RP-57 RP-121110 approved R5 R5-56 R5-123685 agreed 2012-08-15 PWS-RAN_UEConTest - 2012-08-15
1951 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Addition of New Rel-10 eICIC test case RP-57 RP-121117 approved R5 R5-56 R5-123708 agreed 2012-08-15 eICIC_LTE-UEConTest - 2012-08-15
1952 - F Rel-10 10.1.0 10.2.0 Addition of new Rel-10 eICIC test case 8.3.1.19 RP-57 RP-121117 approved R5 R5-56 R5-123709 agreed 2012-08-15 eICIC_LTE-UEConTest - 2012-08-15
1953 - F Rel-11 10.1.0 11.0.0 Addition of Test Case 7.3.4.3 Integrity protection Correct functionality of EPS AS integrity algorithms ZUC RP-57 RP-121122 approved R5 R5-56 R5-123721 agreed 2012-08-16 EEA3_EIA3_UEConTest - 2012-08-16
1954 - F Rel-11 10.1.0 11.0.0 Addition of new ZUC test case 7.3.3.6 correct functionality of EPS UP encryption algorithms RP-57 RP-121122 approved R5 R5-56 R5-123722 agreed 2012-08-16 EEA3_EIA3_UEConTest - 2012-08-16
1955 - F Rel-11 10.1.0 11.0.0 Addition of new TC7.3.3.5 Ciphering and deciphering / Correct functionality of EPS AS encryption algorithms / ZUC RP-57 RP-121122 approved R5 R5-56 R5-123723 agreed 2012-08-16 EEA3_EIA3_UEConTest - 2012-08-16
1956 - F Rel-11 10.1.0 11.0.0 Addition of new TC 9.4.6 Ciphering and deciphering / Correct functionality of EPS NAS encryption algorithm / ZUC RP-57 RP-121122 approved R5 R5-56 R5-123724 agreed 2012-08-16 EEA3_EIA3_UEConTest - 2012-08-16
1957 - F Rel-10 10.1.0 10.2.0 GCF Priority g1 - Correction to EUTRA test cases 8.4.3.2 and 8.4.3.3 RP-57 RP-121100 approved R5 R5-56 R5-123732 agreed 2012-08-16 LTE-UEConTest_SIG - 2012-08-16
1958 - F Rel-10 10.1.0 10.2.0 Correction to EUTRAN-GERAN test cases for classmark change RP-57 RP-121100 approved R5 R5-56 R5-123735 agreed 2012-08-16 LTE-UEConTest_SIG - 2012-08-16
1959 - F Rel-10 10.1.0 10.2.0 GCF Priority U1 - Correction to EMM test case 9.2.3.3.4 RP-57 RP-121100 approved R5 R5-56 R5-123736 agreed 2012-08-16 LTE-UEConTest_SIG - 2012-08-16
1960 - F Rel-10 10.1.0 10.2.0 GCF Priority 3 - Correction to EMM test case 9.2.2.1.3 RP-57 RP-121100 approved R5 R5-56 R5-123790 agreed 2012-08-28 LTE-UEConTest_SIG - 2012-08-28
1961 - F Rel-10 10.1.0 10.2.0 GCF Priority X Addition of new test case 13.4.1.5 RP-57 RP-121100 approved R5 R5-56 R5-123738 agreed 2012-08-16 LTE-UEConTest_SIG - 2012-08-16
1962 - F Rel-10 10.1.0 10.2.0 GCF Priority u1 - Correction to SRVCC test cases 13.4.3.1, 13.4.3.2, 13.4.3.4 and 13.4.3.6 RP-57 RP-121100 approved R5 R5-56 R5-123739 agreed 2012-08-16 LTE-UEConTest_SIG - 2012-08-16
1963 - F Rel-10 10.1.0 10.2.0 Update test case 11.2.11 RP-57 RP-121103 approved R5 R5-56 R5-123749 agreed 2012-08-16 TEI9_Test - 2012-08-16
1964 - F Rel-10 10.1.0 10.2.0 Update of CA TC 7.1.3.11 RP-57 RP-121113 approved R5 R5-56 R5-123753 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1965 - F Rel-10 10.1.0 10.2.0 GCF Priority X - Addition of New Carrier Aggregation test case RP-57 RP-121113 approved R5 R5-56 R5-123754 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1966 - F Rel-10 10.1.0 10.2.0 Correction of CA test case 8.2.2.3 RP-57 RP-121113 approved R5 R5-56 R5-123755 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1967 - F Rel-10 10.1.0 10.2.0 Addition of new TC 7.1.4.19 CA / UE power headroom reporting / SCell activation and DL pathloss change reporting / Extended PHR RP-57 RP-121113 approved R5 R5-56 R5-123756 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1968 - F Rel-10 10.1.0 10.2.0 Addition of new TC 7.1.4.23 CA / Correct handling of MAC control information / Buffer status RP-57 RP-121113 approved R5 R5-56 R5-123794 agreed 2012-08-28 LTE_CA-UEConTest - 2012-08-28
1969 - F Rel-10 10.1.0 10.2.0 Correction of CA test case 8.2.2.4 RP-57 RP-121113 approved R5 R5-56 R5-123758 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1970 - F Rel-10 10.1.0 10.2.0 Correction of CA test case 8.2.2.5 RP-57 RP-121113 approved R5 R5-56 R5-123759 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1971 - F Rel-10 10.1.0 10.2.0 Correction of CA test case 8.2.4.17 RP-57 RP-121113 approved R5 R5-56 R5-123760 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1972 - F Rel-10 10.1.0 10.2.0 Correction of CA test case 8.2.4.18 RP-57 RP-121113 approved R5 R5-56 R5-123761 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1973 - F Rel-10 10.1.0 10.2.0 Correction of CA test case 8.3.1.17 RP-57 RP-121113 approved R5 R5-56 R5-123762 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1974 - F Rel-10 10.1.0 10.2.0 Correction of CA test case 8.3.1.18 RP-57 RP-121113 approved R5 R5-56 R5-123763 agreed 2012-08-16 LTE_CA-UEConTest - 2012-08-16
1975 - F Rel-10 10.1.0 - CR 36.523-1-1975 Correction for LTE<>GERAN test case 6.2.3.17 - - - G3new G3new-55 GP-120895 withdrawn 2012-08-24 TEI_Test - 2012-08-24
1975 - F Rel-10 10.2.1 - CR 36.523-1-1975 TC 6.2.3.28 Clarification of Pre-test conditions - - - G3new G3new-56 GP-121207 withdrawn 2012-10-22 LTE-UEConTest_SIG - 2012-10-22
1975 - F Rel-10 10.1.0 10.2.0 CR 36.523-1-1975 GCF Priority g1 - Deletion of Idle mode test case 6.2.3.20 GP-55 GP-121043 approved G3new G3new-55 GP-121043 agreed 2012-08-29 TEI_Test - 2012-08-29
1976 - F Rel-11 11.0.0 11.1.0 CR 36.523-1-1976 GCF Priority 2 - Correction to Idle Mode testcases refering to 36.508 6.4.2.7A-2 GP-56 GP-121233 approved G3new G3new-56 GP-121233 agreed 2012-11-02 LTE-UEConTest_SIG Wrong version on CR cover 2012-11-02
1977 - F Rel-11 11.0.0 11.1.0 CR 36.523-1-1977 GCF Priority g1 - Corrections to Multi-layer test case 13.4.2.5 GP-56 GP-121234 approved G3new G3new-56 GP-121234 agreed 2012-11-08 LTE-UEConTest_SIG Wrong version on CR cover 2012-11-08
1978 - F Rel-11 11.0.0 11.1.0 GCF P3: Update of TC 9.2.1.1.19 to apply to all types of attach RP-58 RP-121660 approved R5 R5-57 R5-125074 agreed 2012-10-11 LTE-UEConTest_SIG CR 2012-10-11
1979 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 RP-58 RP-121660 approved R5 R5-57 R5-126067 agreed 2012-11-25 LTE-UEConTest_SIG CR 2012-11-25
1980 - F Rel-11 11.0.0 11.1.0 GCF WI-151 - Correction to LTE FDD-TDD Inter-mode test case 6.1.1.1a RP-58 RP-121660 approved R5 R5-57 R5-125080 agreed 2012-10-16 LTE-UEConTest_SIG CR 2012-10-16
1981 - F Rel-11 11.0.0 11.1.0 GCF Priority 3: Correction to EMM test case 9.2.3.1.16 RP-58 RP-121660 approved R5 R5-57 R5-125087 agreed 2012-10-16 LTE-UEConTest_SIG CR 2012-10-16
1982 - F Rel-11 11.0.0 11.1.0 GCF Priority 4 - Correction to EUTRA Idle Mode test case 6.1.1.6a RP-58 RP-121660 approved R5 R5-57 R5-125126 agreed 2012-10-19 LTE-UEConTest_SIG CR 2012-10-19
1983 - F Rel-11 11.0.0 11.1.0 Split of CA TC 7.1.3.11 to Intra-band contiguous CA and Inter-band CA RP-58 RP-121677 approved R5 R5-57 R5-125130 agreed 2012-10-19 LTE_CA-UEConTest CR 2012-10-19
1984 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Update to Multilayer procedure test cases 13.1.3, 13.3.2.1 and 13.3.2.2 RP-58 RP-121660 approved R5 R5-57 R5-125132 agreed 2012-10-19 LTE-UEConTest_SIG CR 2012-10-19
1985 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Corrections_TCs_8.4.7.x RP-58 RP-121664 approved R5 R5-57 R5-125154 agreed 2012-10-22 TEI9_Test CR 2012-10-22
1986 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Renumbering test case 8.4.7.11 to 8.4.7.10 RP-58 RP-121664 approved R5 R5-57 R5-125155 agreed 2012-10-22 TEI9_Test CR 2012-10-22
1987 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA 6.1.2.18 RP-58 RP-121664 approved R5 R5-57 R5-125172 agreed 2012-10-22 TEI9_Test CR 2012-10-22
1988 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA-GERAN 6.2.3.1a RP-58 RP-121664 approved R5 R5-57 R5-125173 agreed 2012-10-22 TEI9_Test CR 2012-10-22
1989 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Editorial correction for test case 9.2.1.1.25 RP-58 RP-121660 approved R5 R5-57 R5-125200 agreed 2012-10-22 LTE-UEConTest_SIG CR 2012-10-22
1990 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Update test case 9.2.1.1.26 RP-58 RP-121660 approved R5 R5-57 R5-125204 agreed 2012-10-22 LTE-UEConTest_SIG CR 2012-10-22
1991 - F Rel-11 11.0.0 11.1.0 Correction to ANR for UTRAN IRAT (E-UTRAN) test case 8.7.1 RP-58 RP-121679 approved R5 R5-57 R5-125207 agreed 2012-10-22 ANR_UTRAN-UEConTest CR 2012-10-22
1992 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Correction to Idle Mode test case 6.2.3.6 RP-58 RP-121660 approved R5 R5-57 R5-125232 agreed 2012-10-23 LTE-UEConTest_SIG CR 2012-10-23
1993 - F Rel-11 11.0.0 11.1.0 GCF Priority u1: Correction to RRC test case 8.1.3.7 RP-58 RP-121660 approved R5 R5-57 R5-125233 agreed 2012-10-23 LTE-UEConTest_SIG CR 2012-10-23
1994 - F Rel-11 11.0.0 11.1.0 GCF Priority u1: Correction to RRC test case 8.4.2.2 RP-58 RP-121660 approved R5 R5-57 R5-125234 agreed 2012-10-23 LTE-UEConTest_SIG CR 2012-10-23
1995 - F Rel-11 11.0.0 11.1.0 GCF Priority u2: Correction to RRC test case 8.4.2.4 RP-58 RP-121660 approved R5 R5-57 R5-125235 agreed 2012-10-23 LTE-UEConTest_SIG CR 2012-10-23
1996 - F Rel-11 11.0.0 11.1.0 Correction to CA test case 8.2.2.4.1 RP-58 RP-121677 approved R5 R5-57 R5-125272 agreed 2012-10-24 LTE_CA-UEConTest CR 2012-10-24
1997 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Update test case 6.2.3.3 RP-58 RP-121660 approved R5 R5-57 R5-125274 agreed 2012-10-24 LTE-UEConTest_SIG CR 2012-10-24
1998 - F Rel-11 11.0.0 11.1.0 Clarification to Local Emergency list provided by the NWK and more RP-58 RP-121664 approved R5 R5-57 R5-125276 agreed 2012-10-24 TEI9_Test CR 2012-10-24
1999 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Correction to PDCP test cases 7.3.4.1 and 7.3.4.2 RP-58 RP-121660 approved R5 R5-57 R5-125317 agreed 2012-10-25 LTE-UEConTest_SIG CR 2012-10-25
2000 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Update of TC 9.2.3.1.27 RP-58 RP-121660 approved R5 R5-57 R5-125333 agreed 2012-10-25 LTE-UEConTest_SIG CR 2012-10-25
2001 - F Rel-11 11.0.0 11.1.0 Addition of new MDT test case 8.6.7.2 RP-58 RP-121676 approved R5 R5-57 R5-125525 agreed 2012-10-26 MDT_UMTSLTE-UEConTest CR 2012-10-26
2002 - F Rel-11 11.0.0 11.1.0 Addition of new MDT test case 8.6.7.3 RP-58 RP-121676 approved R5 R5-57 R5-125526 agreed 2012-10-26 MDT_UMTSLTE-UEConTest CR 2012-10-26
2003 - F Rel-11 11.0.0 11.1.0 Update to GCF P3 TCs 9.2.2.1.3 and 9.2.2.1.4 RP-58 RP-121660 approved R5 R5-57 R5-125532 agreed 2012-10-26 LTE-UEConTest_SIG CR 2012-10-26
2004 - F Rel-11 11.0.0 11.1.0 GCF Priority G1 - Update test case 13.4.3.5 RP-58 RP-121660 approved R5 R5-57 R5-125584 agreed 2012-10-26 LTE-UEConTest_SIG CR 2012-10-26
2005 - F Rel-11 11.0.0 11.1.0 GCF Priority U2 - Correction to UTRA-EUTRA test case 8.4.2.4 RP-58 RP-121660 approved R5 R5-57 R5-125633 agreed 2012-10-26 LTE-UEConTest_SIG CR 2012-10-26
2006 - F Rel-11 11.0.0 11.1.0 GCF Priority U2 - Correction to EMM test case 9.2.3.2.3 RP-58 RP-121660 approved R5 R5-57 R5-125634 agreed 2012-10-26 LTE-UEConTest_SIG CR 2012-10-26
2007 - F Rel-11 11.0.0 11.1.0 GCF WI-151 - Correction to LTE FDD-TDD Inter-mode test case 6.1.1.4a RP-58 RP-121660 approved R5 R5-57 R5-125640 agreed 2012-10-26 LTE-UEConTest_SIG CR 2012-10-26
2008 - F Rel-11 11.0.0 11.1.0 Editorial corrections to some EMM test cases RP-58 RP-121660 approved R5 R5-57 R5-125657 agreed 2012-10-29 LTE-UEConTest_SIG CR 2012-10-29
2009 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Correction to Rel-10 eICIC test case 8.3.1.20 RP-58 RP-121682 approved R5 R5-57 R5-125662 agreed 2012-10-30 eICIC_LTE-UEConTest CR 2012-10-30
2010 - F Rel-10 10.2.0 10.3.0 Removal of technical content in 36.523-1 v10.2.0 and substitution with pointer to the next Release RP-58 RP-121665 approved R5 R5-57 R5-125663 agreed 2012-10-30 TEI10_Test CR 2012-10-30
2011 - F Rel-11 11.0.0 11.1.0 GCF Priority 4 - Correction to EMM test case 9.2.3.2.13 RP-58 RP-121660 approved R5 R5-57 R5-125683 agreed 2012-11-05 LTE-UEConTest_SIG CR 2012-11-05
2012 - F Rel-11 11.0.0 11.1.0 Split of CA TC 7.1.9.1 to Intra-band contiguous CA and Inter-band CA RP-58 RP-121677 approved R5 R5-57 R5-125685 agreed 2012-11-05 LTE_CA-UEConTest CR 2012-11-05
2013 - F Rel-11 11.0.0 11.1.0 GCF Priority 4: Update of EMM test cases 9.2.1.1.1b, 9.2.1.1.15a, 9.2.1.1.16a, 9.2.3.1.15a and 9.2.3.1.18a RP-58 RP-121660 approved R5 R5-57 R5-125697 agreed 2012-11-05 LTE-UEConTest_SIG CR 2012-11-05
2014 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Correction to PDCP test case 7.3.3.1, 7.3.3.2, 7.3.3.3 and 7.3.3.4 RP-58 RP-121660 approved R5 R5-57 R5-125702 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2015 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 RP-58 RP-121660 approved R5 R5-57 R5-125703 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2016 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Correction to EMM test case 9.2.3.3.5a RP-58 RP-121660 approved R5 R5-57 R5-125704 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2017 - F Rel-11 11.0.0 11.1.0 GCF Priority 2 - Correction to Idle Mode testcases refering to 36.508 6.4.2.7A-2 RP-58 RP-121660 approved R5 R5-57 R5-125705 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2018 - F Rel-11 11.0.0 11.1.0 GCF Priority 2 - Update test case 9.2.2.2.2 RP-58 RP-121660 approved R5 R5-57 R5-125707 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2019 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Correction to EMM test case 9.3.1.6 RP-58 RP-121660 approved R5 R5-57 R5-125708 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2020 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Correction to EMM test case 9.2.2.1.3 RP-58 RP-121660 approved R5 R5-57 R5-125710 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2021 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Update test case 9.2.1.1.24 RP-58 RP-121660 approved R5 R5-57 R5-125711 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2022 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - update of TC 9.2.1.1.24 RP-58 RP-121660 approved R5 R5-57 R5-125712 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2023 - F Rel-11 11.0.0 11.1.0 GCF Priority 3: Modification of TC 6.1.2.13 RP-58 RP-121660 approved R5 R5-57 R5-125713 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2024 - F Rel-11 11.0.0 11.1.0 GCF priority 3: Modification of TC 8.3.1.4 RP-58 RP-121660 approved R5 R5-57 R5-125714 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2025 - F Rel-11 11.0.0 11.1.0 GCF priority 3: Modification of TC 8.3.2.6 RP-58 RP-121660 approved R5 R5-57 R5-125715 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2026 - F Rel-11 11.0.0 11.1.0 GCF Priority 2: Modification of EMM TC 9.2.2.1.6 RP-58 RP-121660 approved R5 R5-57 R5-125716 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2027 - F Rel-11 11.0.0 11.1.0 GCF priority 2: Modification of TC 8.3.1.1 RP-58 RP-121660 approved R5 R5-57 R5-125717 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2028 - F Rel-11 11.0.0 11.1.0 GCF priority 2: Modification of TC 8.3.1.2 RP-58 RP-121660 approved R5 R5-57 R5-125718 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2029 - F Rel-11 11.0.0 11.1.0 GCF Priority 4 - Corrections to Single Frequency EUTRA Idle Mode test cases RP-58 RP-121660 approved R5 R5-57 R5-125720 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2030 - F Rel-11 11.0.0 11.1.0 GCF Priority 4 - Correction to EUTRA Idle Mode test case 6.1.2.9a RP-58 RP-121660 approved R5 R5-57 R5-125721 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2031 - F Rel-11 11.0.0 11.1.0 Correction of Rel-9 inter-band test case 8.3.1.16 RP-58 RP-121664 approved R5 R5-57 R5-125722 agreed 2012-11-06 TEI9_Test CR 2012-11-06
2032 - F Rel-11 11.0.0 11.1.0 Correction to Rel-9 EUTRA FDD-TDD test case 8.2.4.14a RP-58 RP-121660 approved R5 R5-57 R5-125723 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2033 - F Rel-11 11.0.0 11.1.0 Correction to Rel-9 EUTRA FDD-TDD test case 8.2.4.15a RP-58 RP-121660 approved R5 R5-57 R5-125724 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2034 - F Rel-11 11.0.0 11.1.0 GCF Priority 4: Update of EMM test case 9.2.3.2.4 RP-58 RP-121660 approved R5 R5-57 R5-125725 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2035 - F Rel-11 11.0.0 11.1.0 GCF Priority 4: Corrections to user PLMN reselection test cases RP-58 RP-121660 approved R5 R5-57 R5-125726 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2036 - F Rel-11 11.0.0 11.1.0 GCF Priority 4 - Correction to test case 6.3.5 RP-58 RP-121660 approved R5 R5-57 R5-125728 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2037 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Update test case 6.2.3.6 RP-58 RP-121660 approved R5 R5-57 R5-125729 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2038 - F Rel-11 11.0.0 11.1.0 GCF Priority u1 - Correction to preamble in 6.2.2.8/6.2.3.3/6.2.3.3a/6.4.5 test cases RP-58 RP-121660 approved R5 R5-57 R5-125730 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2039 - F Rel-11 11.0.0 11.1.0 GCF Priority u1: Modification of TC 6.2.3.13 RP-58 RP-121660 approved R5 R5-57 R5-125731 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2040 - F Rel-11 11.0.0 11.1.0 GCF Priority u1: Modification of TC 6.2.3.32 RP-58 RP-121660 approved R5 R5-57 R5-125732 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2041 - F Rel-11 11.0.0 11.1.0 GCF Priority u1 - Update to RRC test case 8.3.2.3 RP-58 RP-121660 approved R5 R5-57 R5-125733 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2042 - F Rel-11 11.0.0 11.1.0 GCF Priority u1 - Update to RRC test case 8.3.2.4 RP-58 RP-121660 approved R5 R5-57 R5-125734 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2043 - F Rel-11 11.0.0 11.1.0 GCF priority u1: Modification of TC 8.3.2.3 RP-58 RP-121660 approved R5 R5-57 R5-125735 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2044 - F Rel-11 11.0.0 11.1.0 GCF priority u1: Modification of TC 8.3.2.4 RP-58 RP-121660 approved R5 R5-57 R5-125736 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2045 - F Rel-11 11.0.0 11.1.0 GCF Priority u1 - Correction to EMM test case 9.2.3.3.5 RP-58 RP-121660 approved R5 R5-57 R5-126068 agreed 2012-11-25 LTE-UEConTest_SIG CR 2012-11-25
2046 - F Rel-11 11.0.0 11.1.0 GCF Priority u1: Modification of EMM TC 9.2.3.2.1a RP-58 RP-121660 approved R5 R5-57 R5-125738 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2047 - F Rel-11 11.0.0 11.1.0 GCF Priority u1 - Update to SRVCC test cases 13.4.3.1, 13.4.3.2, 13.4.3.4 and 13.4.3.6 RP-58 RP-121660 approved R5 R5-57 R5-125740 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2048 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Update test case 13.4.3.1 RP-58 RP-121660 approved R5 R5-57 R5-125741 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2049 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Update test case 13.4.3.2 RP-58 RP-121660 approved R5 R5-57 R5-125742 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2050 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Update test case 13.4.3.4 RP-58 RP-121660 approved R5 R5-57 R5-125743 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2051 - F Rel-11 11.0.0 11.1.0 GCF Priority u2 - Update to RRC test case 8.3.3.2 RP-58 RP-121660 approved R5 R5-57 R5-125744 agreed 2012-11-06 LTE-UEConTest_SIG CR 2012-11-06
2052 - F Rel-11 11.0.0 11.1.0 GCF P4: Update of TC 9.2.1.1.3 to clarify applicability of all types of attach and more RP-58 RP-121660 approved R5 R5-57 R5-125747 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2053 - F Rel-11 11.0.0 11.1.0 GCF P4: Update of TC 9.2.1.1.4 to clarify applicability of all types of attach and more RP-58 RP-121660 approved R5 R5-57 R5-125748 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2054 - F Rel-11 11.0.0 11.1.0 GCF priority g1: Modification of TC 8.3.2.2 RP-58 RP-121660 approved R5 R5-57 R5-125749 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2055 - F Rel-11 11.0.0 11.1.0 GCF priority g2: Modification of TC 8.3.2.1 RP-58 RP-121660 approved R5 R5-57 R5-125750 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2058 - F Rel-11 11.0.0 11.1.0 GCF Priority m1 - Update of RRC test cases 8.3.2.5 and 8.3.2.6 RP-58 RP-121660 approved R5 R5-57 R5-125753 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2059 - F Rel-11 11.0.0 11.1.0 GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 13.4.1.3 RP-58 RP-121660 approved R5 R5-57 R5-125754 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2060 - F Rel-11 11.0.0 11.1.0 Correction to test cases 6.1.2.15, 6.1.2.15a and 6.1.2.15b RP-58 RP-121660 approved R5 R5-57 R5-125756 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2061 - F Rel-11 11.0.0 11.1.0 Correction to EUTRANFeatureGroupIndicators in EMM test cases RP-58 RP-121660 approved R5 R5-57 R5-125757 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2062 - F Rel-11 11.0.0 11.1.0 Correction to TS 36.523-1 TC 9.2.3.1.5 ""Periodic tracking area update / Accepted"" RP-58 RP-121660 approved R5 R5-57 R5-125758 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2063 - F Rel-11 11.0.0 11.1.0 Correction to Multi-layer test cases 13.1.7,13.1.8,13.1.9,13.1.10 RP-58 RP-121660 approved R5 R5-57 R5-125759 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2064 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA-UTRAN 6.2.3.33 RP-58 RP-121664 approved R5 R5-57 R5-125761 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2065 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA-UTRAN 8.3.2.3a RP-58 RP-121664 approved R5 R5-57 R5-125762 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2066 - F Rel-11 11.0.0 11.1.0 Update of test case 11.2.11 RP-58 RP-121664 approved R5 R5-57 R5-125763 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2067 - F Rel-11 11.0.0 11.1.0 GCF WI-154 - Correction to IMS Emergency Call test case 11.2.2 RP-58 RP-121664 approved R5 R5-57 R5-125764 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2068 - F Rel-11 11.0.0 11.1.0 GCF WI-151 - Correction to LTE FDD-TDD Inter-mode test case 8.3.1.13a RP-58 RP-121664 approved R5 R5-57 R5-125765 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2069 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Updates of e1xCSFB TC_13.1.17 RP-58 RP-121664 approved R5 R5-57 R5-125766 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2070 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA-UTRAN 6.2.3.3a RP-58 RP-121664 approved R5 R5-57 R5-125767 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2071 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA-UTRAN 6.2.3.4a RP-58 RP-121664 approved R5 R5-57 R5-125768 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2072 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA-UTRAN 6.2.3.5a RP-58 RP-121664 approved R5 R5-57 R5-125769 agreed 2012-11-07 TEI9_Test CR 2012-11-07
2073 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Update of test case 8.5.4.1 to Clarify FGI 33 - 36 RP-58 RP-121660 approved R5 R5-57 R5-125770 agreed 2012-11-07 LTE-UEConTest_SIG CR 2012-11-07
2074 - F Rel-11 11.0.0 11.1.0 Update PWS Rel-9 test case 18.1.1 RP-58 RP-121674 approved R5 R5-57 R5-125775 agreed 2012-11-07 PWS-RAN_UEConTest CR 2012-11-07
2075 - F Rel-11 11.0.0 11.1.0 Correction to PWS Rel-9 test case 18.1.3 RP-58 RP-121674 approved R5 R5-57 R5-125776 agreed 2012-11-07 PWS-RAN_UEConTest CR 2012-11-07
2076 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of New Rel-10 H(e)NB test case 6.3.10 RP-58 RP-121683 approved R5 R5-57 R5-125781 agreed 2012-11-08 HNB_HENB_mob_enh-UEConTest_LTE CR 2012-11-08
2077 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new Rel-10 H(e)NB test case 6.3.12 RP-58 RP-121683 approved R5 R5-57 R5-125782 agreed 2012-11-08 HNB_HENB_mob_enh-UEConTest_LTE CR 2012-11-08
2078 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of New Rel-10 H(e)NB test case 6.3.11 RP-58 RP-121683 approved R5 R5-57 R5-125783 agreed 2012-11-08 HNB_HENB_mob_enh-UEConTest_LTE CR 2012-11-08
2079 - F Rel-11 11.0.0 11.1.0 Location stimulus clarification for MDT test cases RP-58 RP-121676 approved R5 R5-57 R5-125785 agreed 2012-11-08 MDT_UMTSLTE-UEConTest CR 2012-11-08
2080 - F Rel-11 11.0.0 11.1.0 New E-UTRAN MDT test case 8.6.2.9 RP-58 RP-121676 approved R5 R5-57 R5-125786 agreed 2012-11-08 MDT_UMTSLTE-UEConTest CR 2012-11-08
2081 - F Rel-11 11.0.0 11.1.0 New E-UTRAN MDT test case 8.6.4.7 RP-58 RP-121676 approved R5 R5-57 R5-125787 agreed 2012-11-08 MDT_UMTSLTE-UEConTest CR 2012-11-08
2082 - F Rel-11 11.0.0 11.1.0 New E-UTRAN MDT test case 8.6.6.4 RP-58 RP-121676 approved R5 R5-57 R5-125788 agreed 2012-11-08 MDT_UMTSLTE-UEConTest CR 2012-11-08
2083 - F Rel-11 11.0.0 11.1.0 Update of MDT test cases 8.6.5.1 and 8.6.7.1 RP-58 RP-121676 approved R5 R5-57 R5-125789 agreed 2012-11-08 MDT_UMTSLTE-UEConTest CR 2012-11-08
2084 - F Rel-11 11.0.0 11.1.0 Addition of new TC 7.1.4.22: Correct HARQ process handling / UL MIMO RP-58 RP-121681 approved R5 R5-57 R5-125790 agreed 2012-11-08 LTE_UL_MIMO-UEConTest CR 2012-11-08
2085 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new test case 13.4.3.7 RP-58 RP-121685 approved R5 R5-57 R5-125793 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2086 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new test case 13.4.3.8 RP-58 RP-121685 approved R5 R5-57 R5-125794 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2087 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new test case 13.4.3.9 RP-58 RP-121685 approved R5 R5-57 R5-125795 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2088 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new test case 13.4.3.10 RP-58 RP-121685 approved R5 R5-57 R5-125796 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2089 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new test case 13.4.3.11 RP-58 RP-121685 approved R5 R5-57 R5-125797 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2090 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new test case 13.4.3.12 RP-58 RP-121685 approved R5 R5-57 R5-125798 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2091 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Addition of new test case 13.4.3.13 RP-58 RP-121685 approved R5 R5-57 R5-125799 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2092 - F Rel-11 11.0.0 11.1.0 Add aSRVCC test case 13.4.3.14 RP-58 RP-121685 approved R5 R5-57 R5-126000 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2093 - F Rel-11 11.0.0 11.1.0 Add aSRVCC test case 13.4.3.16 RP-58 RP-121685 approved R5 R5-57 R5-126001 agreed 2012-11-08 aSRVCC-UEConTest CR 2012-11-08
2094 - F Rel-11 11.0.0 11.1.0 Splitting of CA test case 7.1.4.19 to Intra-band Contiguous CA and Inter-band CA RP-58 RP-121677 approved R5 R5-57 R5-126006 agreed 2012-11-08 LTE_CA-UEConTest CR 2012-11-08
2095 - F Rel-11 11.0.0 11.1.0 Renumbering TC 7.1.4.23 and Splitting it to intra-band contiguous CA and inter-band CA RP-58 RP-121677 approved R5 R5-57 R5-126007 agreed 2012-11-08 LTE_CA-UEConTest CR 2012-11-08
2096 - F Rel-11 11.0.0 11.1.0 GCF Priority X - Update of Carrier Aggregation test case 8.4.2.7 RP-58 RP-121677 approved R5 R5-57 R5-126008 agreed 2012-11-08 LTE_CA-UEConTest CR 2012-11-08
2097 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Update test case 6.2.1.3 RP-58 RP-121660 approved R5 R5-57 R5-126019 agreed 2012-11-08 LTE-UEConTest_SIG CR 2012-11-08
2098 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Correction to EUTRA MAC test cases 7.1.7.1.1, 7.1.7.1.2, 7.1.7.1.3, 7.1.7.1.4, 7.1.7.1.5, 7.1.7.1.6 and 7.1.7.2.1 RP-58 RP-121660 approved R5 R5-57 R5-126021 agreed 2012-11-08 LTE-UEConTest_SIG CR 2012-11-08
2099 - F Rel-11 11.0.0 11.1.0 GCF Priority g1: Correction to EUTRA to GERAN HO test case 8.4.3.3 RP-58 RP-121660 approved R5 R5-57 R5-126022 agreed 2012-11-08 LTE-UEConTest_SIG CR 2012-11-08
2100 - F Rel-11 11.0.0 11.1.0 GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 RP-58 RP-121660 approved R5 R5-57 R5-126023 agreed 2012-11-08 LTE-UEConTest_SIG CR 2012-11-08
2101 - F Rel-11 11.0.0 11.1.0 GCF Priority 3 - Correction to EMM test case 9.3.1.6 RP-58 RP-121660 approved R5 R5-57 R5-126024 agreed 2012-11-08 LTE-UEConTest_SIG CR 2012-11-08
2102 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA 8.3.1.3a RP-58 RP-121664 approved R5 R5-57 R5-126026 agreed 2012-11-08 TEI9_Test CR 2012-11-08
2103 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA 6.1.2.3a RP-58 RP-121664 approved R5 R5-57 R5-126028 agreed 2012-11-08 TEI9_Test CR 2012-11-08
2104 - F Rel-11 11.0.0 11.1.0 Correction of RSRQ EUTRA 6.1.2.17 RP-58 RP-121664 approved R5 R5-57 R5-126029 agreed 2012-11-08 TEI9_Test CR 2012-11-08
2105 - F Rel-11 11.0.0 11.1.0 Addition of new CA related test case: CA / Correct handling of MAC control information / Buffer Status / UL data arrive in the UE Tx buffer / Extended buffer size RP-58 RP-121677 approved R5 R5-57 R5-126030 agreed 2012-11-08 LTE_CA-UEConTest CR 2012-11-08
2106 - F Rel-11 11.0.0 11.1.0 GCF Priority 1 - Update of test case 8.5.4.1 to add Carrier Aggregation IEs RP-58 RP-121677 approved R5 R5-57 R5-126070 agreed 2012-11-25 LTE_CA-UEConTest CR 2012-11-25
2107 - F Rel-11 11.0.0 11.1.0 Addition of New Carrier Aggregation test case for A5 RP-58 RP-121677 approved R5 R5-57 R5-126071 agreed 2012-11-25 LTE_CA-UEConTest CR 2012-11-25
2108 - F Rel-11 11.0.0 11.1.0 Addition of New Carrier Aggregation test case for PCell Change SCell no Change RP-58 RP-121677 approved R5 R5-57 R5-126073 agreed 2012-11-25 LTE_CA-UEConTest CR 2012-11-25
2109 - F Rel-11 11.0.0 11.1.0 Addition of New Carrier Aggregation test case for Event A6 RP-58 RP-121677 approved R5 R5-57 R5-126074 agreed 2012-11-25 LTE_CA-UEConTest CR 2012-11-25
2110 - F Rel-11 11.0.0 11.1.0 Addition of New Carrier Aggregation test case for Event A1 and Event A2 RP-58 RP-121677 approved R5 R5-57 R5-126075 agreed 2012-11-25 LTE_CA-UEConTest CR 2012-11-25
2111 - F Rel-11 11.0.0 11.1.0 Addition of New Carrier Aggregation test case for RLF RP-58 RP-121677 approved R5 R5-57 R5-126076 agreed 2012-11-25 LTE_CA-UEConTest CR 2012-11-25
2112 - F Rel-11 11.1.1 11.2.0 GCF Priority g1 - Correction to EUTRA Idle Mode test case 6.2.3.23 GP-57 GP-130005 approved R5 - GP-130005 - 2013-02-18 TEI8_Test - 2013-02-25
2112 - F Rel-11 11.1.1 11.2.0 CR 36.523-1-2112 GCF Priority g1 - Correction to EUTRA Idle Mode test case 6.2.3.23 GP-57 GP-130005 approved G3new G3new-57 GP-130005 revised 2013-01-21 TEI_Test - 2013-01-21
2112 1 F Rel-11 11.1.1 11.2.0 CR 36.523-1-2112 GCF Priority g1 - Correction to EUTRA Idle Mode test case 6.2.3.23 GP-57 GP-130307 approved G3new G3new-57 GP-130307 agreed 2013-02-26 TEI_Test - 2013-02-26
2115 - F Rel-11 11.1.1 11.2.0 GCF Priority 4 - Correction to EMM tc 9.2.3.2.1c RP-59 RP-130144 approved R5 R5-58 R5-130079 agreed 2013-01-07 TEI8_Test CR 2013-01-07
2116 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Correction to Multi-Layer test case 13.1.3 RP-59 RP-130144 approved R5 R5-58 R5-130081 agreed 2013-01-07 TEI8_Test CR 2013-01-07
2117 - F Rel-11 11.1.1 11.2.0 Update to test case 8.3.1.3a RP-59 RP-130145 approved R5 R5-58 R5-130088 agreed 2013-01-09 TEI9_Test CR 2013-01-09
2118 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.24 RP-59 RP-130144 approved R5 R5-58 R5-130159 agreed 2013-01-14 TEI8_Test CR 2013-01-14
2119 - F Rel-11 11.1.1 11.2.0 GCF Priority u1 - Correction to EMM test case 9.2.3.2.1c RP-59 RP-130144 approved R5 R5-58 R5-130178 agreed 2013-01-15 TEI8_Test CR 2013-01-15
2120 - F Rel-11 11.1.1 11.2.0 GCF Priority 4 - Correction to RRC test case 8.1.2.6 RP-59 RP-130144 approved R5 R5-58 R5-130207 agreed 2013-01-15 TEI8_Test CR 2013-01-15
2121 - F Rel-11 11.1.1 11.2.0 GCF Priority X - Correction to RRC test case 8.2.4.14 RP-59 RP-130145 approved R5 R5-58 R5-130208 agreed 2013-01-15 TEI9_Test CR 2013-01-15
2122 - F Rel-11 11.1.1 11.2.0 GCF Priority U1 - Correction to EMM test case 9.2.1.2.13 RP-59 RP-130144 approved R5 R5-58 R5-130209 agreed 2013-01-15 TEI8_Test CR 2013-01-15
2123 - F Rel-11 11.1.1 11.2.0 GCF Priority U1 - Correction to EMM test case 9.2.3.3.5 RP-59 RP-130144 approved R5 R5-58 R5-130212 agreed 2013-01-15 TEI8_Test CR 2013-01-15
2124 - F Rel-11 11.1.1 11.2.0 GCF Priority u1 - Update test case 13.4.3.2 RP-59 RP-130144 approved R5 R5-58 R5-130312 agreed 2013-01-16 TEI8_Test CR 2013-01-16
2125 - F Rel-11 11.1.1 11.2.0 Update test case 13.4.3.14 RP-59 RP-130160 approved R5 R5-58 R5-130313 agreed 2013-01-16 aSRVCC-UEConTest CR 2013-01-16
2126 - F Rel-11 11.1.1 11.2.0 Update test case 13.4.3.16 RP-59 RP-130160 approved R5 R5-58 R5-130314 agreed 2013-01-16 aSRVCC-UEConTest CR 2013-01-16
2127 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Update test case 9.2.3.1.27 RP-59 RP-130144 approved R5 R5-58 R5-130316 agreed 2013-01-16 TEI8_Test CR 2013-01-16
2128 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Update test case 9.2.3.1.28 RP-59 RP-130144 approved R5 R5-58 R5-130317 agreed 2013-01-16 TEI8_Test CR 2013-01-16
2129 - F Rel-11 11.1.1 11.2.0 Correction of MDT test case 8.6.7.1 RP-59 RP-130154 approved R5 R5-58 R5-130340 agreed 2013-01-17 MDT_UMTSLTE-UEConTest CR 2013-01-17
2130 - F Rel-11 11.1.1 11.2.0 Addition of new MO SMS test cases 11.1.5 and 11.1.6 RP-59 RP-130145 approved R5 R5-58 R5-130341 agreed 2013-01-17 TEI9_Test CR 2013-01-17
2131 - F Rel-11 11.1.1 11.2.0 GCF Priority g1 - Update to EUTRA Idle Mode test case 6.2.3.1 RP-59 RP-130144 approved R5 R5-58 R5-130355 agreed 2013-01-17 TEI8_Test CR 2013-01-17
2132 - F Rel-11 11.1.1 11.2.0 GCF Priority 2 - Correction to EMM test case TC9.4.4 RP-59 RP-130144 approved R5 R5-58 R5-130356 agreed 2013-01-17 TEI8_Test CR 2013-01-17
2133 - F Rel-11 11.1.1 11.2.0 GCF Priority 4 - Correction to Idle Mode test case TC6.2.3.19 RP-59 RP-130144 approved R5 R5-58 R5-130357 agreed 2013-01-17 TEI8_Test CR 2013-01-17
2134 - F Rel-11 11.1.1 11.2.0 Update to test cases 13.4.3.8, 13.4.3.9, 13.4.3.11 and 13.4.3.13 RP-59 RP-130160 approved R5 R5-58 R5-130369 agreed 2013-01-17 aSRVCC-UEConTest CR 2013-01-17
2135 - F Rel-11 11.1.1 11.2.0 GCF Priority g1 - Update to Inter-RAT measurements test case 8.3.2.5 RP-59 RP-130144 approved R5 R5-58 R5-130454 agreed 2013-01-18 TEI8_Test CR 2013-01-18
2136 - F Rel-11 11.1.1 11.2.0 GCF Priority g2 - Update to Inter-RAT measurements test case 8.3.3.3 RP-59 RP-130144 approved R5 R5-58 R5-130455 agreed 2013-01-18 TEI8_Test CR 2013-01-18
2137 - F Rel-11 11.1.1 11.2.0 Correction to test case 11.1.1 & 11.1.4 RP-59 RP-130144 approved R5 R5-58 R5-130527 agreed 2013-01-18 TEI8_Test CR 2013-01-18
2138 - F Rel-11 11.1.1 11.2.0 Updating of EMM cause of test case 11.2.6 and 11.2.7 RP-59 RP-130144 approved R5 R5-58 R5-130539 agreed 2013-01-18 TEI8_Test CR 2013-01-18
2139 - F Rel-11 11.1.1 11.2.0 GCF Priority 1 - Corrections to MAC TC 7.1.4.10 RP-59 RP-130144 approved R5 R5-58 R5-130558 agreed 2013-01-18 TEI8_Test CR 2013-01-18
2140 - F Rel-11 11.1.1 11.2.0 Corrections to TC 13.4.3.3 ""Inter-system mobility / E-UTRA voice to GSM CS voice / SRVCC"" RP-59 RP-130144 approved R5 R5-58 R5-130560 agreed 2013-01-18 TEI8_Test CR 2013-01-18
2141 - F Rel-11 11.1.1 11.2.0 Correction to Table 13.4.3.2.3.3-6: HANDOVER TO UTRAN COMMAND (step 32, Table 13.4.3.2.3.3-5) to include new handover condition defined in TS 36.508 RP-59 RP-130144 approved R5 R5-58 R5-130562 agreed 2013-01-18 TEI8_Test CR 2013-01-18
2142 - F Rel-11 11.1.1 11.2.0 Correction to MDT test case 8.6.3.1 RP-59 RP-130154 approved R5 R5-58 R5-130586 agreed 2013-01-18 MDT_UMTSLTE-UEConTest CR 2013-01-18
2143 - F Rel-11 11.1.1 11.2.0 Correction to preamble for TC 6.2.3.4a RP-59 RP-130146 approved R5 R5-58 R5-130624 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2144 - F Rel-11 11.1.1 11.2.0 GCF Priority X - Correction to RSRQ test case 6.1.2.17 RP-59 RP-130146 approved R5 R5-58 R5-130625 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2145 - F Rel-11 11.1.1 11.2.0 Correction to RSRQ test case 6.1.2.18 RP-59 RP-130146 approved R5 R5-58 R5-130626 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2146 - F Rel-11 11.1.1 11.2.0 Correction to RSQR test case 6.2.3.3a RP-59 RP-130146 approved R5 R5-58 R5-130627 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2147 - F Rel-11 11.1.1 11.2.0 GCF Priority u1 - Correction to EUTRA RRC Test Case 8.4.2.2 RP-59 RP-130144 approved R5 R5-58 R5-130628 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2148 - F Rel-11 11.1.1 11.2.0 GCF Priority u2 - Correction to EUTRA RRC Test Case 8.4.2.4 RP-59 RP-130144 approved R5 R5-58 R5-130629 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2149 - F Rel-11 11.1.1 11.2.0 Update of 8.4.5.4 - Addition of C2K checking parameters RP-59 RP-130144 approved R5 R5-58 R5-130630 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2150 - F Rel-11 11.1.1 11.2.0 Update of 8.4.7.3 - Addition of C2K checking parameters RP-59 RP-130144 approved R5 R5-58 R5-130631 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2151 - F Rel-11 11.1.1 11.2.0 Update of 8.4.7.4 - Addition of C2K checking parameters RP-59 RP-130144 approved R5 R5-58 R5-130632 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2152 - F Rel-11 11.1.1 11.2.0 Update of 8.4.7.5 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130633 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2153 - F Rel-11 11.1.1 11.2.0 Update of 8.4.7.6 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130634 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2154 - F Rel-11 11.1.1 11.2.0 Update of 8.4.7.7 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130635 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2155 - F Rel-11 11.1.1 11.2.0 Update of 8.4.7.8 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130636 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2156 - F Rel-11 11.1.1 11.2.0 Update of 8.4.7.9 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130637 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2158 - F Rel-11 11.1.1 11.2.0 GCF Priority c1 - Correction to title of EUTRA-1xRTT test cases 8.4.7.3 and 8.4.7.4 RP-59 RP-130144 approved R5 R5-58 R5-130639 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2159 - F Rel-11 11.1.1 11.2.0 GCF Priority g1 - Correction to EUTRA RRC Test Cases 8.4.3.2 and 8.4.3.3 RP-59 RP-130144 approved R5 R5-58 R5-130641 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2160 - F Rel-11 11.1.1 11.2.0 GCF Priority 4 - Correction to EMM tc 9.2.3.1.17 RP-59 RP-130144 approved R5 R5-58 R5-130642 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2161 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Update test case 9.3.1.3 RP-59 RP-130144 approved R5 R5-58 R5-130778 agreed 2013-02-05 TEI8_Test CR 2013-02-05
2162 - F Rel-11 11.1.1 11.2.0 GCF Priority 2 - Correction to EMM test case 9.2.3.1.4 RP-59 RP-130144 approved R5 R5-58 R5-130644 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2163 - F Rel-11 11.1.1 11.2.0 GCF Priority U1 - Correction to EMM test case 9.2.3.2.13 RP-59 RP-130144 approved R5 R5-58 R5-130645 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2164 - F Rel-11 11.1.1 11.2.0 GCF Priority U1 - Correction to EMM test case 9.2.1.2.5 RP-59 RP-130144 approved R5 R5-58 R5-130646 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2165 - F Rel-11 11.1.1 11.2.0 GCF Priority 4 - Correction to EMM tc 9.2.3.3.5a RP-59 RP-130144 approved R5 R5-58 R5-130647 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2166 - F Rel-11 11.1.1 11.2.0 New LTE Rel-9 TC for UE rejection of NAS security mode command with EIA0 RP-59 RP-130146 approved R5 R5-58 R5-130649 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2167 - F Rel-11 11.1.1 11.2.0 GCF Priority 1 - Update test case 9.1.3.1 to test not null and null ciphering algorithms RP-59 RP-130146 approved R5 R5-58 R5-130650 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2168 - F Rel-11 11.1.1 11.2.0 Correction to GCF P3 EMM test case 9.2.2.1.8 RP-59 RP-130144 approved R5 R5-58 R5-130651 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2169 - F Rel-11 11.1.1 11.2.0 Update of 11.2.8 - Addition of C2K checking parameters RP-59 RP-130144 approved R5 R5-58 R5-130652 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2170 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Correction to Multi-layer test cases 13.1.x RP-59 RP-130144 approved R5 R5-58 R5-130653 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2171 - F Rel-11 11.1.1 11.2.0 GCF Priority u1 - Update test case 13.1.2 RP-59 RP-130144 approved R5 R5-58 R5-130654 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2172 - F Rel-11 11.1.1 11.2.0 GCF Priority u1 - Update test case 13.1.2a RP-59 RP-130144 approved R5 R5-58 R5-130655 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2173 - F Rel-11 11.1.1 11.2.0 GCF Priority u1 - Update test case 13.1.5 RP-59 RP-130144 approved R5 R5-58 R5-130656 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2174 - F Rel-11 11.1.1 11.2.0 GCF Priority g1 - Update test case 13.1.9 RP-59 RP-130144 approved R5 R5-58 R5-130657 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2175 - F Rel-11 11.1.1 11.2.0 Update of 13.1.17 - Addition of C2K checking parameters RP-59 RP-130144 approved R5 R5-58 R5-130658 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2176 - F Rel-11 11.1.1 11.2.0 Update of 13.1.18 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130659 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2177 - F Rel-11 11.1.1 11.2.0 Update of 13.4.4.1 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130660 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2178 - F Rel-11 11.1.1 11.2.0 Update of 13.4.4.2 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130661 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2179 - F Rel-11 11.1.1 11.2.0 Update of 13.4.4.4 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130662 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2180 - F Rel-11 11.1.1 11.2.0 Update of 13.4.4.5 - Addition of C2K checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130663 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2181 - F Rel-11 11.1.1 11.2.0 Update of 13.4.4.3 - C2K messages contents for checking parameters RP-59 RP-130146 approved R5 R5-58 R5-130664 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2182 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Correction to EMM test case 9.1.5.1 RP-59 RP-130144 approved R5 R5-58 R5-130665 agreed 2013-01-29 TEI8_Test CR 2013-01-29
2183 - F Rel-11 11.1.1 11.2.0 Addition of new Inter-RAT measurement test case for event B1 RP-59 RP-130146 approved R5 R5-58 R5-130669 agreed 2013-01-29 TEI9_Test CR 2013-01-29
2184 - F Rel-11 11.1.1 11.2.0 New aSRVCC TC 13_4_3_15 MO call voice-data SRVCC HO cancelled RP-59 RP-130160 approved R5 R5-58 R5-130697 agreed 2013-01-30 aSRVCC-UEConTest CR 2013-01-30
2185 - F Rel-11 11.1.1 11.2.0 New aSRVCC TC 13_4_3_17 MT call voice-data SRVCC HO cancelled RP-59 RP-130160 approved R5 R5-58 R5-130698 agreed 2013-01-30 aSRVCC-UEConTest CR 2013-01-30
2186 - F Rel-11 11.1.1 11.2.0 Update of eICIC test case 8.3.1.20 RP-59 RP-130157 approved R5 R5-58 R5-130699 agreed 2013-01-30 eICIC_LTE-UEConTest CR 2013-01-30
2187 - F Rel-11 11.1.1 11.2.0 Update of Carrier Aggregation test case 8.2.4.19.1 RP-59 RP-130167 approved R5 R5-58 R5-130701 agreed 2013-01-30 LTE_CA-UEConTest CR 2013-01-30
2188 - F Rel-11 11.1.1 11.2.0 Editorial Corrections to Carrier Aggregation Radio Resource Reconfiguration test cases RP-59 RP-130167 approved R5 R5-58 R5-130703 agreed 2013-01-30 LTE_CA-UEConTest CR 2013-01-30
2189 - F Rel-11 11.1.1 11.2.0 Modification on CA radio resource reconfiguration related test cases RP-59 RP-130167 approved R5 R5-58 R5-130704 agreed 2013-01-30 LTE_CA-UEConTest CR 2013-01-30
2190 - F Rel-11 11.1.1 11.2.0 Editorial Corrections to Carrier Aggregation Handover Test cases RP-59 RP-130167 approved R5 R5-58 R5-130705 agreed 2013-01-30 LTE_CA-UEConTest CR 2013-01-30
2191 - F Rel-11 11.1.1 11.2.0 Modification of CA TC 8.2.4.17 and 8.2.4.18 RP-59 RP-130167 approved R5 R5-58 R5-130707 agreed 2013-01-30 LTE_CA-UEConTest CR 2013-01-30
2192 - F Rel-11 11.1.1 11.2.0 New NIMTC test case 6.1.1.7 PLMN selection / Periodic reselection / MinimumPeriodicSearchTimer RP-59 RP-130159 approved R5 R5-58 R5-130720 agreed 2013-01-31 NIMTC-UEConTest CR 2013-01-31
2193 - F Rel-11 11.1.1 11.2.0 New NIMTC test case 9.2.1.1.27 Attach / Abnormal case / Network reject with Extended Wait Timer RP-59 RP-130159 approved R5 R5-58 R5-130722 agreed 2013-01-31 NIMTC-UEConTest CR 2013-01-31
2194 - F Rel-11 11.1.1 11.2.0 New NIMTC test case 10.5.4 UE requested PDN connectivity not accepted / Network reject with Extended Wait Timer RP-59 RP-130159 approved R5 R5-58 R5-130723 agreed 2013-01-31 NIMTC-UEConTest CR 2013-01-31
2195 - F Rel-11 11.1.1 11.2.0 Addition of new MDT test case 8.6.3.2 RP-59 RP-130154 approved R5 R5-58 R5-130729 agreed 2013-01-31 MDT_UMTSLTE-UEConTest CR 2013-01-31
2196 - F Rel-11 11.1.1 11.2.0 Addition of New MDT test case for Logged MDT RP-59 RP-130154 approved R5 R5-58 R5-130730 agreed 2013-01-31 MDT_UMTSLTE-UEConTest CR 2013-01-31
2198 - F Rel-11 11.1.1 11.2.0 Addition of new test case 8.3.1.bb RP-59 RP-130146 approved R5 R5-58 R5-130733 agreed 2013-01-31 TEI9_Test CR 2013-01-31
2199 - F Rel-11 11.1.1 11.2.0 Addition of new test case 8.3.1.cc RP-59 RP-130146 approved R5 R5-58 R5-130734 agreed 2013-01-31 TEI9_Test CR 2013-01-31
2200 - F Rel-11 11.1.1 11.2.0 Addition of new test case 8.3.1.dd RP-59 RP-130146 approved R5 R5-58 R5-130735 agreed 2013-01-31 TEI9_Test CR 2013-01-31
2202 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 - Corrections to EMM TC 9.2.1.1.12, 9.2.3.1.12, 9.2.3.1.18 RP-59 RP-130144 approved R5 R5-58 R5-130739 agreed 2013-01-31 TEI8_Test CR 2013-01-31
2203 - F Rel-11 11.1.1 11.2.0 GCF Priority U1 - Correction to EMM test case 9.2.1.2.8 RP-59 RP-130144 approved R5 R5-58 R5-130740 agreed 2013-01-31 TEI8_Test CR 2013-01-31
2204 - F Rel-11 11.1.1 11.2.0 GCF Priority g1 - Update test case 13.1.8 RP-59 RP-130144 approved R5 R5-58 R5-130741 agreed 2013-01-31 TEI8_Test CR 2013-01-31
2205 - F Rel-11 11.1.1 11.2.0 GCF Priority g1 - Update test case 13.1.12 RP-59 RP-130144 approved R5 R5-58 R5-130742 agreed 2013-01-31 TEI8_Test CR 2013-01-31
2206 - F Rel-11 11.1.1 11.2.0 GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 8.3.1.15a RP-59 RP-130146 approved R5 R5-58 R5-130746 agreed 2013-01-31 TEI9_test CR 2013-01-31
2207 - F Rel-11 11.1.1 11.2.0 GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 8.3.1.16a RP-59 RP-130146 approved R5 R5-58 R5-130747 agreed 2013-01-31 TEI9_Test CR 2013-01-31
2208 - F Rel-11 11.1.1 11.2.0 GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 RP-59 RP-130144 approved R5 R5-58 R5-130748 agreed 2013-01-31 TEI8_Test CR 2013-01-31
2209 - F Rel-11 11.1.1 11.2.0 Modification of CA TC 8.2.4.19 RP-59 RP-130167 approved R5 R5-58 R5-130752 agreed 2013-01-31 LTE_CA-UEConTest CR 2013-01-31
2210 - F Rel-11 11.1.1 11.2.0 Modification of CA TC 8.2.4.20 RP-59 RP-130167 approved R5 R5-58 R5-130753 agreed 2013-01-31 LTE_CA-UEConTest CR 2013-01-31
2211 - F Rel-11 11.1.1 11.2.0 Modification of CA TC 8.2.4.21 RP-59 RP-130167 approved R5 R5-58 R5-130754 agreed 2013-01-31 LTE_CA-UEConTest CR 2013-01-31
2212 - F Rel-11 11.1.1 11.2.0 Modification of CA TCs 8.3.1.17 and 8.3.1.18 RP-59 RP-130167 approved R5 R5-58 R5-130755 agreed 2013-01-31 LTE_CA-UEConTest CR 2013-01-31
2213 - F Rel-11 11.1.1 11.2.0 Modification of CA TC 8.3.1.22 RP-59 RP-130167 approved R5 R5-58 R5-130756 agreed 2013-01-31 LTE_CA-UEConTest CR 2013-01-31
2214 - F Rel-11 11.1.1 11.2.0 Modification of CA TC 8.4.2.7 RP-59 RP-130167 approved R5 R5-58 R5-130757 agreed 2013-01-31 LTE_CA-UEConTest CR 2013-01-31
2215 - F Rel-11 11.1.1 11.2.0 Update of Carrier Aggregation test case 8.2.4.20.1 RP-59 RP-130167 approved R5 R5-58 R5-130758 agreed 2013-01-31 LTE_CA-UEConTest CR 2013-01-31
2216 - F Rel-11 11.1.1 11.2.0 GCF Priority 3 – Corrections to EMM tcs 9.2.3.2.1a and 9.2.3.3.4 RP-59 RP-130146 approved R5 R5-58 R5-130762 agreed 2013-01-31 TEI9_Test CR 2013-01-31
2217 - F Rel-11 11.1.1 11.2.0 GCF Priority ee1 - Corrections to Emgerency Call over IMS test cases RP-59 RP-130146 approved R5 R5-58 R5-130784 agreed 2013-02-19 TEI9_Test CR 2013-02-19
2218 - F Rel-11 11.1.1 11.2.0 GCF Priority c1 - Correction to EUTRA-HRPD test case 8.3.2.8 RP-59 RP-130144 approved R5 R5-58 R5-130785 agreed 2013-02-19 TEI8_Test CR 2013-02-19
2219 - F Rel-11 11.1.1 11.2.0 GCF Priority c1 - Correction to EUTRA-1xRTT test case 8.3.2.10 RP-59 RP-130144 approved R5 R5-58 R5-130786 agreed 2013-02-19 TEI8_Test CR 2013-02-19
2220 - F Rel-11 11.2.0 11.3.0 CR 36.523-1-2220 GCF Priority 1 - Correction to EUTRA Idle Mode Test Case 6.2.3.15 GP-58 GP-130357 approved G3new G3new-58 GP-130357 agreed 2013-04-18 TEI10_Test - 2013-04-18
2221 - F Rel-11 11.2.0 11.3.0 CR 36.523-1-2221 GCF priority g1 - Correction to Idle Mode test case 6.2.1.6 GP-58 GP-130358 approved G3new G3new-58 GP-130358 agreed 2013-04-18 TEI10_Test - 2013-04-18
2222 - F Rel-11 11.2.0 11.3.0 CR 36.523-1-2222 Removal of TC 6.2.3.22 GP-58 GP-130371 approved G3new G3new-58 GP-130371 agreed 2013-04-18 LTE-UEConTest_SIG - 2013-04-18
2224 - F Rel-11 11.2.0 11.3.0 Update of CDMA2000 specification references: Clause 2 of TS 36.523-1 RP-60 RP-130610 approved R5 R5-59 R5-131066 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2225 - F Rel-11 11.2.0 11.3.0 Update of CDMA2000 specification references for UE Capability Transfer RP-60 RP-130610 approved R5 R5-59 R5-131071 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2226 - F Rel-11 11.2.0 11.3.0 Update of CDMA2000 specification references for Inter-RAT Handover RP-60 RP-130610 approved R5 R5-59 R5-131072 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2227 - F Rel-11 11.2.0 11.3.0 Update of CDMA2000 specification references of Inter-system session management RP-60 RP-130610 approved R5 R5-59 R5-131073 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2228 - F Rel-11 11.2.0 11.3.0 Update of of LTE MDT test case 8.6.3.3 RP-60 RP-130626 approved R5 R5-59 R5-131077 agreed 2013-05-13 TEI10_Test CR 2013-05-13
2229 - F Rel-11 11.2.0 11.3.0 Editorial Remove square bracket in TC 8.3.2.1 RP-60 RP-130610 approved R5 R5-59 R5-131087 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2230 - F Rel-11 11.2.0 11.3.0 Editorial Remove square bracket and FFS in TCs 13.4.2.2, 13.4.3.3, 13.4.3.5 RP-60 RP-130610 approved R5 R5-59 R5-131088 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2231 - F Rel-11 11.2.0 11.3.0 Editorial TC 12.1.1 RP-60 RP-130610 approved R5 R5-59 R5-131091 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2232 - F Rel-11 11.2.0 11.3.0 Correction of description on 36523-3 RP-60 RP-130635 approved R5 R5-59 R5-131128 agreed 2013-05-13 TEI11_Test CR 2013-05-13
2233 - F Rel-11 11.2.0 11.3.0 GCF Priority X - Correction to Idle Mode test case 6.3.11 RP-60 RP-130626 approved R5 R5-59 R5-131142 agreed 2013-05-13 TEI10_Test CR 2013-05-13
2234 - F Rel-11 11.2.0 11.3.0 GCF Priority X - Correction to Idle Mode test case 6.3.10 RP-60 RP-130626 approved R5 R5-59 R5-131143 agreed 2013-05-13 TEI10_Test CR 2013-05-13
2235 - F Rel-11 11.2.0 11.3.0 Update to test function Update UE Location Information RP-60 RP-130626 approved R5 R5-59 R5-131169 agreed 2013-05-13 TEI10_Test CR 2013-05-13
2236 - F Rel-11 11.2.0 11.3.0 GCF Priority u1 - Update to EMM test case 9.2.3.2.9 RP-60 RP-130610 approved R5 R5-59 R5-131215 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2237 - F Rel-11 11.2.0 11.3.0 GCF Priority 3 - Correction to EUTRA MAC test case 7.1.4.2 RP-60 RP-130610 approved R5 R5-59 R5-131255 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2238 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.3 RP-60 RP-130612 approved R5 R5-59 R5-131294 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2239 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.7 RP-60 RP-130612 approved R5 R5-59 R5-131295 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2240 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.10 RP-60 RP-130612 approved R5 R5-59 R5-131296 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2241 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.15 RP-60 RP-130612 approved R5 R5-59 R5-131298 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2242 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.11 RP-60 RP-130612 approved R5 R5-59 R5-131299 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2243 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.13 RP-60 RP-130612 approved R5 R5-59 R5-131300 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2244 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.4 RP-60 RP-130612 approved R5 R5-59 R5-131301 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2245 - F Rel-11 11.2.0 11.3.0 Update test case 13.1.16 RP-60 RP-130612 approved R5 R5-59 R5-131302 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2246 - F Rel-11 11.2.0 11.3.0 Correction to RSRQ test case 8.3.2.3a RP-60 RP-130612 approved R5 R5-59 R5-131314 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2247 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA-HRPD test case 8.3.3.4 RP-60 RP-130610 approved R5 R5-59 R5-131316 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2248 - F Rel-11 11.2.0 11.3.0 Correction to EMM test case 9.2.1.2.8 RP-60 RP-130610 approved R5 R5-59 R5-131317 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2249 - F Rel-11 11.2.0 11.3.0 Correction to EMM test case 9.2.2.1.8 RP-60 RP-130610 approved R5 R5-59 R5-131318 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2250 - F Rel-11 11.2.0 11.3.0 Correction to CA test cases 8.3.1.18.1 and 8.3.1.18.2 RP-60 RP-130636 approved R5 R5-59 R5-131324 agreed 2013-05-13 LTE_CA-UEConTest CR 2013-05-13
2251 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.2.1 RP-60 RP-130612 approved R5 R5-59 R5-131366 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2252 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.1 RP-60 RP-130612 approved R5 R5-59 R5-131367 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2253 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.2 RP-60 RP-130612 approved R5 R5-59 R5-131368 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2254 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.7 RP-60 RP-130612 approved R5 R5-59 R5-131369 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2255 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.8 RP-60 RP-130612 approved R5 R5-59 R5-131370 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2256 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.9 RP-60 RP-130612 approved R5 R5-59 R5-131371 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2257 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.10 RP-60 RP-130612 approved R5 R5-59 R5-131372 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2258 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.11 RP-60 RP-130612 approved R5 R5-59 R5-131373 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2259 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.12 RP-60 RP-130612 approved R5 R5-59 R5-131375 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2260 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.13 RP-60 RP-130612 approved R5 R5-59 R5-131376 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2261 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.14 RP-60 RP-130612 approved R5 R5-59 R5-131377 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2262 - F Rel-11 11.2.0 11.3.0 Update test case 13.4.3.16 RP-60 RP-130612 approved R5 R5-59 R5-131378 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2263 - F Rel-11 11.2.0 11.3.0 Correction to test case 8.3.1.26 RP-60 RP-130612 approved R5 R5-59 R5-131441 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2264 - F Rel-11 11.2.0 11.3.0 Update IMS emergency call pre-test condition RP-60 RP-130612 approved R5 R5-59 R5-131470 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2265 - F Rel-11 11.2.0 11.3.0 Adding a new TC 9.2.3.1.5a for NIMTC conformance testing RP-60 RP-130624 approved R5 R5-59 R5-131480 agreed 2013-05-13 NIMTC-UEConTest CR 2013-05-13
2266 - F Rel-11 11.2.0 11.3.0 Splitting TC 11.2.8 in two TCs one for UTRA/GERAN and one for 1xRTT RP-60 RP-130612 approved R5 R5-59 R5-131485 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2267 - F Rel-11 11.2.0 11.3.0 Editorial update of test case 13.1.5 RP-60 RP-130612 approved R5 R5-59 R5-131504 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2268 - F Rel-11 11.2.0 11.3.0 Update of 8.4.7.10 - Addition of C2K checking parameters RP-60 RP-130612 approved R5 R5-59 R5-131557 agreed 2013-05-13 TEI9_Test CR 2013-05-13
2269 - F Rel-11 11.2.0 11.3.0 Addition of new test case for PLMN change in eMDT RP-60 RP-130629 approved R5 R5-59 R5-131626 agreed 2013-05-13 eMDT_UMTSLTE-UEConTest CR 2013-05-13
2270 - F Rel-11 11.2.0 11.3.0 Addition of new test case for EventB2 reporting in eMDT RP-60 RP-130629 approved R5 R5-59 R5-131633 agreed 2013-05-13 eMDT_UMTSLTE-UEConTest CR 2013-05-13
2271 - F Rel-11 11.2.0 11.3.0 Addition of new test case for RACH reporting in eMDT RP-60 RP-130629 approved R5 R5-59 R5-131635 agreed 2013-05-13 eMDT_UMTSLTE-UEConTest CR 2013-05-13
2272 - F Rel-11 11.2.0 11.3.0 Correction to EMM Test Case 9.2.3.1.19 RP-60 RP-130610 approved R5 R5-59 R5-131675 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2273 - F Rel-11 11.2.0 11.3.0 GCF Priority 2 / 3 - Editorial corrections to EMM test cases 9.2.1.1.1a and 9.2.3.1.17 RP-60 RP-130610 approved R5 R5-59 R5-131693 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2274 - F Rel-11 11.2.0 11.3.0 GCF Priority 2 - Corrections to SMS over SGs test cases RP-60 RP-130610 approved R5 R5-59 R5-131708 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2275 - F Rel-11 11.2.0 11.3.0 Editorial correction to TC 9.2.1.1.1 RP-60 RP-130635 approved R5 R5-59 R5-131713 agreed 2013-05-13 TEI11_Test CR 2013-05-13
2276 - F Rel-11 11.2.0 11.3.0 Correction to LTE-A test case 8.2.2.5.1/8.2.2.5.2 RP-60 RP-130636 approved R5 R5-59 R5-131733 agreed 2013-05-13 LTE_CA-UEConTest CR 2013-05-13
2277 - F Rel-11 11.2.0 11.3.0 CSG reselection requirements correction in TC 6.3.1 RP-60 RP-130610 approved R5 R5-59 R5-131810 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2278 - F Rel-11 11.2.0 11.3.0 CSG reselection requirements correction in TC 6.3.3 RP-60 RP-130610 approved R5 R5-59 R5-131811 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2279 - F Rel-11 11.2.0 11.3.0 CSG reselection requirements correction in TC 6.3.4 RP-60 RP-130610 approved R5 R5-59 R5-131812 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2280 - F Rel-11 11.2.0 11.3.0 CSG reselection requirements correction in TC 6.3.7 RP-60 RP-130610 approved R5 R5-59 R5-131813 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2281 - F Rel-11 11.2.0 11.3.0 CSG reselection requirements correction in TC 6.3.8 RP-60 RP-130610 approved R5 R5-59 R5-131814 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2282 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA Idle mode Test case 6.1.2.13 RP-60 RP-130610 approved R5 R5-59 R5-131815 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2283 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA Idle mode test case 6.2.3.1a RP-60 RP-130612 approved R5 R5-59 R5-131816 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2284 - F Rel-11 11.2.0 11.3.0 Correction to MAC test case 7.1.1.2 RP-60 RP-130610 approved R5 R5-59 R5-131817 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2285 - F Rel-11 11.2.0 11.3.0 Update of test case 8.5.4.1 RP-60 RP-130610 approved R5 R5-59 R5-131818 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2286 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA-1xRTT test case 8.3.2.10 RP-60 RP-130610 approved R5 R5-59 R5-131819 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2287 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA-HRPD test case 8.3.2.8 RP-60 RP-130610 approved R5 R5-59 R5-131820 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2288 - F Rel-11 11.2.0 11.3.0 New TC 8.3.4.5 Inter-frequency E-UTRAN FDD - FDD / CSG Proximity Indication RP-60 RP-130612 approved R5 R5-59 R5-131821 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2289 - F Rel-11 11.2.0 11.3.0 Addition of new test case 8.3.1.23 RP-60 RP-130612 approved R5 R5-59 R5-131822 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2290 - F Rel-11 11.2.0 11.3.0 Addition of new test case 8.3.1.27 RP-60 RP-130612 approved R5 R5-59 R5-131823 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2291 - F Rel-11 11.2.0 11.3.0 GCF Priority 1 - Correction to EUTRA RRC Test Case 8.3.2.2. RP-60 RP-130610 approved R5 R5-59 R5-131824 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2292 - F Rel-11 11.2.0 11.3.0 GCF Priority x - Correction to EUTRA test case 8.3.1.13 RP-60 RP-130612 approved R5 R5-59 R5-131825 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2293 - F Rel-11 11.2.0 11.3.0 Editorial Remove square bracket in TC 8.4.3.2 RP-60 RP-130610 approved R5 R5-59 R5-131826 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2294 - F Rel-11 11.2.0 11.3.0 Update to test case 9.2.1.2.3 and 9.2.3.2.3 RP-60 RP-130635 approved R5 R5-59 R5-131827 agreed 2013-05-23 TEI11_Test CR 2013-05-23
2295 - F Rel-11 11.2.0 11.3.0 GCF Priority 3 - Corrections to EMM TC 9.2.1.1.12, 9.2.3.1.12, 9.2.3.1.18 RP-60 RP-130610 approved R5 R5-59 R5-131828 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2296 - F Rel-11 11.2.0 11.3.0 Correction to EMM test case 9.2.3.2.1a RP-60 RP-130610 approved R5 R5-59 R5-131829 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2297 - F Rel-11 11.2.0 11.3.0 Correction to EMM test case 9.2.3.3.2 RP-60 RP-130610 approved R5 R5-59 R5-131830 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2298 - F Rel-11 11.2.0 11.3.0 GCF Priority 2 - Correction to EUTRA EMM Test Case 9.2.3.2.3 RP-60 RP-130610 approved R5 R5-59 R5-131831 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2299 - F Rel-11 11.2.0 11.3.0 GCF Priority 2: Extending the scope of TC 9.1.4.2 to verify IMEISV RP-60 RP-130610 approved R5 R5-59 R5-131832 agreed 2013-05-22 TEI8_Test CR 2013-05-22
2300 - F Rel-11 11.2.0 11.3.0 GCF G2: Corrections to EMM test case 9.2.3.4.1 RP-60 RP-130610 approved R5 R5-59 R5-131833 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2301 - F Rel-11 11.2.0 11.3.0 GCF Priority U1: Correction to EMM test case 9.2.3.3.4 RP-60 RP-130610 approved R5 R5-59 R5-131834 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2302 - F Rel-11 11.2.0 11.3.0 9.2.3.1.8 'Load Balancing TAU' does not test the main requirement RP-60 RP-130610 approved R5 R5-59 R5-131835 agreed 2013-06-05 TEI8_Test CR 2013-06-05
2303 - F Rel-11 11.2.0 11.3.0 Correction to EMM test case 9.1.3.3 RP-60 RP-130612 approved R5 R5-59 R5-131836 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2304 - F Rel-11 11.2.0 11.3.0 Update to test case 11.2.6 RP-60 RP-130635 approved R5 R5-59 R5-131837 agreed 2013-05-22 TEI11_Test CR 2013-05-22
2305 - F Rel-11 11.2.0 11.3.0 Update test case 11.2.11 RP-60 RP-130612 approved R5 R5-59 R5-131838 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2306 - F Rel-11 11.2.0 11.3.0 Update of test case 8.3.3.5 RP-60 RP-130610 approved R5 R5-59 R5-131839 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2307 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA Multi-layer Test Case 13.3.1.3 RP-60 RP-130612 approved R5 R5-59 R5-131840 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2308 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.1.1 RP-60 RP-130612 approved R5 R5-59 R5-131841 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2309 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.1.2 RP-60 RP-130612 approved R5 R5-59 R5-131842 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2310 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.1.3 RP-60 RP-130612 approved R5 R5-59 R5-131843 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2311 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.1.4 RP-60 RP-130612 approved R5 R5-59 R5-131844 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2312 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.1.5 RP-60 RP-130612 approved R5 R5-59 R5-131845 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2313 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.2.1 RP-60 RP-130612 approved R5 R5-59 R5-131846 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2314 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.2.2 RP-60 RP-130612 approved R5 R5-59 R5-131847 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2315 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.2.3 RP-60 RP-130612 approved R5 R5-59 R5-131848 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2316 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.2.4 RP-60 RP-130612 approved R5 R5-59 R5-131849 agreed 2013-05-22 TEI9_Test CR 2013-05-22
2317 - F Rel-11 11.2.0 11.3.0 Correction to PWS(CMAS) test case 18.1.3 RP-60 RP-130612 approved R5 R5-59 R5-131850 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2318 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.3.1 RP-60 RP-130626 approved R5 R5-59 R5-131851 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2319 - F Rel-11 11.2.0 11.3.0 Corrections to eMBMS test case 17.3.2 RP-60 RP-130626 approved R5 R5-59 R5-131852 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2320 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.2.1 RP-60 RP-130626 approved R5 R5-59 R5-131853 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2321 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.2.2 RP-60 RP-130626 approved R5 R5-59 R5-131854 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2322 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.2.3 RP-60 RP-130626 approved R5 R5-59 R5-131855 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2323 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.2.4 RP-60 RP-130626 approved R5 R5-59 R5-131856 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2324 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.2.5 RP-60 RP-130626 approved R5 R5-59 R5-131857 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2325 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.2.8 RP-60 RP-130626 approved R5 R5-59 R5-131858 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2326 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.3.1 RP-60 RP-130626 approved R5 R5-59 R5-131859 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2327 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.3.2 RP-60 RP-130626 approved R5 R5-59 R5-131860 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2328 - F Rel-11 11.2.0 11.3.0 Correction to E-UTRA MDT test case 8.6.3.3 RP-60 RP-130626 approved R5 R5-59 R5-131861 agreed 2013-05-22 TEI10_Test CR 2013-05-22
2330 - F Rel-11 11.2.0 11.3.0 Correction to MAC LTE CA test case 7.1.3.11 RP-60 RP-130636 approved R5 R5-59 R5-131879 agreed 2013-05-23 LTE_CA-UEConTest CR 2013-05-23
2331 - F Rel-11 11.2.0 11.3.0 Correction to MAC LTE CA test case 7.1.4.18 RP-60 RP-130636 approved R5 R5-59 R5-131880 agreed 2013-05-23 LTE_CA-UEConTest CR 2013-05-23
2332 - F Rel-11 11.2.0 11.3.0 Correction to MAC LTE CA test case 7.1.9.1 RP-60 RP-130636 approved R5 R5-59 R5-131881 agreed 2013-05-23 LTE_CA-UEConTest CR 2013-05-23
2333 - F Rel-11 11.2.0 11.3.0 Correction to MAC LTE CA test case 7.1.4.20.1 RP-60 RP-130636 approved R5 R5-59 R5-131882 agreed 2013-05-23 LTE_CA-UEConTest CR 2013-05-23
2334 - F Rel-11 11.2.0 11.3.0 Correction to MAC LTE CA test case 7.1.4.19.1 RP-60 RP-130636 approved R5 R5-59 R5-131883 agreed 2013-05-23 LTE_CA-UEConTest CR 2013-05-23
2335 - F Rel-11 11.2.0 11.3.0 Update of eICIC test case 8.3.1.20 RP-60 RP-130622 approved R5 R5-59 R5-131886 agreed 2013-05-23 eICIC_LTE-UEConTest CR 2013-05-23
2336 - F Rel-11 11.2.0 11.3.0 Adding a new TC 9.2.1.1.2a for NIMTC conformance testing RP-60 RP-130624 approved R5 R5-59 R5-131892 agreed 2013-05-22 NIMTC-UEConTest CR 2013-05-22
2337 - F Rel-11 11.2.0 11.3.0 Addition of new test case for TDD additional special subframe configuration with CRS based transmission scheme RP-60 RP-130633 approved R5 R5-59 R5-131894 agreed 2013-05-23 LTE_TDD_add_subframe-UEConTest CR 2013-05-23
2338 - F Rel-11 11.2.0 11.3.0 Addition of new test case for TDD additional special subframe configuration with UE-specific reference signals based transmission scheme RP-60 RP-130633 approved R5 R5-59 R5-131895 agreed 2013-05-23 LTE_TDD_add_subframe-UEConTest CR 2013-05-23
2339 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA EMM Test Case 9.2.3.2.1b RP-60 RP-130610 approved R5 R5-59 R5-131898 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2340 - F Rel-11 11.2.0 11.3.0 Correction to EUTRA EMM Test Case 9.2.1.2.1b RP-60 RP-130610 approved R5 R5-59 R5-131899 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2341 - F Rel-11 11.2.0 11.3.0 Update to test case 8.2.4.17.2 RP-60 RP-130636 approved R5 R5-59 R5-132003 agreed 2013-05-24 LTE_CA-UEConTest CR 2013-05-24
2342 - F Rel-11 11.2.0 11.3.0 Correction to RRC test case 8.2.4.14 RP-60 RP-130612 approved R5 R5-59 R5-132005 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2343 - F Rel-11 11.2.0 11.3.0 New Carrier Aggregation test case on MIMO RP-60 RP-130636 approved R5 R5-59 R5-132018 agreed 2013-05-23 LTE_CA-UEConTest CR 2013-05-23
2344 - F Rel-11 11.2.0 11.3.0 Correction to usage of cells in Inter-band LTE CA test case 8.2.4.19.2 RP-60 RP-130636 approved R5 R5-59 R5-132019 agreed 2013-05-24 LTE_CA-UEConTest CR 2013-05-24
2345 - F Rel-11 11.2.0 11.3.0 Correction to usage of cells in Inter-band LTE CA test case 8.2.4.20.2 RP-60 RP-130636 approved R5 R5-59 R5-132020 agreed 2013-05-24 LTE_CA-UEConTest CR 2013-05-24
2346 - F Rel-11 11.2.0 11.3.0 Correction to usage of cells in Inter-band LTE CA test case 8.2.4.21.2 RP-60 RP-130636 approved R5 R5-59 R5-132021 agreed 2013-05-24 LTE_CA-UEConTest CR 2013-05-24
2347 - F Rel-11 11.2.0 11.3.0 Addition of SCell configuration type to CA test cases RP-60 RP-130636 approved R5 R5-59 R5-132022 agreed 2013-05-23 LTE_CA-UEConTest CR 2013-05-23
2348 - F Rel-11 11.2.0 11.3.0 Correction to eICIC test case 8.3.1.19 RP-60 RP-130622 approved R5 R5-59 R5-132024 agreed 2013-05-24 eICIC_LTE-UEConTest CR 2013-05-24
2349 - F Rel-11 11.2.0 11.3.0 Correction to idle mode test case 6.1.2.17 RP-60 RP-130612 approved R5 R5-59 R5-132032 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2350 - F Rel-11 11.2.0 11.3.0 Correction to LTE FDD-TDD Inter-mode test case 8.1.3.12a RP-60 RP-130612 approved R5 R5-59 R5-132033 agreed 2013-05-23 TEI9_Test CR 2013-05-23
2351 - F Rel-11 11.2.0 11.3.0 GCF Priority 1 - Update of EUTRA RRC test case 8.5.4.1 to handle Rel-11 IEs RP-60 RP-130610 approved R5 R5-59 R5-132034 agreed 2013-05-23 TEI8_Test CR 2013-05-23
2352 - F Rel-11 11.2.0 11.3.0 Correction to EMM test case 9.2.3.3.4 RP-60 RP-130610 approved R5 R5-59 R5-132035 agreed 2013-05-24 TEI8_Test CR 2013-05-24
2353 - F Rel-11 11.2.0 11.3.0 GCF Priority 2 - Corrections to ESM test case 10.3.1 RP-60 RP-130610 approved R5 R5-59 R5-132042 agreed 2013-05-24 TEI8_Test CR 2013-05-24
2354 - F Rel-11 11.2.0 11.3.0 GCF Priority 2 - Corrections to ESM test case 10.9.1 RP-60 RP-130610 approved R5 R5-59 R5-132043 agreed 2013-05-24 TEI8_Test CR 2013-05-24
2355 - F Rel-11 11.2.0 11.3.0 Addition of new test case for T300 expiry in eMDT RP-60 RP-130629 approved R5 R5-59 R5-132044 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2356 - F Rel-11 11.2.0 11.3.0 Addition of new test case about TAC and PLMN id in eMDT RP-60 RP-130629 approved R5 R5-59 R5-132045 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2357 - F Rel-11 11.2.0 11.3.0 Addition of new test case about PLMN list in eMDT RP-60 RP-130629 approved R5 R5-59 R5-132046 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2358 - F Rel-11 11.2.0 11.3.0 Addition of new test case about Location information for eMDT RP-60 RP-130629 approved R5 R5-59 R5-132047 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2359 - F Rel-11 11.2.0 11.3.0 Addition of new test case for inter-frequency measurements report in eMDT RP-60 RP-130629 approved R5 R5-59 R5-132048 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2360 - F Rel-11 11.2.0 11.3.0 Addition of new test case for inter-RAT measurements report in eMDT RP-60 RP-130629 approved R5 R5-59 R5-132049 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2361 - F Rel-11 11.2.0 11.3.0 Addition of new test case for reporitng reestablishment in eMDT RP-60 RP-130629 approved R5 R5-59 R5-132054 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2362 - F Rel-11 11.2.0 11.3.0 Addition of new test case for EventA2 reporting in eMDT RP-60 RP-130629 approved R5 R5-59 R5-132056 agreed 2013-05-24 eMDT_UMTSLTE-UEConTest CR 2013-05-24
2363 - F Rel-11 11.2.0 11.3.0 GCF Priority X - Correction to Idle Mode test case 6.3.12 RP-60 RP-130626 approved R5 R5-59 R5-132058 agreed 2013-05-23 TEI10_Test CR 2013-05-23
2364 - F Rel-11 11.2.0 11.3.0 GCF Priority ee1 - Update of Emergency Call over IMS test cases RP-60 RP-130612 approved R5 R5-59 R5-132067 agreed 2013-05-24 TEI9_Test CR 2013-05-24
2365 - F Rel-11 11.2.0 11.3.0 GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 6.1.1.4a RP-60 RP-130610 approved R5 R5-59 R5-132069 agreed 2013-05-24 TEI8_Test CR 2013-05-24
2366 - F Rel-11 11.2.0 11.3.0 Update of TC 11.2.7 to consider document C1-131732 RP-60 RP-130612 approved R5 R5-59 R5-132084 agreed 2013-06-05 TEI9_Test CR 2013-06-05
2367 - F Rel-11 11.2.0 11.3.0 Correction to generic MO CSFB procedures RP-60 RP-130610 approved R5 R5-59 R5-131496 agreed 2013-05-13 TEI8_Test CR 2013-05-13
2368 - F Rel-11 11.3.0 11.4.0 Correction to CA test case 8.2.4.21.2 RP-61 RP-131111 approved R5 R5-60 R5-133081 agreed 2013-07-04 LTE_CA-UEConTest CR 2013-07-04
2369 - F Rel-11 11.3.0 11.4.0 GCF Priority 3 - Correction to EMM test case 9.2.1.1.11 RP-61 RP-131101 approved R5 R5-60 R5-133082 agreed 2013-07-08 TEI8_Test CR 2013-07-08
2370 - F Rel-11 11.3.0 11.4.0 Correction to EMM test case 9.2.3.4.1 RP-61 RP-131101 approved R5 R5-60 R5-133093 agreed 2013-07-09 TEI8_Test CR 2013-07-09
2371 - F Rel-11 11.3.0 11.4.0 Clarification for handling of differences between conformance requirements in different releases of core specifications RP-61 RP-131101 approved R5 R5-60 R5-133114 agreed 2013-07-11 TEI8_Test CR 2013-07-11
2372 - F Rel-11 11.3.0 11.4.0 Correction to CA Test Case 8.2.2.5.1 and 8.2.2.5.2 RP-61 RP-131111 approved R5 R5-60 R5-133128 agreed 2013-07-12 LTE_CA-UEConTest CR 2013-07-12
2373 - F Rel-11 11.3.0 11.4.0 Correction to EMM test case 9.2.1.1.1b RP-61 RP-131101 approved R5 R5-60 R5-133145 agreed 2013-07-18 TEI8_Test CR 2013-07-18
2374 - F Rel-11 11.3.0 11.4.0 Editorial update of TC 9.2.3.3.2 RP-61 RP-131101 approved R5 R5-60 R5-133167 agreed 2013-07-19 TEI8_Test CR 2013-07-19
2375 - F Rel-11 11.3.0 11.4.0 Update of text for Update UE Location Information RP-61 RP-131114 approved R5 R5-60 R5-133184 agreed 2013-07-22 TEI10_Test CR 2013-07-22
2376 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.7.4 RP-61 RP-131116 approved R5 R5-60 R5-133322 agreed 2013-07-25 eMDT_UMTSLTE-UEConTest CR 2013-07-25
2377 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.4.8 RP-61 RP-131116 approved R5 R5-60 R5-133323 agreed 2013-07-25 eMDT_UMTSLTE-UEConTest CR 2013-07-25
2378 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.4.9 RP-61 RP-131116 approved R5 R5-60 R5-133324 agreed 2013-07-25 eMDT_UMTSLTE-UEConTest CR 2013-07-25
2379 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.4.10 RP-61 RP-131116 approved R5 R5-60 R5-133325 agreed 2013-07-25 eMDT_UMTSLTE-UEConTest CR 2013-07-25
2380 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.8.2 RP-61 RP-131116 approved R5 R5-60 R5-133326 agreed 2013-07-25 eMDT_UMTSLTE-UEConTest CR 2013-07-25
2381 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.8.5 RP-61 RP-131116 approved R5 R5-60 R5-133327 agreed 2013-07-25 eMDT_UMTSLTE-UEConTest CR 2013-07-25
2382 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.9.1 RP-61 RP-131116 approved R5 R5-60 R5-133328 agreed 2013-07-25 eMDT_UMTSLTE-UEConTest CR 2013-07-25
2383 - F Rel-11 11.3.0 11.4.0 Correction to test case 8.4.3.2 RP-61 RP-131101 approved R5 R5-60 R5-133342 agreed 2013-07-25 TEI8_Test CR 2013-07-25
2384 - F Rel-11 11.3.0 11.4.0 Correction of ESM test cases 10.3.1 and 10.9.1 RP-61 RP-131101 approved R5 R5-60 R5-133362 agreed 2013-07-25 TEI8_Test CR 2013-07-25
2385 - F Rel-11 11.3.0 11.4.0 GCF Priority 4: Modification to TC 6.1.2.12 RP-61 RP-131101 approved R5 R5-60 R5-133483 agreed 2013-07-26 TEI8_Test CR 2013-07-26
2386 - F Rel-11 11.3.0 11.4.0 Modification to TC 8.3.1.13a RP-61 RP-131101 approved R5 R5-60 R5-133486 agreed 2013-07-26 TEI8_Test CR 2013-07-26
2387 - F Rel-11 11.3.0 11.4.0 Update to test case 9.2.1.1.18 RP-61 RP-131097 approved R5 R5-60 R5-133510 agreed 2013-07-26 TEI_Test CR 2013-07-26
2388 - F Rel-11 11.3.0 11.4.0 GCF Priority 3 - Correction to 6.1.2.9a test cases RP-61 RP-131101 approved R5 R5-60 R5-133585 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2389 - F Rel-11 11.3.0 11.4.0 Define new TC 6.1.2.19 for Intra-frequency cell reselection with MFBI support RP-61 RP-131103 approved R5 R5-60 R5-133586 agreed 2013-08-06 TEI9_Test CR 2013-08-06
2390 - F Rel-11 11.3.0 11.4.0 Define new TC 6.1.2.21 for Inter-band cell reselection with MFBI support RP-61 RP-131103 approved R5 R5-60 R5-133587 agreed 2013-08-06 TEI9_Test CR 2013-08-06
2391 - F Rel-11 11.3.0 11.4.0 GCF priority 4 - Correction to EUTRA RRC test cases 8.2.1.5 and 8.2.1.6 RP-61 RP-131101 approved R5 R5-60 R5-133589 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2392 - F Rel-11 11.3.0 11.4.0 Correction to FDD-TDD test case 8.3.1.15a RP-61 RP-131103 approved R5 R5-60 R5-133590 agreed 2013-08-06 TEI9_Test CR 2013-08-06
2393 - F Rel-11 11.3.0 11.4.0 GCF Priority 4 - Corrections to EUTRA-GERAN Test Case 8.4.3.3 RP-61 RP-131101 approved R5 R5-60 R5-133591 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2394 - F Rel-11 11.3.0 11.4.0 GCF Priority 3 - Correction to test case 9.2.3.1.18a RP-61 RP-131101 approved R5 R5-60 R5-133592 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2395 - F Rel-11 11.3.0 11.4.0 GCF Priority 2 - Correction to test case 9.2.3.3.6 RP-61 RP-131101 approved R5 R5-60 R5-133593 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2396 - F Rel-11 11.3.0 11.4.0 Correction to EMM TC 9.2.2.1.3 RP-61 RP-131103 approved R5 R5-60 R5-133594 agreed 2013-08-06 TEI9_Test CR 2013-08-06
2397 - F Rel-11 11.3.0 11.4.0 GCF Priority 2 - Correction to test case 9.2.1.2.4 and 9.2.3.2.4 RP-61 RP-131101 approved R5 R5-60 R5-133595 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2398 - F Rel-11 11.3.0 11.4.0 Correction to EUTRA test case 9.2.1.2.1b RP-61 RP-131101 approved R5 R5-60 R5-133596 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2399 - F Rel-11 11.3.0 11.4.0 Correction to EMM Test Case 9.2.3.1.6 RP-61 RP-131101 approved R5 R5-60 R5-133597 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2400 - F Rel-11 11.3.0 11.4.0 Clarification of EMM Test case 9.2.2.2.2 RP-61 RP-131101 approved R5 R5-60 R5-133598 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2401 - F Rel-11 11.3.0 11.4.0 Add test case Attach / Success / IMS RP-61 RP-131101 approved R5 R5-60 R5-133599 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2402 - F Rel-11 11.3.0 11.4.0 GCF Priority U1 – Correction to EMM test case 9.2.1.2.13 RP-61 RP-131101 approved R5 R5-60 R5-133600 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2403 - F Rel-11 11.3.0 11.4.0 Add test case EPS bearer context deactivation / Re-establishment RP-61 RP-131101 approved R5 R5-60 R5-133602 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2404 - F Rel-11 11.3.0 11.4.0 Corrections to allow both ISIM or USIM to be used in test cases using IMS RP-61 RP-131101 approved R5 R5-60 R5-133603 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2405 - F Rel-11 11.3.0 11.4.0 Correction to SRVCC test case 13.4.3.1 RP-61 RP-131103 approved R5 R5-60 R5-133604 agreed 2013-08-06 TEI9_Test CR 2013-08-06
2406 - F Rel-11 11.3.0 11.4.0 Correction to eMBMS test case 17.3.1 RP-61 RP-131114 approved R5 R5-60 R5-133605 agreed 2013-08-06 TEI10_Test CR 2013-08-06
2407 - F Rel-11 11.3.0 11.4.0 Correction to eMBMS test case 17.3.2 RP-61 RP-131114 approved R5 R5-60 R5-133606 agreed 2013-08-06 TEI10_Test CR 2013-08-06
2408 - F Rel-11 11.3.0 11.4.0 GCF Priority 4: Modification to TC 6.1.2.14 RP-61 RP-131101 approved R5 R5-60 R5-133610 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2409 - F Rel-11 11.3.0 11.4.0 Modification to TC 8.3.1.13 RP-61 RP-131101 approved R5 R5-60 R5-133611 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2410 - F Rel-11 11.3.0 11.4.0 Update of test case 8.3.3.2 RP-61 RP-131101 approved R5 R5-60 R5-133613 agreed 2013-08-06 TEI8_Test CR 2013-08-06
2411 - F Rel-11 11.3.0 11.4.0 Correction to CA Test Case 8.3.1.18.1 and 8.3.1.18.2 RP-61 RP-131111 approved R5 R5-60 R5-133733 agreed 2013-08-28 LTE_CA-UEConTest CR 2013-08-28
2412 - F Rel-11 11.3.0 11.4.0 Correction to CA Test Case 8.3.1.22.1 and 8.3.1.22.2 RP-61 RP-131111 approved R5 R5-60 R5-133617 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2413 - F Rel-11 11.3.0 11.4.0 Correction to CA Test Case 8.3.1.17.2 RP-61 RP-131111 approved R5 R5-60 R5-133618 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2414 - F Rel-11 11.3.0 11.4.0 Correction to CA Test Case 8.2.2.3.2 RP-61 RP-131111 approved R5 R5-60 R5-133619 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2415 - F Rel-11 11.3.0 11.4.0 Correction to CA Test Case 8.2.4.21.1 and 8.2.4.21.2 RP-61 RP-131111 approved R5 R5-60 R5-133620 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2416 - F Rel-11 11.3.0 11.4.0 Update of CA Test Case 8.2.2.3.1 RP-61 RP-131111 approved R5 R5-60 R5-133621 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2417 - F Rel-11 11.3.0 11.4.0 Correction to CA test case 8.5.1.7 RP-61 RP-131111 approved R5 R5-60 R5-133622 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2418 - F Rel-11 11.3.0 11.4.0 Correction to EUTRA CA RRC test cases 8.2.4.17.1 and 8.2.4.17.2 RP-61 RP-131111 approved R5 R5-60 R5-133623 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2419 - F Rel-11 11.3.0 11.4.0 Correction to EUTRA CA RRC test cases 8.2.4.19.1 and 8.2.4.19.2 RP-61 RP-131111 approved R5 R5-60 R5-133624 agreed 2013-08-06 LTE_CA-UEConTest CR 2013-08-06
2420 - F Rel-11 11.3.0 11.4.0 Update of Test Case 8.3.1.20 RP-61 RP-131113 approved R5 R5-60 R5-133646 agreed 2013-08-07 eICIC_LTE-UEConTest CR 2013-08-07
2421 - F Rel-11 11.3.0 11.4.0 Addition of new eICIC Test Case 8.3.1.27 RP-61 RP-131113 approved R5 R5-60 R5-133730 agreed 2013-08-27 eICIC_LTE-UEConTest CR 2013-08-27
2422 - F Rel-11 11.3.0 11.4.0 Correction of eICIC TC 8.3.1.19 & 8.3.1.20 RP-61 RP-131113 approved R5 R5-60 R5-133648 agreed 2013-08-07 eICIC_LTE-UEConTest CR 2013-08-07
2423 - F Rel-11 11.3.0 11.4.0 Addition of new eMDT test case 8.6.9.3 RP-61 RP-131116 approved R5 R5-60 R5-133660 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2424 - F Rel-11 11.3.0 11.4.0 New eMBMS service continuity test case 17.4.1 RP-61 RP-131117 approved R5 R5-60 R5-133663 agreed 2013-08-07 MBMS_LTE_SC-UEConTest CR 2013-08-07
2425 - F Rel-11 11.3.0 11.4.0 New eMBMS service continuity test case 17.4.2 RP-61 RP-131117 approved R5 R5-60 R5-133664 agreed 2013-08-07 MBMS_LTE_SC-UEConTest CR 2013-08-07
2426 - F Rel-11 11.3.0 11.4.0 New TC 17.4.7 MBMS Interest Indication after Radio Link Failure RP-61 RP-131117 approved R5 R5-60 R5-133665 agreed 2013-08-07 MBMS_LTE_SC-UEConTest CR 2013-08-07
2427 - F Rel-11 11.3.0 11.4.0 Introduction of New eMBMS Service Continuity Improvements test case 17.4.4 RP-61 RP-131117 approved R5 R5-60 R5-133666 agreed 2013-08-07 MBMS_LTE_SC-UEConTest CR 2013-08-07
2428 - F Rel-11 11.3.0 11.4.0 Addition of new TC 8.6.2.11 Logged MDT / Logging and reporting / Reporting at intra LTE handover / PLMN list RP-61 RP-131116 approved R5 R5-60 R5-133667 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2429 - F Rel-11 11.3.0 11.4.0 Addition of new TC 8.6.2.12 Logged MDT / Logging and reporting / Reporting at RRC connection re-establishment / PLMN list RP-61 RP-131116 approved R5 R5-60 R5-133668 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2430 - F Rel-11 11.3.0 11.4.0 Addition of new TC 8.6.3.4 Logged MDT / Logging and reporting / Reporting at UTRAN Inter-RAT handover / PLMN list RP-61 RP-131116 approved R5 R5-60 R5-133669 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2431 - F Rel-11 11.3.0 11.4.0 Addition of new TC 8.6.6.5 Handover Failure logging / Logging and reporting / Reporting at RRC connection establishment / PLMN list RP-61 RP-131116 approved R5 R5-60 R5-133670 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2432 - F Rel-11 11.3.0 11.4.0 Addition of new TC 8.6.6.6 Handover Failure logging / Logging and reporting / Reporting at intra LTE handover / PLMN list RP-61 RP-131116 approved R5 R5-60 R5-133671 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2433 - F Rel-11 11.3.0 11.4.0 Addition of new TC 8.6.6.7 Handover Failure logging / Logging and reporting / Reporting at RRC connection re-establishment / PLMN list RP-61 RP-131116 approved R5 R5-60 R5-133672 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2434 - F Rel-11 11.3.0 11.4.0 Addition of new TC 8.6.9.4 Connection Establishment Failure logging / Logging and reporting / Reporting of CDMA2000 Inter-RAT measurements RP-61 RP-131116 approved R5 R5-60 R5-133673 agreed 2013-08-07 eMDT_UMTSLTE-UEConTest CR 2013-08-07
2435 - F Rel-11 11.3.0 11.4.0 Introduction of New LTE RAN Enhancements for Diverse Data Applications test case 8.2.2.6.2 RP-61 RP-131118 approved R5 R5-60 R5-133675 agreed 2013-08-07 LTE_eDDA-UEConTest CR 2013-08-07
2436 - F Rel-11 11.3.0 11.4.0 New test case 8.2.2.6.1 RRC connection reconfiguration/ UE Assistance Information/power preference indication setup and release RP-61 RP-131118 approved R5 R5-60 R5-133676 agreed 2013-08-07 LTE_eDDA-UEConTest CR 2013-08-07
2437 - F Rel-11 11.3.0 11.4.0 New test case 8.2.2.6.3 RRC connection reconfiguration/ UE Assistance Information/T340 running RP-61 RP-131118 approved R5 R5-60 R5-133677 agreed 2013-08-07 LTE_eDDA-UEConTest CR 2013-08-07
2438 - F Rel-11 11.3.0 11.4.0 Addition of new TC 7.1.3.X Correct handling of DL assignment / Dynamic case / EPDCCH RP-61 RP-131119 approved R5 R5-60 R5-133679 agreed 2013-08-07 LTE_enh_dl_ctrl-UEConTest CR 2013-08-07
2439 - F Rel-11 11.3.0 11.4.0 Addition of new TC 7.1.3.Y Correct handling of DL assignment / Semi-persistent case / EPDCCH RP-61 RP-131119 approved R5 R5-60 R5-133680 agreed 2013-08-07 LTE_enh_dl_ctrl-UEConTest CR 2013-08-07
2440 - F Rel-11 11.3.0 11.4.0 Update of TC 6.2.1.1 Inter-RAT PLMN Selection for OPLMN Automatic mode RP-61 RP-131101 approved R5 R5-60 R5-133723 agreed 2013-08-27 TEI8_Test CR 2013-08-27
2441 - F Rel-11 11.3.0 11.4.0 Define new TC 6.1.2.20 for Inter-frequency cell reselection with MFBI support. RP-61 RP-131103 approved R5 R5-60 R5-133692 agreed 2013-08-08 TEI9_Test CR 2013-08-08
2442 - F Rel-11 11.3.0 11.4.0 Update of Test Case 8.2.4.13a RP-61 RP-131103 approved R5 R5-60 R5-133732 agreed 2013-08-28 TEI9_Test CR 2013-08-28
2443 - F Rel-11 11.3.0 11.4.0 Addition of new MFBI test case: 8.2.4.22 RRC connection reconfiguration / Handover / MFBI / target cell broadcasting information disregarded by the UE RP-61 RP-131103 approved R5 R5-60 R5-133695 agreed 2013-08-08 TEI9_Test CR 2013-08-08
2444 - F Rel-11 11.3.0 11.4.0 Update of Emergency Call over IMS test case 11.2.7 RP-61 RP-131103 approved R5 R5-60 R5-133696 agreed 2013-08-08 TEI9_Test CR 2013-08-08
2445 - F Rel-11 11.3.0 11.4.0 New eMBMS service continuity test case 17.4.6 RP-61 RP-131117 approved R5 R5-60 R5-133699 agreed 2013-08-08 MBMS_LTE_SC-UEConTest CR 2013-08-08
2446 - F Rel-11 11.3.0 11.4.0 New eMBMS service continuity test case 17.4.8 RP-61 RP-131117 approved R5 R5-60 R5-133700 agreed 2013-08-08 MBMS_LTE_SC-UEConTest CR 2013-08-08
2447 - F Rel-11 11.3.0 11.4.0 Addition of new Rel-10 eICIC test case 8.3.1.21 RP-61 RP-131113 approved R5 R5-60 R5-133707 agreed 2013-08-08 eICIC_LTE-UEConTest CR 2013-08-08
2448 - F Rel-11 11.3.0 11.4.0 Correction of EUTRA RRC test case 8.5.4.1 RP-61 RP-131101 approved R5 R5-60 R5-133725 agreed 2013-08-27 TEI8_Test CR 2013-08-27

page generated from database: 2013-10-16 10:34:31